TIDMPRL 
 
RNS Number : 3820A 
Polo Resources Limited 
07 October 2009 
 

7 October 2009 
Polo Resources Limited 
("Polo" or "the Company") 
 
 
Erds Coal Project - JORC Compliant Maiden Resource Statement 
 
 
Total Indicated and Inferred resource estimate of 807 million tonnes thermal 
coal 
 
 
Polo Resources (PRL), the AIM listed mining company with uranium and coal 
interests in Africa, Australia, Europe and Asia, is pleased to announce a maiden 
JORC compliant resource estimate for the Erds coal project in Mongolia, operated 
by its recently established 50:50 joint venture with Peabody Energy Corporation 
(NYSE:BTU) ("Peabody"). The joint venture was formed to hold all of Polo's coal 
and mineral interests in Mongolia. The joint venture has 54 licenses throughout 
the South Gobi and elsewhere in Mongolia which are currently being explored for 
coal. 
The Erds Coal Project adjoins a tenement to the west owned by Gulfside Minerals 
Ltd who recently announced NI 43-101 compliant resources of 1,185 million tonnes 
of thermal coal at the Onjuul coal deposit. Polo, through its joint venture 
company with Peabody Energy, also has tenements (Altanshiree) immediately south 
of the Gulfside resource and adjoins the Erds resource to the east. The geology 
of the coal basin, combined with the large thicknesses of coal reported at 
Onjuul and Erds, strongly indicates that additional coal resources will be 
discovered at Altanshiree. Drilling is due to commence there this coming month. 
The Erds coal project is located in the sub province of Altanshiree of the 
Dornogovi province. The project is approximately 430km south-east of 
Ulaanbaatar. It is close to rail and power infrastructure and is around 140km 
from the border of China. The deposit style for the project is a rift basin, 
which coincides with the Jurassic-Cretaceous intracontinental rift evolution. 
Deposits in the project area are hosted in the Huhteeg Formation, which contains 
thick coal seams. The area has undergone a series of exploration campaigns and 
the results indicate potential for large scale, multi bench, and open-cut 
operations. 
Micromine designed a resource development programme in order to collect 
sufficient data of a high enough standard to allow a JORC compliant resource 
estimate, which was subsequently conducted in May 2009. The programme delivered 
an estimate for the total Indicated and Inferred resource of 807 million tonnes 
of thermal coal. 
The resource estimation process included performing quality checks on the 
geological and assay information and modelling coal seam morphology, moisture, 
ash, volatiles, fixed carbon, sulphur, relative density and specific energy on 
an air-dried basis. Resource estimation was based on modelling of morphology of 
the seams by gridding, followed by interpolation of coal quality data and 
categorisation of resources based upon points of observation. 
Boreholes drilled in the 2009 exploration campaign were cored from near surface 
and all boreholes were geophysically logged to check coal depths and thickness 
in situ. Coal seam continuity was interpreted from cross sections and nine major 
seam groups identified with further subdivision into 60 plies. The resource 
estimate excludes weathered coal (typically 12 to 28 metres below surface) and 
resources outside the tenement boundary. 
Total indicated and inferred rounded resources are estimated as follows: 
 
 
Table 1: Classified total Resource, air-dried basis. 
+-----------+-------------+-------------+--------+--------+----------+-------+-------+-------+-------+ 
| Class     |     Volume  |     Tonnes  |     RD |   ASH  |       CV |   IM  |   VM  |   FC  |    S  | 
|           |          m3 |           t |   t/m3 |      % |  kcal/kg |     % |     % |     % |     % | 
+-----------+-------------+-------------+--------+--------+----------+-------+-------+-------+-------+ 
| Indicated | 162,955,539 | 254,000,000 |   1.56 |  26.13 | 3,658.65 | 19.26 | 29.71 |  24.9 |  1.33 | 
+-----------+-------------+-------------+--------+--------+----------+-------+-------+-------+-------+ 
| Inferred  | 356,869,903 | 553,000,000 |   1.55 |  24.95 | 3,734.28 | 19.24 |  29.7 | 26.11 |  1.27 | 
+-----------+-------------+-------------+--------+--------+----------+-------+-------+-------+-------+ 
| Total     | 519,825,442 | 807,000,000 |   1.55 |  25.32 |  3710.46 | 19.25 | 29.70 | 25.73 |  1.29 | 
+-----------+-------------+-------------+--------+--------+----------+-------+-------+-------+-------+ 
 
 
Analytical work shows that the low rank Erds coal can be classified as "Lignite 
A" according to the ASTM classification system, or a "Brown Coal" in the 
Australian classification system. The test work to date suggests the coal would 
be suitable for mine mouth feedstock for local coal fired power generation. 
 
 
From a 10kg composite sample for detail testing, indications are that the coal 
is suitable for power generation with a favourable Hardgrove Index, but high 
sulphur (1.86%) and moderate ash fusion temperatures (1,150 to 1,300 degrees C). 
 
 
The geotechnical parameters of the deposit need further assessment. Preliminary 
observations show sediments overlying the coal have weak rock strength, which 
may place constraints on potential future pit designs. However, defect spacing 
and bedding plane shears do not appear to be an issue based on the core logging 
observations. Overall the Erds coal deposit has very good potential for 
development into a large scale mine with a low strip ratio, producing a low rank 
thermal coal product. 
 
 
Neil Herbert, Managing Director of Polo Resources, said: 
"The Erds coal deposit has very good potential for development into a large 
scale mine with a low strip ratio, producing a low rank thermal coal product for 
power stations.  The project is close to the existing rail network and 
approximately 140km from the Chinese border.  With additional licenses in the 
area the JV has further potential to expand the resource." 
 
 
The full report can be viewed on Polo Resources' website at 
www.poloresources.com. 
 
 
The JV also completed a preliminary exploration programme on a number of its 
South Gobi licenses during the season now ending but there were no new 
significant findings to report. 
 
 
 
 
- Ends - 
 
 
 
 
The information contained in this announcement has been reviewed by Mr. Paul 
Ingram, CEO, Australia & Director of Polo, P.Geo, AIMM, MICA, BSc Geo. Mr. 
Ingram has sufficient experience relevant to the style of mineralisation and 
type of deposit under consideration and to the activity which he is undertaking, 
to qualify as a Qualified Person for the purposes of this announcement. 
 
 
 
 
Contacts: 
 
 
+------------------------------------------------------+--------------------------+ 
| Polo Resources Limited                               |   + 27 82 404 36 37      | 
| Neil Herbert, Managing Director                      |                          | 
|                                                      |                          | 
+------------------------------------------------------+--------------------------+ 
| Canaccord Adams Limited                              |   + 44 (0) 20 7050 6500  | 
| Mike Jones / Ryan Gaffney                            |                          | 
|                                                      |                          | 
+------------------------------------------------------+--------------------------+ 
| Financial Dynamics                                   |   + 44 (0) 20 7831 3113  | 
| Ben Brewerton / Ed Westropp                          |                          | 
|                                                      |                          | 
+------------------------------------------------------+--------------------------+ 
 
 
 
 
Glossary 
 
 
+--------------------------+------------------------------------------------------+ 
| Air-dried basis          | An analysis expressed on the basis of a coal sample  | 
|                          | that has been dried in the laboratory until the      | 
|                          | moisture content is in approximate equilibrium with  | 
|                          | the surrounding atmosphere.                          | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| ASTM                     | American Society for Testing and Materials           | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| JORC                     | The Australasian Joint Ore Reserves Committee,       | 
|                          | responsible for the creation of the Australasian     | 
|                          | Code for Reporting of Mineral Resources and Ore      | 
|                          | Reserves (the JORC Code).                            | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| Inferred Resource        | that part of a mineral resource for which quantity,  | 
|                          | grade or quality, densities, shape and physical      | 
|                          | characteristics can be estimated with a low level of | 
|                          | confidence. It is inferred from geological evidence  | 
|                          | and limited sampling and reasonably assumed, but not | 
|                          | verified, geological and grade continuity. The       | 
|                          | estimate is based on limited information and         | 
|                          | sampling gathered.                                   | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| Indicated Resource       | that part of a mineral resource for which quantity,  | 
|                          | grade or quality, densities, shape and physical      | 
|                          | characteristics can be estimated with a reasonable   | 
|                          | level of confidence. The estimate is based on        | 
|                          | detailed and reliable exploration and testing        | 
|                          | information gathered through appropriate techniques  | 
|                          | from locations such as outcrops, trenches, pits,     | 
|                          | workings and drill holes that are spaced closely     | 
|                          | enough for geological and grade continuity to be     | 
|                          | reasonably assumed                                   | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| Jurassic-Cretaceous      | Jurassic and Cretaceous are the two consecutive      | 
|                          | geologic time periods that extend from 200 Ma        | 
|                          | (million years ago) to 65 Ma                         | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| Ash                      | Inorganic residue left after the coal is burnt       | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| CV                       | Calorific Value is the quantity of heat produced     | 
|                          | when a unit weight of coal burns. Calorific value is | 
|                          | measured in British thermal units per pound or       | 
|                          | kilocalories per kilogram.                           | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| IM                       | Inherent Moisture is the moisture that is left in    | 
|                          | the coal after drying in the laboratory at ambient   | 
|                          | temperature and pressure.                            | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| VM                       | Volatile Matter is the percentage of coal which is   | 
|                          | lost as gases (mostly hydrocarbons and not including | 
|                          | water) when coal is incinerated under standard       | 
|                          | conditions.                                          | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| FC                       | Fixed Carbon is the carbon left in the coal after    | 
|                          | volatile compounds are driven off.                   | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| S                        | Sulphur is one of the inorganic elements found in    | 
|                          | coal.                                                | 
+--------------------------+------------------------------------------------------+ 
|                          |                                                      | 
+--------------------------+------------------------------------------------------+ 
| RD                       | Relative Density is the density of a rock in         | 
|                          | relation to water, which has a density of 1.00 grams | 
|                          | per cubic centimetre or 1.00 metric tonnes per cubic | 
|                          | metre.                                               | 
+--------------------------+------------------------------------------------------+ 
 
 
About the Company 
Polo is an emerging energy company focused on acquiring and developing advanced 
stage uranium and coal properties. For complete details on Polo Resources 
Limited, management encourages investors and interested parties to view its 
public documents filed on AIM Exchange at www.poloresources.com. 
 
 
About Peabody 
 
 
Peabody is the world's largest private-sector coal company. Its coal products 
fuel approximately 10 percent of all U.S. electricity generation and 2 percent 
of worldwide electricity. www.peabodyenergy.com 
 
 
 
 
 
 
CAUTIONARY STATEMENT 
The AIM Market of London Stock Exchange plc does not accept responsibility for 
the adequacy or accuracy of this release. No stock exchange, securities 
commission or other regulatory authority has approved or disapproved the 
information contained herein. All statements, other than statements of 
historical fact, in this news release are forward-looking statements that 
involve various risks and uncertainties, including, without limitation, 
statements regarding potential values, the future plans and objectives of Polo 
Resources Limited. There can be no assurance that such statements will prove to 
be accurate, achievable or recognizable in the near term. Actual results and 
future events could differ materially from those anticipated in such statements. 
These and all subsequent written and oral forward-looking statements are based 
on the estimates and opinions of management on the dates they are made and are 
expressly qualified in their entirety by this notice. Polo Resources Limited 
assumes no obligation to update forward-looking statements should circumstances 
or management's estimates or opinions change. 
 
 
 
This information is provided by RNS 
            The company news service from the London Stock Exchange 
   END 
 
 MSCUUGMUUUPBGUM 
 

Polo Res.(See LSE:POL) (LSE:PRL)
과거 데이터 주식 차트
부터 11월(11) 2024 으로 12월(12) 2024 Polo Res.(See LSE:POL) 차트를 더 보려면 여기를 클릭.
Polo Res.(See LSE:POL) (LSE:PRL)
과거 데이터 주식 차트
부터 12월(12) 2023 으로 12월(12) 2024 Polo Res.(See LSE:POL) 차트를 더 보려면 여기를 클릭.