DEME awarded inter-array cable and secondary steel contract for Oranjewind Offshore Wind Farm

DEME has been awarded a substantial contract to carry out the transport and installation works for the inter-array cables and secondary steel for the OranjeWind offshore wind farm in the Netherlands. With an installed capacity of nearly 800 MW, the wind farm is being developed by a joint venture of leading energy companies RWE and TotalEnergies.

 

Attachment

  • P2024 DEME Oranjewind 20241024 ENG

Deme Group NV (EU:DEME)
과거 데이터 주식 차트
부터 1월(1) 2025 으로 2월(2) 2025 Deme Group NV 차트를 더 보려면 여기를 클릭.
Deme Group NV (EU:DEME)
과거 데이터 주식 차트
부터 2월(2) 2024 으로 2월(2) 2025 Deme Group NV 차트를 더 보려면 여기를 클릭.