P2 Gold Inc. (“P2” or the “Company”) (TSX-V:PGLD)
(OTCQB:PGLDF), reports results from the remaining drill holes from
the 2022 Drill Program at its gold-copper BAM Project located in
the Golden Triangle in northwest British Columbia.
“We are pleased to report the remaining drill
results from the BAM 2022 Drill Program, where significant
near-surface gold mineralization has now been defined over a strike
length of more than one kilometer at the Monarch Gold Zone, which
remains open to the north and south,” commented Joe Ovsenek,
President and CEO of P2. “With these results in hand,
we have started preparation of the maiden Mineral Resource estimate
for the near-surface gold mineralization at the Monarch Gold Zone.
We have also received the results from the NSMT and ZTEM
geophysical surveys which are being compiled with the available
geology and geochemistry data in order to develop the 2023
exploration program. The 2023 exploration program at BAM will focus
on locating the porphyry source of the near-surface gold and copper
mineralization, which we believe underlies the BAM Project claims,
as well as the expansion of the near-surface gold
mineralization.”
BAM Project Select Drill Results
Select drill results (see Table 1 below for
drill results) from holes BAM-038, 041 to 045, 048 and 050 to 101
drilled at the BAM Project include:
- Hole
BAM-061 intersected 1.73 g/t gold over
46.5 meters, including 11.0 meters grading 3.70
g/t gold;
- Hole
BAM-067 intersected 1.00 g/t gold over
43.0 meters, including 4.5 meters grading 1.85 g/t
gold; and
- Hole
BAM-076 intersected 0.64 g/t gold over
104.25 meters, including 7.6 meters grading 1.65
g/t gold.
Drill hole BAM-076 was drilled on the northern
most section drilled in the 2022 BAM Drill Program. Drill hole
BAM-061 was drilled approximately 550 meters south of drill hole
BAM-076, and drill hole BAM-067 was drilled 750 meters south of
drill hole BAM-076. These drill holes demonstrate the extent and
grade potential of the Monarch Gold Zone.
2022 BAM Drill Program Recap
The focus of the 2022 BAM Drill Program was to
find the limits of the epithermal surface mineralization at the
Monarch Gold Zone and provide geologic information to aid in the
interpretation of the airborne and ground geophysical surveys. This
interpretation of the airborne and ground geophysical surveys is
essential to discovering the higher-grade feeder systems for the
near-surface epithermal gold mineralization and any associated
porphyry mineralization.
The 2022 BAM Drill Program and geological
mapping defined multiple structural trends which converge at the
Monarch Gold Zone and were active either during and/or after the
mineralization event. Gold grades intersected by the drilling
generally increase towards these structures, suggesting they are
potentially related to a feeder system. Drill holes in the latter
half of the program also showed that the conglomerate along the
eastern edge of the Monarch Gold Zone is well mineralized for over
one kilometer. The conglomerate lies along the contact with the
More Creek Granite suggesting that the contact may be part of the
feeder system for the gold mineralization.
An updated geological model for the Monarch Gold
Zone is being prepared based on drilling and mapping to date. The
maiden Mineral Resource estimate for the Monarch Gold Zone is
targeted for completion in the first quarter of 2023.
2022 BAM Drill Results
A plan map and sections for drill holes BAM-038,
041 to 045, 048 and 050 to 101 of the 2022 BAM Drill Program are
available here.
Drill holes BAM-076, 079 and 081 were drilled on
Section AA, the northern-most section drilled this season on the
Monarch Gold Zone. The significant gold intersected in drill holes
BAM-076 and 079 extends the Monarch Gold Zone to the north and
indicates the excellent potential for further expansion of the zone
to the northeast.
Drill holes BAM-038, 041, 044, 048, 050, 052,
053, 055, 060 and 085 were drilled on Section A, approximately 150
meters south of Section AA at the northern end of the Monarch Gold
Zone. The gold mineralization on Section A was encountered in
siltstone and conglomerate.
Drill holes BAM-071, 072, 073, 075, 077, 086,
088 and 089 were drilled on Section B, approximately 100 meters
south of Section A. All holes were drilled in siltstone and
intersected lower grade gold mineralization. This section is
interpreted to be located in the mineralization “shadow” of a
regional east-west structure which pooled the mineralization in the
sections further to the south. The conglomerate along the contact
with the More Creek Granite was not tested near surface on Section
B and additional work is required to determine the controls on
mineralization.
Drill holes BAM-042, 043, 045, 064, 066, 082 to
084 and 099 were drilled on Section C, approximately 100 meters
south of Section B. Mapping and drilling indicate an east-west
structure along the northern end of the mapped carbonate horst (see
the attached plan map of the 2022 BAM Drill Program) is in part
marked by a mafic dyke. The holes drilled from pads C-8.5 and C-10,
BAM-042, 043, 045, 064, 066, 084 and 099 encountered higher-grade
gold mineralization in siltstone immediately south of the mafic
dyke.
Drill holes BAM-051, 054, 056 to 059, 061, 095,
096 and 098 were drilled on Section E, approximately 200 meters
south of Section C. Gold mineralization was intersected in the
drill holes located to the east of the carbonate horst.
Higher-grade gold was encountered in the conglomerate close to the
contact with the More Creek Granite (drill holes BAM-058, 059 and
061).
Drill holes BAM-062, 063, 065, 087, 092, 094,
097, 100 and 101 were drilled on Section F, approximately 100
meters south of Section E. All drill holes were drilled to the east
of the carbonate horst. Holes drilled off section encountered
higher-grade gold mineralization than those drilled vertically or
oriented east-west. Statistical analysis of the drill
results will be completed to determine the optimum drill
orientation for future programs. Drill holes BAM-087 and 097 were
drilled to test a geophysical target at depth. Both drill holes
intersected a sequence of bedded sediments and ended in the More
Creek Granite in the case of hole 087, and an ultramafic intrusive
for hole 097. Hole BAM-097 failed to reach the target depth to
determine the source of the geophysical target.
Drill holes BAM-067, 068, 070, 090, 091 and 093
were drilled on Section G, approximately 100 meters south of
Section F. As with Section F, all drill holes were drilled to the
east of the carbonate horst. Drill holes BAM-067, 068 and 070,
drilled from the eastern most drill pad, intersected higher-grade
gold mineralization within the conglomerate. This
drilling confirms the trend of higher-grade gold mineralization in
the conglomerate along the contact with the More Creek Granite.
From Section G, the conglomerate has been mapped approximately 100
meters further to the south before being cut off by one of the
regional northeast-southwest structures. This extension of the
conglomerate is expected to host similar or better grades than
those encountered in holes BAM-067, 068 and 070.
Drill hole BAM-069 was drilled in the BAM 10
Gold Zone located approximately three kilometers south of the
Monarch Gold Zone. This drill hole was drilled below high-grade
gold mineralization encountered in surface trenching completed in
the early 1980s and intersected 1.36 g/t gold over 8.8 meters,
including 3.45 meters of 2.42 g/t gold, 26.0 meters downhole, and
2.39 g/t gold over 1.9 meters 52 meters downhole. Unlike the gold
mineralization encountered in the Monarch Gold Zone, the gold
mineralization in hole BAM-069 was hosted by quartz stockwork zones
within the More Creek Granite. The mineralization is associated
with an 800 meter-long gold soil anomaly and warrants additional
drilling to understand the potential of this zone.
Drill hole BAM-074 was drilled in the Jan Copper
Zone to test the copper mineralization down dip from drill hole
BAM-004 (which was drilled in 2021 and intersected 1.1% copper over
39.25 meters) and encountered 0.36% copper of 22.0 meters,
including 2.0 meters of 2.15% copper. Additional work is required
to understand the source of the copper mineralization at the Jan
Copper Zone.
BAM Project Geophysics
Results from the natural source magneto-telluric
geophysics survey (“NSMT Survey”) and the Z-Tipper Axis
Electromagnetic airborne geophysical survey (“ZTEM Survey”) have
been received and are being compiled to provide a three-dimensional
interpretation of the BAM Project at depth. A review of the
preliminary ZTEM 3D model confirms the northeast structural trends
that are associated with the near-surface gold mineralization of
the Monarch Gold Zone, which sits within a northeast trending
resistivity high separating resistivity lows.
As previously announced, a prominent feature has
been identified by the NSMT Survey, which is believed to be the
feeder zone of the near-surface epithermal gold mineralization.
This feature is the contact between the older granitic intrusive to
the east with the sediments to the west and aligns with the
structures that appear to be controlling the near-surface
mineralization that has been intersected by drilling. This contact
is potentially part of the feeder system for the near-surface
epithermal mineralization.
Once the three-dimensional geophysics
interpretation is available, targets will be selected for next
year’s drill program focused on expanding the near-surface gold
mineralization and discovering the feeder zones and porphyry source
at depth.
A plan view from the ZTEM Survey with the
Monarch Gold Zone drilling and a two-dimensional section from the
NSMT Survey looking north, that corresponds with Section D-D’ from
the 2022 BAM Drill Program, is available here.
Table 1: Selected BAM Drill Results,
December 2022 (BAM-038, 041 to 045, 048 and 050 to
101)(1, 2)
Hole |
Collar Coords |
Dip/Azimuth |
From(m) |
To(m) |
Interval(m) |
Gold(g/t) |
Silver(g/t) |
DrillPad |
Monarch Gold Zone |
BAM-038 |
N6342298E386810 |
-70/90 |
No significant values |
A-8 |
BAM-041 |
N6342305E387372 |
-70/270 |
10.0 |
46.0 |
36.0 |
0.55 |
3.09 |
A-13.5 |
BAM-042 |
N6342064E386999 |
-45/270 |
7.2 |
22.0 |
14.8 |
1.14 |
6.20 |
C-10 |
|
|
Incl |
16.0 |
20.0 |
4.0 |
1.88 |
10.54 |
|
BAM-043 |
N342064E387003 |
-45/90 |
21.0 |
41.0 |
20.0 |
0.80 |
4.90 |
C-10 |
|
|
Incl |
24.4 |
29.0 |
4.6 |
1.71 |
7.69 |
|
BAM-044 |
N6342305E387380 |
-45/90 |
9.5 |
23.0 |
13.5 |
0.44 |
2.38 |
A-13.5 |
|
|
|
69.8 |
115.5 |
45.7 |
0.48 |
1.87 |
|
BAM-045 |
N6342064E387002 |
-90/00 |
10.85 |
30.0 |
19.15 |
0.76 |
8.59 |
C-10 |
|
|
incl |
19.0 |
25.0 |
6.0 |
1.12 |
5.29 |
|
BAM-048 |
N6342305E387377 |
-70/90 |
7.5 |
61.0 |
53.5 |
0.71 |
3.48 |
A-13.5 |
|
|
incl |
53.0 |
58.0 |
5.0 |
1.85 |
7.05 |
|
BAM-050 |
6342298/387256 |
-45/90 |
63.6 |
69.65 |
6.05 |
1.32 |
1.68 |
A-12.5 |
BAM-051 |
6341862/387059 |
-45/90 |
8.0 |
12.5 |
4.5 |
0.61 |
1.30 |
E-11 |
|
|
|
34.0 |
37.0 |
3.0 |
1.80 |
3.39 |
|
|
|
|
56.3 |
76.0 |
19.7 |
0.80 |
4.19 |
|
|
|
Incl |
71.5 |
76.0 |
4.5 |
1.61 |
7.02 |
|
|
|
|
109.85 |
121.5 |
11.65 |
0.42 |
4.94 |
|
BAM-052 |
6342298/387255 |
-70/90 |
68.0 |
75.5 |
7.5 |
0.73 |
17.83 |
A-12.5 |
|
|
|
91.0 |
106.0 |
15.0 |
1.64 |
4.38 |
|
|
|
Incl |
101.5 |
104.5 |
3.0 |
5.18 |
4.84 |
|
BAM-053 |
6342299/387250 |
-70/270 |
102.85 |
115.6 |
12.75 |
0.48 |
6.17 |
A-12.5 |
BAM-054 |
6341863/387057 |
-70/90 |
36.7 |
59.0 |
22.3 |
0.33 |
2.69 |
E-11 |
BAM-055 |
6342299/387250 |
-45/270 |
117.5 |
125.15 |
7.65 |
0.67 |
4.39 |
A-12.5 |
|
|
|
143.0 |
179.9 |
36.9 |
0.64 |
4.76 |
|
|
|
Incl |
157.5 |
162.0 |
4.5 |
0.98 |
9.86 |
|
BAM-056 |
6341863/387052 |
-45/270 |
27.0 |
32.25 |
5.25 |
0.48 |
2.66 |
E-11 |
|
|
|
44.0 |
60.45 |
16.45 |
0.44 |
2.98 |
|
|
|
Incl |
56.0 |
60.45 |
4.45 |
0.94 |
3.60 |
|
BAM-057 |
6341863/387052 |
-70/270 |
20.4 |
32.5 |
12.10 |
0.51 |
3.28 |
E-11 |
|
|
|
51.5 |
56.4 |
4.9 |
1.14 |
2.00 |
|
|
|
|
68.8 |
84.3 |
15.5 |
0.39 |
1.87 |
|
BAM-058 |
6341905/387262 |
-45/90 |
33.45 |
81.35 |
47.90 |
0.41 |
3.80 |
E-12.5 |
BAM-059 |
6341905/387262 |
-90/0 |
22.0 |
43.0 |
21.0 |
0.91 |
2.92 |
E12.5 |
|
|
Incl |
25.0 |
34.0 |
9.0 |
1.19 |
3.41 |
|
|
|
|
86.0 |
92.9 |
6.9 |
1.36 |
0.94 |
|
BAM-060 |
6342300/387250 |
-45/315 |
64.5 |
77.0 |
12.5 |
0.30 |
0.98 |
A-12.5 |
|
|
|
241.0 |
266.25 |
25.25 |
0.34 |
1.92 |
|
BAM-061 |
6341905/387257 |
-45/270 |
18.5 |
65.0 |
46.5 |
1.73 |
6.42 |
E-12.5 |
|
|
Incl |
46.0 |
57.0 |
11.0 |
3.70 |
18.12 |
|
BAM-062 |
6341785/387214 |
-45/90 |
18.5 |
25.0 |
6.5 |
1.26 |
1.89 |
F-12 |
|
|
|
40.25 |
65.0 |
24.75 |
0.84 |
2.06 |
|
|
|
Incl |
47.75 |
57.75 |
10.0 |
1.24 |
2.18 |
|
BAM-063 |
6341785/387210 |
-90/0 |
32.7 |
38.0 |
5.3 |
0.51 |
2.22 |
F-12 |
|
|
|
175.0 |
185.05 |
10.05 |
0.52 |
0.56 |
|
BAM-064 |
6342066/387004 |
-45/45 |
56.5 |
72.5 |
16.0 |
1.00 |
4.27 |
C-10 |
|
|
Incl |
57.65 |
62.5 |
4.85 |
1.48 |
4.31 |
|
BAM-065 |
6341785/387206 |
-45/270 |
24.0 |
33.0 |
9.0 |
1.08 |
9.82 |
F-12 |
|
|
Incl |
28.0 |
30.0 |
2.0 |
1.72 |
29.94 |
|
BAM-066 |
6342065/386997 |
-45/315 |
7.65 |
33.0 |
25.35 |
1.01 |
4.50 |
C-10 |
|
|
Incl |
7.65 |
13.5 |
5.85 |
1.87 |
3.42 |
|
BAM-067 |
6341685/387189 |
-45/90 |
10.0 |
53.0 |
43.0 |
1.00 |
3.17 |
G-12 |
|
|
Incl |
33.0 |
37.5 |
4.5 |
1.85 |
3.00 |
|
BAM-068 |
6341685/387187 |
-90/0 |
3.5 |
20.0 |
16.5 |
1.00 |
2.35 |
G12 |
|
|
Incl |
8.0 |
10.5 |
2.5 |
2.82 |
4.99 |
|
BAM-070 |
6341685/387183 |
-45/270 |
4.35 |
32.0 |
27.65 |
1.10 |
2.61 |
G-12 |
|
|
incl |
7.0 |
10.0 |
3.0 |
5.27 |
4.38 |
|
BAM-071 |
6342227/387173 |
-45/90 |
87.1 |
106.3 |
19.2 |
0.81 |
3.48 |
B-11.5 |
BAM-072 |
6342227/387172 |
-90/0 |
72.8 |
78.5 |
5.7 |
0.67 |
1.77 |
B-11.5 |
BAM-073 |
6342226/387170 |
-45/225 |
133.7 |
137.1 |
3.4 |
0.81 |
8.09 |
B-11.5 |
BAM-075 |
6342228/387168 |
-45/270 |
140.0 |
146.0 |
6.0 |
0.34 |
2.55 |
B-11.5 |
BAM-076 |
6342426/387475 |
-45/90 |
44.75 |
149.0 |
104.25 |
0.64 |
3.01 |
AA-14.5 |
|
|
Incl |
48.55 |
56.15 |
7.6 |
1.65 |
1.84 |
|
BAM-077 |
6342229/387168 |
-45/315 |
212.5 |
213.6 |
1.1 |
0.60 |
4.28 |
B-11.5 |
BAM-078 |
6342307/387101 |
-45/90 |
80.6 |
90.0 |
9.4 |
0.50 |
4.44 |
A-11 |
BAM-079 |
6342426/387474 |
-90/0 |
42.0 |
64.5 |
22.5 |
0.67 |
1.03 |
AA-14.5 |
|
|
Incl |
44.5 |
49.0 |
4.5 |
1.50 |
0.78 |
|
|
|
|
73.3 |
115.0 |
41.7 |
0.42 |
1.26 |
|
|
|
Incl |
97.0 |
103.0 |
6.0 |
1.06 |
3.50 |
|
BAM-080 |
6342307/387101 |
-90/0 |
116.0 |
125.65 |
9.65 |
0.98 |
8.61 |
A-11 |
|
|
Incl |
123.0 |
125.65 |
2.65 |
1.94 |
6.07 |
|
BAM-081 |
6342426/387470 |
-45/270 |
140.25 |
145.5 |
5.25 |
0.64 |
2.42 |
AA-14.5 |
BAM-082 |
6342066/387094 |
-45/90 |
18.85 |
34.5 |
15.65 |
0.25 |
6.07 |
C-11 |
BAM-083 |
6342066/387093 |
-90/0 |
11.5 |
17.0 |
5.5 |
0.39 |
3.54 |
C-11 |
BAM-084 |
6342068/386849 |
-90/0 |
11.0 |
21.0 |
10.0 |
0.72 |
2.42 |
C-8.5 |
BAM-085 |
6342308/387372 |
-45/315 |
11.0 |
21.0 |
10.0 |
0.72 |
2.42 |
A-13.5 |
|
|
|
38.3 |
53.0 |
14.7 |
0.44 |
1.47 |
|
|
|
|
61.0 |
78.0 |
17.0 |
0.92 |
3.43 |
|
|
|
Incl |
71.0 |
76.0 |
5.0 |
2.42 |
5.26 |
|
|
|
|
123.0 |
132.95 |
9.95 |
0.70 |
1.66 |
|
|
|
|
180.2 |
204.5 |
24.3 |
0.43 |
1.83 |
|
|
|
incl |
184.5 |
190.0 |
5.5 |
0.75 |
1.98 |
|
BAM-086 |
6342204/387274 |
-45/90 |
53.25 |
62.0 |
8.75 |
0.35 |
1.52 |
B-12.5 |
BAM-087(3) |
6341797/387003 |
-75/90 |
17.7 |
28.4 |
10.7 |
0.73 |
6.73 |
F-10 |
|
|
|
67.0 |
77.0 |
10.0 |
0.66 |
1.75 |
|
|
|
|
82.5 |
87.0 |
4.5 |
0.50 |
1.98 |
|
BAM-088 |
6342204/387274 |
-90/0 |
41.45 |
56.5 |
15.05 |
0.69 |
2.41 |
B-12.5 |
BAM-089 |
6342203/387270 |
-45/225 |
72.0 |
82.5 |
10.5 |
0.47 |
3.91 |
B-12.5 |
BAM-090 |
6341685/386926 |
-45/90 |
No significant values |
G-9 |
BAM-091 |
6341685/386925 |
-90/0 |
No significant values |
G-9 |
BAM-092 |
6341797/387004 |
-45/90 |
30.5 |
37.0 |
6.5 |
1.06 |
3.79 |
F-10 |
|
|
|
62.5 |
68.3 |
5.8 |
1.04 |
4.27 |
|
|
|
|
90.75 |
100.0 |
9.25 |
0.67 |
1.62 |
|
|
|
|
169.5 |
172.5 |
3.0 |
1.56 |
3.76 |
|
BAM-093 |
6341686/386921 |
-45/315 |
8.65 |
20.0 |
11.35 |
0.36 |
2.08 |
G-9 |
BAM-094 |
6341797/386998 |
-45/270 |
29.0 |
30.0 |
1.0 |
1.13 |
2.40 |
F-10 |
BAM-095 |
6341897/386806 |
-45/90 |
No significant values |
E-8 |
BAM-096 |
6341897/386806 |
-90/0 |
No significant values |
E-8 |
BAM-097 |
6341797/386999 |
-80/270 |
17.3 |
21.0 |
3.7 |
1.18 |
4.03 |
F-10 |
BAM-098 |
6341898/386802 |
-45/270 |
No significant values |
E-8 |
BAM-099 |
6342068/386849 |
-90/0 |
63.35 |
82.65 |
19.3 |
0.81 |
1.98 |
C-8.5 |
|
|
Incl |
71.7 |
79.4 |
7.7 |
1.34 |
3.11 |
|
BAM-100 |
6341794/387003 |
-45/150 |
23.35 |
36.0 |
12.65 |
0.70 |
2.68 |
F-10 |
|
|
|
110.5 |
114.9 |
4.4 |
1.49 |
2.00 |
|
BAM-101 |
6341800/387003 |
-45/40 |
27.1 |
62.0 |
34.9 |
0.77 |
2.93 |
F-10 |
|
|
Incl |
28.5 |
33.5 |
5.0 |
1.31 |
2.59 |
|
|
|
|
101.5 |
108.0 |
6.5 |
0.46 |
9.67 |
|
BAM 10 Gold Zone |
BAM-069 |
6338956/386417 |
-68/270 |
25.95 |
34.75 |
8.8 |
1.36 |
0.75 |
L1000 |
|
|
incl |
31.3 |
34.75 |
3.45 |
2.42 |
1.40 |
|
|
|
|
52.2 |
54.1 |
1.9 |
2.39 |
1.40 |
|
Jan Copper Zone |
Hole |
Collar Coords |
Dip/Azimuth |
From(m) |
To(m) |
Interval(m) |
Gold(g/t) |
Silver(g/t) |
Copper(%) |
BAM-074 |
6340887/386292 |
-68/270 |
43.00 |
65.35 |
22.35 |
0.01 |
2.82 |
0.36 |
% |
|
|
|
59.0 |
61.0 |
2.0 |
0.03 |
11.38 |
2.15 |
% |
(1) True thickness
to be determined.
(2) All
samples were submitted for preparation and analysis by ALS Global
at its facilities in Terrace, BC. All samples were analyzed using
multi-digestion with ICP finish and fire assay with AA finish for
gold. Samples with over 10 ppm gold were fire assayed with a
gravimetric finish. One in 20 samples was blank, one in 20 was a
standard sample, and one in 20 samples had a sample cut from assay
rejects assayed as a field duplicate at ALS Global in North
Vancouver, BC.
(3) Drill
hole BAM-087 also intersected 0.15% copper between 82.5 and 87.0
meters.
Quality Assurance
Ken McNaughton, M.A.Sc., P.Eng., Chief
Exploration Officer, P2 Gold, is the Qualified Person, as defined
by National Instrument 43-101, responsible for the BAM Project. Mr.
McNaughton has reviewed, verified and approved the scientific and
technical information in this news release.
About P2 Gold Inc.
P2 Gold is a mineral exploration and development
company focused on advancing precious metals and copper discoveries
and acquisitions in the western United States and British
Columbia.
For further information, please contact:
Joseph Ovsenek President &
CEO(778) 731-1055P2 Gold Inc.Suite 1100, 355 Burrard
StreetVancouver, BCV6C 2G8info@p2gold.com(SEDAR filings: P2 Gold
Inc.) |
Michelle RomeroExecutive Vice
President(778) 731-1060 |
Neither the TSX Venture Exchange (the
“Exchange”) nor its Regulation Services Provider (as that term is
defined in the policies of the Exchange) accepts responsibility for
the adequacy or accuracy of this release.
Forward Looking Information
This press release contains “forward-looking
information” within the meaning of applicable securities laws that
is intended to be covered by the safe harbours created by those
laws. “Forward-looking information” includes statements that use
forward-looking terminology such as “may”, “will”, “expect”,
“anticipate”, “believe”, “continue”, “potential” or the negative
thereof or other variations thereof or comparable terminology. Such
forward-looking information includes, without limitation,
information with respect to the Company’s expectations, strategies
and plans for the BAM Project including the Company’s planned
expenditures and exploration activities.
Forward-looking information is not a guarantee
of future performance and is based upon a number of estimates and
assumptions of management at the date the statements are made.
Furthermore, such forward-looking information involves a variety of
known and unknown risks, uncertainties and other factors which may
cause the actual plans, intentions, activities, results,
performance or achievements of the Company to be materially
different from any future plans, intentions, activities, results,
performance or achievements expressed or implied by such
forward-looking information. See “Risk Factors” in the Company’s
annual information form for the year ended December 31, 2021, dated
March 31, 2022 filed on SEDAR at www.sedar.com for a discussion of
these risks.
The Company cautions that there can be no
assurance that forward-looking information will prove to be
accurate, as actual results and future events could differ
materially from those anticipated in such information. Accordingly,
investors should not place undue reliance on forward-looking
information.
Except as required by law, the Company does not
assume any obligation to release publicly any revisions to
forward-looking information contained in this press release to
reflect events or circumstances after the date hereof.
P2 Gold (TSXV:PGLD)
과거 데이터 주식 차트
부터 1월(1) 2025 으로 2월(2) 2025
P2 Gold (TSXV:PGLD)
과거 데이터 주식 차트
부터 2월(2) 2024 으로 2월(2) 2025