Pure Energy Minerals Completes Fourth Successful Lithium Brine Pumping Test at Clayton Valley South Project, Nevada
27 3월 2017 - 10:57PM
Pure Energy Minerals Limited (TSX VENTURE:PE) (FRANKFURT:A111EG)
(OTCQB:PEMIF) (the “Company” or “Pure Energy”) is pleased to
announce that it has completed a constant-rate pumping test at its
newest exploration well, CV-8, at the Clayton Valley South Project
(the “CVS Project”). The test ran continuously for three days and
included a collection of brine samples along with extensive
hydrogeological data on the brine aquifer system. CV-8 is believed
to be the deepest well drilled in Clayton Valley, having reached a
total depth of 3,194 ft (974 m) below ground level. The drillers
completed the well with casing and filter pack to a depth of 2,874
ft (876 m), installing perforated casing and seals around two
separate intervals. This type of well construction allows for
isolation and separate testing of shallow and deeper zones of the
aquifer system.
The well encountered numerous aquifers, including the
interlayered volcanic ash and silt that are typical of Clayton
Valley lithium production. At greater depths, the well passed
through travertine (hot springs deposits) and conglomerate (gravel)
that had not previously been described on the CVS Project, thus
offering the potential for new brine hosting aquifers. Down hole
fluid logging revealed elevated electrical conductivity to the
bottom of the well, suggesting the presence of brine at greater
depths than any previous sampling on the project.
The pumping test was configured using an electric submersible
pump and monitoring apparatus in CV-8. The test ran at a constant
pumping rate of approximately 2.0 litres per second (30 gallons per
minute) for its duration. The hydrogeologists collected
approximately 48 separate brine samples (including QA/QC samples)
for lithium analysis over the 72-hour pumping period.
Monitoring during the test revealed that the extracted brine
from CV-8 reached near steady-state elevated fluid conductivity and
fluid density, comparable to other brine wells on the CVS Project.
Based on previously observed correlations between conductivity and
lithium content, this suggests the production of consistent
lithium-bearing brine during the entire pumping test. Data
collected during the pumping test will be used to enhance
understanding of the hydrogeology of the CVS Project. The team also
collected depth-specific brine samples for chemical analysis. These
results are expected in April. The upcoming Preliminary Economic
Assessment (PEA) will include a full discussion and interpretation
of the data from CV-8.
Patrick Highsmith, Pure Energy Minerals CEO commented, “CV-8
probed greater depths and encountered new aquifers not yet seen on
the CVS Project. It is significant that CV-8 more than doubled the
thickness of known brine-saturated sediments in our resource when
compared with the drilling in the maiden resource. This pumping
test is an important milestone as it adds considerably to our
knowledge for the resource model and the preliminary design of a
production well field. We look forward to working through the data
as we update the mineral resource and deliver the first PEA
at the CVS Project.”
This pumping test was designed and supervised by Pure Energy’s
hydrogeological consulting specialists, Montgomery & Associates
(“Montgomery”). The test was performed in accordance with State of
Nevada waivers and permits issued to Pure Energy by the Nevada
Division of Water Resources and the Division of Environmental
Protection, which allowed for the extraction of brine from the well
for the extended duration of this test and subsequent discharge to
surface.
Quality Assurance
Patrick Highsmith, Certified Professional Geologist (AIPG CPG #
11702), is a qualified person as defined by NI 43-101, and has
supervised the preparation of the scientific and technical
information that forms the basis for this news release. Mr.
Highsmith is not independent of the Company as he is an officer and
director.
About Pure Energy Minerals Ltd.
Pure Energy is a lithium resource developer that is driven to
become a low-cost supplier for the burgeoning lithium battery
industry. The Company is currently focused on the development
of the CVS Lithium Brine Project and the adjoining Glory Lithium
Clay Project in Clayton Valley, Nevada. Pure Energy also
recently announced the acquisition of a purchase option on a major
new lithium brine project in the Lithium Triangle of South America,
the Terra Cotta Project (TCP). The TCP is located on Pocitos
Salar in Salta, Argentina, where it enjoys some of the best
infrastructure and access of any lithium brine exploration project
in the country. Execution of the definitive agreement
concerning the Terra Cotta purchase option is expected during Q1 of
2017.
Pure Energy has developed core strengths in innovative
development and processing technologies for lithium brines and
lithium mineral deposits. The Company’s key attributes and
activities include:
- Generating positive results on a large land position with
excellent infrastructure in a first-class mining jurisdiction:
approx. 11,000 acres in four main claim groups in Clayton Valley,
Esmeralda County, Nevada;
- The only lithium brine resource in North America except for its
neighbor, which is the only producing lithium operation in the
United States (Albemarle’s Silver Peak lithium brine mine);
- An inferred mineral resource containing approximately 816,000
metric tonnes of Lithium Carbonate Equivalent (LCE) at an average
grade of approximately 102 mg/L lithium, reported in accordance
with NI 43-101 (see July 2015 Inferred Resource Report);
- An advanced program of testing the efficacy and economics of
modern environmentally-responsible processing technologies to
convert the CVS brines into high purity lithium products for new
energy storage uses;
- A new early stage exploration program on the 13,000 hectare
Terra Cotta Project (TCP), located on Pocitos Salar in Salta
Province; and
- An active business development program, applying its expertise
to the evaluation of new lithium targets around the world.
On behalf of the Board of Directors, “Patrick Highsmith” Chief
Executive Officer
Forward Looking Statements: The information in this news release
contains forward looking statements that are subject to a number of
known and unknown risks, uncertainties and other factors that may
cause actual results to differ materially from those anticipated in
our forward looking statements. Factors that could cause such
differences include: changes in world commodity markets, equity
markets, costs and supply of materials relevant to the mining
industry, change in government and changes to regulations affecting
the mining industry. Forward-looking statements in this release may
include statements regarding mineral processing, adaptation of test
work to larger scale and/or future operational scales, estimates of
reduced future capital and operating expenses, delivery of a
preliminary economic assessment, future exploration programs,
operation plans, geological interpretations, and mineral tenure
issues. Although we believe the expectations reflected in our
forward looking statements are reasonable, results may vary, and we
cannot guarantee future results, levels of activity, performance or
achievements.
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of
this release
CONTACT:
Pure Energy Minerals Limited (www.pureenergyminerals.com)
Email: info@pureenergyminerals.com
Telephone – 604 608 6611, ext 5
Pure Energy Minerals (TSXV:PE)
과거 데이터 주식 차트
부터 11월(11) 2024 으로 12월(12) 2024
Pure Energy Minerals (TSXV:PE)
과거 데이터 주식 차트
부터 12월(12) 2023 으로 12월(12) 2024