Pure Energy Minerals Appoints Walter Weinig as Vice President - Projects & Permitting
16 3월 2017 - 7:30PM
Pure Energy Minerals Limited (TSX-V:PE) (FRANKFURT:A111EG)
(OTCQB:PEMIF) (the “Company” or “Pure Energy”) is pleased to
announce the appointment of Walter Weinig as Vice President of
Projects and Permitting effective April 1, 2017. This appointment
continues the transition of the Company from exploration to
development activities at the Clayton Valley South Lithium Project
(the “CVS Project”) while helping to launch the exploration stage
at the Terra Cotta Project in Argentina.
Mr. Weinig brings nearly 30 years of experience in mining
hydrogeology, permitting, and project management at sites around
the globe to Pure Energy. He has managed multi-disciplinary
engineering and scientific teams to accomplish complex design and
permitting projects in surface and underground mining, industrial,
and environmental arenas. Mr. Weinig has led and performed
groundwater and environmental investigations throughout the
southwestern United States, including mining-related baseline
studies and assessments for several projects in Nevada. He has also
provided oversight and input to the resource quantification for a
lithium-brine project in Argentina (unrelated to Pure Energy). He
is currently involved with the Company in a consulting capacity,
focusing on the resource evaluation at the CVS Project.
Mr. Weinig earned a B.Sc. degree in geology from the University
of Wisconsin and an M.Sc. in hydrology and water resources from the
University of Arizona. He is a registered Professional Geologist, a
certified Project Management Professional, and is a Qualified
Person as defined in National Instrument 43-101.
Pure Energy also announces that Dr. Andy Robinson will resign
from his position as Chief Operating Officer of the Company
effective March 31, 2017. Dr. Robinson joined Pure Energy as Chief
Operating Officer in November 2014 and was appointed a Director in
September 2015. He presided over considerable growth of the Company
during the early stages of the CVS Project. Dr. Robinson remains a
Director of the Company.
Pure Energy CEO, Patrick Highsmith, commented about the
evolution of the team, “This will be a year of transition at the
Clayton Valley South Project as we progress from exploration to
development. At the same time we launch an important exploration
program at the new Terra Cotta Project. We are very excited that
Walter Weinig is joining our team at Pure Energy. Not only does he
have specialist hydrogeology and lithium experience, but he is also
a professional project manager. This skill set will keep us focused
on the timely delivery of important milestones at the CVS and Terra
Cotta Projects. Walter is a great communicator and extremely
organized. I look forward to his leadership in the field and in the
boardroom.”
Mr. Highsmith continued with respect to the resignation of Dr.
Andy Robinson, “It has been a pleasure working alongside Andy for
the last year. We have learned a lot from him in the field during
the drilling campaigns. He did an excellent job in leading the
engineering team through the mini-pilot plant and to the production
of the first flowsheet for the CVS Project, which was released in
December of last year. We wish him success and good fortune in his
future endeavors.”
About Pure Energy Minerals Ltd.
Pure Energy is a lithium resource developer that is driven to
become a low-cost supplier for the burgeoning lithium battery
industry. The Company is currently focused on the development
of the CVS Lithium Brine Project and the adjoining Glory Lithium
Clay Project in Clayton Valley, Nevada. Pure Energy also
recently announced the acquisition of a purchase option on a major
new lithium brine project in the Lithium Triangle of South America,
the Terra Cotta Project (TCP). The TCP is located on Pocitos
Salar in Salta, Argentina, where it enjoys some of the best
infrastructure and access of any lithium brine exploration project
in the country.
Pure Energy has developed core strengths in innovative
development and processing technologies for lithium brines and
lithium mineral deposits. The Company’s key attributes and
activities include:
- Generating positive results on a large land position with
excellent infrastructure in a first-class mining jurisdiction:
approx. 11,000 acres in four main claim groups in Clayton Valley,
Esmeralda County, Nevada;
- The only lithium brine resource in North America except for its
neighbor, which is the only producing lithium operation in the
United States (Albemarle’s Silver Peak lithium brine mine);
- An inferred mineral resource containing approximately 816,000
metric tonnes of Lithium Carbonate Equivalent (LCE) at an average
grade of approximately 102 mg/L lithium, reported in accordance
with NI 43-101 (see July 2015 Inferred Resource Report);
- An advanced program of testing the efficacy and economics of
modern environmentally-responsible processing technologies to
convert the CVS brines into high purity lithium products for new
energy storage uses;
- A new early stage exploration program on the 13,000 hectare
Terra Cotta Project (TCP), located on Pocitos Salar in Salta
Province; and
- An active business development program, applying its expertise
to the evaluation of new lithium targets around the world.
On behalf of the Board of Directors, “Patrick Highsmith” Chief
Executive Officer
Forward Looking Statements: The information in this news release
contains forward looking statements that are subject to a number of
known and unknown risks, uncertainties and other factors that may
cause actual results to differ materially from those anticipated in
our forward looking statements. Factors that could cause such
differences include: changes in world commodity markets, equity
markets, costs and supply of materials relevant to the mining
industry, change in government and changes to regulations affecting
the mining industry. Forward-looking statements in this release may
include statements regarding the fulfilment of the Company’s
obligations under the Agreement, the preparation of the technical
report in respect of the Properties, the approval of the Agreement
by the TSX Venture Exchange, mineral processing, adaptation of test
work to larger scale and/or future operational scales, estimates of
reduced future capital and operating expenses, delivery of a
preliminary economic assessment, future exploration programs,
operation plans, geological interpretations, and mineral tenure
issues. Although we believe the expectations reflected in our
forward looking statements are reasonable, results may vary, and we
cannot guarantee future results, levels of activity, performance or
achievements.
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of
this release.
CONTACT:
Pure Energy Minerals Limited (www.pureenergyminerals.com)
Email: info@pureenergyminerals.com
Telephone – 604 608 6611, ext 5
Pure Energy Minerals (TSXV:PE)
과거 데이터 주식 차트
부터 11월(11) 2024 으로 12월(12) 2024
Pure Energy Minerals (TSXV:PE)
과거 데이터 주식 차트
부터 12월(12) 2023 으로 12월(12) 2024