QUARTERLY ACTIVITY REPORT

FOR THE THREE MONTHS ENDED 30 June 2014

Highlights

Bullabulling Gold Project

   --    Diamond drilling program completed 
   -     1303 metres of HQ and PQ diameter core 
   -     Multi element analysis undertaken 
   -     Core to be used for metallurgical and geotechnical test-work 
   --    Geotechnical testing of drill core undertaken 
   -     Favourable rock properties confirmed 
   --    Metallurgical test-work carried out 
   -     Nanofiltration performance confirmed 
   -     Flotation evaluated 
   --    Geotechnical evaluation of the proposed tailings storage facility site commenced 

-- Flora and fauna field studies confirm the site to be free of any significant populations that would be impacted by the proposed development

Corporate

   --    Unsolicited takeover offer received from Norton Gold Fields 
   -     7 cents per share cash offer declared on 17 April 2014 
   -     Norton offer increased to 8 cents per share 

- The Directors recommended the offer after Norton secured over 40% of the Company's shares delivering effective control

   -     Norton controlled 74.83% of the Company's shares at the date of this report 
   --    Board and management changes were announced following the change of control 
   --    $525,000 R&D tax incentive received in early July. 
   --    Cash and deposits at 30 June 2014 total $2,055,350 million (excluding R&D grant). 

Bullabulling Gold Project

During the quarter, engineering and evaluation studies continued in support of the definitive feasibility study into the establishment of a 7.5 million tonne per annum open pit mining operation at Bullabulling.

Diamond Drilling Program

A 10 hole diamond drilling program was conducted at the Bullabulling Gold project providing a total of 1,303 metres of HQ and PQ diameter core samples for metallurgical and geotechnical testing required by the project to achieve definitive feasibility study (DFS) standards.

The diamond drill holes were distributed broadly across the proposed mine development to evaluate variability in geotechnical and metallurgical properties. Core samples of oxidized, transitional and fresh rock were obtained.

201 additional specific gravity (SG) determinations were carried out on selected segments of drill core to confirm and improve the level of confidence in earlier SG measurements. Some sections of whole core were subjected to destructive testing to improve knowledge of physical rock properties as part of the geotechnical assessment and mine design. A quarter sample of all remaining core was dispatched for multi-element analysis to provide a comprehensive data base to assist in compositing samples for metallurgical test-work and to aid the interpretation of the results.

Drill hole location data and significant gold intercepts are presented in table 1 below.

 
                 Table 1: Drill Hole Locations and Significant Gold Intercepts 
 
 Hole Number    Easting    Northing    RL (m)   Dip   Azi   From    To (m)   Interval   Grade 
                   (m)        (m)                            (m)                (m)      (g/t) 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM012         299927.6   6566817.8   431.5    -66   270    35.0     41.0        6.0     0.95 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             83.6     93.0        9.4     2.84 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM019         299788.1   6567275.6   435.2    -67   90     27.6     31.6        4.0     1.28 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                            133.0    138.0        5.0     0.99 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM035         299713.2   6567823.4   441.2    -60   90    125.0    129.0        4.0     1.98 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM037         299925.7   6568075.4   449.5    -79   90      7.0      9.6        2.6     9.05 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             35.0     37.6        2.6     1.08 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                            109.0    111.0        2.0     0.52 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM039         299969.4   6569501.3   446.4    -57   90     27.0     30.0        3.0     0.53 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             31.0     33.0        2.0     1.10 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             33.3     36.0        2.7     2.14 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM041         299689.2   6566424.5   428.3    -75   270    35.0     38.0        3.0     7.05 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                            159.0    164.0        5.0     1.08 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM045         299753.4   6567152.6   435.2    -75   90     35.0     37.0        2.0     0.64 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM046         299689.6   6567476.2   436.8    -71   90     19.0     25.0        6.0     1.46 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             38.0     40.0        2.0     0.59 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             41.0     44.0        3.0     1.12 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             86.0     97.0       11.0     1.00 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             98.0    103.0        5.0     1.92 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM047         299710.5   6564432.4   419.7    -60   90     37.0     39.0        2.0     1.71 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             42.7     47.0        4.4     1.26 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             50.0     57.0        7.0     0.85 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 BJM049         299905.6   6571048.6   431.2    -50   90     45.0     47.0        2.0     1.29 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             47.2     51.0        3.8     1.03 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             52.0     56.0        4.0     1.17 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             60.0     63.7        3.7     1.28 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
                                                             69.0     72.0        3.0     0.90 
-------------  ---------  ----------  -------  ----  ----  ------  -------  ---------  ------- 
 

Mining Studies

Work continued with to progress on the mining plans with the primary focus on developing staged pit designs, optimisation of the extraction sequence and refinement of production cost estimates incorporating detailed data from the original equipment manufacturers.

Geotechnical testing of the diamond drill core samples produced favorable results, indicating high rock strengths adjacent to the final pit wall positions, with not overly tough rock within the main mining areas providing positive implications for drill and blast costs.

Initial assessment of the test data by the Company's geotechnical consultants has indicated that pit slopes within the oxide horizon of the pit can be steeped, thereby reducing waste mining requirements and that the overall slope of western wall of the pit can the increased. This provides scope to move the pit crest on the west wall in to reduce the strip ratio or push the toe of the west wall out to increase ore recovery.

Metallurgical Test-work

Preliminary test-work on mineralised reverse circulation drill samples from the Bullabulling Gold project had indicated that nanofiltration of process water could substantially reduce consumption of cyanide and lime (see release of 12 March 2014). During the quarter a more comprehensive test-work program was carried out to validate the initial nanofiltration results and further optimise processing parameters.

The latest test-work was carried out on primary mineralised diamond core from a 2012 drilling program and included a further 18 leach tests comparing reagent consumption at various pH levels and cyanide concentrations in nanofiltered water and raw bore water. The results of the program were consistent with the preliminary test-work indicating that use of nanofiltration to reduce magnesium levels in the process water, significantly reduces the amount of lime required to achieve targeted pH levels in the gold leaching circuit.

Tests were carried out in raw water at pH levels of 8.5 to 9.5, with 1.53kg of lime required for each tonne of ore to achieve a pH of 9.5. In nanofiltered water, pH levels of 9.5 to 10.5 were able to be achieved with much lower lime addition. A pH of 9.5 was maintained with lime consumption of 0.20 kg/t, 87.2% less than lime consumption in raw water.

Average cyanide consumption in all nanofiltration tests was 28.0% lower than in the raw water tests. Lime and cyanide consumption rates over the range of pH levels tested are presented graphically in Figure 1. It should be noted that these results are intended to enable a comparison of reagent consumption in nanofiltered water relative to raw bore water and final estimates of operational consumption may vary from these numbers.

Figure 1: Cyanide and lime consumption at various pH levels (available in the full version of the announcement on the Company's website).

An initial phase of flotation test-work was also performed. Flotation tests were carried out at grind sizes between 75um and 212um to determine whether there was potential to save energy costs by concentrating the gold mineralisation at a coarse grind size and or improve gold recovery through intensive grinding and leaching of a low volume concentrate.

The Bullabulling mineralised samples responded well to flotation, with 87% to 95% of sulphides reporting to a flotation concentrate of less than 5% of initial sample mass, as shown in Table 2. Most of the gold also reported to the flotation concentrate, indicating that there may be scope to lift overall gold recovery by subjecting the concentrate to fine grinding and intensive leaching. However there was a material amount of gold remaining in the flotation tail that is likely to require recovery through conventional grinding and leaching. This suggests that the potential to deliver major savings in energy costs through coarser grinding is low.

The potential merits of implementing flotation as a means of increasing gold recovery will be further evaluated.

 
               Table 2: Summary of Flotation Results 
------------------------------------------------------------------ 
 Grind Size   Concentrate   Sulphur Recovery   Gold in Concentrate 
                  Mass 
-----------  ------------  -----------------  -------------------- 
   212um         4.3%            87.0%                61.2% 
-----------  ------------  -----------------  -------------------- 
   150um         4.2%            91.8%                65.6% 
-----------  ------------  -----------------  -------------------- 
   106um         3.7%            94.6%                71.6% 
-----------  ------------  -----------------  -------------------- 
    75um         3.6%            95.3%                74.3% 
-----------  ------------  -----------------  -------------------- 
 

Tailings Storage Facility (TSF)

As part of studies associated with optimising the tailings storage method, geotechnical evaluation of the proposed location of the TSF was carried out during the quarter. This involved excavating a series of trenches across the proposed TSF site located to the east of the mine site. The trenched were dug to excavator refusal, which generally occurred upon the intersection of competent cap-rock one to three metres below surface. The thickness and composition of the cap-rock was evaluated using a hand-held diamond coring drill.

An initial assessment of the data from the trenching and coring indicated that the selected site is well suited for a TSF, with the cap-rock expected to provide an impervious barrier that would prevent seepage entering the groundwater system.

Flora and Fauna Studies

Field studies were carried out during the quarter to determine whether there were occurrences of significant flora or fauna species that would be adversely affected by the proposed mine development. The latest studies followed up on earlier work which identified two species of flora and one of fauna (Mallee Fowl) that required further assessment.

Limited occurrences of the targeted plant species were identified and these were outside the limits of disturbance.

There were no Mallee Fowl observed during a detailed systematic search of the proposed mine site and surrounding area, although four abandoned nests and one nest that appeared to be active were discovered. The location of the potentially active nest would not be threatened by the current mine plan.

Preliminary assessment of the survey results indicates that the proposed mine development will not impact any significant species of flora or fauna.

Corporate

Norton Takeover Offer

On 17 April 2014, Bullabulling Gold Limited received notice of an unsolicited takeover offer from Norton Gold Fields ("Norton") to acquire all of the shares in Bullabulling. Norton offered 7 cents cash for every Bullabulling share ("the Offer"). The offer became capable of acceptance on 2 May 2014.

On 16 June 2014 Norton advised that the Offer would be increased to 8 cents per share on the condition that Norton obtained a relevant interest in 30% or more of the Company's shares by 30 June 2014 and that this offer price was its best and final offer. Norton advised on 1 July 2014 that they had acquired an interest in 41.35% of the Company's shares and that the increased offer of 8 cents per share was unconditional.

In response to Norton gaining effective control of the Company, on 3 July 2014 the Directors of Bullabulling recommended that shareholders accept the increased offer. The reasons for the Director's recommendation are more fully outlined in the Third Supplementary Target's Statement released that day.

On 14 July 2014 Norton advised that they had formally gained control of the Company with an interest in Bullabulling shares exceeding 50%. It was subsequently agreed that Norton Managing Director, Dr Dianmin Chen, and Non-Executive Director, Dr Noel White, would join the board of Bullabulling as Non-Executive Directors, subject to the completion of regulatory requirements. It was also agreed that the position of Managing Director of Bullabulling would be abolished, ending the executive duties of the incumbent, Brett Lambert, who will also leave the board upon the appointment of Norton's appointees.

At the date of this report Norton held an interest in 74.83% of Bullabulling's shares and the offer is scheduled to close on 18 August 2014.

Research and Development Incentive

On 24 June 2014 the Company reported that an application for a research and development tax incentive for a sum of $525,129 had been approved.

Cash Position

The Company held cash and deposits of $2,055,350 million at quarter end.

Director Fees

On 31 May 2013 the Company advised that in order to aid cash preservation, the non-executive directors of the Company would accept the issue of shares in satisfaction of 50% of their directors fees, subject to shareholder approval. The number of shares to be issued was to be calculated on a calendar quarterly basis, with the issue price being the five day volume weighted average price (VWAP) at the end of the relevant quarter.

Shareholder approval to issue the shares was obtained at the annual general meeting of shareholders on 27 May 2014 and subsequently 1,333,094 shares were issued in place of directors fees for the nine months to 31 March 2014 totaling $69,375.

For the June quarter 2014, 321,180 Bullabulling Gold Limited ordinary shares were issued at a price of 7.2 cents in place of directors fees totaling $23,125.

New Share Issues

Following shareholder approval at the Company's annual general meeting on 27 May 2014 two share issues were made.

2,261,938 shares were issued as payment for drilling services associated with the geotechnical and metallurgical diamond drilling program and 2,859,756 shares were issued as placement for $117,250 in accordance with a subscription agreement entered into in January 2014.

The total number of shares on issue at the date of this report was 350,811,553.

Mineral Resources

There was no change to the Mineral Resource inventory of the Company during the quarter. Mineral Resources are summarised in the table below.

 
        Bullabulling Gold Project Mineral Resource Estimate (0.5g/t 
                                  cut-off) 
--------------------------------------------------------------------------- 
 Deposit                 Classification   Tonnage     Grade      Cont. Gold 
----------------------  ---------------  ---------  ---------  ------------ 
 Bullabulling Laterite      Inferred       1.7 Mt    0.89 g/t    48,000 oz 
----------------------  ---------------  ---------  ---------  ------------ 
 Bullabulling Primary      Indicated      72.4 Mt    0.98 g/t    2,279,000 
                                                                     oz 
----------------------  ---------------  ---------  ---------  ------------ 
                            Inferred      35.0 Mt    1.12 g/t    1,257,000 
                                                                     oz 
----------------------  ---------------  ---------  ---------  ------------ 
 Bullabulling Total       Ind. & Inf.     109.1 Mt   1.02 g/t    3,584,000 
                                                                     oz 
----------------------  ---------------  ---------  ---------  ------------ 
 Gibraltar                  Inferred       4.9 Mt    1.07 g/t   169,000 oz 
----------------------  ---------------  ---------  ---------  ------------ 
 Project Total               Ind. &       114.0 Mt   1.02 g/t    3,753,000 
                               Inf.                                  oz 
----------------------  ---------------  ---------  ---------  ------------ 
 

Note: Small discrepancies may occur due to the effects of rounding

For information, contact:

 
 David McArthur                   Westhouse Securities Limited 
  Bullabulling Gold Limited        (UK Broker & Nominated Adviser) 
  Level 2, 55 Carrington Street    Martin Davison / Hugo Rubinstein 
  Nedlands, WA, 6009, Australia    Tel: +44 20 7601 6100 
  Tel: +61 8 9386 4086 
-------------------------------  ---------------------------------- 
 

About Bullabulling Gold Limited

Bullabulling Gold Limited is listed on the Australian Securities Exchange (ASX:BAB) and London's AIM Market (AIM:BGL) and has approximately 341.7 million shares on issue. The Company's primary asset is the wholly owned Bullabulling Gold Project, located 60 kilometres west of Kalgoorlie in Western Australia.

The Bullabulling Gold Project hosts JORC compliant Mineral Resources of 3.75 million ounces comprising Indicated Resources of 72.4 million tonnes at 0.98 g/t gold (2.28 million ounces) and Inferred Resources of 41.6 million tonnes at 1.11 g/t gold (1.47 million ounces). Exploration has demonstrated strong potential for further expansion of the resource base.

The Bullabulling deposit is amenable to bulk tonnage open pit mining and conventional CIL processing. All resources are situated on granted Mining Leases in close proximity to infrastructure.

The Company is conducting a definitive feasibility study into the development of a large scale, low cost mining operation at Bullabulling, scheduled for completion in 2015.

Competent Person Statement

The information in this report that relates to the Exploration Results, Mineral Resources or Ore Reserves is based upon information compiled by Mr Trevor Pilcher, who is a full time employee of the Company and is a member of The Australasian Institute of Mining and Metallurgy. Mr Pilcher has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and the activity in which he is undertaking to qualify as a Competent Person under 2012 Edition of the Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr Pilcher consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Exploration Results, Mineral Resources or Ore Reserves was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported. All material assumptions and technical parameters underpinning the estimates of mineral resources continue to apply and have not materially changed.

TENEMENTS LISTING AT 30 JUNE 2014

Bullabulling Gold Limited has used the cash and assets in a form readily convertible to cash, that it had at the time of admission to the Australian Securities Exchange, in a manner consistent with Bullabulling Gold Limited's business objectives

 
        Tenement Description          Tenement Numbers    Percentage 
                                                           Interest 
 Bullabulling Project - Coolgardie 
  District                                E15/1263           100% 
 Bullabulling Project - Coolgardie 
  District                                E15/1264           100% 
 Bullabulling Project - Coolgardie 
  District                                E15/1320           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/156           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/157           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/158           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/196           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/206           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/218           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/222           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/328           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/330           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/331           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/332           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/333           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/334           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/335           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/336           100% 
 Bullabulling Project - Coolgardie 
  District                                 L15/339           100% 
 Bullabulling Project - Coolgardie 
  District                                 M15/282           100% 
 Bullabulling Project - Coolgardie 
  District                                 M15/483           100% 
 Bullabulling Project - Coolgardie 
  District                                 M15/503           100% 
 Bullabulling Project - Coolgardie 
  District                                 M15/529           100% 
 Bullabulling Project - Coolgardie 
  District                                 M15/552           100% 
 Bullabulling Project - Coolgardie 
  District                                 M15/554           100% 
 
 

TENEMENTS LISTING AT 30 JUNE 2014 (continued)

 
        Tenement Description           Tenement Numbers      Percentage 
                                                               Interest 
------------------------------------  ------------------  ---------------- 
 Bullabulling Project - Coolgardie 
  District                                 M15/1414             100% 
 Bullabulling Project - Coolgardie 
  District                                 M15/4798             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/4799             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/4887             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5186             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5187             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5188             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5354             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5355             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5356             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5357             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5358             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5381             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5382             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5383             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5384             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5385             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5386             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5387             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5388             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5512             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5513             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5514             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5515             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5516             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5533             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5535             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5538             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5539             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5540             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5541             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5567             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5661             100% 
 
 
 

TENEMENTS LISTING AT 30 JUNE 2014 (continued)

 
        Tenement Description           Tenement Numbers      Percentage 
                                                               Interest 
------------------------------------  ------------------  ---------------- 
 Bullabulling Project - Coolgardie 
  District                                 P15/5662             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5663             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5664             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5669             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5673             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5674             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5758             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5799             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5800             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5802             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5848             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5849             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5850             100% 
 Bullabulling Project - Coolgardie 
  District                                 P15/5851             100% 
 
 
 

BULLABULLING GOLD LIMITED

June 2014 Quarter JORC Table 1 - Summary Information

The information in the following Table 1 is summarised here:

The Bullabulling deposits lie in close proximity to the western edge of the Archaean Norseman Wiluna greenstone belt, within the Coolgardie Domain. The Bullabulling stratigraphy comprises mafic and ultramafic rocks at the base of the Archaean greenstone sequence overlain by more felsic volcanics, volcaniclastics and sediments of upper greenschist to mid-amphibolite facies metamorphic grade.

The gold deposits that comprise the Bullabulling gold camp are clustered around the SW corner of the Bali Monzogranite and define a trend that broadly follows the margin of the intrusion and stratigraphy for approximately 14 km; north-south on its western edge (the Bullabulling Trend) and progressively swinging southeast and then to the east (Gibraltar trend) . The primary host rocks are a mix of amphibolites and felsic schists, the former derived from mafic volcanics or ultramafic (metakomatiite) and related high magnesium basalt; and the latter from the sediments and felsic to intermediate volcanics and volcaniclastics. Banded and more massive amphibolite with shear fabrics are the main primary hosts with metakomatiite a significant minor host. Mineralisation occurs as fabric-parallel anastomosing lenses marginal to the contacts between metakomatiite and surrounding amphibolite.The greenstones are intruded by several generations of granite. Pegmatite bodies are common, often oriented parallel to the stratigraphy.

Scattered laterite and sub-cropping shallow oxide mineralisation occurs along much of the trend and thus is well defined by gold soil geochemistry. Primary mineralisation occurs as a series of stacked lodes up to 300m wide parallel to the ultramafic contacts trending in a general north-south orientation for 8km from the Bonecrusher to Gryphon-Edwards prospects and then swinging to the southeast and east linking with the Gibraltar deposit. Several significant hard rock mines have been developed in the past: the Gibraltar pit during the early 1900s, and late 1980s to mid-1990s; the Bacchus and Phoenix pits in mid-1990s (Resolute Ltd); and shallow laterite mining at occurred intermittently from mid-1980s to 2010 (CKGM and Jervois).

The resource has been defined by drilling which has targeted the surface +50 ppb Au soil anomaly. A total of 4866 reverse circulation (RC) and 52 diamond (DD) drillholes have been drilled with 291,593 and 3164 samples respectively compiled into the database as the basis for resource estimation. The Bullabulling mineralisation parallels the stratigraphy over a strike length of approximately 9 km; striking approximately north-south from Bonecrusher at its north end to Edwards over approximately 7 km of strike where it dips at between 15deg and 60deg towards the west, averaging around 30deg. Extending southeast of Edwards mineralisation swings as an open fold with the stratigraphy and then strikes northwest-southeast for approximately 2 km as defined by drilling with mineralisation dipping between 30deg and 45deg to the southwest. The maximum down dip extent delineated by drilling is about 500 m. Gibraltar mineralisation extends over a strike length of 2 km with maximum depth delineated of approximately 200m down dip.

The resource block model has been generated by consultant Snowden Group using its Datamine software package. BGL provided data and 0.1 g/t composited Au grade shapefiles to Snowden. Drillhole data was coded using the wireframe interpretations by Snowden representing oxidation surfaces and mineralised lenses. Samples were composited to 1m downhole. Statistical analysis of the domains indicated that laterite gold population is only mildly skewed while other domains show a high degree of skewness. The laterite mineralisation was estimated using conventional ordinary block kriging (no unfolding). The primary mineralisation has been estimated using a combination of unfolded ordinary and multiple indicator kriging using hard boundary domains for all domains. Where top cutting was limited to 13 or fewer samples (< 3 % of the data) per domain, ordinary kriging was used to determine the final block grade. The remaining domains were estimated using multiple indicator kriging. A parent block size of 10m x 25 m by 4 m (east-west, north-south and vertical directions respectively) to reflect both the drillhole spacing and BGL's plan to mine the deposit using bulk mining methods. The estimates were validated using a visual and statistical comparison of the block grade estimates to the input drillhole composite data. The Bullabulling deposit was previously estimated in toto in September 2012 (BB0912v1) and subsequently estimates were undertaken for subsets firstly encompassing Gryphon-Edwards (south of 6564800N) based on drilling in January-February 2013 (BB0413v1) and then Dicksons-Bonecrusher (north of 6569000N) based on drilling in September 2013 (BB0913v1). The Gibraltar deposit was estimated in October 2013.

The estimate have been classified as an Indicated and Inferred Mineral Resource based on the integrity of the data, spatial continuity of both the geology and the gold grades as demonstrated by variography, the drillhole spacing as well as the quality of the estimation as summarised in this table. Indicated Resources (amphibolite) were modelled using closed wireframe solids. The main criteria was a a minimum of 75 m along strike (north-south to northwest-southeast) and 35 m (east-west or northeast-southwest) which contained a mixture of historical and new drilling results. The down dip and along strike extents of the mineralisation were typically projected 35 m past the last drillhole. In some cases this distance was shortened, more commonly where mineralisation appeared to be pinching out. Mineralisation within 50 m of the indicated boundary was classified as Inferred. In drilled areas with no defined Indicated Amphibolite Resource, Inferred Resources were defined where two or more consecutive sections had three or more drillholes delineating the mineralisation in the along strike and down dip directions. The classified material was typically projected 50 m along strike and down dip from the last drillhole. All of the laterite mineralisation was classified as Inferred. Snowden believes the estimate appropriately reflects the view of the competent person.

The deposit is the subject of a Feasibility Study (FS) which is considered mining, metallurgical and economic factors. The FS describing the mining parameters is anticipated to be delivered in first half 2015.

 
                             JORC Code (2012) Draft Table 1 - sampling techniques and data 
--------------------------  ------------------------------------------------------------------------- 
         Criteria                                            Comments 
--------------------------  ------------------------------------------------------------------------- 
    Sampling techniques      A total of 4866 reverse circulation (RC) and 52 diamond (DD) 
                              drillholes have been drilled with 291,593 and 3164 samples 
                              respectively compiled into the database as the basis for resource 
                              estimation. 
                              The data used for resource estimation is based on the logging 
                              and sampling of RC and Diamond drilling (NQ-HQ core). Snowden's 
                              review indicates it has been done to a good standard. 2 kg 
                              to 5 kg chip samples were collected from each metre of RC 
                              drilling. The bulk of RC Samples were pulverised and split 
                              to produce a 50 g charge. Drill core sampled were typically 
                              half HQ at 1m intervals unless sub-sampled to lithological 
                              boundaries. Core samples are crushed prior to pulverising 
                              and splitting to obtain a 30-50 g charge. The charge is subject 
                              to fire assay with an aqua regia digest finish. The solution 
                              is then analysed for gold using AAS. Rock chips for logging 
                              were obtained by sieving a large scoop from each bag. Washed 
                              chips were placed into appropriately labelled chip trays. 
                              Magnetic susceptibility was measured using a model KT-10 portable 
                              magnetic susceptibility meter with readings taken at 1m intervals. 
                              XRF determinations are performed to verify lithogeochemistry 
                              using a PAS XL3t 950s GOLDD+ portable analyser. 
--------------------------  ------------------------------------------------------------------------- 
    Drilling techniques      The bulk of the drilling is RC (96.5%) with a few diamond 
                              holes (3.5%) completed for geological information, bulk density 
                              determinations and metallurgical testing. A total of 4866 
                              reverse circulation (RC) and 52 (diamond (DD) were drilled 
                              for 291,593 and 3164 samples respectively. Holes were drilled 
                              on a nominal 35 m x 75 m grid spacing. RC drillholes in toto 
                              range in depth from 1 m to 348 m averaging 59m and BGL diamond 
                              drillholes range in depth from 136 m to 573.5 m averaging 
                              355m. 
--------------------------  ------------------------------------------------------------------------- 
   Drill sample recovery     RC recovery data was routinely collected by BGL for the bulk 
                              of recent drilling. Analysis of results yielded an average 
                              recovery of 97%. Diamond core recoveries averaged 99%. 
--------------------------  ------------------------------------------------------------------------- 
          Logging            Geological logging was undertaken on RC chip samples with 
                              following characteristics logged: lithology, oxidation strength, 
                              mineralogy, grainsize, texture, colour, vein infill and percentage, 
                              metal sulphide percentage and alteration type and strength. 
                              Geological logging, structural measurements, RQD and recovery 
                              measurements were carried out on diamond core. Diamond core 
                              was photographed wet. XRF determinations of lithophile elements 
                              Ni and Cr were utilised to confirm the visual identification 
                              of ultramafic or komatiitic units. According to Snowden, logging 
                              of drillhole samples was done with sufficient detail to meet 
                              the requirements of resource estimation and mining studies. 
--------------------------  ------------------------------------------------------------------------- 
  Sub-sampling techniques    A nominal 1 m sample interval was used for the RC and diamond 
   and sample preparation     drilling. RC samples were collected using a cone splitter 
                              to cut the sample stream and produce a 2 kg to 5 kg sample. 
                              Diamond drilling sample lengths were adjusted so that they 
                              did not cross lithological boundaries. Diamond drillhole samples 
                              are collected from half core cut using a diamond saw. RC samples 
                              were delivered by BGL road transport in purpose built cages 
                              to ALS Kalgoorlie from June 2010 to September 2012 with some 
                              overflow to ALS Perth. From January 2013 to April 2014, delivery 
                              laboratory was the Amdel Kalgoorlie facility. Field duplicates 
                              were collected every 20m on average. A proportion of pulp 
                              duplicates were re- submitted for assay and then assayed by 
                              an umpire laboratory. Standards and blanks were inserted in 
                              the sample stream at nominal 20m spacing inserted through 
                              the course of the resource drilling. Snowden's review indicates 
                              it has been done to an acceptable standard. 
--------------------------  ------------------------------------------------------------------------- 
     Quality of assay        In the period June 2010 to December 2012 samples were assayed 
    data and laboratory       for gold at ALS facilities by ALS fire assay method Au-AA26 
           tests              (50g charge 0.01 DL). RC samples from 5 precollars in the 
                              first 7 hole diamond drilling program (June-August 2010) were 
                              assayed using ALS fire assay method Au-AA21 (30g charge 0.002 
                              DL) and the half core samples assayed using ALS fire assay 
                              method Au-AA25 (30g charge 0.01ppm DL). Solutions of samples 
                              assaying >10ppm Au were diluted and reanalysed using method 
                              Au-DIL. The final Au assay is selected in priority Au-DIL 
                              if not then Au-AA26 if not then Au-AA25 if not then Au-AA21. 
                              In the period January 2013 to April 2014 samples were assayed 
                              for gold at Bureau Veritas Amdel Kalgoorlie laboratory using 
                              method FA001 (40 g charge 0.01 DL). 
--------------------------  ------------------------------------------------------------------------- 
      Verification of        Snowden Group have been retained since 2010 as consultants 
   sampling and assaying      to BGL to undertake resource estimates to inform scoping, 
                              prefeasibility and feasibiliy studies for the Bullabulling 
                              project. Snowden carried out a field inspection of operations 
                              at Bullabulling at commencement of RC drilling in November 
                              2010 to verify RC sampling procedures in practice and inspecting 
                              the core logging and storage facilities which were still being 
                              established. 
                              Snowden's analysis of the QC data for the Bullabulling deposit 
                              found the blanks and standards results to be acceptable. The 
                              duplicate results were poor. Part of the reason for the poor 
                              duplicate results is that the low tenor of the mineralisation 
                              is distorting the HARD values (118 pairs of 187 submitted 
                              from Jan-Feb 2013 round of drilling had grades less than 0.1 
                              g/t Au). 
                              A review of RC field duplicates analyses by a third party 
                              and Snowden found 75% of the data had HARD of 30% or less 
                              considered by Snowden a poor result. A batch of 563 pulp duplicates 
                              from the November 2010 to December 2011 campaign were resubmitted 
                              to umpire laboratory Amdel. As expected for the sample type 
                              the level of precision was slightly better than obtained from 
                              the field duplicate analyses (72% of the data with a HARD 
                              value of less than 15%). 
--------------------------  ------------------------------------------------------------------------- 
     Location of data        The local mine grid is based on AMG Zone 51 coordinates. All 
           points             collars have been surveyed by Fugro or ABIMS by dDGPS (accuracy 
                              +/-0.1m). A campaign of dGPS surveys of extant historical 
                              collars was undertaken by Fugro (x holes) and results compared 
                              with the inherited database. Results indicate that location 
                              data for historical drilling is accurate. 
--------------------------  ------------------------------------------------------------------------- 
                             Almost all the BGL drilling has been subject to gyroscopic 
                              survey. No downhole surveys were undertaken on vertical holes. 
                              From November 2012 to January 2011, early in the infill RC 
                              program in approximately X holes downhole surveys were undertaken 
                              by optical method prior to supercession by gyroscopic surveying. 
                              From January 2011 to April 2014, continuous downhole surveys 
                              were performed mainly in-rod by gyroscopic technique in the 
                              bulk of RC drillholes (85%). A proportion (13%) were surveyed 
                              down open hole. 24 holes where downhole surveys were unable 
                              to be performed rely on collar survey data for downhole traces. 
                              Very few of the historic RC drillholes have downhole surveys 
                              and therefore rely on collar information. Historic diamond 
                              holes have downhole survey information based on optical surveys. 
--------------------------  ------------------------------------------------------------------------- 
     Data spacing and        The drilling of the 7km north-south oriented segment of the 
        distribution          Bullabulling Mineralised Trend was completed along a set of 
                              east-west trending sections. The section spacing typically 
                              ranges from 20 m to 20 m apart to 35 m by 75 m apart. Preliminary 
                              drilling of the northwest-southeast oriented portion of the 
                              mineralised trend over a strike length of 2km was undertaken 
                              on east-west sections. From January 2013 infill drilling of 
                              the northwest-southeast oriented trend along the Gryphon-Edwards 
                              areas was completed on northeast-southwest trending sections 
                              orthogonal to the mineralised trend. Section spacing was maintained 
                              at 35 m by 75m. 
--------------------------  ------------------------------------------------------------------------- 
                             The section spacing is sufficient to establish the degree 
                              of geological and grade continuity necessary to support the 
                              resource classifications that were applied. 
--------------------------  ------------------------------------------------------------------------- 
      Orientation of         The location and orientation of the Bullabulling drilling 
      data in relation        is appropriate given the strike and morphology of the mineralisation. 
  to geological structure 
--------------------------  ------------------------------------------------------------------------- 
      Sample Security        RC and core samples were collected from drill site and delivered 
                              by BGL to Kalgoorlie ( by road 65km) either to ALS or Amdel, 
                              following standard chain of custody procedures. Core prepared 
                              for metallurgical testwork was stored at site and then freighted 
                              to ALS Metallurgical facility in Perth. Pulp samples are boxed 
                              and stored at site in locked sea containers. 
--------------------------  ------------------------------------------------------------------------- 
    Audits and reviews       In late 2011 a review of the ALS assay data was undertaken 
                              by contractor RSC on behalf of BGL who made a number of recommendations 
                              to improve laboratory practices. Following the review the 
                              quality of the QC samples submitted by BGL improved. 
--------------------------  ------------------------------------------------------------------------- 
           Item              Section 3 Estimation and Reporting of Mineral Resources 
--------------------------  ------------------------------------------------------------------------- 
    Database integrity       BGL store all of their drilling information in a commercial 
                              database (GBIS). The data was provided to Snowden in Excel 
                              spread sheets. Snowden undertook a basic check of the database 
                              for potential errors as a preliminary step to compiling the 
                              resource estimate: Drillholes with overlapping sample intervals, 
                              Sample intervals with no assay data, Duplicate records, Assay 
                              grade ranges, Collar coordinate ranges, Valid hole orientation 
                              data. No significant flaws were identified. 
--------------------------  ------------------------------------------------------------------------- 
        Site visits          Snowden carried out a field inspection of operations at Bullabulling 
                              at commencement of RC drilling in November 2010 observing 
                              and verifying RC sampling procedures in practice and inspecting 
                              the core logging and storage facilities which were still being 
                              established. 
--------------------------  ------------------------------------------------------------------------- 
 Geological interpretation   It is Snowden's opinion that the local geology is well understood 
                              as a result of work undertaken by BGL and previous workers 
                              in the area. The gold mineralisation has been interpreted 
                              by Snowden based on gold threshold grades of 0.1 g/t supplied 
                              by BGL. Pervasive amphibolite facies metamorphism and metasomatism 
                              has masked most of the original stratigraphy although komatiitic 
                              units are readily distinguishable based on metamorphogenic 
                              mineralogy (tremolite +/-antigorite and texture and high background 
                              Ni measured by portable XRF determinations). Scattered laterite 
                              and sub-cropping shallow oxide mineralisation occurs along 
                              much of the trend and thus is well defined by gold soil geochemistry 
                              (*50ppb Au contour). Banded and more massive amphibolite with 
                              shear fabrics are the main primary hosts with metakomatiite 
                              a significant minor host. Mineralisation occurs as fabric 
                              parallel anastomosing lenses marginal to the contacts between 
                              metakomatiite and surrounding amphibolite. 
--------------------------  ------------------------------------------------------------------------- 
                             Alternative interpretations of the mineralisation are unlikely 
                              to significantly change the overall volume of gold mineralised 
                              envelope in terms of the reported classified resources. 
--------------------------  ------------------------------------------------------------------------- 
        Dimensions           The Bullabulling mineralisation parallels the stratigraphy 
                              over a strike length of approximately 9 km; striking approximately 
                              north-south from Bonecrusher at its north end to Edwards over 
                              approximately 7 km of strike where it dips at between 15deg 
                              and 60deg towards the west, averaging around 30deg. Extending 
                              southeast of Edwards mineralisation swings as an open fold 
                              with the stratigraphy and then strikes northwest-southeast 
                              for approximately 2 km as defined by drilling with mineralisation 
                              dipping between 30deg and 45deg to the southwest. The maximum 
                              down dip extent delineated by drilling is about 500 m. The 
                              Gibraltar mineralisation extends over a strike length of 2 
                              km with maximum depth delineated of approximately 200m down 
                              dip. 
--------------------------  ------------------------------------------------------------------------- 
      Estimation and         Drillhole data was coded using the wireframe interpretations 
    modelling techniques      representing oxidation surfaces and mineralised lenses. Samples 
                              were composited to 1m downhole. Statistical analysis of the 
                              domains indicated that laterite gold population is only mildly 
                              skewed while other domains show a high degree of skewness. 
                              The laterite mineralisation was estimated using conventional 
                              ordinary block kriging (no unfolding). The primary mineralisation 
                              has been estimated using a combination of unfolded ordinary 
                              and multiple indicator kriging using hard boundary domains 
                              for all domains. Where top cutting was limited to 13 or fewer 
                              samples (< 3 % of the data) per domain, ordinary kriging was 
                              used to determine the final block grade. The remaining domains 
                              were estimated using multiple indicator kriging. A parent 
                              block size of 10m x 25 m by 4 m (east-west, north-south and 
                              vertical directions respectively) to reflect both the drillhole 
                              spacing and BGL's plan to mine the deposit using bulk mining 
                              methods. The estimates were validated using a visual and statistical 
                              comparison of the block grade estimates to the input drillhole 
                              composite data. The Bullabulling deposit was previously estimated 
                              in toto in September 2012 (BB0912v1) and subsequently estimates 
                              were undertaken for subsets firstly encompassing Gryphon-Edwards 
                              (south of 6564800N) based on drilling in January-February 
                              2013 (BB0413v1) and then Dicksons-Bonecrusher (north of 6569000N) 
                              based on drilling in September 2013 (BB0913v1). The Gibraltar 
                              deposit was estimated in October 2013. 
--------------------------  ------------------------------------------------------------------------- 
         Moisture            All tonnages have been estimated as dry tonnages. 
--------------------------  ------------------------------------------------------------------------- 
    Cut-off parameters       The gold mineralisation was reported using 0.5 g/t gold cut-off 
                              grade provided by BGL. The selected cut-off of 0.5 g/t is 
                              based on pit optimisation and mining optimisation studies 
                              that indicate a grade between 0.35 and 0.4 g/t cut-off is 
                              economic to mine and process (using forecast gold price and 
                              throughput assumed in FS 2014). 
--------------------------  ------------------------------------------------------------------------- 
      Mining factors         The deposit is the subject of a Feasibility Study (FS) which 
      and assumptions         is considered mining, metallurgical and economic factors. 
                              The FS concluded that the deposit will be mined using large 
                              scale open cut methods and a standard carbon in leach (CIL) 
                              operation processing about 7.5 Mt a year. Relatively large 
                              parent cell ore bocks (10 m x 25 m x 4m) reflect SMUs conducive 
                              to a large scale open cut mining operation. A FS descibing 
                              the mining parameters is anticipated to be delivered in first 
                              half 2015. 
--------------------------  ------------------------------------------------------------------------- 
   Metallurgical factors     Metallurgical testwork has been undertaken at Scoping and 
      and Assumptions         Prefeasibility Study levels. Results show that mineralisation 
                              is amenable to conventional CIL processing. 
--------------------------  ------------------------------------------------------------------------- 
   Environmental factors     Environmental factors were considered in the PFS. The most 
       or assumptions         significant environmental issues identified by consultant 
                              RPS were rated as medium risk. The outcome of the study indicated 
                              that the Bullabulling Project would most loikely be assessed 
                              by the DMP as a Mining Proposal without the requirement for 
                              referral to the Environmental Protection Authority (EPA) for 
                              formal Environmental Impact Assessment (EIA). Work is underway 
                              on environmental studies as part of the DFS and so there have 
                              been no revised assumptions made here. 
--------------------------  ------------------------------------------------------------------------- 
          Density            There is sufficient historical and BGL density data (water 
                              displacement method) for a mineral resource estimate. The 
                              amphibolite hosted mineralisation is hard and competent and 
                              generally non-porous. 
--------------------------  ------------------------------------------------------------------------- 
      Classification         The estimate have been classified as an Indicated and Inferred 
                              Mineral Resource based on the integrity of the data, spatial 
                              continuity of both the geology and the gold grades as demonstrated 
                              by variography, the drillhole spacing as well as the quality 
                              of the estimation as summarised in this table. Indicated Resources 
                              (amphibolite) were flagged in the model using closed wireframe 
                              solids. The main criteria was a a minimum of 75 m along strike 
                              (north-south to northwest-southeast) and 35 m (east-west or 
                              northeast-southwest) which contained a mixture of historical 
                              and new drilling results. The down dip and along strike extents 
                              of the mineralisation were typically projected 35 m past the 
                              last drillhole. In some cases this distance was shortened, 
                              more commonly where mineralisation appeared to be pinching 
                              out. 
                              Mineralisation within 50 m of the indicated boundary was 
                              classified as Inferred. In drilled areas with no defined Indicated 
                              Amphibolite Resource, Inferred Resources were defined where 
                              two or more consecutive sections had three or more drillholes 
                              delineating the mineralisation in the along strike and down 
                              dip directions. The classified material was typically projected 
                              50 m along strike and down dip from the last drillhole. All 
                              of the laterite mineralisation was classified as Inferred. 
                              Snowden believes the estimate appropriately reflects the view 
                              of the competent person. 
--------------------------  ------------------------------------------------------------------------- 
    Audits and reviews       The previous Snowden Mineral Resource estimate was briefly 
                              reviewed by CSA (CSA, 2012b) and no significant issues were 
                              identified. 
--------------------------  ------------------------------------------------------------------------- 
    Relative confidence      The estimate in the mined areas of Bacchus was reconciled 
        and accuracy          against the historical production figures. The relative accuracy 
                              and confidence in the Mineral Resource Estimate is reflected 
                              in the reporting of the Mineral Resource as set out in the 
                              JORC code (2012 Edition) 
--------------------------  ------------------------------------------------------------------------- 
 

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/01, 01/06/10, 17/12/10

 
Name of entity 
BULLABULLING GOLD LIMITED 
------------------------- 
 
 
ABN             Quarter ended ("current 
                 quarter") 
50 153 234 532  30 JUNE 2014 
--------------  ----------------------- 
 

Consolidated statement of cash flows

 
                                            Current quarter   Year to date 
  Cash flows related to operating            $A'000            (6 months) 
   activities 
                                                               $A'000 
                                           ----------------  ------------- 
 1.1    Receipts from product sales                       -              - 
         and related debtors 
        Payments for (a) exploration 
         and evaluation                               (691)        (1,150) 
         (b) development                                  -              - 
         (c) production                                   -              - 
 1.2     (d) administration                           (324)          (839) 
 1.3    Dividends received                                -              - 
        Interest and other items of 
 1.4     a similar nature received                       14             42 
 1.5    Interest and other costs of                       -              - 
         finance paid 
 1.6    Income taxes received / (paid)                    -              - 
 1.7    Other - STI bonus payments                        -          (261) 
                    Norton takeover                   (109)          (109) 
 
          Net Operating Cash Flows                  (1,110)        (2,317) 
-----  ----------------------------------  ----------------  ------------- 
 
          Cash flows related to investing 
          activities 
        Payment for purchases of: 
         (a) prospects                                    -              - 
         (b) equity investments                           -              - 
 1.8     (c) other fixed assets                           -            (1) 
 1.9    Proceeds from sale of: (a)                        -              - 
         prospects                                        -              - 
         (b) equity investments                           -              - 
         (c) other fixed assets 
 1.10   Loans to other entities                           -              - 
 1.11   Loans repaid by other entities                    -              - 
 1.12   Other (provide details if                         -              - 
         material) 
 
          Net investing cash flows                        -            (1) 
                                           ----------------  ------------- 
        Total operating and investing 
         cash flows 
 1.13    (carried forward)                          (1,110)        (2,318) 
-----  ----------------------------------  ----------------  ------------- 
 
 
        Total operating and investing 
         cash flows 
 1.13    (brought forward)                    (1,110)      (2,318) 
-----  ---------------------------------- 
 
          Cash flows related to financing 
          activities 
        Proceeds from issues of shares, 
 1.14    options, etc.                            117          117 
 1.15   Proceeds from sale of forfeited             -            - 
         shares 
 1.16   Proceeds from borrowings                    -            - 
 1.17   Repayment of borrowings                     -            - 
 1.18   Dividends paid                              -            - 
 1.19   Other - capital raising costs               -            - 
-----  ----------------------------------  ----------  ----------- 
        Net financing cash flows                  117          117 
-----  ----------------------------------  ----------  ----------- 
 
          Net increase (decrease) in 
          cash held                             (993)     (2,2018) 
        Cash at beginning of quarter/year 
 1.20    to date                                3,049        4,257 
 1.21   Exchange rate adjustments                   -            - 
         to item 1.20 
                                           ----------  ----------- 
 1.22   Cash at end of quarter                  2,056        2,056 
-----  ----------------------------------  ----------  ----------- 
 

Payments to directors of the entity and associates of the directors

Payments to related entities of the entity and associates of the related entities

 
                                                               Current quarter 
                                                                $A'000 
                                                              ---------------- 
 
             Aggregate amount of payments to the parties 
   1.23      included in item 1.2                                          295 
                                                              ---------------- 
 
   1.24      Aggregate amount of loans to the parties                        - 
             included in item 1.10 
--------  --------------------------------------------------  ---------------- 
 
   1.25      Explanation necessary for an understanding of the transactions 
  1.7 & 4.4 - At the reporting date, creditors in relation 
   to the Norton takeover amount to $1 million 
 
   1.23 - Includes salaries and fees paid to directors, 
   as well as superannuation paid on behalf of directors 
   and senior executives. 
 ----------------------------------------------------------------------------- 
 

Non-cash financing and investing activities

 
 2.1   Details of financing and investing transactions which 
        have had a material effect on consolidated assets and 
        liabilities but did not involve cash flows 
       None 
      ------------------------------------------------------- 
 
 
 2.2   Details of outlays made by other entities to establish 
        or increase their share in projects in which the reporting 
        entity has an interest 
       None 
      ------------------------------------------------------------ 
 

Financing facilities available

Add notes as necessary for an understanding of the position.

 
                                     Amount available   Amount used 
                                      $A'000             $A'000 
 3.1   Loan facilities                        * 2,000             - 
                                    -----------------  ------------ 
 3.2   Credit standby arrangements                  -             - 
----  ----------------------------  -----------------  ------------ 
 
   *        Comprises a loan from Norton Gold Fields Limited 

Estimated cash outflows for next quarter

 
                                     $A'000 
                                   -------- 
 4.1   Exploration and evaluation     1,297 
                                   -------- 
 4.2   Development                        - 
                                   -------- 
 4.3   Production                         - 
                                   -------- 
 4.4   Administration               * 1,951 
----  ---------------------------  -------- 
       Total                          3,248 
----  ---------------------------  -------- 
 

* Includes $1,514,000 related to Norton takeover with approximately $1,000,000 included in creditors at 30 June 2014.

Reconciliation of cash

 
 Reconciliation of cash at the             Current quarter   Previous quarter 
  end of the quarter (as shown              $A'000            $A'000 
  in the consolidated statement 
  of cash flows) to the related 
  items in the accounts is as follows. 
----------------------------------------  ----------------  ----------------- 
 5.1    Cash on hand and at bank                     1,600              1,449 
                                          ----------------  ----------------- 
 5.2    Deposits at call                               456              1,600 
                                          ----------------  ----------------- 
 5.3    Bank overdraft                                   -                  - 
                                          ----------------  ----------------- 
 5.4    Other (provide details)                          -                  - 
                                          ----------------  ----------------- 
        Total: cash at end of quarter 
         (item 1.22)                                 2,056              3,049 
-----  ---------------------------------  ----------------  ----------------- 
 

Note: $525,000 Research and Development refund from ATO received in early July.

Changes in interests in mining tenements

 
                           Tenement      Nature of interest   Interest        Interest 
                            reference     (note (2))           at beginning    at end 
                                                               of quarter      of quarter 
                          ------------  -------------------  --------------  ------------ 
       Interests in 
        mining tenements 
        relinquished, 
        reduced or 
 6.1    lapsed               P 15/5188     Gold exploration     100%            - 
                          ------------  -------------------  --------------  ------------ 
       Interests in 
        mining tenements 
        acquired or 
 6.2    increased 
                            P 15/5848     Gold exploration     -               100% 
                             P 15/5849     Gold exploration     -               100% 
                          ------------  -------------------  --------------  ------------ 
 

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

 
                              Total number   Number quoted   Issue price     Amount paid 
                                                              per security    up per security 
                                                              (see note       (see note 3) 
                                                              3) (cents)      (cents) 
---------------------------  -------------  --------------  --------------  ----------------- 
 7.1    Preference 
         +securities 
         (description) 
                             -------------  --------------  --------------  ----------------- 
 7.2    Changes during 
         quarter 
         (a) Increases 
         through issues 
         (b) Decreases 
         through returns 
         of capital, 
         buy-backs, 
         redemptions 
-----  --------------------  -------------  --------------  --------------  ----------------- 
        +Ordinary 
         securities 
 7.3     **                    350,490,376     350,490,373 
                             -------------  --------------  --------------  ----------------- 
        Changes during 
 7.4     quarter 
         (a) Increases 
          through issues 
                                 2,261,938       2,261,938       6.5 cents          6.5 cents 
         (b) Decreases 
          through returns 
          of capital, 
          buy-backs              2,859,756       2,859,756       4.1 cents          4.1 cents 
                                 1,333,094       1,333,094       7.1 cents          7.1 cents 
                                         -               - 
 7.5    +Convertible 
         debt securities 
         (description) 
                             -------------  --------------  --------------  ----------------- 
 7.6    Changes during 
         quarter 
         (a) Increases 
         through issues 
         (b) Decreases 
         through securities 
         matured, converted 
        Options 
         (description                                        Exercise 
         and conversion                                       price          Expiry date 
 7.7     factor)                14,591,621               -    Various         Various 
                             -------------  --------------  --------------  ----------------- 
        Issued during 
 7.8     quarter                 2,000,000               -      10.7 cents        29 May 2018 
                             -------------  --------------  --------------  ----------------- 
 7.9    Exercised 
         during quarter               None 
                             -------------  --------------  --------------  ----------------- 
        Expired during 
 7.10    quarter                 1,000,000               -      28.4 cents         1 May 2014 
                             -------------  -------------- 
 7.11   Debentures 
         (totals only) 
                             -------------  -------------- 
 7.12   Unsecured 
         notes (totals 
         only) 
-----  --------------------  -------------  -------------- 
 

1,333,094 fully paid ordinary shares were issued to directors in lieu of 50% of their director fees;

2,261,938 fully paid ordinary shares were issued pursuant to drilling services.

Compliance statement

1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).

   2          This statement does give a true and fair view of the matters disclosed. 
   Sign here:                               Date:  31 July 2014 

Company Secretary

   Print name:    David M McArthur 

Notes

1 The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

2 The "Nature of interest" (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

3 Issued and quoted securities. The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities.

4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources andAASB 107: Statement of Cash Flows apply to this report.

5 Accounting Standards. ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCQKDDPFBKKBFK

Bullabulling (LSE:BGL)
과거 데이터 주식 차트
부터 5월(5) 2024 으로 6월(6) 2024 Bullabulling 차트를 더 보려면 여기를 클릭.
Bullabulling (LSE:BGL)
과거 데이터 주식 차트
부터 6월(6) 2023 으로 6월(6) 2024 Bullabulling 차트를 더 보려면 여기를 클릭.