Cartier Drills 10.3 g/t Au over 5.0 m Below Pusticamica Deposit on the Benoist Property
27 2월 2014 - 10:00PM
Marketwired
Cartier Drills 10.3 g/t Au over 5.0 m Below Pusticamica Deposit on
the Benoist Property
VAL-D'OR, QUEBEC--(Marketwired - Feb 27, 2014) - Cartier
Resources Inc. (TSX-VENTURE:ECR) ("Cartier") announces drill
results from two of the five-hole program aimed at evaluating the
gold-bearing potential below the Pusticamica Gold Deposit, on the
Benoist property. The first drill hole returned an intersection of
10.3 g/t Au over 5.0 meters.
"These drill results reward our perseverance",
commented Philippe Cloutier, President and CEO, "to date all of
the holes have intersected the targeted mineralization-alteration
zone below the deposit". The holes three and four are
completed and samples were sent to the lab for assaying. The final
hole of the program is presently in progress.
Drill Hole |
From |
To |
Length* |
Gold (Au) |
Silver (Ag) |
Copper (Cu) |
(m) |
(m) |
(m) |
(g/t) |
(g/t) |
(%) |
PU-14-09 |
334.0 |
387.0 |
53.0 |
2.4 |
Pending |
Pending |
including |
334.0 |
338.0 |
4.0 |
3.3 |
Pending |
Pending |
including |
345.0 |
350.0 |
5.0 |
10.3 |
Pending |
Pending |
including |
347.0 |
350.0 |
3.0 |
14.2 |
Pending |
Pending |
including |
365.0 |
372.0 |
7.0 |
3.3 |
Pending |
Pending |
including |
381.0 |
386.0 |
5.0 |
2.8 |
Pending |
Pending |
PU-14-10 |
430.0 |
458.0 |
28.0 |
0.3 |
Pending |
Pending |
* Reported intersections are measured
along the hole. Additional drilling required to determine the true
thickness of the zones. |
The Benoist property is 65 km northeast of the town of
Lebel-sur-Quévillon, 25 km south-east of the Bachelor mine and 25
km north-west of the Langlois mine.
About Cartier
The company's objective is to develop and maintain a balanced
portfolio of mining projects ranging from exploration to resource
definition, development and production. Its VISION is to develop
the company's current and future assets into mineral production
within a timeframe that is consistent with its human and financial
resources while respecting sustainable development practices.
Quality Assurance / Quality Control
The scientific and/or technical information presented in this
press release has been reviewed and approved by Mr. Gaétan
Lavallière, P. Geo., and Vice President for Cartier. Mr. Lavallière
is a qualified person as defined by National Instrument 43-101.
Neither the TSX Venture Exchange nor its regulatory services
provider accepts responsibility for the adequacy or accuracy of
this press release.
Philippe CloutierPresident and CEOCartier Resources Inc.819
856-0512info@ressourcescartier.comwww.ressourcescartier.com
Cartier Resources (TSXV:ECR)
과거 데이터 주식 차트
부터 4월(4) 2024 으로 5월(5) 2024
Cartier Resources (TSXV:ECR)
과거 데이터 주식 차트
부터 5월(5) 2023 으로 5월(5) 2024