42.61 G/T GOLD OVER 7.05 METERS AT MOSQUITO
CREEK ZONE AND
20.27 G/T GOLD OVER 4.20 METERS AT SHAFT
ZONE
TORONTO, Sept. 13, 2018 /CNW/ - Barkerville Gold Mines
Ltd. (TSXV: BGM) (the "Company" or "Barkerville")
is pleased to announce final drilling results from the 50,000-meter
2018 Island Mountain exploration and delineation program at the
Company's flagship Cariboo Gold Project. The infill drilling
results continue to expand known vein corridors at depth and
demonstrate continuity at both Shaft Zone and Mosquito Creek Zone
on Island Mountain.
Recent highlights include high-grade intersections at Mosquito
Creek Zone hole IM-18-146 that assayed 42.61 g/t Au over
7.05 meters at a vertical depth of 130 meters. This intercept
is 50 meters down dip from hole IM-18-147 that assayed 11.95 g/t
Au over 1.30 meters. At Shaft Zone, hole IM-18-152
intersected 23.70 g/t Au over 3.85 meters at a vertical
depth of 550 meters and includes a sample of 120.50 g/t Au over
0.65 meter. IM-18-152 is one of the deepest mineralized
intercepts to date. Detailed drilling results are presented in the
table below. A drill hole location plan map is presented at the end
of this release. The Company's 3D deposit model with assay
highlights is located here.
Selected Drilling Highlights:
- IM-18-130: 20.27 g/t Au over 4.20 meters
- IM-18-137: 27.66 g/t Au over 2.30 meters
- IM-18-144: 21.27 g/t Au over 4.35 meters
- IM-18-146: 42.61 g/t Au over 7.05 meters
- IM-18-148: 12.44 g/t Au over 6.55 meters
- IM-18-150: 15.27 g/t Au over 4.00 meters
- IM-18-151: 79.01 g/t Au over 1.70 meters
- IM-18-151: 12.42 g/t Au over 3.75 meters
- IM-18-152: 23.70 g/t Au over 3.85 meters
- IM-18-154: 17.96 g/t Au over 4.40 meters
- IM-18-156: 38.50 g/t Au over 2.10 meters
- IM-18-160: 20.46 g/t Au over 3.95 meters
Infill Program on Island Mountain Successful in Delineation
Vein Corridors and Expansion at Depth
The intervals noted above were intersected in holes from both
Shaft Zone and Mosquito Creek Zone on Island Mountain. The holes
were designed to infill and expand mineralized vein corridors.
Vein corridors are defined as a high-density network of
mineralized quartz veins within the sandstones.
Mineralized quartz veins on the Cariboo Gold Project are
overall sub-vertical dip and northeast strike. These
corridors have been defined from surface to a vertical depth of up
to 600 meters and remain open for expansion at depth and down
plunge. Gold grades are intimately associated with vein-hosted
pyrite as well as pyritic, intensely silicified wall rock haloes in
close proximity to the veins.
The Company is currently exploring and delineating vein
corridors with six drill rigs on Cow Mountain. Results from these
holes will become available in the coming weeks.
Qualified Persons
Exploration activities at the Cariboo Gold Project are
administered on site by the Company's Project Geologists,
Kyle Orr and Felipe Castaneda. As per National Instrument
43-101 Standards of Disclosure for Mineral Projects, Maggie Layman, P.Geo. Vice President
Exploration, is the Qualified Person for the Company and has
prepared, validated and approved the technical and scientific
content of this news release. The Company strictly adheres to CIM
Best Practices Guidelines in conducting, documenting, and reporting
its exploration activities on the Cariboo Gold Project.
Quality Assurance – Quality Control
Once received from the drill and processed, all drill core
samples are sawn in half, labelled and bagged. The remaining
drill core is subsequently stored on site at the Company's secure
facility in Wells, BC. Numbered security tags are applied to
lab shipments for chain of custody requirements. The Company
inserts quality control (QC) samples at regular intervals in the
sample stream, including blanks and reference materials with all
sample shipments to monitor laboratory performance. The QAQC
program was designed and approved by Lynda
Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen
by the Company's Qualified Person, Maggie
Layman, P.Geo, Vice President Exploration.
Drill core samples are submitted to ALS Geochemistry's
analytical facility in North Vancouver,
British Columbia for preparation and analysis. The ALS
facility is accredited to the ISO/IEC 17025 standard for gold
assays and all analytical methods include quality control materials
at set frequencies with established data acceptance criteria. The
entire sample is crushed and 250 grams is pulverized. Analysis for
gold is by 50g fire assay fusion with atomic absorption (AAS)
finish with a lower limit of 0.01 ppm and upper limit of 100 ppm.
Samples with gold assays greater than 100 ppm are re-analyzed using
a 1,000g screen metallic fire assay. A selected number of samples
are also analyzed using a 48 multi-elemental geochemical package by
a 4-acid digestion, followed by Inductively Coupled Plasma Atomic
Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass
Spectroscopy (ICP-MS).
About Barkerville Gold Mines Ltd.
The Company is focused on developing its extensive mineral
rights package located in the historical Cariboo Mining District of
central British Columbia.
Barkerville's Cariboo Gold Project mineral tenures cover 1,950
square kilometres; along a strike length of 67 kilometres which
includes several past producing placer and hard rock mines, making
it one of the most well-endowed land packages in British Columbia. Since the management change
in mid-2015, the Company has unlocked the fundamental structural
controls of gold mineralization. The Company's Brownfield's
exploration team is focused on developing and delineating a
mineable resource within the 7 kilometers of principle project area
located near the town of Wells, British Columbia. The
Company's Greenfield's team is developing quality exploration
assets throughout the remaining land package through systematic,
scientific, exploration. The operation's team is focused on
developing and mining the Bonanza Ledge and BC Vein deposits on
Barkerville Mountain. This operation allows the company to
generate near term cash flow, train a local work force, keeps the
present mining permit active, and de-risk's the project through
staged production growth. Processing of material from these
deposits is processed at the QR mill. QR is a fully owned,
permitted mill and tailings facility, located approximately 110
kilometres away from Wells, and can be accessed by an all-season
road.
Cautionary Statement on Forward -Looking
Information
Neither the TSX Venture Exchange ('TSXV') nor
its Regulation Services Provider (as that term is defined in the
policies of the TSXV) accepts responsibility for the adequacy or
accuracy of this release. No stock exchange, securities commission
or other regulatory authority has approved or disapproved the
information contained herein. This news release contains
forward-looking information which is not comprised of historical
facts. Forward-looking information involves risks, uncertainties
and other factors that could cause actual events, results,
performance, prospects and opportunities to differ materially from
those expressed or implied by such forward-looking information.
Forward looking information in this news release includes, but is
not limited to, the Company's objectives, goals or future plans,
statements regarding exploration results and exploration plans.
Factors that could cause actual results to differ materially from
such forward-looking information include, but are not limited to,
capital and operating costs varying significantly from estimates,
the preliminary nature of metallurgical test results, delays in
obtaining or failures to obtain required governmental,
environmental or other project approvals, uncertainties relating to
the availability and costs of financing needed in the future,
changes in equity markets, inflation, fluctuations in commodity
prices, delays in the development of projects and the other risks
involved in the mineral exploration and development industry, and
those risks set out in the Company's public documents filed on
SEDAR. Although the Company believes that the assumptions and
factors used in preparing the forward-looking information in this
news release are reasonable, undue reliance should not be placed on
such information, which only applies as of the date of this news
release, and no assurance can be given that such events will occur
in the disclosed time frames or at all. The Company disclaims any
intention or obligation to update or revise any forward-looking
information, whether as a result of new information, future events
or otherwise, other than as required by law.
Table 1: Length weighted gold composites from Island
Mountain
|
|
|
|
|
|
|
HOLE
ID
|
|
FROM
|
TO
|
CORE
LENGTH
(M)
|
AU
(G/T)
|
ZONE
|
IM-18-126
|
|
64.95
|
67.35
|
2.40
|
19.11
|
Shaft
|
|
Including
|
64.95
|
66.30
|
1.35
|
29.40
|
|
|
And
|
66.30
|
66.80
|
0.50
|
9.80
|
|
|
|
83.00
|
85.10
|
2.10
|
27.32
|
|
|
Including
|
83.00
|
83.60
|
0.60
|
34.60
|
|
|
And
|
83.60
|
84.50
|
0.90
|
37.80
|
|
|
|
176.95
|
179.20
|
2.25
|
36.54
|
|
|
Including
|
177.45
|
178.70
|
1.25
|
61.10
|
|
|
|
190.10
|
193.05
|
2.95
|
14.07
|
|
|
Including
|
190.10
|
190.85
|
0.75
|
42.50
|
|
|
|
400.75
|
402.10
|
1.35
|
12.90
|
|
|
|
406.85
|
407.50
|
0.65
|
16.80
|
|
IM-18-127
|
|
25.00
|
25.70
|
0.70
|
4.40
|
Shaft
|
|
|
32.65
|
35.20
|
2.55
|
20.10
|
|
|
|
50.50
|
51.40
|
0.90
|
7.68
|
|
|
|
52.70
|
53.20
|
0.50
|
3.94
|
|
|
|
436.40
|
437.50
|
1.10
|
5.44
|
|
IM-18-128
|
|
254.75
|
255.30
|
0.55
|
4.94
|
Shaft
|
IM-18-129
|
|
42.00
|
42.50
|
0.50
|
15.55
|
|
|
|
55.40
|
56.20
|
0.80
|
77.10
|
|
|
|
77.30
|
78.90
|
1.60
|
5.98
|
|
|
Including
|
77.30
|
78.15
|
0.85
|
9.96
|
|
|
|
126.65
|
127.35
|
0.70
|
9.83
|
|
|
|
139.35
|
139.85
|
0.50
|
5.67
|
|
|
|
140.35
|
140.85
|
0.50
|
4.32
|
|
|
|
141.35
|
141.85
|
0.50
|
5.25
|
|
IM-18-130
|
|
166.20
|
166.70
|
0.50
|
20.60
|
Shaft
|
|
|
211.50
|
212.45
|
0.95
|
13.50
|
|
|
|
355.00
|
357.50
|
2.50
|
5.25
|
|
|
Including
|
355.50
|
356.00
|
0.50
|
12.15
|
|
|
|
371.50
|
375.00
|
3.50
|
10.73
|
|
|
Including
|
371.50
|
373.00
|
1.50
|
20.90
|
|
|
And
|
374.50
|
375.00
|
0.50
|
8.35
|
|
|
|
430.80
|
432.00
|
1.20
|
30.60
|
|
|
|
450.80
|
455.00
|
4.20
|
20.27
|
|
|
Including
|
452.40
|
453.10
|
0.70
|
42.30
|
|
|
And
|
454.15
|
455.00
|
0.85
|
34.90
|
|
|
|
492.00
|
493.00
|
1.00
|
6.40
|
|
|
|
493.80
|
497.60
|
3.80
|
16.09
|
|
|
Including
|
494.40
|
495.40
|
1.00
|
50.40
|
|
|
And
|
496.85
|
497.60
|
0.75
|
8.91
|
|
IM-18-131
|
|
41.20
|
42.00
|
0.80
|
9.28
|
Shaft
|
|
|
95.50
|
96.10
|
0.60
|
6.45
|
|
|
|
100.85
|
108.00
|
7.15
|
4.07
|
|
|
Including
|
101.50
|
102.00
|
0.50
|
11.35
|
|
|
And
|
105.05
|
106.35
|
1.30
|
9.17
|
|
|
And
|
107.50
|
108.00
|
0.50
|
10.15
|
|
|
|
161.10
|
162.00
|
0.90
|
4.90
|
|
|
|
165.25
|
166.00
|
0.75
|
5.97
|
|
|
|
172.30
|
173.30
|
1.00
|
41.30
|
|
|
|
179.65
|
180.50
|
0.85
|
6.02
|
|
IM-18-132
|
No Significant
Assays
|
|
|
|
Shaft
|
IM-18-133
|
|
11.70
|
12.20
|
0.50
|
10.05
|
Shaft
|
|
|
112.50
|
113.05
|
0.55
|
6.41
|
|
|
|
257.00
|
258.00
|
1.00
|
34.20
|
|
|
|
268.05
|
270.25
|
2.20
|
11.45
|
|
|
Including
|
268.05
|
269.40
|
1.35
|
15.55
|
|
|
|
293.90
|
295.70
|
1.80
|
7.66
|
|
|
Including
|
294.85
|
295.70
|
0.85
|
11.30
|
|
IM-18-134
|
|
103.25
|
103.75
|
0.50
|
4.90
|
Shaft
|
|
|
121.30
|
121.80
|
0.50
|
7.84
|
|
|
|
177.25
|
179.70
|
2.45
|
4.86
|
|
|
Including
|
177.75
|
178.50
|
0.75
|
7.97
|
|
IM-18-135
|
|
15.00
|
15.60
|
0.60
|
22.50
|
Shaft
|
|
|
167.70
|
169.85
|
2.15
|
20.77
|
|
|
Including
|
167.70
|
168.30
|
0.60
|
29.90
|
|
|
And
|
169.00
|
169.85
|
0.85
|
30.90
|
|
|
|
211.50
|
213.65
|
2.15
|
23.66
|
|
|
Including
|
211.50
|
212.25
|
0.75
|
54.50
|
|
IM-18-136
|
|
13.80
|
16.05
|
2.25
|
6.13
|
Shaft
|
|
Including
|
14.30
|
14.90
|
0.60
|
7.87
|
|
|
And
|
15.40
|
16.05
|
0.65
|
9.26
|
|
|
|
89.80
|
90.30
|
0.50
|
10.20
|
|
|
|
112.55
|
114.45
|
1.90
|
4.62
|
|
|
|
159.55
|
160.05
|
0.50
|
10.15
|
|
|
|
172.20
|
173.10
|
0.90
|
5.25
|
|
|
|
187.50
|
188.25
|
0.75
|
34.70
|
|
|
|
220.55
|
221.20
|
0.65
|
10.70
|
|
|
|
342.00
|
343.50
|
1.50
|
41.92
|
|
|
Including
|
342.00
|
342.50
|
0.50
|
120.00
|
|
IM-18-137
|
|
13.60
|
14.65
|
1.05
|
33.93
|
Shaft
|
|
Including
|
14.10
|
14.65
|
0.55
|
62.20
|
|
|
|
79.45
|
79.95
|
0.50
|
17.30
|
|
|
|
130.10
|
131.40
|
1.30
|
35.59
|
|
|
Including
|
130.10
|
130.60
|
0.50
|
73.10
|
|
|
|
307.80
|
308.50
|
0.70
|
26.20
|
|
|
|
312.70
|
314.00
|
1.30
|
7.26
|
|
|
|
318.80
|
319.30
|
0.50
|
6.47
|
|
|
|
321.20
|
322.00
|
0.80
|
4.24
|
|
|
|
344.20
|
346.50
|
2.30
|
27.66
|
|
|
Including
|
344.20
|
345.30
|
1.10
|
34.60
|
|
IM-18-138
|
|
18.75
|
19.55
|
0.80
|
3.88
|
Shaft
|
|
|
106.60
|
107.10
|
0.50
|
127.50
|
|
|
|
140.35
|
141.75
|
1.40
|
17.61
|
|
|
Including
|
141.00
|
141.75
|
0.75
|
25.20
|
|
|
|
164.85
|
165.35
|
0.50
|
9.38
|
|
|
|
173.10
|
174.05
|
0.95
|
3.92
|
|
|
|
197.35
|
199.80
|
2.45
|
18.56
|
|
|
Including
|
197.35
|
198.50
|
1.15
|
33.90
|
|
|
And
|
199.20
|
199.80
|
0.60
|
10.20
|
|
|
|
207.10
|
208.00
|
0.90
|
4.32
|
|
|
|
208.75
|
209.75
|
1.00
|
26.30
|
|
|
|
231.25
|
233.75
|
2.50
|
12.28
|
|
|
Including
|
231.25
|
232.05
|
0.80
|
21.80
|
|
|
And
|
232.80
|
233.75
|
0.95
|
13.95
|
|
IM-18-139
|
|
26.50
|
27.00
|
0.50
|
14.80
|
Shaft
|
|
|
37.75
|
38.25
|
0.50
|
5.68
|
|
|
|
92.25
|
92.75
|
0.50
|
5.34
|
|
|
|
120.00
|
120.50
|
0.50
|
14.55
|
|
IM-18-140
|
|
30.80
|
33.60
|
2.80
|
6.31
|
Shaft
|
|
Including
|
32.15
|
33.10
|
0.95
|
10.40
|
|
|
|
173.80
|
176.00
|
2.20
|
5.40
|
|
|
Including
|
175.00
|
176.00
|
1.00
|
7.33
|
|
|
|
307.00
|
310.10
|
3.10
|
5.68
|
|
|
Including
|
307.90
|
308.80
|
0.90
|
14.05
|
|
IM-18-141
|
|
152.75
|
153.85
|
1.10
|
5.84
|
Shaft
|
|
|
161.75
|
163.00
|
1.25
|
4.01
|
|
|
|
263.50
|
264.00
|
0.50
|
23.20
|
|
IM-18-142
|
|
279.50
|
280.20
|
0.70
|
8.13
|
Shaft
|
|
|
283.50
|
285.20
|
1.70
|
6.61
|
|
|
Including
|
283.50
|
284.00
|
0.50
|
11.00
|
|
|
And
|
284.70
|
285.20
|
0.50
|
8.97
|
|
|
|
348.80
|
349.40
|
0.60
|
10.35
|
|
|
|
356.90
|
360.00
|
3.10
|
15.05
|
|
|
|
356.90
|
357.40
|
0.50
|
7.43
|
|
|
|
358.10
|
358.75
|
0.65
|
62.20
|
|
IM-18-143
|
|
136.25
|
137.25
|
1.00
|
11.10
|
Shaft
|
IM-18-144
|
|
27.85
|
32.20
|
4.35
|
21.27
|
Shaft
|
|
Including
|
27.85
|
29.00
|
1.15
|
27.40
|
|
|
And
|
29.00
|
30.20
|
1.20
|
11.15
|
|
|
And
|
30.20
|
31.60
|
1.40
|
26.80
|
|
|
And
|
31.60
|
32.20
|
0.60
|
16.85
|
|
IM-18-145
|
|
58.00
|
61.50
|
3.50
|
5.71
|
Mosquito
Creek
|
|
Including
|
58.00
|
59.00
|
1.00
|
7.47
|
|
|
And
|
60.00
|
61.00
|
1.00
|
6.32
|
|
|
And
|
61.00
|
61.50
|
0.50
|
8.28
|
|
|
|
70.00
|
71.50
|
1.50
|
6.71
|
|
IM-18-146
|
|
150.85
|
157.90
|
7.05
|
42.61
|
Mosquito
Creek
|
|
Including
|
151.40
|
152.00
|
0.60
|
256.00
|
|
|
And
|
152.00
|
153.15
|
1.15
|
15.80
|
|
|
And
|
153.15
|
153.70
|
0.55
|
10.45
|
|
|
And
|
154.20
|
155.20
|
1.00
|
11.50
|
|
|
And
|
155.20
|
155.80
|
0.60
|
21.70
|
|
|
And
|
155.80
|
156.70
|
0.90
|
98.60
|
|
IM-18-147
|
|
104.70
|
106.00
|
1.30
|
11.95
|
Mosquito
Creek
|
|
|
109.00
|
111.60
|
2.60
|
4.59
|
|
|
Including
|
109.00
|
110.00
|
1.00
|
6.47
|
|
IM-18-148
|
|
25.55
|
27.60
|
2.05
|
34.50
|
Shaft
|
|
Including
|
26.55
|
27.60
|
1.05
|
60.30
|
|
|
|
134.90
|
141.45
|
6.55
|
12.44
|
|
|
Including
|
134.90
|
136.05
|
1.15
|
16.20
|
|
|
And
|
139.20
|
139.70
|
0.50
|
45.60
|
|
|
And
|
140.35
|
141.45
|
1.10
|
26.10
|
|
|
|
360.00
|
361.00
|
1.00
|
468.00
|
|
|
|
439.30
|
442.50
|
3.20
|
6.79
|
|
|
Including
|
440.70
|
441.70
|
1.00
|
9.55
|
|
|
And
|
441.70
|
442.50
|
0.80
|
11.10
|
|
IM-18-149
|
|
53.40
|
54.10
|
0.70
|
36.40
|
Shaft
|
|
|
115.15
|
117.75
|
2.60
|
18.25
|
|
|
Including
|
115.15
|
115.85
|
0.70
|
26.40
|
|
|
And
|
115.85
|
116.55
|
0.70
|
21.10
|
|
|
And
|
117.25
|
117.75
|
0.50
|
26.70
|
|
|
|
172.15
|
173.20
|
1.05
|
6.37
|
|
IM-18-150
|
|
135.50
|
136.15
|
0.65
|
7.14
|
Shaft
|
|
|
196.40
|
200.40
|
4.00
|
15.27
|
|
|
Including
|
197.20
|
198.00
|
0.80
|
19.00
|
|
|
And
|
198.65
|
199.20
|
0.55
|
20.80
|
|
|
And
|
199.20
|
199.90
|
0.70
|
32.90
|
|
|
|
373.00
|
373.75
|
0.75
|
7.78
|
|
IM-18-151
|
|
81.25
|
81.75
|
0.50
|
5.95
|
Shaft
|
|
|
101.15
|
102.85
|
1.70
|
79.01
|
|
|
Including
|
101.15
|
101.85
|
0.70
|
147.50
|
|
|
And
|
101.85
|
102.35
|
0.50
|
59.20
|
|
|
|
495.60
|
497.00
|
1.40
|
13.21
|
|
|
Including
|
496.30
|
497.00
|
0.70
|
16.45
|
|
|
|
555.50
|
556.00
|
0.50
|
4.22
|
|
|
|
573.10
|
574.65
|
1.55
|
14.69
|
|
|
Including
|
573.10
|
573.70
|
0.60
|
31.50
|
|
|
|
604.50
|
608.25
|
3.75
|
12.42
|
|
|
Including
|
604.50
|
605.00
|
0.50
|
12.35
|
|
|
And
|
607.65
|
608.25
|
0.60
|
58.80
|
|
|
|
621.60
|
622.20
|
0.60
|
20.30
|
|
|
|
646.70
|
647.60
|
0.90
|
14.90
|
|
|
|
671.90
|
672.40
|
0.50
|
7.22
|
|
|
|
682.55
|
683.15
|
0.60
|
7.20
|
|
|
|
684.15
|
684.65
|
0.50
|
5.16
|
|
|
|
692.55
|
693.05
|
0.50
|
5.96
|
|
IM-18-152
|
|
154.00
|
155.00
|
1.00
|
5.03
|
Shaft
|
|
|
358.00
|
358.50
|
0.50
|
12.30
|
|
|
|
462.00
|
463.25
|
1.25
|
19.80
|
|
|
|
472.00
|
472.50
|
0.50
|
5.82
|
|
|
|
475.50
|
476.00
|
0.50
|
5.06
|
|
|
|
510.00
|
513.00
|
3.00
|
4.69
|
|
|
Including
|
512.50
|
513.00
|
0.50
|
7.67
|
|
|
|
561.30
|
564.00
|
2.70
|
5.59
|
|
|
|
570.00
|
570.50
|
0.50
|
25.50
|
|
|
|
572.50
|
573.00
|
0.50
|
20.30
|
|
|
|
581.30
|
582.00
|
0.70
|
62.30
|
|
|
|
585.00
|
586.20
|
1.20
|
8.50
|
|
|
|
588.00
|
590.50
|
2.50
|
3.57
|
|
|
|
628.00
|
628.80
|
0.80
|
8.99
|
|
|
|
657.20
|
657.70
|
0.50
|
8.02
|
|
|
|
667.55
|
671.40
|
3.85
|
23.70
|
|
|
Including
|
667.55
|
668.20
|
0.65
|
120.50
|
|
|
And
|
668.20
|
669.00
|
0.80
|
6.89
|
|
|
And
|
670.60
|
671.40
|
0.80
|
8.14
|
|
|
|
691.60
|
692.40
|
0.80
|
5.81
|
|
IM-18-153
|
|
91.20
|
91.70
|
0.50
|
6.74
|
Shaft
|
|
|
138.60
|
139.35
|
0.75
|
23.20
|
|
IM-18-154
|
|
97.60
|
98.60
|
1.00
|
8.26
|
Shaft
|
|
|
151.40
|
155.45
|
4.05
|
10.42
|
|
|
Including
|
151.40
|
152.25
|
0.85
|
14.05
|
|
|
And
|
154.95
|
155.45
|
0.50
|
45.40
|
|
|
|
162.65
|
163.40
|
0.75
|
6.03
|
|
|
|
165.00
|
169.40
|
4.40
|
17.96
|
|
|
Including
|
165.00
|
165.50
|
0.50
|
7.17
|
|
|
And
|
165.50
|
166.00
|
0.50
|
12.30
|
|
|
And
|
166.00
|
166.50
|
0.50
|
40.40
|
|
|
And
|
166.50
|
167.15
|
0.65
|
28.20
|
|
|
And
|
167.15
|
167.90
|
0.75
|
8.47
|
|
|
And
|
167.90
|
168.85
|
0.95
|
23.80
|
|
|
And
|
168.85
|
169.40
|
0.55
|
3.26
|
|
|
|
174.90
|
176.25
|
1.35
|
50.80
|
|
IM-18-155
|
|
150.75
|
152.25
|
1.50
|
6.32
|
Mosquito
Creek
|
|
|
165.50
|
166.75
|
1.25
|
8.89
|
|
IM-18-156
|
|
86.20
|
88.30
|
2.10
|
38.50
|
Shaft
|
|
Including
|
87.30
|
88.30
|
1.00
|
68.30
|
|
|
|
153.35
|
154.25
|
0.90
|
6.89
|
|
|
|
215.10
|
215.60
|
0.50
|
5.91
|
|
IM-18-157
|
|
41.40
|
42.15
|
0.75
|
10.10
|
Shaft
|
|
|
104.00
|
104.50
|
0.50
|
4.52
|
|
|
|
109.00
|
109.50
|
0.50
|
8.10
|
|
|
|
146.40
|
146.90
|
0.50
|
4.77
|
|
|
|
182.30
|
182.80
|
0.50
|
125.50
|
|
|
|
186.50
|
187.50
|
1.00
|
29.60
|
|
|
|
192.50
|
193.50
|
1.00
|
4.17
|
|
|
|
194.65
|
195.15
|
0.50
|
31.10
|
|
|
|
214.80
|
216.50
|
1.70
|
10.45
|
|
|
Including
|
215.40
|
216.50
|
1.10
|
12.05
|
|
IM-18-158
|
|
227.65
|
229.45
|
1.80
|
5.28
|
Mosquito
Creek
|
|
|
227.65
|
228.15
|
0.50
|
7.76
|
|
|
|
250.50
|
251.00
|
0.50
|
4.78
|
|
IM-18-159
|
|
107.00
|
107.60
|
0.60
|
4.74
|
Mosquito
Creek
|
|
|
126.50
|
127.70
|
1.20
|
17.60
|
|
IM-18-160
|
|
318.55
|
322.10
|
3.55
|
6.08
|
Shaft
|
|
Including
|
320.65
|
322.10
|
1.45
|
12.25
|
|
|
|
414.95
|
415.50
|
0.55
|
6.32
|
|
|
|
416.55
|
420.50
|
3.95
|
20.46
|
|
|
Including
|
416.55
|
417.10
|
0.55
|
20.80
|
|
|
And
|
417.85
|
418.90
|
1.05
|
51.50
|
|
|
And
|
418.90
|
419.75
|
0.85
|
9.13
|
|
|
And
|
419.75
|
420.50
|
0.75
|
10.05
|
|
IM-18-161
|
No Significant
Assays
|
|
|
|
Shaft
|
True widths are
estimated to be 50 to 75% of reported core length intervals.
Intervals not recovered by drilling were assigned zero grade. Top
cuts have not been applied to high grade assays.
|
Table 2: Drillhole Collar Orientations:
HOLE
ID
|
AZIMUTH
|
DIP
|
IM-18-126
|
134
|
-60
|
IM-18-127
|
132
|
-62
|
IM-18-128
|
120
|
-65
|
IM-18-129
|
155
|
-61
|
IM-18-130
|
131
|
-62
|
IM-18-131
|
131
|
-54
|
IM-18-132
|
134
|
-62
|
IM-18-133
|
143
|
-58
|
IM-18-134
|
130
|
-56
|
IM-18-135
|
125
|
-56
|
IM-18-136
|
142
|
-59
|
IM-18-137
|
147
|
-56
|
IM-18-138
|
141
|
-44
|
IM-18-139
|
130
|
-48
|
IM-18-140
|
150
|
-63
|
IM-18-141
|
133
|
-62
|
IM-18-142
|
136
|
-65
|
IM-18-143
|
143
|
-63
|
IM-18-144
|
132
|
-63
|
IM-18-145
|
125
|
-42
|
IM-18-146
|
132
|
-61
|
IM-18-147
|
133
|
-54
|
IM-18-148
|
127
|
-56
|
IM-18-149
|
142
|
-57
|
IM-18-150
|
147
|
-50
|
IM-18-151
|
135
|
-58
|
IM-18-152
|
131
|
-56
|
IM-18-153
|
146
|
-63
|
IM-18-154
|
125
|
-65
|
IM-18-155
|
136
|
-47
|
IM-18-156
|
165
|
-53
|
IM-18-157
|
136
|
-47
|
IM-18-158
|
314
|
-46
|
IM-18-159
|
314
|
-60
|
IM-18-160
|
139
|
-58
|
IM-18-161
|
133
|
-59
|
SOURCE Barkerville Gold Mines Ltd.