04 February 2025
Helix Exploration
PLC
("Helix Exploration" or
"Helix" or the "Company")
Acidisation of Clink
#1
and
Operational
Update
Helix Exploration, the helium
exploration and development company with near-term production
assets within the Montana Helium Fairway, is pleased to announce
that it will commence re-entry and acidisation of Clink #1, and has
commissioned Petroleum Consultants LLC to oversee contractor
services.
Highlights:
· Acidisation of Clink #1 well to commence mid-February
2025
· Re-entry and acidisation to take circa. 10 days from
commencement
· Acidisation will test capacity to stimulate flow from the
Charles Formation
· Contractor services to be overseen by Petroleum Consultants
LLC
· Additional production wells being surveyed at Rudyard for
drilling in Q2 2025
Bo
Sears, CEO of Helix Exploration, commented:
"While our recent focus has been on the rapid
commercialisation of the Rudyard Project, we remain committed to
the significant potential of Ingomar Dome, and the promising helium
and hydrogen indications seen at Clink #1. Following the successful
closure of our non-discounted placing to raise £5 million, we are
now fully funded to bring Rudyard into production in the coming
months, with excess capital to fund growth projects. This enables
us to commence acidisation at Clink #1, a highly cost-effective
method to test the production potential of the Charles Formation by
removing near-wellbore damage caused by heavy muds. We are looking
forward to updating the market in due course."
Background
Operations are due to commence
shortly on the acidisation of the Clink #1 well to stimulate and
flow test the Charles Formation. The Charles Formation, a
limestone reservoir, is expected to respond well to stimulation
with hydrochloric acid. The Company is confident in the
reservoir properties of the Charles Formation, based on drill
cuttings that demonstrated visible porosity, gas shows including
helium, and pulsed neutron wire-line logs indicating reservoir
quality.
Further confidence is derived from
the interpretation of pressure build-up data from our initial flow
test attempt in November 2024. Following the initial swabbing of
the Charles perforation interval, a decision was made to pump into
the perforations to confirm the presence of an open flow path,
ensuring no plugged tubing and correct packer depth. The pump-in
test indicated a pressure break at approximately 1,800 psi,
equivalent to around 0.8 psi/ft, consistent with the normal
fracture gradient. The significant difference in pressure build-up
before and after the pump-in test suggests that the induced minor
fracture created a flow path to virgin reservoir. However, this was
insufficient for sustained flow as the fracture healed quickly. The
subsequent acid treatment is expected to remove drilling fluid
permeability blockages near the wellbore and establish open flow
paths.
Acidisation of the Charles Formation
is expected to commence in mid-February 2025, depending on local
weather conditions, with flow rate results available approximately
ten days from the commencement of operations. Results of the flow
testing will be announced alongside assay results of any gas
recovered from the operation.
Rudyard
Helix management have recently
conducted a site visit to Darwin #1 wellhead and proposed initial
plant location. The visit allowed the Company to advance
discussions with Hill Country Electric regarding power provision,
as well as inspecting pipeline routes from the wellhead to the
plant-site. Helix management have also met with various
landowners and service providers local to the Rudyard area who
could expediate development into production.
The Company has commenced surveying
the location of the next production wells at Rudyard. New
wells, along with the Darwin #1 well drilled in November 2024, will
increase supply of raw helium gas to the processing
plant. Drilling is targeted to commence in early Q2 2025 when
warmer temperatures reduce drilling costs.
This announcement contains inside
information for the purposes of the UK Market Abuse Regulation, and
the Directors of the Company are responsible for the release of
this announcement.
Enquiries
Helix Exploration
Cairn - Nominated Adviser
Liam Murray
|
+44 (0)20 7213 0880
|
Ludovico Lazzaretti
|
|
James Western
|
|
Hannam & Partners - Joint Broker
Neil Passmore
|
+44 (0)20 7907 8502
|
|
Spencer Mignot
|
|
|
SI
Capital - Joint Broker
|
|
Nick Emerson
|
+44 (0)14 8341 3500
|
Renato Rufus
|
|
OAK
Securities - Joint Broker
Jerry Keen
|
+44 (0)20 3973 3678
|
Henry Clark
|
|
Tavira Securities - Joint Broker
Chris Kipling
Oliver Stansfield
Jonathan Evans
|
+44 (0)20 7100 5100
|
Camarco - Financial PR
Notes to Editors
Helix Exploration is a helium
exploration company focused on the exploration and
development of helium deposits within the 'Montana Helium
Fairway'. Founded by industry experts with extensive
experience of helium systems in the US, the Company listed in April
2024 raising £7.5 million from an offer book of over £22
million.
The Company has drilled two wells on
two assets in 2024. Darwin #1 well at Rudyard Project tested
236ft in the Souris and Red River formations, flowing 2,750 Mcf/day
at 1.1% helium. Rudyard field can
support multiple production wells and has potential to generate net
revenue of $115 - $220 million over a 12 - 14 year life of
field.
Clink #1 well at Ingomar Dome
Project recovered gas samples from the Flathead Formation assayed
at 55.2% Hydrogen in gas sample isolated from drilling mud and 2.5%
helium in gas sample recovered from the reservoir. Gas
samples demonstrate helium and hydrogen potential with additional
stimulation required to potentially generate commercial flow rates
in Flathead and Charles formations.
Helix Exploration is focussed on
early production at the Rudyard Projects, taking advantage of
existing infrastructure and low-cost processing to target first gas
production in 2025. Helix is committed to open and
transparent communication with investors and the wider market as
the project progresses through development into
production.
The Company's Admission Document,
and other information required pursuant to AIM Rule 26, is
available on the Company's website at https://www.helixexploration.com/.
Caution regarding forward looking statements
Certain statements in this
announcement, are, or may be deemed to be, forward looking
statements. Forward looking statements are identified by their use
of terms and phrases such as ''believe'', ''could'', "should"
''envisage'', ''estimate'', ''intend'', ''may'', ''plan'',
''potentially'', "expect", ''will'' or the negative of those,
variations or comparable expressions, including references to
assumptions. These forward-looking statements are not based on
historical facts but rather on the Directors' current expectations
and assumptions regarding the Company's future growth, results of
operations, performance, future capital and other expenditures
(including the amount, nature and sources of funding thereof),
competitive advantages, business prospects and opportunities. Such
forward looking statements reflect the Directors' current beliefs
and assumptions and are based on information currently available to
the Directors.