Significant activity toward the initial Feasibility Study for the Salamanca 
Uranium Project (SUP) took place over the last quarter. Encouraging progress in 
all project areas has been achieved. Work focused mainly on tank leach 
metallurgical test work and Reverse Circulation (RC) drilling aimed at upgrading 
and extending the Mineral Resources announced in the first quarter. 
 
The highlights for the quarter: 
 
1.  Uranium recoveries up to 94% from metallurgical tank leach tests for 
composite samples from Sageras, Palacios and Alameda South with a relatively 
coarse grind and low acid consumption 
2.  Recoveries of up to 87% U3O8 in Bottle Roll Leach Test work (BRT) simulating 
heap leach characteristics in advance of the column leach test work 
3.  The Exploitation Plan for the SUP which includes the mining plan, 
reclamation plan, environmental and radiological study was completed and has 
been submitted to Berkeley's JV partner ENUSA 
4.  Commencement of the RC drilling program at Sageras, Palacios and Alameda 
South to upgrade resource categories and test for possible extensions. The 
8,000m programme was 45% complete by the end of the quarter.  Results to date 
confirm the resource models and have identified additional potential at Sageras 
where two holes have discovered a new mineralised zone, and at Alameda where 
initial chemical assay results are better than expected 
5.  Updated resources for Sageras and Alameda South and new pit optimisations 
and production schedules will be finalised in the 3rd quarter 
6.  The environmental and radiological baseline studies are approximately 60% 
complete and scheduled to be completed in the 4th quarter 
7.  Approximately five tonnes of "representative" core samples were selected for 
dispatch to SGS in Perth for column leach test work 
8.  A combined RC drilling and diamond drilling programme was planned and 
submitted to the Mines Department for the Retortillo and Santidad deposits 
 
Berkeley Managing Director, Mr. Ian Stalker commented "The quarter has been an 
extremely productive period as we progressed the Salamanca Uranium Project. The 
very encouraging tank leach results indicating high recoveries at a coarse grind 
and low acid consumption add to our knowledge and assist in project design 
criteria and equipment selection. The infill resource and extension RC drilling 
programme is nearly 50% complete. The initial results are providing upside to 
the existing resource models and equally importantly enable upgrading of the 
Inferred resources at Alameda and Sageras." 
 
Enquiries -       Managing Director:       Ian Stalker               Tel:  +34 
608 221 497 
                        RBC Capital Markets:   Martin Eales            Tel: +44 
20 7029 7881 
 
 
Salamanca Uranium Project Feasibility Study 
Work towards the initial Feasibility Study is progressing well and is scheduled 
to be completed by the end of the year.  The Feasibility Study is focussing on a 
tank leach scenario using the Quercus Plant to produce 2.1mlbs U3O8 per year 
from the Sageras, Palacios and Alameda South deposit. The aim is to complete the 
study by the end of the year.  Simultaneously, work is progressing to assess the 
heap leach options for these deposits and the satellite deposits at Retortillo. 
 
1. Drilling Programmes 
 
Diamond and RC drilling operated continuously during the quarter for a total of 
5,199 metres (Table 1) at Alameda South, Sageras and Palacios.  At the end of 
the quarter, four RC rigs and one diamond rig were operating. 
 
                      Table 1 - 2nd Quarter Drilling Totals 
+----------+-----+-----+-------+-------+-------+-------+ 
| Deposit  |  Q2 Drill Holes   |    Q2 Drill Metres    | 
+----------+-------------------+-----------------------+ 
|          |DDH  | RC  |TOTAL  |  DDH  |  RC   |Total  | 
+----------+-----+-----+-------+-------+-------+-------+ 
| Alameda  |  8  | 21  |  29   |  885  |2,182  |3,067  | 
| South    |     |     |       |       |       |       | 
+----------+-----+-----+-------+-------+-------+-------+ 
| Palacios |  1  |  0  |  1    |  78   |  0    |  78   | 
| North    |     |     |       |       |       |       | 
+----------+-----+-----+-------+-------+-------+-------+ 
| Sageras  | 10  | 20  |  30   |  782  |1,271  |2,053  | 
+----------+-----+-----+-------+-------+-------+-------+ 
| Total    | 19  | 41  |  60   |1,746  |3,453  |5,199  | 
+----------+-----+-----+-------+-------+-------+-------+ 
 
This work addressed several objectives, as detailed below. 
Heap Leach Metallurgical diamond drilling - approximately 1,100 metres of large 
diameter PQ diamond drilling at Sageras and Alameda was completed in May to 
generate additional material for metallurgical test work.  These holes were not 
included in the Mineral Resource Estimates announced in the first quarter but 
the e-grades correlate well with the resource models and provide further 
confirmation of the historical drilling data. 
 
RC Drilling- approximately 8,000 metres of planned RC drilling commenced in June 
with the following objectives: 
 
·To upgrade the current resource classifications from Indicated to Measured and 
from Inferred to Indicated 
·To test for lateral and depth extensions of current resources 
·To test a number of high priority targets identified by surface mapping and 
ground radiometrics, proximal to the existing resources 
·To complete sterilisation drilling of the area to the north of Sageras where 
the conceptual waste dump and crushing facility have been located 
This programme was approximately 45% complete by the end of the quarter and is 
scheduled to finish in early August.  All of the RC samples are being sent to 
ALS Chemex in Vancouver for chemical analysis after preparation at the ALS 
Chemex laboratory in Seville.  Down hole gamma readings are used to select the 
anomalous intervals to assay and the calculated e-grades on the completed holes 
are showing very good correlation with the resource model. 
The initial chemical assay results indicate potential upside to the resource 
model at Alameda South with some high grade intersections returned in holes 
ASR-029 (28 - 63m, 35m @ 2,044ppm U3O8), ASR-031 (29 - 55m, 26m @ 3,923ppm U3O8) 
and ASR-032 (22 - 40m, 18m @ 1,401ppm U3O8). 
At Sageras, two RC holes have identified a new mineralised zone that appears to 
be open to the north-west.  Hole ZRC-012 intersected very high grade 
mineralisation from 44m depth over a 3 metre interval grading 7,027ppm U3O8. 
This intersection will be followed up by further RC drilling in the next 
quarter. 
A list of notable intersections for the quarter is shown in Table 2.  The 
diamond drill holes are presented as eU3O8 grades calculated from down hole 
radiometrics whereas the RC holes are presented as U3O8 chemical assays. 
                        Table 2 - Notable Intersections 
+---------+---------+------+------+----------+-------+ 
|Deposit  |  Hole   |From  |  To  |Interval  |eU3O8  | 
|         |   ID    |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
|         |         | (m)  | (m)  |   (m)    |(ppm)  | 
+---------+---------+------+------+----------+-------+ 
| Alameda |ASD-020  |22.7  |24.7  |   1.9    |4,814  | 
| South   |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
| Alameda |ASD-021  |16.5  |21.9  |   5.4    |2,439  | 
| South   |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
| Alameda |ASD-023  |37.3  |42.6  |   5.3    |3,142  | 
| South   |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
|         |         |68.3  |71.0  |   2.7    |1,934  | 
+---------+---------+------+------+----------+-------+ 
| Alameda |ASD-024  |73.4  |83.6  |  10.2    |1,048  | 
| South   |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
| Alameda |ASD-026  |30.8  |41.7  |  10.9    |1,047  | 
| South   |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
|         |         |92.8  |98.2  |   5.4    |1,239  | 
+---------+---------+------+------+----------+-------+ 
| Alameda |ASD-027  |62.3  |67.3  |   5.0    |1,086  | 
| South   |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
| Sageras |SGD-020  |21.9  |24.1  |   2.2    |3,747  | 
+---------+---------+------+------+----------+-------+ 
|         |         |25.2  |28.8  |   3.6    |4,925  | 
+---------+---------+------+------+----------+-------+ 
| Sageras |SGD-021  |47.3  |49.0  |   1.7    |2,963  | 
+---------+---------+------+------+----------+-------+ 
|         |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
|Deposit  |  Hole   |From  |  To  |Interval  | U3O8  | 
|         |   ID    |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
|         |         | (m)  | (m)  |   (m)    |(ppm)  | 
+---------+---------+------+------+----------+-------+ 
| Alameda |ASR-029  |  28  |  63  |    35    |2,044  | 
| South   |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
| Alameda |ASR-031  |  29  |  55  |    26    |3,923  | 
| South   |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
| Alameda |ASR-032  |  22  |  40  |    18    |1,401  | 
| South   |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
| Sageras |ZMR-012  |  38  |  42  |    4     |1,461  | 
| West    |         |      |      |          |       | 
+---------+---------+------+------+----------+-------+ 
|         |         |  44  |  47  |    3     |7,027  | 
+---------+---------+------+------+----------+-------+ 
|         |         |  63  |  71  |    8     |1,716  | 
+---------+---------+------+------+----------+-------+ 
 
A full table of intersections for the quarter is included in the Appendix.  They 
have been calculated using a nominal 200ppm lower cut-off and a minimum 
thickness of at least 1m.  All intersections correlate well with the historical 
drill hole data in both thickness, location down the hole and grade. 
 
 
 
2. Metallurgical Test Work 
During the quarter further representative samples taken from diamond drill core 
from the Palacios, Sageras and Alameda South deposits were sent to the SGS 
Metallurgical laboratories in Perth, Australia to continue the ongoing testwork 
supervised by Orway Mineral Consultants Pty Ltd of Australia. 
 
The first phase of the testwork campaign commenced in March 2010 and has been 
focused on optimising the process conditions for treating the uranium ore 
lithologies at Sageras, Palacios and Alameda in a tank leach configuration. 
Phase 1 is scheduled to be completed in the 3rd quarter 2010 with the following 
testwork in progress: 
 
1    Preliminary mineralogy on various ore types 
2    Comminution (crushing and grinding) 
3    Tank leaching 
4    Heap leaching 
5    Engineering Data 
6    Geotechnical and geochemical testing of the final process residues and 
7    Effluent neutralisation 
 
The initial results can be found in the Berkeley announcement - "Metallurgical 
testwork update" released on the 7 June 2010. 
 
Mineralogy 
 
QEMSCAN mineralogy on composites of the ores from Sageras, Palacios and Alameda 
has revealed: 
1   The Sageras uranium minerals have a finer grain structure (< 20 microns) and 
are predominantly coffinite with a lesser quantity of uraninite 
2   In Palacios, the uranium minerals have a coarse grain structure (20 - 50 
micron) with uraninite dominating and lesser quantities of coffinite, often 
intergrown 
3   The Alameda uranium minerals are medium grained in between Sageras and 
Palacios in grain size and have an almost equal distribution between uraninite 
and coffinite 
 
On the basis of these results, Palacios has the best leaching characteristics 
probably because the uraninite is more amenable to leaching than coffinite and 
coarser grains have more exposed surfaces available to leaching. 
 
Comminution 
 
A second batch of metallurgical test work samples consisting of 1,274kg of 
diamond drill core was sent to SGS in June for detailed comminution test work. 
This followed a review of the historical comminution flow sheet which showed 
that a significant uranium concentration can be achieved in a crushing and wet 
scrubbing process.  This test work commenced during the quarter and is aimed at 
determining additional comminution data associated with crushing, scrubbing and 
ball milling. In conjunction with this test work, other physical concentration 
and gravimetric processes will be examined.  These include: 
1   flotation (oxide and sulphide) 
2   spirals 
3   various gravity processes 
 
Agitated Tank Leaching 
 
Leach tests are on going on bulk composite samples: 
4   Alameda and Palacios continue to yield high leach extractions of uranium of 
93 - 94% in batch leaches with modest sulphuric acid consumptions of 18 - 23 
kg/tonne of ore 
5   The leach extractions for the Sageras composite are typically 87 - 88% at 
acid consumptions below 10 kg/t 
6   All the above results have been achieved at a grind size of P100 1.5 mm, at 
a temperature of 20ºC with very low oxidant requirements of 1 - 2 kg/tonne of 
commercial pyrolusite 
7   The leach-end slurries were amenable to vacuum belt filtration with 
acceptable treatment rates.  This development will permit the disposal of "dry 
tailings" resulting in reduced environmental issues 
 
Bottle Roll Leach Tests (BRT) 
 
During the quarter a parallel static heap leach test work programme commenced to 
explore the amenability of ore to heap leach. This work started with a suite of 
intermittent bottle roll tests as a precursor to future column tests, scheduled 
to start in the 3rd quarter. 
The initial bottle roll test have provided an encouraging response for all ores 
with Sageras at 82%, Palacios at 85% and Alameda at 87% average extractions of 
uranium. 
The consulting group Kappes Cassidy are supervising the heap leach test work 
after selecting over 5,000kg of diamond drill core from the Alameda South 
deposit.  This material will be dispatched to SGS Perth in July.  The first one 
metre column tests are due to start in August with initial results expected in 
October. 
3. Environmental Studies 
 
One of the most important components of the Feasibility Study is to establish 
the Environmental Baseline Study conditions at all of the project sites.  This 
work is being co-ordinated by Golder Associates with most of the studies 
commencing during the 1st quarter.  In general, the work is progressing very 
well with regular monitoring continuing during the quarter and it is on track to 
be completed by the end of the year. 
 
10 Land-use and landscape. Berkeley retained AIA Consultants to perform the 
landscape characterisation study. The study commenced in March and the final 
report is due by the end of July. A soil sampling program was initiated and 
samples were collected in May. The samples are being analysed at the laboratory 
of the University of Cantabria for a comprehensive suite of parameters 
11 Climate and Meteorology. A weather station has been installed by INGEMISA in 
Alameda and it is now working as intended with data being collected and managed 
by INGEMISA. Historical data will be purchased for nearby weather stations from 
AEMET (Agencia Estatal de Meterologia). Several locations have also been 
selected at Aldea del Obispo, Castillejo de Martín Viejo, Ciudad Rodrigo, 
Fuentes de Oñoro, Gallegos de Argañán, Saelices el Chico and Villar de Argañán. 
Work is progressing as planned 
12 Air Quality. The air quality monitoring program has been developed based on 9 
preliminary monitoring points for sedimentable particles (6 in Sageras and 
Palacios and 3 in Alameda).  Scheduled monitoring of dust particles will 
commence once the agreements with the landowners have been cleared. Samples will 
be analysed at INTERLAB for physical/chemical parameters and at EICHROM for 
radiological parameters 
13 Noise. The noise monitoring program has been planned based on a total of 18 
monitoring points for baseline noise levels, 12 in Sageras and Palacios and 6 in 
Alameda. The first monitoring campaign was completed by Berkeley and Golder in 
April and the next monitoring campaign will be performed in October. 
14 Surface Water Quality. The surface monitoring program has been developed 
based on a total of 7 surface water monitoring points in the area of Sageras and 
Palacios and 3 surface monitoring points in Alameda. Monitoring is being 
undertaken by Berkeley under the supervision of Golder Associates and sample 
analysis is done by AGQ laboratories in Sevilla. The first monitoring campaign 
was performed in February with ongoing bi-monthly sampling programmes. The 
results from the first campaign indicate no relevant affection of surface water. 
In addition, samples of the ENUSA discharge has been taken and sent for analysis 
15 Groundwater Quality. The groundwater monitoring programme includes publicly 
available information from wells and springs in nearby villages. In addition, 
Golder has established 6 groundwater monitoring points in the area of Sageras 
and Palacios and 3 groundwater monitoring points in Alameda. Monitoring is being 
undertaken on a quarterly basis during 2010 with the first campaign completed at 
the end of March. Sampling and analysis of groundwater is continuing as planned 
16 Flora and Fauna. 
o The study concerning aquatic flora, fauna and sediments studies has been 
appointed to IPROMA SL. The scope of works includes surveying and sampling in 
Alameda, Sageras and Palacios 
o The study concerning vegetation and flora studies for the areas of Alameda and 
Sageras/Palacios has been appointed to the Catedratico Botanical University of 
Salamanca. A literature study over the areas was performed in March/April and 
the field campaign started in April (weekly site visits have been planned until 
July). The final reports are expected in July 
o The study concerning fauna (mammals, fish, and reptiles) has been assigned to 
the University of Salamanca. The study started in May and the final report is 
expected in August 
o The study concerning local birds has been assigned to Estudios Zoologicos 
Iberia SL. The final report will be delivered by end July. The study includes a 
special focus on the Black Stork 
17 Socio-Economic Baseline. The Socio-Economical Baseline study has been 
assigned to the Geography Department at the University of Salamanca. The scope 
of the study includes a compilation of baseline socio-economical data, spatial 
planning aspects and traffic. The study also includes Phase I of a social 
acceptance study (identification of relevant target groups and the design of a 
suitable format of a survey). During May, Golder Associates has discussed the 
ESIA process and the public consultation processes in relation to the Berkeley 
Public Relations Strategy in order to co-ordinate the two efforts. A selection 
process for a potential PR consultant has been initiated. 
4. Radiological Studies 
The radiation assessment for the Feasibility Study is being conducted by an 
Australian consulting company, Paulka Radiation & Environment.  All methodology 
employed in the assessment has been based on international standards recommended 
by the International Atomic Energy Agency (IAEA) and the International 
Commission of Radiological Protection (ICRP).  These bodies are recognised by 
the European Union as the standard for radiation protection.  In addition, 
recommendations from international best practice guidance material have been 
incorporated where applicable. 
 
The first part of the assessment has been the design and implementation of a 
baseline monitoring program to characterise the current radiological aspects of 
the project.  The monitoring programme includes parameters for radionuclides in 
dust, radon, gamma dose, radionuclides in soils, ground and surface waters and 
biota.  The baseline monitoring programme commenced in February 2010 and is 
approximately 50% complete. During the quarter the following monitoring was 
conducted: 
 
1    The second round of surface water sampling was completed and results 
received for the first and second rounds 
2    Water samples were collected from public fountains and results received. 
3    Groundwater samples were collected as part of the hydrogeological pumping 
tests and partial results were received 
4    Soil samples from the various landform types were collected in 
collaboration with the soil and landscape consultants, analytical results are 
pending 
5    Quarterly continuous dust deposition, radon and gamma radiation monitoring 
commenced 
6    Aquatic plants, fish and river sediments were collected by the Flora & 
Fauna consultants, analytical results are pending 
 
Analysis of these results will occur in the 3rd quarter. The remainder of the 
assessment will involve the identification and quantification of any radiation 
risks the project may have with regard to workers, the public and the 
environment. The assessment will recommend design and institutional control 
mechanisms that will assist in keeping radiation doses optimised to As Low as 
Reasonably Achievable (ALARA).  The results of the radiation assessment will 
feed into the Feasibility Study, the Environmental Impact Assessment and 
applications for authorisations to operate. 
 
During the quarter the following radiation assessment tasks were undertaken: 
 
1    Collation and analysis of historic radiological data provided by ENUSA. 
This is now ready for reporting; and 
2    Development of draft radiation design criteria for the mining and 
processing engineering teams for inclusion in the Feasibility Study 
 
The majority of the radiation risk assessment has been scheduled for completion 
during July and August with the final report to be issued in the 4th quarter. 
 
5. Water Management 
 
The water management programme is progressing well with a significant amount of 
fieldwork undertaken during the quarter.  The long term groundwater monitoring 
at Alameda and Sageras is continuing and the short term low rate hydraulic 
testing is ongoing at Sageras, Palacios and Alameda as well as groundwater 
tracer tests. Conceptual hydrogeological models have been developed for each 
deposit: 
 
1   Palacios - Permeability (K) of 10-7 m/s will result in 400kl/day groundwater 
inflows to the pit which are very low and should be easily manageable by pumping 
with most water being evaporated. 
2   Sageras - K between 10-7 and10-6 m/s will result groundwater inflows between 
400 to 2,000kl/day.  Flows may be higher in Tertiary covered areas (10-5) where 
extra flows of up to 300kl per day may be intercepted.  However, surface water 
can easily be diverted around the open pit. 
3   Alameda - K from 10-6 and10-8 m/s resulting in flows from 600 to 2,500 
kl/day. 
 
These results show that ground water inflows to the open pits should not be 
excessive and will be easily managed during mining activities. 
 
This on-going work and the results derived are currently being used to complete 
the water balance and dewatering planning aspects of the water management study. 
 
6. Waste Characterisation 
 
The waste characterisation programme is a critical part of the Feasibility Study 
process as all potential waste material types must be identified, classified and 
characterised as part of the exploitation application process.  This programme 
is being supervised by Golder Associates and is on schedule although it is 
dependent on the availability of the residue samples from the metallurgical test 
work being undertaken at SGS in Perth. These samples are expected to become 
available in July after which characterisation of the samples can be initiated. 
 
During the quarter, a review was conducted of the anticipated waste rock 
characteristics based on information on the site geology and mine planning. 
Forty five waste rock samples (Sageras, Palacios and Alameda, five weathering 
stages and eight lithologies) were selected by Berkeley geologists and reviewed 
by Golder Associates, before being shipped to SGSCEMI in Vancouver for 
geochemical characterisation tests including: 
 
1    mineralogical analysis by XRD 
2    chemical assay 
3    acid base accounting (ABA) 
4    net acid generation (NAG) testing 
5    radiological analysis 
 
After completion of the initial testing and review of the analytical results, 
subsets of these samples were submitted for static leach testing (SPLP) and 
analysis of NAG leachates. After a review of the leach test results, a smaller 
subset will be submitted for kinetic testing (HC-tests). 
 
In addition, eight residue samples (seven leach products and one water treatment 
plant residue) and seven feed samples were selected from the tank leach test 
work program at SGS in Perth for geochemical characterisation. More residue 
samples will become available by the end of July and these will undergo the 
geochemical characterisation tests listed above.   After completion of the July 
testing and review of the analytical results, a subset of these samples will be 
submitted for analysis of NAG leachates and kinetic testing. 
 
7. Mining Studies 
A considerable amount of work was undertaken during the quarter following the 
announcement of the Mineral Estimates at the end of March.  Pit optimisations 
were completed for various processing and production options and operating costs 
were further refined following discussions with a number of mining contractors. 
 A summary of the mining studies undertaken during the quarter include: 
1   The first draft of the Feasibility Study geotechnical report was received 
from AMC Consultants (UK) which included the configuration of bench batter 
angles and berm widths.  The new overall pit slope angles range from 45º to 50º 
resulting in potentially lower strip ratios. 
2   AMC Consultants (UK) has completed updated pit optimisations for Palacios, 
Sageras and Alameda South.  The optimisations used more accurate operating costs 
after further contact with potential mining contractors, new geotechnical 
parameters and a U3O8 price of US$60 per lb. 
3   Detailed pit designs for all three deposits commenced using the new pit 
slope and optimised pit shells and will be completed in July. 
4   A detailed mining schedule has been developed based on the latest processing 
plant requirements and using the updated pit optimisation results. 
5   A review of the potential waste dump locations was undertaken during the 
quarter and conceptual designs for the dumps and tailings management facility 
were completed by Golder Associates. 
6   Trade off studies are underway to look at the cost benefits of an "owner 
operated fleet" as opposed to using a mining contractor. 
7   The January 2008 Scoping Study pit optimsations for Retorillo and Santidad 
were incorporated into the overall mining schedule. 
8. Process Engineering 
 
During the quarter, work began on interpreting the test work results and 
constructing the basic engineering package for more detailed design by Aker 
Solutions.  The package components include: 
1    Basis of Design - testwork interpretation into design data 
2    Process Flow diagrams - reflecting the flowsheet details 
3    Mass Energy Balance - for the concentrate and metallurgical plants 
4    Mechanical Equipment List 
5    Motor / Starter List 
6    Plant Layout - plot plans 
7    Operating Cost Model 
The final engineering data will be delivered to Aker Solutions in the 3rd 
quarter for review and incorporation into the Feasibility Study.  Aker Solutions 
has also commenced several trade off studies related to the process plant. 
 
 
9. Permits and Licensing 
 
An application was submitted to the Salamanca Mines Department for infill and 
extension RC drilling at the Retortillo and Santidad deposits.  The main 
objective of the drilling campaign is to upgrade the Inferred resources into 
Indicated and Measured categories.  In addition, 15 diamond drill holes were 
planned to provide sufficient material for metallurgical heap leach test work. 
Table 3 gives a breakdown of the number of holes and metres to be drilled at 
each deposit. 
                   Table 3 - Retortillo/ Santidad RC Drilling 
+------------+--------+--------+-------+ 
|  Deposit   |  Hole  |Metres  |Holes  | 
|            |  Type  |        |       | 
+------------+--------+--------+-------+ 
|Retortillo  |  RC    | 8,465  |  144  | 
+------------+--------+--------+-------+ 
|            |  DDH   |  635   |  9    | 
+------------+--------+--------+-------+ 
|            |        |        |       | 
+------------+--------+--------+-------+ 
|  Santidad  |  RC    | 3,445  |  59   | 
+------------+--------+--------+-------+ 
|            |  DDH   |  335   |  6    | 
+------------+--------+--------+-------+ 
|            |        |        |       | 
+------------+--------+--------+-------+ 
|   Total    |  RC    |11,910  |  203  | 
+------------+--------+--------+-------+ 
|            |  DDH   |  970   |  15   | 
+------------+--------+--------+-------+ 
Work continued during the quarter on the mining exploitation plan which will be 
submitted to ENUSA in the next quarter.  The Exploitation Plan is the 
preliminary document that initiates the permitting process and it includes: 
1    Mining Plan 
2    Reclamation Plan 
3    Environmental Study 
4    Radiological Study 
 
 
 
 
 
 
A full version of this announcement incorporating diagrams can be found of the 
Company's website www.berkeleyresources.com.au 
 
10. Appendix 
 
Palacios Diamond Drill Hole Intersections (e-grades) 
+---------+---------+----------+-----------+-------+---------+-----+------+------+----------+-------+ 
|  Hole   |Easting  |Northing  |Elevation  |Depth  |Azimuth  |Dip  |From  |  To  |Interval  |eU3O8  | 
|   ID    |         |          |           |       |         |     |      |      |          |       | 
+---------+---------+----------+-----------+-------+---------+-----+------+------+----------+-------+ 
|         |  (m)    |   (m)    |    (m)    |  (m)  |  (º)    |(º)  | (m)  | (m)  |   (m)    |(ppm)  | 
+---------+---------+----------+-----------+-------+---------+-----+------+------+----------+-------+ 
|MDD-016  | 701093  | 4500820  |  633.0    |78.45  |  118    |-80  |57.1  |60.7  |   3.6    |  289  | 
+---------+---------+----------+-----------+-------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |       |         |     |68.0  |69.1  |   1.1    |2,589  | 
+---------+---------+----------+-----------+-------+---------+-----+------+------+----------+-------+ 
 
 
Sageras Diamond Drill Hole Intersections (e-grades) 
 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|  Hole   |Easting  |Northing  |Elevation  | Depth  |Azimuth  |Dip  |From  |  To  |Interval  |eU3O8  | 
|   ID    |         |          |           |        |         |     |      |      |          |       | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |  (m)    |   (m)    |    (m)    |  (m)   |  (º)    |(º)  | (m)  | (m)  |   (m)    |(ppm)  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|SGD-019  | 699792  | 4502947  |  679.5    | 87.81  |         |     |30.6  |36.9  |   6.3    |  712  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |40.9  |43.0  |   2.1    |1,137  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |43.6  |44.7  |   1.1    |2,207  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |46.0  |49.4  |   3.4    |  451  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |50.5  |53.4  |   3.0    |1,290  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|SGD-020  | 700372  | 4502695  |  645.4    | 63.20  |         |     | 5.0  | 6.1  |   1.1    |  621  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |21.9  |24.1  |   2.2    |3,747  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |25.2  |28.8  |   3.6    |4,925  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|SGD-021  | 700574  | 4502470  |  656.1    | 70.00  |         |     |31.7  |35.2  |   3.5    |  463  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |40.8  |42.0  |   1.2    |  400  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |43.5  |44.6  |   1.2    |1,595  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |47.3  |49.0  |   1.7    |2,963  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |56.9  |58.0  |   1.1    |2,189  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|SGD-022  | 700285  | 4502755  |  643.1    |139.25  |   50    |-50  |12.1  |14.4  |   2.4    |1,074  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|SGD-023  | 700585  | 4502088  |  654.8    | 42.20  |         |     |              NOT               | 
|         |         |          |           |        |         |     |          MINERALIZED           | 
+---------+---------+----------+-----------+--------+---------+-----+--------------------------------+ 
|SGD-024  | 700554  | 4501987  |  649.8    | 41.15  |         |     |              NOT               | 
|         |         |          |           |        |         |     |          MINERALIZED           | 
+---------+---------+----------+-----------+--------+---------+-----+--------------------------------+ 
|ZMD-006  | 699686  | 4502992  |  683.6    | 84.00  |         |     |              NOT               | 
|         |         |          |           |        |         |     |          MINERALIZED           | 
+---------+---------+----------+-----------+--------+---------+-----+--------------------------------+ 
|ZMD-007  | 699688  | 4502924  |  679.8    |100.20  |         |     |53.6  |56.7  |   3.1    |  355  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |65.5  |66.7  |   1.2    |  463  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|ZMD-008  | 699655  | 4503027  |  684.1    | 83.70  |         |     |29.0  |33.6  |   4.6    |  329  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|         |         |          |           |        |         |     |57.2  |59.5  |   2.2    |  687  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
|ZMD-009  | 699689  | 4502852  |  678.6    | 70.80  |         |     |39.3  |41.1  |   1.8    |  393  | 
+---------+---------+----------+-----------+--------+---------+-----+------+------+----------+-------+ 
 
 
 
 
 
Sageras RC Drill Hole Intersections (chemical assays) 
 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|  Hole   |Easting  |Northing  |Elevation  | Depth  |Azimuth  |Dip  |From  | To  |Interval  | U3O8  | 
|   ID    |         |          |           |        |         |     |      |     |          |       | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |  (m)    |   (m)    |    (m)    |  (m)   |  (º)    |(º)  | (m)  |(m)  |   (m)    |(ppm)  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|ZMR-010  | 699668  | 4502976  |  680.1    | 88.00  |         |     |  44  | 47  |    3     |  242  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  50  | 51  |    1     |  209  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  53  | 54  |    1     |  435  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  61  | 65  |    4     |  337  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|ZMR-012  | 699580  | 4503027  |  674.2    |103.00  |         |     |  19  | 20  |    1     |  483  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  21  | 23  |    2     |  239  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  25  | 26  |    1     |  321  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  38  | 42  |    4     |1,461  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  44  | 47  |    3     |7,027  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  48  | 49  |    1     |1,633  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  52  | 53  |    1     |1,046  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  61  | 62  |    1     |1,135  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  63  | 71  |    8     |1,716  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|ZMR-013  | 699545  | 4503026  |  669.6    | 75.00  |         |     |  31  | 32  |    1     |  441  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  34  | 35  |    1     |  349  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  39  | 44  |    5     |  270  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  46  | 48  |    2     |  255  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  49  | 52  |    3     |  263  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  58  | 60  |    2     |  348  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  64  | 65  |    1     |  253  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
 
 
Alameda Diamond Drill Hole Intersections (e-grades) 
 
 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|  Hole   |Easting  |Northing  |Elevation  | Depth  |Azimuth  |Dip  | From  |  To   |Interval  |eU3O8  | 
|   ID    |         |          |           |        |         |     |       |       |          |       | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |  (m)    |   (m)    |    (m)    |  (m)   |  (º)    |(º)  |  (m)  |  (m)  |   (m)    |(ppm)  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|ASD-020  | 689214  | 4500696  |  733.5    | 70.00  |  103    |-60  |  0.4  |  2.9  |   2.5    |  927  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     |  3.6  |  4.8  |   1.2    |  334  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 13.7  | 14.7  |   1.0    |1,257  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 22.7  | 24.7  |   1.9    |4,814  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|ASD-021  | 689166  | 4500790  |  737.8    | 70.50  |  103    |-60  |  3.3  |  4.4  |   1.1    |1,238  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     |  9.9  | 13.3  |   3.4    |2,140  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 16.5  | 21.9  |   5.4    |2,439  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 60.1  | 61.3  |   1.2    |2,305  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|ASD-022  | 689131  | 4500976  |  749.0    |137.20  |  103    |-72  | 47.8  | 49.5  |   1.8    |  669  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 89.8  | 91.9  |   2.1    |  387  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|ASD-023  | 689120  | 4500863  |  739.3    | 87.10  |  103    |-60  | 37.3  | 42.6  |   5.3    |3,142  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 47.8  | 53.4  |   5.7    |  724  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 57.4  | 58.8  |   1.4    |  543  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 68.3  | 71.0  |   2.7    |1,934  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|ASD-024  | 689052  | 4500865  |  738.0    |110.08  |  103    |-65  | 12.2  | 13.3  |   1.1    |  534  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 19.2  | 22.3  |   3.2    |  586  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 39.4  | 40.4  |   1.0    |  440  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 42.4  | 45.2  |   2.8    |  436  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 50.4  | 53.3  |   2.9    |1,279  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 55.0  | 59.0  |   4.0    |  243  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 62.3  | 64.1  |   1.8    |  393  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 70.6  | 72.4  |   1.8    |1,925  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 73.4  | 83.6  |  10.2    |1,047  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|ASD-025  | 689101  | 4501036  |  748.7    |147.87  |  103    |-65  |104.2  |106.2  |   2.0    |  606  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     |119.2  |120.8  |   1.6    |  613  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     |121.0  |123.3  |   2.3    |  431  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|ASD-026  | 688991  | 4500828  |  732.8    |125.15  |  103    |-65  | 30.8  | 41.7  |  10.9    |1,047  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 43.8  | 45.7  |   1.9    |1,271  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 47.6  | 49.1  |   1.5    |1,102  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 69.1  | 71.9  |   2.8    |  342  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     | 92.8  | 98.2  |   5.4    |1,239  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     |106.2  |114.8  |   8.6    |  884  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|ASD-027  | 688907  | 4500797  |  728.4    |136.84  |  103    |-70  | 62.3  | 67.3  |   5.0    |1,086  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
|         |         |          |           |        |         |     |111.8  |113.7  |   1.9    |  555  | 
+---------+---------+----------+-----------+--------+---------+-----+-------+-------+----------+-------+ 
 
 
 
Alameda South RC Drill Hole Intersections (chemical assays) 
 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|  Hole   |Easting  |Northing  |Elevation  | Depth  |Azimuth  |Dip  |From  | To  |Interval  | U3O8  | 
|   ID    |         |          |           |        |         |     |      |     |          |       | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |  (m)    |   (m)    |    (m)    |  (m)   |  (º)    |(º)  | (m)  |(m)  |   (m)    |(ppm)  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|ASR-029  | 689203  | 4501188  |  753.2    | 99.00  |  103    |-70  |  22  | 27  |    5     |  585  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  28  | 63  |    35    |2,044  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  67  | 68  |    1     |  233  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  69  | 70  |    1     |  404  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  82  | 83  |    1     |  284  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|ASR-030  | 689154  | 4501199  |  750.9    | 70.00  |  103    |-70  |  17  | 19  |    2     |  311  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  20  | 26  |    6     |  479  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  29  | 36  |    7     |  618  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  41  | 42  |    1     |  269  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  43  | 45  |    2     |  431  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  46  | 47  |    1     |  257  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  54  | 55  |    1     |  229  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  61  | 62  |    1     |  498  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  68  | 70  |    2     |  533  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|ASR-031  | 689191  | 4501242  |  751.9    |110.00  |  103    |-60  |  29  | 55  |    26    |3,923  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  58  | 61  |    3     |  346  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     | 103  |106  |    3     |  229  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|ASR-032  | 689238  | 4501233  |  753.8    |100.00  |  103    |-60  |  22  | 40  |    18    |1,401  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  41  | 46  |    5     |  478  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  55  | 62  |    7     |  829  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|ASR-034  | 689212  | 4501340  |  750.2    |120.00  |  103    |-60  |  52  | 53  |    1     |  347  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  55  | 57  |    2     |  909  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  70  | 71  |    1     |  283  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  73  | 75  |    2     |  270  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  78  | 84  |    6     |  667  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  86  | 87  |    1     |  321  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     |  99  |101  |    2     |  203  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     | 106  |107  |    1     |  252  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
|         |         |          |           |        |         |     | 111  |112  |    1     |  611  | 
+---------+---------+----------+-----------+--------+---------+-----+------+-----+----------+-------+ 
 
 
 
11. Supplementary Information 
 
The uranium grades reported in this release are annotated with a sub-prefix "e" 
because they have been reported as uranium equivalent grades derived from 
down-hole gamma ray logging results and so they should be regarded as 
approximations only. 
The Berkeley drill holes were logged with a GeoVista total count gamma tool. The 
gamma tool was calibrated in Adelaide at the Department of Water, Land and 
Biodiversity Conservation in calibration pits constructed under the supervision 
of CSIRO. The various calibration factors were calculated by David Wilson BSc 
MSc MAusIMM from 3D Exploration Ltd based in Perth, Western Australia. 
Drill intersections are calculated using a 200 ppm eU3O8 lower cut-off with a 
minimum one metre intersection 
The Mineral Resources are presented in accordance with the 2004 Edition of the 
"Australasian Code for Reporting of Exploration Results, Mineral Resource and 
Ore Reserves" (JORC Code). 
The information in this report that relates to the metallurgical test work 
results is based on information compiled by Mr Grenvil Dunn, who is a Chemical 
Engineer and a Member of the South African Institute of Mining and Metallurgy. 
Mr Dunn is a Technical Consultant with Orway Mineral Consultants who are 
consultants of Berkeley Resources.  Mr Dunn has sufficient experience which is 
relevant to the style of mineralisation and type of deposit under consideration 
and to the activity which he is undertaking to qualify as a Competent Person as 
defined in the 2004 Edition of the Australasian Code for Reporting of 
Exploration Results, Mineral Resources and Ore Reserves (The JORC Code). 
 
 
The information in this report that relates to Exploration Results, Mineral 
Resources or Ore Reserves is based on information compiled by Mr. Ross Corben, 
who is a Member of The Australian Institute of Mining and Metallurgy and an 
employee of Berkeley Resources Limited. Mr. Corben has sufficient experience 
which is relevant to the style of mineralisation and type of deposit under 
consideration and to the activity which he is undertaking to qualify as a 
Competent Person as defined in the 2004 Edition of the 'Australasian Code for 
Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr. 
Corben consents to the inclusion in the report of the matters based on his 
information in the form and context in which it appears. 
 
 
This information is provided by RNS 
            The company news service from the London Stock Exchange 
   END 
 
 MSCLIFLDDIIIVII 
 

Berkeley Energia (LSE:BKY)
과거 데이터 주식 차트
부터 6월(6) 2024 으로 7월(7) 2024 Berkeley Energia 차트를 더 보려면 여기를 클릭.
Berkeley Energia (LSE:BKY)
과거 데이터 주식 차트
부터 7월(7) 2023 으로 7월(7) 2024 Berkeley Energia 차트를 더 보려면 여기를 클릭.