Pure Energy Minerals Commences Drilling New Lithium Brine Exploration Borehole at Clayton Valley South Project, Nevada
17 11월 2016 - 9:32PM
Pure Energy Minerals Limited (TSX VENTURE:PE) (FRANKFURT:A111EG)
(OTCQB:PEMIF) (the “Company” or “Pure Energy”) is pleased to
announce that it has commenced drilling its newest exploration
borehole, CV-7, on the Clayton Valley South Project (“CVS
Project”). Pure Energy has all necessary permits and government
permissions in hand to commence work, and the Company’s drilling
contractor has already completed collaring of the borehole. All
ancillary works are in place to immediately commence rotary coring
of the basin-fill sediments. CV-7 is located approximately 1.75 km
(1.1 miles) southwest of the recently drilled CV-3 well.
The technical team selected the drill site based on a detailed
review of various technical data in three dimensions, including
previously conducted gravity and seismic reflection geophysical
surveys as well as new subsurface data from the CV-3 well. Based on
recent successful drilling and aquifer testing at CV-3, the Company
expects this borehole to target depths of approximately 450 – 610m
(1,500-2,000 ft) below ground level. Successful drilling of this
hole should yield the deepest continuous core samples yet obtained
from the CVS Project. Once completed to target depth, the Company
expects to collect new brine samples for lithium analysis and
integrate that data into its existing inferred lithium brine
resource.
Patrick Highsmith, Pure Energy Minerals CEO commented, “The best
way to grow a lithium brine resource is to identify quality targets
and keep drilling. We are excited to see the results of CV-7 as we
are targeting high quality geophysical and geological targets just
south of our best drill hole to date, CV-3. We also expect to
collar CV-8 in the very near future as we wind down the phase 3
drill program. The technical team has worked very closely on these
drill holes and we look forward to the results.”
Patrick Highsmith, Certified Professional Geologist (AIPG CPG #
11702), is a qualified person as defined by NI 43-101, and has
supervised the preparation of the scientific and technical
information that forms the basis for this news release. Mr.
Highsmith is not independent of the Company as he is an officer and
director.
About Pure Energy Minerals Ltd.Pure Energy is a
lithium-brine resource developer that is driven to become the
lowest-cost lithium supplier for the burgeoning North American
lithium battery industry. Pure Energy is currently focused on
the development of our prospective CVS Lithium Brine Project, which
has the following key attributes:
- A large land position with excellent existing infrastructure in
a first-class mining jurisdiction: Approximately 9,544 acres in
three main claim groups in the southern half of Clayton Valley,
Esmeralda County, Nevada;
- Adjacent to the only producing lithium operation in the United
States (Albemarle’s Silver Peak lithium brine mine);
- An inferred mineral resource of 816,000 metric tonnes of
Lithium Carbonate Equivalent (LCE), reported in accordance with NI
43-101;
- Metallurgical and process studies underway to better understand
the feasibility and economics of using modern
environmentally-responsible processing technology to convert the
CVS brines into high purity lithium products for new energy storage
uses.
On behalf of the Board of Directors, “Patrick Highsmith” Chief
Executive Officer
Forward Looking Statements: The information in this news release
contains forward looking statements that are subject to a number of
known and unknown risks, uncertainties and other factors that may
cause actual results to differ materially from those anticipated in
our forward looking statements. Factors that could cause such
differences include: changes in world commodity markets, equity
markets, costs and supply of materials relevant to the mining
industry, change in government and changes to regulations affecting
the mining industry. Forward-looking statements in this release may
include statements regarding mineral processing, adaptation of test
work to larger scale and/or future operational scales, estimates of
reduced future capital and operating expenses, delivery of a
preliminary economic assessment, future exploration programs,
operation plans, geological interpretations, and mineral tenure
issues. Although we believe the expectations reflected in our
forward looking statements are reasonable, results may vary, and we
cannot guarantee future results, levels of activity, performance or
achievements.
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of
this release
CONTACT:
Pure Energy Minerals Limited (www.pureenergyminerals.com)
Email: info@pureenergyminerals.com
Telephone – 604 608 6611, ext 5
Pure Energy Minerals (TSXV:PE)
과거 데이터 주식 차트
부터 12월(12) 2024 으로 1월(1) 2025
Pure Energy Minerals (TSXV:PE)
과거 데이터 주식 차트
부터 1월(1) 2024 으로 1월(1) 2025