Golden Touch Resources Corp. ("Golden Touch" or the "Company") (TSX
VENTURE:GOT)(FRANKFURT:0GT) is pleased to announce that the Company will
immediately commence a first round diamond drilling program to evaluate the
potential of its platinum project in North Eastern Albania. 


The start of drilling has been held up for the past few weeks awaiting the
renewal of Exploration Permit EP 1376, which covers the Company's platinum
prospect. 


EP 1376 has now been renewed under the recently introduced new Mining Laws of
Albania. Under the new law exploration permits are granted for up to three, one
year periods, the annual renewal being subject to a review of the exploration
activity undertaken. The EP 1376 renewal document suggests, that the Company has
already met the expenditure commitments required for this project. 


The upcoming platinum drilling program will evaluate ultramafic rocks in which
zones of anomalous platinum group elements (PGE) and chromite mineralisation are
known to occur. 


Surface sampling of three separate and parallel trenches by the Company over an
area of outcrop within EP 1376 (known as Bregu I Bibes) returned the following
significant platinum intersections:  




--  14m @ 1.5 g/t Pt 
--  11m @ 1.9 g/t Pt 
--  5m @ 2.1 g/t Pt



Mineralogical work carried out by ALS Mineralogy on samples from the trenches
showed that platinum (Pt) comprises around 80% of the all the platinum group
elements (PGE's), with lesser amounts of palladium (Pd) and traces of rhodium
(Rh), ruthenium (Ru), iridium (Ir) and osmium (Os) also occurring. 


Grab samples indicate that up to 27% chromite (Cr2O3) are associated with the
PGE's. 


The first round drilling will start by evaluating the area down dip of the
trench intersections at Bregu I Bibes and then gradually evaluate an area
extending north east from the Bregu I Bibes, towards a second anomalous platinum
outcrop at Pode. The area of interest has a strike length of approximately 1
kilometre. 


To view the map associated with this press release, please visit:
http://media3.marketwire.com/docs/got-1115-map.jpg.


The area of interest was investigated by the Albanian Geological Survey in the
1980's. Despite the fact that considerable drilling was undertaken at that time,
and that there are unconfirmed reports of mineralisation up to 27 g/t Pt being
encountered, unfortunately the location of many of the assays and holes cannot
be verified, and there is no core remaining for independent evaluation. As a
result, the historical work does not meet NI 43-101 standards, requiring the
upcoming drilling program to evaluate the commercial potential of the project
from scratch.


The first five drill holes will focused on evaluating the area down dip from the
anomalous trench results recorded by the Company at the Bregu I Bibes outcrop. 


Golden Touch will use the same contractor for the first round platinum drilling,
as recently completed the drilling at the Company's gold project. The Company
has been impressed with the quality and professionalism of the work undertaken
by this contractor. 


The drilling contractor has already commenced mobilising to site and is expected
to begin drilling very soon, with the objective of completing the first round
before the onset of winter weather. 


Golden Touch will report the results of the drilling as they are received. 

Robert Murdoch, Chairman of Golden Touch Resources, a Fellow of the Australasian
Institute of Mining and Metallurgy and a Fellow of the Australian Institute of
Geoscientists and hence a qualified person under the meaning of Canadian
National Instrument 43-101, is responsible for the technical content of this
news release.


On Behalf of the Board of Directors 

Golden Touch Resources Corp.

Rob Murdoch, Chairman

Goliath Resources (TSXV:GOT)
과거 데이터 주식 차트
부터 5월(5) 2024 으로 6월(6) 2024 Goliath Resources 차트를 더 보려면 여기를 클릭.
Goliath Resources (TSXV:GOT)
과거 데이터 주식 차트
부터 6월(6) 2023 으로 6월(6) 2024 Goliath Resources 차트를 더 보려면 여기를 클릭.