Meridian Gold Inc - Filing of certain prospectuses and communications in connection with business combination transactions (425)
19 10월 2007 - 3:38AM
Edgar (US Regulatory)
Filed by Yamana Gold Inc.
pursuant to Rule 425 under
the Securities Act of 1933
Subject Company: Meridian
Gold Inc.
Commission File Number:
333-146361
Date: October 18, 2007
|
Brazilian &
Honduran Operations Ludovico Costa, Vice President, Technical Services
|
|
VP Operations Brazil Sustainability
Underground Open Pit Maintenance General VP Operations Brazil Task Force Cost
Control Operational Excellence Risk Management Process Development
Maintenance Improv. Document Control Tech Services Mineral Reserves Strategic
Planning Project Control Due Diligence Tech Revisions Engineering Economic
Evaluation Operations Brazil Jacobina MFB Maracá SBMM Mining Beneficiation
Administration Maintenance
|
|
People Overview
Yamana currently employs approximately 3,800 people in Brazil: Chapada
Jacobina São Francisco Brasileiro Total Employees 574 839 415 607 2,435
Contractors 354 363 394 272 1,383 Total 928 1,202 809 879 3,818
|
|
Operations
Overview OVERVIEW Chapada Jacobina São Francisco MINING METHOD Open Pit Underground
Sub level
stopping Open Pit TRUCKS 52 Randon (28t) 9 2 Volvo (35t), 7 Caterpillar (45t)
35 Randon (28t) LOADERS / EXCAVATORS 11 8 Liebherr, 3 Caterpillar 16 5 Atlas
Copco, 5 Volvo, 6 Toro 8 4 Liebherr, 4 Caterpillar MAIN EQUIPMENT TRACTORS
(Bulldozer) 5 5 Caterpillar - 4 4 Caterpillar DRILLS 4 3 Bucyrus, 1 Wolf 14 6
Atlas Copco, 8 Tamrock, 4 2 Sandvik,
2 Atlas Copco
OTHER - 2 Scale 3 Anfo Loader, 3 Scissor Lifts, - 3 Grader 1 Grader 2 Grader
Crushing Crushing Crushing Grinding Grinding Gravity Flotation CIP Heap Leach
Dewatering PROCESS POWER DISTRIBUTION TENSION OF SUPPLY CELG
(230 kV) COELBA
(69 kV) CEMAT (138 kV) INSTALLED POWER 37 MVA 13 MVA 7 MVA Brasileiro
Underground Sub level stopping 11 8 Volvo (35t), 3 Volvo (25t) 8 4
Caterpillar, 3 Sandvick, 1 Michigan, 2 2 Caterpillar 7 6 Atlas Copco, 1
Sandvik 2 Scale 3 Anfo Loader, 5 Scissor Lifts 1 Grader Crushing Grinding CIP
COELBA (69 kv) 12 MVA
|
|
Production
Forecast 2007 - Brazil Total koz Au 445 - 465 Brasiliero koz Au 85 - 90
Jacobina koz Au 60 - 65 São Franciso koz Au 115 - 120 Chapada koz Au 185 -
190 Chapada kt conc. 205 - 210
|
|
Chapada Copper Mine Mineração Maracá Ind. e Com.
|
|
Site Location -
MMIC Alto Horizonte Located in the north of Goiás state near the City of Alto
Horizonte 330 Km north of Brasília, the capital city of Brazil 340 Km north
of Goiânia, the state capital of Goiás.
|
|
Project Cost In
local currency terms, Chapada was completed on budget for approximately $R527
million. In US$ terms the breakdown is as follows: Expenditures Description Dimension Accumulated
DIRECT COST Mininig US$ 000 40,466 Process plant US$ 000
115,305 Tailings Disposal US$ 000 12,254 Utilities & Services US$ 000 20,653
General Facilities US$ 000 14,924 Concentrade Handing US$ 000 3,234 Miscellaneous
US$ 000 2,735 Total Direct Cost US$ 000 209,572 INDIRECT COST Indirects US$ 000 31,282 Total Direct Cost US$ 000 31,282 PROJECT TOTAL US$ 000 240,854 Exchange rate: Feasibility 3.00
Actual 2.19
|
|
February 2007
Commercial Production November 2006 Start-Up October 2006 Commissioning
September 2006 Mechanical Completion May 2005 Detail Engineering Start
December 2004 Construction Start (Site Preparation) DATE MILESTONES Major
Milestones Commercial production was achieved ahead of schedule in February
2007
|
|
Reserves and
Resources Jan 07 MINEABLE RESERVE First five years: 76,0 million tonnes
0.443% Cu and 0.401 g Au/t ore LOM 303 million tonnes 0.34% Cu and 0.26 g
Au/t ore Metal prices: US$ 450 Au and US$ 1.10 Cu Contained Metal: 2.31 B lbs
Cu and 2.51 M oz Au Proven and Probable Reserves Ore
Source Unity Total Mineral Reserve Proven Probable Total Ore K tonnes 20,002 282,992 302,994 Cu
Equiv % 0.600 0.473 0.481 Copper Grade % 0.420
0.340 0.345 Gold
Grade g/t 0.340 0.250 0.256 Cu
content lbs (mm) 184.6
2,126.3 2,310.9 Gold
Content Koz 218.6 2,290.6 2,509.2 Measured, Indicated and Inferred
Resources (1) Total Mineral Resource Ore
Source Unity Measured / Indicated Inferred Total Ore K tonnes 420,521 250,693 671,214 Cu
Equiv % 0.422 0.330 0,388 Copper % 0.302
0.250 0,283 Gold
Grade g/t 0.225 0.150 0,197 Cu
content lbs (mm) 2,801.0
1,392.3 4,193.3 Gold
Content Koz 3,032.1 1,223.5 4,255.6 (1) Including
proven and probable reserves
|
|
Processing Mine
Hauling High grade Low Grade Oxide Processing Stock pile Stock pile Waste
Waste Dump Processing (High Grade) Crushing Surge Pile Milling Floatation
Thickening Filtering Concentrate Tailings Dam Water
|
|
Production
& Costs - Chapada (1) Assumes strip ratio of 0.8 to 1 MM IC 2007 Forecast Total Mined t 000 24,400 PLANT
Ore Plant Feed t000 13,690
Grade Au g/t 0.56
Grade Cu % 0.49
Plant Recovery Rate Gold %
75.00 Copper % 88.50
PRODUCTION Concentrade t 000 205 - 210 Gold k oz 185
- 190 Copper lb MM 128 - 132 COSTS
2007 Forecast M i
ne US$/t moved 1.20 - 1.30 Plant
US$/t 2.42 - 2.45 G&A US$/t 0.30 - 0.35 Total
US$/t 4.85 - 5.15 Total
Cost (1) US$/lb US$/oz 0.62 - 0.66 190 - 195 (1) Includes TCRC (1)
Assumes strip ratio of 0.8 to 1
|
|
Mine
Reconciliation 2006 / 2007 Gold (k oz) Copper (m lb) 2006 2007 Block Model
Actual 2006 2007 Block Model Actual
|
|
Chapada
2008/2009 Production Targets 175 mm lbs. 165 mm lbs. Copper ~185 K oz ~175 K
oz Gold Production 0.52 0.52 Grade (%Cu) ~0.46 ~0.46 Grade (g/t) 17,500
16,500 Tonnes/yr (000s) 2009 2008
|
|
Continue the
successful ramp-up to achieve higher than designed plant capacity (targeting
+ 15% throughput) Increase Mine productivity New dispatch software
Optimization of ore transportation Blasting optimization Implementation of
the Mine to Mill programme Improvement on Throughput and Recoveries Milling
Improvements Particle Size Indicator (PSI) Pebble crusher optimization
Flotation Improvement Automatic reagents dosage On Line Stream analyzer
installation Pyrite recovery Ultimately to significantly increase (perhaps
double) throughput Value Enhancing Opportunities
|
|
Pyrite Scoping
Study opportunity for production of 580,000 tpy of pyrite concentrate
recovered from copper tails 94 mm lbs. 5 mm lbs. Copper 320K oz 17,000 oz
Gold 10.6 mm tonnes 560 TONNES Sulphuric Acid (93% H2SO4) Annual operating
costs ~ $8 mm ($14.00/tonne of acid) NPV (assuming Capex of $195 million and
long-term commodity price assumptions1) is US$ 276 million Increases to ~ US$ 500 million at current commodity prices Yamana is evaluating merits of
producing pyrite for sale to end users they in turn would produce the
sulphuric aid (1) $70/t H2SO4; $600/oz Au; $150/lb Cu Economics as per AMEX
Scoping Study, May 2007
|
|
Jacobina
Mineração e Comércio
|
|
Location Map -
JMC
|
|
Resources and
reserves Dec 31/07 Jacobina Proven
and Probable Reserves Total Mineral Reserve Ore Source Unity Proven Probable Total Ore K tonnes 1,868 15,313
17,181 Gold Grade g/t 2.50 2.10 2.14 Gold Content Koz 150 1.035 1,185 Measured,
Indicated and Inferred Resources Total Mineral Resource Ore Source Unity Measured
/ Inferred
Total Indicated Ore K
tonnes 31.207 45,657 76,864 Gold Grade g/t 2.29 2.84 2,62 Gold Content Koz 2.924
4,164 7,088 Total Y/E 07 resources targeted at ± 8 million ounces
|
|
Mine Hauling
ORE Waste Processing Waste Dump / Disposal UG Processing Crushing Grinding
Gravity CIP ADR Plant Smelting Free Gold
|
|
(i) Total includes internal waste Production
& Costs - Jacobina 2007
PRODUCTION Forecast
Total Mined t 000 1,412 Ore t 000 1,108 Waste t 000 304 PLANT Feed
t 000 1,108 Grade Au g Au/t 1.88 Plant recovery rate % 94.15 Gold Production k
oz 60 - 65 2007 COSTS Forecast MINE US$/t moved 11.00 - 11.80
PLANT US$/t 7.80 - 8.40 G&A US$/t 2.10 - 2.30 TOTAL US$/t 24.50 - 26.30
PRODUCTION US$/oz 430 - 460
|
|
Plant Expansion
Plan Mill capacity expanded to nominal 5,000 tpd in November 2006 with
addition of cone crusher for feed to Mill #2 Phase 1 Expansion - 6,500 by Q1
2008: 2-stage Crushing + Mill # 2 New Shell & Motor 4.5 khp Phase 2
Expansion - Targeting > 8,000 tpd by Q3 2008 : 3-stage Crushing + Mill # 2
New Shell & Motor 4.5 khp A new tailings dam: project in 2007 ;
Construction in 2008 By Q4 2008, Jacobina should be at a runrate to sustain
production at levels above 200,000 ounces per year at cash costs targeted below
US $300/oz
|
|
Mine
Development Plan João Belo Mine: Air blast - January 07 Resume Mining: May 07
Full capacity: September 07 Canavieiras: Development Start-up: March 07
Mining operation: December 07 Full Mines operation: December 09 Basal:
Development start-up : February 07 Mining operation: June 08 Linking Basal
& Canavieiras: April 08 Morro do Vento: Development start-up : January 05
Mining operation: January 07
|
|
Canavieiras -Recent
Results Canavieiras is a significant high grade ore deposit than the João
Belo Mine as evidenced by the following Preliminary Results September - 7,995
t - 3.43 g Au/t October (until 9th ) - 5,048 - 4.99 g Au/t By mid to late
2009 ore fed from Canavieiras should represent approximately 2500 - 3000 Tpd
|
|
Increase mine
productivity New mine equipment - 45 mt trucks, anfo-loaders, scalers,
loaders Dispatch system implementation Miners training program Ore dilution
and recovery improvements Canavieiras Mine development Access via two ramps
providing more flexibility Higher grade and lower haulage distance to mill
Cost reduction Consumables optimization - price and consumption reduction
Power and water process consumption optimization Plant recovery improvement
Gravity circuit implementation Implementation of the Mine to Mill program
Optimizing blasting costs Optimizing milling costs Improving plant capacity
Opportunities New mine manager, Sergio Cordoso, to focus on:
|
|
Jacobina -
2008/09 Production Targets 190-200 140-150 Production (K oz) 2.2 2.1 Grade
(g/t) 2,800 2,200 Tonnes (000s) 2009 2008
|
|
Emphasis On
Safety - Case Study Longitudinal Section showing João Belo pillar collapse
|
|
AIR BLAST IN
JOÃO BELO ACTIONS All operations on levels below 730 were suspended on Jan
23rd following a sill pillar collapse After the event, Itasca experts (Loren
Lorig) visited the mine and conducted analysis and provided recommendations
with respect to preparing for future such incidents. Mine Ventilation and Air
Blast experts, BBE South Africa (Frank von Glehn), contracted to conduct
analysis and recommendation on protective barricades and overpressure
releases. Protective barricades were built on the cross-cut accesses from the
ramp to the levels between 535 level and 700 level. New mine layout with sill
and rib pillars size and stoping sequence according to Itasca
recommendations. Mine Ventilation Services from USA (Keith Wallace)
contracted to conduct studies on new ventilation circuits and fans for the
new mine development and stoping layouts and escape way. Risk Analyses to
re-start mine operation.
|
|
São Francisco SBMM - Serra da Borda Mineração e
Metalurgia.
|
|
Mato Grosso
Location Map - SBMM
|
|
Project Cost
São Francisco PROJECT COST US$ 000 Mine 12,102 Mechanical and Electrical
Equipaments 12,647 Electrical and Inctrumentation Material 2,257 Civil
Construction 19,689 Steel Structure 3,612 Piping Material 3,463 Transmission
Line & Main Substation 4,166 Electromechanical Assembly 8,027 Others 10,488
Total 76,450
|
|
Start up dates
MINE July 2005 PROCESS PLANT March 1st, 2006 HEAP LEACH March 15th, 2006 ADR
May 1st, 2006 Production Milestones
|
|
Resources and
Reserves December 31, 2006 Proven
and Probable Reserves Total Mineral Reserve Ore Source Unity Proven Probable Total Ore K tonnes 29,614 29,680
59,294 Gold Grade g/t 0.78 0.71 0.74 Gold Content Koz 741 675 1,416 Measured,
Indicated and Inferred Resources Total Mineral Resource Ore Source Unity Measured
/ Inferred
Total Indicated Ore K
tonnes 88,129 110,681 198,810 Gold Grade g/t 0.66 0.41 0.52 Gold Content Koz 1,876
1,477 3,323
|
|
Processing
Hauling DLO High Grade Waste Processing Processing Waste Dump Processing DLO
Ore Heap Leach Crushing Gravity Plant Crushed Free Gold Heap Leach ADR Plant
Smelting Mine
|
|
Production
& Costs São Francisco 2007 Forecast Mine Ore t 000 3,372 DLO t 000
4,627 Waste t 000 14,938 Total t 000 22,937 Grade Ore g Au/t 0.83 DLO g Au/t
0.43 Gravity Feed t 000 2,670 Gold Production k Oz 115 -120 2007 Forecast
Mine US$/t moved 1.20 - 1.30 Plant US$/t 1.60 - 1.80 G&A US$/t 0.30 -
0.45 Total US$/t 5.20 - 5.60 Production US$/Oz 355 - 370 SBMM Costs
|
|
Gold Production
São Francisco 2007 RECOVERY Forecast k oz 20 - 30 Gravity % 30.0 Heap Leach k oz 90 - 95 Total k oz 115
- 120 Crushed DLO Heap Leach Recoveries (%) 39.2% 49.6% 80.5% 89.0% 51.0%
92.8% 80.7% 87.0% 79.8% 61.9% 40.6% 15.2% 73.8% 71.6% 77,0% 77% 0% 10% 20%
30% 40% 50% 60% 70% 80% 90% 100% H6 H7 H8 H9 H10 H11 H12 H13 H14 H15 H16 H11B
H12B H13B H14B Heap Number Depleted
|
|
Mine Reconciliation
2006 / 2007 140 120 100 80 60 40 20 0 140 120 100 80 60 40 20 0 Gold oz
Gold (kOz) 2006 Gold (kOz) 2007 DLO Crushed DLO + Crushed DLO Crushed DLO + Crushed Block Model Actual Block
Model Actual To date the mine call
factor has been positive primarily based on reconciliation of lower grade
areas still too early to determine results for higher grade areas
|
|
São Fransisco
2008/09 Production Targets 130 - 140 125 - 135 Production (K oz) 0.65 0.65
Grade (g/t) 8,500 8,000 Tonnes (000s) 2009 2008
|
|
Increase Mine
productivity Sub-contracting waste removal Concentrate on ore selectivity New
dispatch software Improve Grade control Reverse circulation drill sampling
dedicated Improvement on the structural geologic model Improvement on the
mined gold characteristics (chemical and gravimetric) Costs optimization
Implementation of the Mine to Mill program Optimization of ore transportation
Gravimetric Plant operation with higher gold grade ore Heap leach operation
optimization Opportunities
|
|
Mineração
Fazenda Brasileiro
|
|
Mine Mine Rio de Janeiro MINA PARAGUAÇU BR - 116 RIO
JACUIPE RIO ITAPICURU RIO MARIA PRETA Santa Luz Araci MINA FAZ. BRASILEIRO
Teofilândia SERRINHA FEIRA DE SANTANA SALVADOR A.F.F.S.A BR - 120 BR - 116 BR
- 324 OCEANO ATLÂNTICO FAZENDA FAZENDA BRASILEIRO BRASILEIRO Mine Mine Rio de
Janeiro MINA PARAGUAÇU BR - 116 RIO JACUIPE RIO ITAPICURU RIO MARIA PRETA
Santa Luz Araci MINA FAZ. BRASILEIRO Teofilândia SERRINHA FEIRA DE SANTANA
SALVADOR A.F.F.S.A BR - 120 BR - 116 BR - 324 OCEANO ATLÂNTICO FAZENDA
FAZENDA BRASILEIRO BRASILEIRO LOCATION MAP - MFB
|
|
1972 -
Exploration startup - Base metal 1974 - Rio Itapicuru Greenstone Belt
characterization 1976 - Gold discovery by Docegeo 1977 - First diamond drill
hole 1984 - Open pit mining / Heap leaching plant 1988 - Underground mine /
CIP plant (25,000 tpm) 1992 - Mine project expansion (80,000 tpm) 1997 -
CVRDs privatization 1999 - Shaft operation begins 2003 - Yamana Gold Inc.
acquires from CVRD 2006 - Accumulated production: 2,380,000 oz Au Milestones
|
|
Resources and
Reserves December 31, 2006 Proven
and Probable Reserves Total Mineral Reserve Ore Source Unity Proven Probable Total Ore K tonnes 2,193.2 254.2
2,447.4 Gold Grade g/t 3.34 2.39 3.24 Gold Content Koz 235.4 19.5 254.9 Measured,
Indicated and Inferred Resources Total Mineral Resource Ore Source Unity Measured
/ Inferred
Total Indicated Ore K
tonnes 1,805.6 685,8 2,491.5 Gold Grade g/t 3.09 4.3 3.43 Gold Content Koz 179.9
94.9 274.8
|
|
Mine Hauling /
Shaft ORE Waste Processing Waste Dump / Disposal UG Processing Crushing
Grinding Gravity CIP ADR Plant Smelting Free Gold
|
|
2007 PRODUCTION Forecast Total Mined t 000 1,547 Ore t 000 1,031
Waste t 000 517 PLANT Feed t 000 1,019 grade Au g Au/t 2.84 Plant
recovery rate % 94.45 Gold Production k oz 85 - 90 2007 COSTS
Forecast MINE US$/t moved 11.00 - 11.50
PLANT US$/t 8.00 - 8.30 G&A US$/t 4.60 - 4.80 TOTAL US$/t 29.50 - 30.50
PRODUCTION US$/oz 350 - 360 (i) Total
includes internal mining of internal waste Production & Costs -
Brasileiro
|
|
Percentual?????
Mine Reconciliation 2006 / 2007 Gold oz
|
|
Recently
retained Proudfoot to review possible productivity improvements Increase Mine
productivity Waste rock disposal in the Underground Mine Trucks replacement
Mine operation on Sundays Ore dilution and recovery improvements E-deep and E
1200 (E-Deeper) development Cost reduction Consumables optimization - price
and consumption reduction Power and water process consumption optimization
Implementation of the Mine to Mill program Optimizing blasting costs
Optimizing milling costs Improving plant capacity Opportunities
|
|
Brasileiro
2008/09 Production Targets 90 - 100 85 95 Production range (000s) 2.75 2.80
Grade (g/t) 1,150 1,050 Tonnes (000s) 2009 2008
|
|
San Andres
Antenor Silva, President & COO
|
|
Project
Location Strategic location in Central America allows the San Andres mine to
be used as a logistical and economic base for expanding Yamanas presence in
Central America and Mexico.
|
|
San Andres
Honduras, Central America Ongoing open pit production since 1983 in an
extensive high-sulfidation, epithermal gold deposit; Experienced Central
American technical and production team with the proven capability to work and
operate successfully in tropical environments; Experienced environmental team
with industry leading reclamation and environmental projects currently
underway; Long-term agreements recently signed (September) with local communities
for social aid and infrastructure development projects; Aggressive ongoing
exploration drilling campaign utilizing 3 drill rigs (+29,000 meters drilled
since 2006) continually adding to the resource base so as to extend mine life
beyond 2011; Metallurgical studies currently underway to evaluate the
significant sulfide resource potential at San Andres (both open pit and
underground); Vertical leach pad expansion and all environmental permits for
the mining of the Twin Hills pit have been granted by the Honduran
government; Successful commencement of mining in the Twin Hills pit
(September). Current Twin Hills Proven and Probable reserves stand at 17.3
million tonnes @ 0.72 g/t Au for a contained 398,121 ounces of Au;
|
|
San Andres
Honduras, Central America Horizontal leach pad expansion permit (Phases 3 and
4) remains pending however is expected to be granted by the end of October;
Aggressive mine expansion project set to begin in October (upgraded crushing
circuit) with the goal of increasing mine production 15-20% by the end of the
first quarter of 2008 (420,000 tonnes of ore/month) so as to increase gold
production to +80,000 ounces per year; Currently working towards ISO 14000
and 18000 certification; the first company of its kind to do so in Honduras.
|
|
Site Layout
Twin Hills Pit East Ledge Pit Concession Boundary (399 Ha) San Andres
Azacualpa San Miguel ADR Plant Phase 1 & 2 Leach Pads Phase 3 & 4
Expansion New Public Road Project Primary Crusher Secondary Crusher Grid =
500 x 500 m
|
|
San Andres
2008/09 Production Targets 85 - 90 85 90 Production (K oz) 0.71 0.71 Grade
(g/t) 4,800 4,700 Tonnes (000s) 2009 2008 2007 production is projected at
approximately 60,000 ounces
|
|
Exploration
Targets HONDURAS San Andres Mine.
|
|
Reclamation
Projects
|
|
Corporate
Systems Sustainability Tech Services Operations Brazil Task Force
|
|
Corporate
Systems SYG Accounting Supply All Yamanas operations follow the corporate
systems IT SOX Others
|
|
Operations
Sustainability Operational Corporate Systems Maintenance Operational
Excellence Control Risk Management Technical Revision
|
|
Organizational
Culture Maintenance Pillars World Class Maintenance ENGINEERING PERFORMANCE
COSTS PREVENTIVE & PREDICTIVE MATERIALS & CONTRACTORS HUMAN RESOURCES
IMPLEMENTATION LIDERSHIP PLANNING INDICATORS
|
|
Evaluation
Example Operational Excellence Budget Target 1 Production -Ounces 20 77,490
87,839 > 91500 2 Cash Cost ( US$/Oz) 20 372.0 309 < 290 3 LTIFR
improvements 4 5.6 4.5 < 2.8 4 Weekly Interaction per manager 4 50 75 >
100 5 Yamana Maintenance System Implementation 4 0% 80 > 95 6 SYG
Implementation 4 0% 80 > 95 7 Community Complaints 4 2 2 0 8 SHE
evaluation 10 9 Competence Evaluation 30 2007 MFB - 2007 Targets 2006 % Item
|
Meridian Gold (NYSE:MDG)
과거 데이터 주식 차트
부터 1월(1) 2025 으로 2월(2) 2025
Meridian Gold (NYSE:MDG)
과거 데이터 주식 차트
부터 2월(2) 2024 으로 2월(2) 2025
Meridian Gold (뉴욕 증권거래소)의 실시간 뉴스: 최근 기사 0
More Meridian Gold Inc News Articles