RNS Number : 0869G
  AIM Resources Limited
  17 October 2008
   
    AIM RESOURCES LIMITED 

    17 OCTOBER 2008

    MUMBWA DRILLING RESULTS

    AIM Resources Limited ("the Company", ASX: AIM, AIM: AIMR) is pleased to provide the following assay results from the current Phase 3
drilling program being completed on the Mumbwa Joint Venture Project in Zambia.  
    The Company received results for hole S36-014, and drill interpreted intersections are presented below. 
    These intersections represent drilled thickness and are calculated based on "cut off" grades of 0.25% copper (Cu) and 0.25g/t gold (Au).
True width intersections were not quoted in these results as additional interpretation is required to correlate data from adjacent drill
holes.

    Summary of Results for drillhole S36-014

�        2 metres @ 0.38 % Cu between 85 to 87 metres.
�        1 metre @ 0.65 % Cu between 118 to 119 metres.
�        6 metres @ 0.95 % Cu between 154 to 160 metres,
      including 3 metres @ 1.57 % Cu between 157 to 160 metres.
�        33 metres @ 0.43 % Cu between 224 to 257 metres,
      including 2 metres @ 0.49 % Cu between 224 to 226 metres,
      and 2 metres @ 0.47 % Cu between 231 to 233 metres,
      and 15 metres @ 0.65 % Cu between 242 to 257 metres,
   and 1 metre @ 1.21 % Cu between 243 to 244 metres,
   and 1 metre @ 1.02 % Cu between 252 to 253 metres.
�        9 metres @ 0.60 % Cu between 263 to 272 metres,
      including 5 metres @ 0.85 % Cu between 267 to 272 metres,
   and 1 metre @ 2.69 % Cu between 270 to 271 metres.
�        3 metres @ 0.35 % Cu between 278 to 281 metres.
�        7 metres @ 0.38 % Cu between 309 to 316 metres,
      including 2 metres @ 0.67 % Cu between 310 to 312 metres.
�        39 metres @ 0.51 % Cu between 329 to 368 metres,
      including 1 metre @ 1.04% Cu between 329 to 330 metres,
      and 1 metre @ 1.31 % Cu between 339 to 340 metres,
      and 2 metres @ 1.04 % Cu between 346 to 348 metres,
      and 1 metre @ 1.02 % Cu between 350 to 351 metres,
      and 1 metre @ 1.06 % Cu between 353 to 354 metres,
      and 2 metres @ 0.74 % Cu between 358 to 360 metres,
      and 2 metres @ 0.76 % Cu between 366 to 368 metres.
�        18 metres @ 0.44 % Cu between 372 to 390 metres,
      including 4 metres @ 0.97% Cu between 380 to 384 metres,
      and 1 metre @ 1.01% Cu between 389 to 390 metres.
�        3 metres @ 0.26 % Cu between 402 to 405 metres.
�        2 metres @ 0.61 % Cu between 423 to 425 metres.
�        4 metres @ 0.29 % Cu between 431 to 435 metres.
�        3 metres @ 0.28 % Cu between 462 to 465 metres.
�        2 metres @ 0.38 % Cu between 468 to 470 metres.
�        3 metres @ 0.32 % Cu between 528 to 531 metres.

    Drillhole S36-014 is located on the western side of the target area, and situated approximately 350 metres south from hole S36-001,
drilled in 2007 during the previous Phase 2 program.
    S36-014 was drilled at an angle of 70 degrees towards the east (090 degrees), for an end of hole depth totalling 594 meters. A total of
568 samples of drill core were submitted for preparation and analysis by AH Knight Group of laboratories.
    Diagrams and Table of Results from hole S36-014 are available on www.aimresources.com.au, which provides a drill hole location plan,
cross section and details of all sample intervals for hole S36-014.

 ATTRIBUTION  The information in this report which relates to Exploration
              Results at the Mumbwa JV Project has been reviewed and approved
              for release by Mr Michael J Robertson, MSc, Pr.Sci.Nat., MSAIMM
              who has 20 years experience in mineral exploration, and who is a
              full-time employee of MSA Geoservices, and has sufficient
              experience in relation to the style of mineralisation and type
              of deposit under consideration to qualify as a Competent Person
              as defined by the "Australasian Code for Reporting of
              Exploration Results, Mineral Resources and Ore Reserves" (The
              JORC Code 2004 Edition) and as a Qualified Person under the AIM
              Rules. Mr Robertson has consented to inclusion of this
              information in the form and context in which it appears. 

    Note: 
    Gold and copper assays are performed by ISO/17025 accredited Alaska Assay Laboratories (a Member of the Alfred H. Knight Group) in
Alaska, using hot aqua regia atomic absorption spectroscopic (AAS) analyses for copper and conventional fire assay procedures with AAS
finish on 30g aliquots for gold. Multi-element inductively coupled plasma mass spectroscopic (ICP-MS) analyses are currently subcontracted
to ACME Analytical Laboratories Ltd in Vancouver.  

    A Quality Assurance/Quality Control (QA/QC) program forms part of the drilling, sampling and assay program on the Mumbwa Project. This
program includes chain of custody protocol as well as systematic submittal of certified reference materials, duplicates and blank samples
into the flow of samples produced by the drilling.

    Should you require further information please contact:

    Scott Lowe
    Managing Director
    Ph: + 61 2 9357 9000

    Fiona Owen
    Grant Thornton UK LLP
    Ph: +44 20 7383 5100



    www.aimresources.com.au


This information is provided by RNS
The company news service from the London Stock Exchange
 
  END 
 
DRLMRBPTMMJBMPP

Aim Res. (LSE:AIMR)
과거 데이터 주식 차트
부터 5월(5) 2024 으로 6월(6) 2024 Aim Res. 차트를 더 보려면 여기를 클릭.
Aim Res. (LSE:AIMR)
과거 데이터 주식 차트
부터 6월(6) 2023 으로 6월(6) 2024 Aim Res. 차트를 더 보려면 여기를 클릭.