Trinity Valley Energy Corp. (TSX VENTURE:TE) (The "Company") has been advised by
Anderson County Land Company ("ACLC") that Weatherford Laboratories has
completed and reported on the analysis of the core the remaining five of the ten
core holes drilled on the Days Chapel Enhanced Oil Recovery ("EOR") Project
("Days Chapel" or the "Project"), located in Anderson County, East Texas
approximately 110 miles southeast of Dallas, Texas.


This report is an update from the press release of November 12th 2013 wherein
the results of the first 5 core holes were reported. A total of 91 plugs,
ranging from 6 plugs to 33 plugs per core, were extracted from the cores for
retort processing. The average range of porosity was from 30.6% to 33.7%. Oil
saturation within the pore space of the Carrizo averaged 34%.


Combined with the first 5 core holes, a total of 161 plugs have been evaluated
and measure a weighted average porosity of 36% and weighted average oil
saturation of 34%. Selected additional samples, using the Deak Stearns process
are being undertaken with the objective of comparing derived porosities
undergoing biaxial stress testing(retort analysis) with those undergoing
triaxial stress testing(Dean Stark) for any disparities due to overburden
pressures. Also, the results will provide for measured oil saturation
compatibilities between the two methods of testing.


Gerrard Kiefer has used the combination of well logs and core analysis to remap
the Carrizo formation in the Days Chapel field. The revised mapping indicates an
increase in gross pay specifically to the north. Our leasing program has been
modified to increase our land position accordingly. Richard Cooper, Consulting
Engineer is utilizing this data set to prepare a modelling of the field to
identify the best combination of technology to exploit the Days Chapel Carrizo
formation. He recently visited the field with Mr. Kiefer.


The calculation of Original-Oil-In-Place has been initiated. Robert Naas P.
Eng., an independent reservoir engineer has been retained to provide an opinion
on the determination. Mr. Naas prepared the NI51-101F2 dated December 17, 2012
for the Company.


In conclusion, results from the above modeling program and analysis's will
provide information to update a NI 51-101 compliant independent reservoir
engineering report such that all or a portion of Probable Reserves can be
reclassified as Proven Undeveloped Reserves. (see news release February 12,
2013).


About The Days Chapel Project

The Days Chapel oilfield in Anderson County, East Texas is shallow Carrizo sand
(Eocene Formation) at a depth of 550 feet to 700 feet. The formation lacks
natural reservoir "drive" in the form of solution natural gas or water drive.
Accordingly, it must be artificially heated to enable the oil to be produced.

The Days Chapel oilfield is one of a number of contiguous Carrizo oilfields in
the southern part of Anderson County. Whereas the Carrizo formation lacks
natural reservoir energy in the form of solution natural gas or water drive, in
the late 1960's Shell Oil Company developed the Slocum field, less than two
miles south of Days Chapel with a full scale steam-injection using vertical well
7-spot injection patterns.


The Days Chapel Project has established infrastructures that include paved
highways throughout the property, rail access, a sale gas pipeline runs through
property, good water sources with rights, valid lease and Mineral Deeds have
been assembled by ACLC over a 4-year period. The Project is strategically
located close to the Gulf Coast Refineries in the Houston Ship Channel and
Beaumont/Lake Charles areas, offering significantly higher oil price
differential to Canadian oil producers (Heavy Oil) per barrel.


Gerrard Kiefer, Professional Geologist, is the Qualified Person under National
Instrument 51-101 responsible for preparing and reviewing the data contained in
this press release.


ON BEHALF OF THE BOARD

Michael Dake, President

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that
term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this release.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Trinity Valley Energy Corp.
(888) 909-5548
(888) 909-1033 (FAX)
info@trinityvalleyenergy.com
www.trinityvalleyenergy.com

Trinity Valley Energy Corp. (TSXV:TE)
과거 데이터 주식 차트
부터 5월(5) 2024 으로 6월(6) 2024 Trinity Valley Energy Corp. 차트를 더 보려면 여기를 클릭.
Trinity Valley Energy Corp. (TSXV:TE)
과거 데이터 주식 차트
부터 6월(6) 2023 으로 6월(6) 2024 Trinity Valley Energy Corp. 차트를 더 보려면 여기를 클릭.