P2 Gold Inc. (“P2” or the “Company”) (TSX-V:PGLD)
(OTCQB:PGLDF), reports results from 11-drill holes from the 2022
Drill Program at its gold-copper BAM Project located in the Golden
Triangle in northwest British Columbia.
“We wrapped up the BAM 2022 Drill Program in
late September after a very successful exploration season with
13,958 meters drilled in 95 holes,” commented Joe Ovsenek,
President and CEO of P2. “An additional 59 holes are in the lab
awaiting assaying, which we expect to release over the next couple
of months. We believe BAM is on its way to becoming the next
significant discovery in the Golden Triangle.”
BAM Project Drill Results
Select drill results (see Table 1 below for
drill results) from holes BAM-032 to 037, 39, 40, 46, 47 and 49
drilled at the BAM Project include:
- Hole
BAM-032 intersected 1.30 g/t gold over
59.05 meters, including 15.0 meters grading 3.64
g/t gold;
- Hole
BAM-034 intersected 1.59 g/t gold over
36.5 meters, including 7.0 meters grading 5.63 g/t
gold; and
- Hole
BAM-037 intersected 1.38 g/t gold over
80.0 meters, including 12.2 meters grading 2.43
g/t gold.
Drill holes BAM-032 to 037, 39, 40, 46, 47 and
49 were drilled on Section D running east-west through the center
of the Monarch Gold Zone. Of these holes, BAM-032 to 34 were
collared in mineralized conglomerate to the east of an interpreted
carbonate horst in the center of Section D with the higher-grade
gold intercepts located closer to the structure on the eastern
margin of the carbonate horst. BAM-037, 038 and 039 and BAM-046,
047 and 049 were collared in mineralized siltstone to the west of
the interpreted carbonate horst with the higher-grade gold
intercepts located closer to the structure on the western margin of
the carbonate horst. Holes BAM-35 and 036 were collared within the
interpreted carbonate horst and did not encounter gold
mineralization within the carbonate.
A plan map and sections for drill holes BAM-032
to 037, 39, 40, 46, 47 and 49 of the 2022 BAM Drill Program are
available here.
The focus of the 2022 BAM Drill Program has been
to find the limits of the epithermal surface mineralization and
provide geologic information to aid in the interpretation of the
airborne and ground geophysical surveys. This interpretation will
be essential in discovering the source of the surface epithermal
zone and any associated high grade and/or porphyry
mineralization.
This latest drilling has continued to define
several structures that were active either during and/or after the
mineralization event. Gold grades intercepted by the drilling
generally increase towards these structures suggesting they are
potentially related to a feeder system. In addition, it is
anticipated that the identification of assay gradients within the
mineralization may confirm that these structures are part of the
feeder system for the surface mineralization. This will allow
future programs to focus on the high-grade, structurally controlled
mineralization.
Table 1: Selected BAM Drill Results,
October 2022 (BAM-032 to 037, 39, 40, 46, 47 and
49)(1, 2)
Hole |
Collar Coords |
Dip/Azimuth |
From(m) |
To(m) |
Interval(m) |
Gold(g/t) |
Silver(g/t) |
DrillPad |
BAM-032 |
N6341978E387220 |
-45/270 |
33.95 |
93.0 |
59.05 |
1.30 |
3.64 |
D-12 |
|
|
incl |
43.0 |
58.0 |
15.0 |
3.84 |
6.52 |
|
BAM-033 |
N6341977E387222 |
-70/270 |
21.5 |
36.0 |
14.5 |
0.92 |
1.28 |
D-12 |
|
|
incl |
21.5 |
24.15 |
2.65 |
3.11 |
2.95 |
|
|
|
|
44.0 |
63.0 |
19.0 |
0.36 |
2.25 |
|
BAM-034 |
N6341977E387225 |
-70/90 |
24.5 |
61.0 |
36.5 |
1.59(3) |
3.92 |
D-12 |
|
|
incl |
42.0 |
49.0 |
7.0 |
5.63(3) |
6.72 |
|
|
|
|
106.5 |
112.5 |
6.0 |
0.65 |
4.54 |
|
BAM-035 |
N6341974E387076 |
-45/90 |
46.0 |
57.0 |
11.0 |
0.65 |
4.56 |
D-10.5 |
|
|
|
105.0 |
141 |
36.0 |
1.17 |
6.22 |
|
|
|
incl |
105.0 |
115.5 |
10.5 |
1.67 |
6.43 |
|
BAM-036 |
N6341974E387074 |
-70/90 |
NSV |
D-10.5 |
BAM-037 |
N6341998E386782 |
-43/270 |
3.0 |
83.0 |
80.0 |
1.38 |
2.17 |
D-7.5 |
|
|
incl |
53.0 |
65.2 |
12.2 |
2.43 |
2.65 |
|
BAM-039 |
N6341998E386783 |
-70/270 |
3.0 |
23.0 |
20.0 |
1.09 |
2.21 |
D-7.5 |
|
|
incl |
3.0 |
11.0 |
8.0 |
1.82 |
3.94 |
|
|
|
|
37.2 |
57.00 |
19.8 |
1.27 |
1.27 |
|
BAM-040 |
N6341997E386787 |
-70/90 |
3.0 |
17.5 |
14.5 |
0.82 |
1.72 |
D-7.5 |
|
|
|
25.0 |
50.0 |
25 |
0.65 |
1.71 |
|
|
|
incl |
36.5 |
40.5 |
4.0 |
1.94 |
2.41 |
|
BAM-046 |
N6342002E386649 |
-45/270 |
NSV |
D-6.5 |
BAM-047 |
N6342002E386650 |
-90/00 |
90.7 |
93.3 |
2.6 |
1.44 |
2.08 |
D-6.5 |
BAM-049 |
N6342001E386656 |
-45/90 |
59.05 |
82.0 |
22.95 |
0.82 |
6.54 |
D-6.5 |
|
|
incl |
61.0 |
66.4 |
5.4 |
1.55 |
17.61 |
|
(1) |
True thickness to be determined. |
(2) |
All samples were submitted for preparation and analysis by ALS
Global at its facilities in Terrace, BC. All samples were analyzed
using multi-digestion with ICP finish and fire assay with AA finish
for gold. Samples with over 10 ppm gold were fire assayed with a
gravimetric finish. One in 20 samples was blank, one in 20 was a
standard sample, and one in 20 samples had a sample cut from assay
rejects assayed as a field duplicate at ALS Global in North
Vancouver, BC. |
(3) |
One sample cut to 30.0 g/t gold. |
Quality Assurance
Ken McNaughton, M.A.Sc., P.Eng., Chief
Exploration Officer, P2 Gold, is the Qualified Person, as defined
by National Instrument 43-101, responsible for the BAM Project. Mr.
McNaughton has reviewed, verified and approved the scientific and
technical information in this news release.
About P2 Gold Inc.
P2 Gold is a mineral exploration and development
company focused on advancing precious metals and copper discoveries
and acquisitions in the western United States and British
Columbia.
For further information, please contact:
Joseph Ovsenek President & CEO(778) 731-1055P2 Gold Inc.Suite
1100, 355 Burrard StreetVancouver, BCV6C 2G8info@p2gold.com(SEDAR
filings: P2 Gold Inc.) |
Michelle RomeroExecutive Vice President(778) 731-1060 |
Neither the TSX Venture Exchange (the
“Exchange”) nor its Regulation Services Provider (as that term is
defined in the policies of the Exchange) accepts responsibility for
the adequacy or accuracy of this release.
Forward Looking Information
This press release contains “forward-looking
information” within the meaning of applicable securities laws that
is intended to be covered by the safe harbours created by those
laws. “Forward-looking information” includes statements that use
forward-looking terminology such as “may”, “will”, “expect”,
“anticipate”, “believe”, “continue”, “potential” or the negative
thereof or other variations thereof or comparable terminology. Such
forward-looking information includes, without limitation,
information with respect to the Company’s expectations, strategies
and plans for the BAM Project including the Company’s planned
expenditures and exploration activities.
Forward-looking information is not a guarantee
of future performance and is based upon a number of estimates and
assumptions of management at the date the statements are made.
Furthermore, such forward-looking information involves a variety of
known and unknown risks, uncertainties and other factors which may
cause the actual plans, intentions, activities, results,
performance or achievements of the Company to be materially
different from any future plans, intentions, activities, results,
performance or achievements expressed or implied by such
forward-looking information. See “Risk Factors” in the Company’s
annual information form for the year ended December 31, 2021, dated
March 31, 2022 filed on SEDAR at www.sedar.com for a discussion of
these risks.
The Company cautions that there can be no
assurance that forward-looking information will prove to be
accurate, as actual results and future events could differ
materially from those anticipated in such information. Accordingly,
investors should not place undue reliance on forward-looking
information.
Except as required by law, the Company does not
assume any obligation to release publicly any revisions to
forward-looking information contained in this press release to
reflect events or circumstances after the date hereof.
P2 Gold (TSXV:PGLD)
과거 데이터 주식 차트
부터 1월(1) 2025 으로 2월(2) 2025
P2 Gold (TSXV:PGLD)
과거 데이터 주식 차트
부터 2월(2) 2024 으로 2월(2) 2025