Pure Energy Minerals Commences Drilling Newest Lithium Brine Exploration Borehole at Clayton Valley South Project, Nevada
30 11월 2016 - 9:32PM
Pure Energy Minerals Limited (TSX VENTURE:PE) (FRANKFURT:A111EG)
(OTCQB:PEMIF) (the “Company” or “Pure Energy”) is pleased to
announce that it has commenced drilling its newest exploration
borehole, CV-8, on the Clayton Valley South Project (“CVS
Project”). This latest borehole is the final one in Pure Energy’s
current phase of exploration work, and Pure Energy has all
necessary permits and government permissions in hand to commence
work. Since this borehole is being drilled concurrently with CV-7,
the Company has retained Boart Longyear as the drilling contractor
for CV-8. Boart Longyear has completed collaring of the borehole,
and all ancillary works are in place to immediately commence rotary
coring of the basin-fill sediments. CV-8 is located approximately
1.8 km (1.1 miles) west-southwest of the recently completed CV-3
well. The Company is targeting depths of approximately 600 – 900 m
(2,000-3,000 ft) below ground level for CV-8.
CV-8 is in a highly prospective part of Pure Energy’s claim
package, targeting geophysical and stratigraphic features of
interest in a very deep portion of the basin. If completed to its
full target depth, the Company believes this would be the deepest
lithium brine exploratory hole in the area. Upon successful
completion of the borehole to target depth as a well, the Company
expects to collect new brine samples for lithium analysis and
integrate that data into its existing inferred lithium brine
resource. At the conclusion of the Phase 3 drilling program, Pure
Energy will have drilled a total of approximately 4.1 km (13,320
ft) of exploration boreholes across their claims.
Patrick Highsmith, Pure Energy Minerals CEO commented, “A second
drill rig has arrived at the CVS Project and begun work on CV-8,
the final drill hole in our phase 3 program. Our understanding of
the CVS brines and their host sediments has improved markedly
through 2016. The geophysics and hydrogeological interpretations
suggest that familiar aquifers from CV-1 and CV3 await us in CV-8.
We look forward to testing the hydrogeology in this area to new
depths. Once the drilling is complete, we shall prepare an update
to the resource that incorporates all the new data.”
Patrick Highsmith, Certified Professional Geologist (AIPG CPG #
11702), is a qualified person as defined by NI 43-101, and has
supervised the preparation of the scientific and technical
information that forms the basis for this news release. Mr.
Highsmith is not independent of the Company as he is an officer and
director.
About Pure Energy Minerals Ltd.
Pure Energy is a lithium resource developer that is driven to
become a low-cost supplier for the burgeoning lithium battery
industry. While the Company is currently focused on the
development of the CVS Lithium Brine Project and the adjoining
Glory Lithium Clay Project in Clayton Valley, Nevada, it is
actively evaluating new lithium targets in North and South
America.
Pure Energy has developed core strengths in innovative
development and processing technologies for lithium brines and
lithium mineral deposits. The Company’s key attributes and
activities include:
- Generating positive results on a large land position with
excellent infrastructure in a first-class mining jurisdiction:
approx. 11,000 acres in four main claim groups in Clayton Valley,
Esmeralda County, Nevada;
- The only lithium brine resource in North America except for its
neighbor, which is the only producing lithium operation in the
United States (Albemarle’s Silver Peak lithium brine mine);
- An inferred mineral resource containing approximately 816,000
metric tonnes of Lithium Carbonate Equivalent (LCE), reported in
accordance with NI 43-101;
- An advanced program of testing the efficacy and economics of
modern environmentally-responsible processing technologies to
convert the CVS brines into high purity lithium products for new
energy storage uses; and,
- An active business development program, applying its expertise
to the evaluation of new lithium targets around the world.
On behalf of the Board of Directors, “Patrick Highsmith” Chief
Executive Officer
Forward Looking Statements: The information in this news release
contains forward looking statements that are subject to a number of
known and unknown risks, uncertainties and other factors that may
cause actual results to differ materially from those anticipated in
our forward looking statements. Factors that could cause such
differences include: changes in world commodity markets, equity
markets, costs and supply of materials relevant to the mining
industry, change in government and changes to regulations affecting
the mining industry. Forward-looking statements in this release may
include statements regarding mineral processing, adaptation of test
work to larger scale and/or future operational scales, estimates of
reduced future capital and operating expenses, delivery of a
preliminary economic assessment, future exploration programs,
operation plans, geological interpretations, and mineral tenure
issues. Although we believe the expectations reflected in our
forward looking statements are reasonable, results may vary, and we
cannot guarantee future results, levels of activity, performance or
achievements.
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of
this release
CONTACT:
Pure Energy Minerals Limited (www.pureenergyminerals.com)
Email: info@pureenergyminerals.com
Telephone – 604 608 6611, ext 5
Pure Energy Minerals (TSXV:PE)
과거 데이터 주식 차트
부터 11월(11) 2024 으로 12월(12) 2024
Pure Energy Minerals (TSXV:PE)
과거 데이터 주식 차트
부터 12월(12) 2023 으로 12월(12) 2024