LAKE GILES FEASIBILITY STUDY UPDATE: Macarthur applying for additional tenements to support groundwater drilling campaign fo...
26 3월 2021 - 9:00PM
Macarthur Minerals Limited (TSX-V: MMS)
(ASX: MIO) (OTCQB: MMSDF) (the “Company” or “Macarthur”)
is pleased to announce that has made applications for tenements to
support a groundwater search drilling programme following the
successful completion by CGG Aviation of a Tempest airborne
electromagnetic (AEM) survey of palaeovalleys adjacent to the Lake
Giles Iron Project.
The AEM survey was undertaken to assist in the
identification of groundwater drilling targets.
Highlights
- Recently completed Tempest AEM survey covered an extensive area
of the Rebecca palaeovalley, which is in close proximity to the
Lake Giles Iron Project where a large quantity of groundwater is
expected to occur.
- AEM survey results are being interpreted and drill targets will
now be defined, with subsequent drilling planned during the first
part of this year to test quality and quantity of water to support
magnetite processing requirements.
- The announced tenements applications are Miscellaneous Licences
that are required to support the planned groundwater search
activities.
- Macarthur is working with hydrogeologists from Rockwater to
design a groundwater drilling exploration programme across
prospective zones identified from the AEM survey.
|
Macarthur continues to work with consulting
hydrogeologists from Rockwater Pty Ltd (“Rockwater”) to define a
source for process water requirements for magnetite processing at
its Lake Giles Iron Project.
The Goldfields region contains numerous buried
palaeovalleys that are likely to contain large volumes of
groundwater. Such systems are currently exploited to supply process
water demands for other Goldfields operations such as BHP’s Nickel
West, Glencore’s Murrin Murrin Nickel Project and Gold Road’s
Gruyere Gold Project.
The western limb of the Rebecca palaeovalley is
located approximately 15 to 40 km east of the Lake Giles Iron
Project and extends over 160 km North to South (Figure 1). This
system is expected to contain abundant groundwater and is currently
not exploited by other operators.
Macarthur recently completed an airborne AEM
survey covering an area of 970 km2 across the Rebecca palaeovalley.
Preliminary results have been obtained (Figure 2) with additional
data processing ongoing to generate detailed information to map the
palaeovalley geometry. Macarthur has now made applications for two
groundwater search miscellaneous licences covering an area of 553
km2 across the prospective zone interpreted from the AEM survey.
The Company is now preparing to undertake a groundwater exploration
program targeting approximately 30 holes to obtain detailed
information on water flows and water quality.
The Tempest AEM system is suited to conductivity
mapping and has previously been utilised for mapping the location,
extent and basement topography of palaeodrainage systems.
Interpretation of the data collected will be undertaken by
hydrogeologists from Rockwater, who are experts in the application
of hydrogeological surveys, to define suitable drill targets for
groundwater exploration.
Figure 1. Tempest AEM Survey area over the
Rebecca Palaeovalley as mapped by the Kalgoorlie 1:1,000,000 Sheet.
Project GDA94, Zone
50:https://www.globenewswire.com/NewsRoom/AttachmentNg/1447d62d-36b0-47d7-9195-7a53f802552c
Andrew Bruton, Chief Executive Officer
of Macarthur Minerals commented:
“Macarthur’s applications for
two Miscellaneous Licences to support planned groundwater search
activities is another important step forward for the Lake Giles
Iron Project Feasibility Study. Following completion of analysis of
the AEM survey data, Macarthur will work with consulting
hydrologists from Rockwater, to identify suitable drill
targets.
The Company plans to commence groundwater
exploration activities as soon as possible following the grant of
the relevant tenements. This important programme of work will
enable the Company to test the quantity and quality of water
required to support its magnetite processing requirements, and it
will form part of a much broader scope of site-based activities
planned by the Company at Lake Giles this year.
Step by step, the Macarthur team is working
through every aspect of the Lake Giles Iron Project to ensure the
delivery of a robust Feasibility Study that has the potential to
deliver a valuable and sustainable high-grade magnetite project for
its shareholders.
We look forward to providing many more updates
on progress in the coming months.”
Issue of Performance
Incentive
Pursuant to the Company’s Share Compensation
Plans, the Company has granted to a director 321,060 Bonus Shares
with a deemed price on grant of C$0.6147 and a consultant 291,666
Bonus Shares with a deemed price on grant of C$0.6240 per share.
The issue of the Bonus Shares following grant maybe subject to
shareholder approval, if required.
On behalf of the Board of Directors, Mr
Cameron McCall, Chairman
For more information please contact:
Joe Phillips |
|
|
|
Managing Director |
|
|
|
+61 7 3221 1796 |
|
|
|
communications@macarthurminerals.com |
|
|
|
|
|
|
|
Investor Relations – Australia |
|
|
Investor Relations - Canada |
Advisir |
|
|
Investor Cubed |
Sarah Lenard, Partner |
|
|
Neil Simon, CEO |
sarah.lenard@advisir.com.au |
|
|
+1 647 258 3310 |
info@investor3.ca |
|
|
info@investor3.ca |
Company profileMacarthur is an
iron ore development, gold and lithium exploration company that is
focused on bringing to production its Western Australia iron ore
projects. The Lake Giles Iron Project mineral resources include the
Ularring hematite resource (approved for development) comprising
Indicated resources of 54.5 million tonnes at 47.2% Fe and Inferred
resources of 26 million tonnes at 45.4% Fe; and the Lake Giles
magnetite resource of 53.9 million tonnes (Measured), 218.7 million
tonnes (Indicated) and 997 million tonnes (Inferred). Macarthur has
prominent (~721 square kilometer tenement area) gold, lithium and
copper exploration interests in Pilbara region of Western
Australia. In addition, Macarthur has lithium brine Claims in the
emerging Railroad Valley region in Nevada, USA.
This news release is not for
distribution to United States services or for dissemination in the
United States
Caution Regarding Forward Looking
StatementsCertain of the statements made and information
contained in this press release may constitute forward-looking
information and forward-looking statements (collectively,
“forward-looking statements”) within the meaning of applicable
securities laws. All statements herein, other than statements
of historical fact, that address activities, events or developments
that the Company believes, expects or anticipates will or may occur
in the future, including but not limited to statements regarding
expected completion of the Feasibility Study; conversion of Mineral
Resources to Mineral Reserves or the eventual mining of the
Project, are forward-looking statements. The forward-looking
statements in this press release reflect the current expectations,
assumptions or beliefs of the Company based upon information
currently available to the Company. Although the Company believes
the expectations expressed in such forward-looking statements are
based on reasonable assumptions, such statements are not guarantees
of future performance and no assurance can be given that these
expectations will prove to be correct as actual results or
developments may differ materially from those projected in the
forward-looking statements. Factors that could cause actual
results to differ materially from those in forward-looking
statements include but are not limited to: unforeseen
technology changes that results in a reduction in iron or magnetite
demand or substitution by other metals or materials; the discovery
of new large low cost deposits of iron magnetite; the general level
of global economic activity; failure to complete the FS; inability
to demonstrate economic viability of Mineral Resources; and failure
to obtain mining approvals. Readers are cautioned not to
place undue reliance on forward-looking statements due to the
inherent uncertainty thereof. Such statements relate to future
events and expectations and, as such, involve known and unknown
risks and uncertainties. The forward-looking statements contained
in this press release are made as of the date of this press release
and except as may otherwise be required pursuant to applicable
laws, the Company does not assume any obligation to update or
revise these forward-looking statements, whether as a result of new
information, future events or otherwise.
Macarthur Minerals (TSXV:MMS)
과거 데이터 주식 차트
부터 11월(11) 2024 으로 12월(12) 2024
Macarthur Minerals (TSXV:MMS)
과거 데이터 주식 차트
부터 12월(12) 2023 으로 12월(12) 2024