Valley High Ventures Ltd. ("Valley High", or the "Company") (TSX VENTURE:VHV) is
pleased to announce, that Levon Resources Ltd. ("Levon"), as Operator of the
Cordero Joint Venture, has provided additional assays from the ongoing Phase III
exploration and drill program currently underway at the Company's 49% owned
Cordero silver, gold, zinc and lead project located 35 kilometres northeast of
Hidalgo Del Parral, Chihuahua, Mexico. Drill results are highlighted by the
discovery of high grade contact replacement-style mineralization in the Josefina
Zone in hole C11-105 where a 50 metre interval returned 97.2 g/t silver, 0.30
g/t gold, 3.2% zinc and 1.6% lead. In addition, drilling at the north end of the
Porphyry Zone, continues to expand and highlight the potential of this new area
of mineralization demonstrated by drill hole C11-102 which returned 122 metres
grading 22.9 g/t silver, 0.90% zinc and 0.40% lead


Drill results presented herein are from a variety of targets on the large
Cordero property and include holes designed as initial tests of distal targets
(Molina de Viento, Dos Mils Diez), three holes along the eastern perimeter of
the Pozo de Plata Zone, five holes from the large Porphyry Zone target and two
holes from the Josefina Zone located between the Pozo de Plata and the Porphyry
Zones. 


Tables 1a to 1d summarize the results. Silver equivalent definitions are
presented at the end of this release. Table 2 summarizes the drill hole
locations and Figure 1 illustrates the drill hole locations. 


Josefina Mine Zone

The Josefina Mine Zone (Josefina) is located east of the Pozo de Plata Diatreme
discovery and extends for 800 metres northeast towards the Porphyry zone. The
Josefina has been tested by a number of holes that include strong results from
holes previously reported holes C10-23 and C10-32 (news release of May 13,
2010). Hole C11-105 was collared 100 metres northeast of hole C10-32 and was
drilled to the north at -60 degrees. The drill hole encountered numerous well
mineralized intervals with the most significant being a high grade intercept of
over 50 metres of mineralized diatreme breccia cutting hornfels limestone
grading 97.2 g/t silver, 0.30 g/t gold, 3.2% zinc and 1.63% lead beginning at
314 metres depth.




Table 1a: Josefina Zone Drill Results

---------------------------------------------------------------------------
                           length      Ag      Au                     Ag Eq.
HoleID    from (m)  to (m)     (m)   (g/T)   (g/T)   Zn %    Pb %   (g/T)(i)
---------------------------------------------------------------------------
C11-98        120     130      10    11.4   0.310    0.48    0.19     32.97
---------------------------------------------------------------------------
C11-105         8      28      20    26.1   0.160    0.11    0.09     33.01
---------------------------------------------------------------------------
C11-105        86      94       8    51.7   0.035    3.25    0.96    176.71
---------------------------------------------------------------------------
C11-105       118     126       8    29.7   0.033    0.56    0.49     62.42
---------------------------------------------------------------------------
C11-105       226     246      20    31.9   0.104    0.90    0.53     80.33
---------------------------------------------------------------------------
C11-105       270     278       8    17.4   0.050    1.28    0.20     63.91
---------------------------------------------------------------------------
C11-105       314     364      50    97.2   0.298    3.24    1.63    259.87
---------------------------------------------------------------------------



Pozo de Plata Diatreme Zone

Three holes were drilled to define the eastern limits of the Pozo de Plata
Diatreme Zone ("Pozo"). All three holes encountered intervals of mineralization
including a 6 metre high grade section in hole C11-103 starting at 244 metres
depth. The Pozo appears to be limited to the east; however these results may
represent a low grade interval between two higher grade lobes that define the
Pozo de Plata deposit and the Josefina to the east. The Pozo remains open to the
south and southwest where additional drilling is ongoing with results pending. 




Table 1b: Pozo de Plata Zone Drill Results

---------------------------------------------------------------------------
                           length      Ag      Au                     Ag Eq.
HoleID    from (m)  to (m)     (m)   (g/T)   (g/T)   Zn %    Pb %   (g/T)(i)
---------------------------------------------------------------------------
C11-103       198     212      14    41.6   0.037    1.34    0.99    112.40
---------------------------------------------------------------------------
C11-103       262     270       8    25.4   0.015    1.13    0.50     73.97
---------------------------------------------------------------------------
C11-103       344     350       6   244.4   0.470    4.72    2.91    470.09
---------------------------------------------------------------------------
C11-108       304     310       6    46.6   0.480    0.97    0.35     88.11
---------------------------------------------------------------------------
C11-108       360     370      10     4.5   0.007    1.65    0.07     54.99
---------------------------------------------------------------------------
C11-109        16      46      30     7.5   0.014    0.86    0.04     34.76
---------------------------------------------------------------------------
C11-109       148     184      36    42.0   0.171    0.52    0.56     84.95
---------------------------------------------------------------------------
C11-109       196     206      10    18.7   0.089    0.35    0.15     38.99
---------------------------------------------------------------------------
C11-109       274     288      14     8.6   0.240    1.15    0.29     52.38
---------------------------------------------------------------------------



Porphyry Zone

The Porphyry Zone is located 1,000 metres east of the Pozo de Plata Diatreme
Zone and comprises a number of mineralized centres over a large area of 1,200
metres by 800 metres. Reported current holes at the north end of the Porphyry
zone in holes C11-102, C11-97 and C11-92 have returned several long intervals of
mineralization including an interval in hole C11-102 of 122 metres grading 22.9
gpT Ag, 0.90% Zn and 0.40% Pb. These values are consistent with previously
drilled holes in the Porphyry zone including holes C10-41, C10-87, C10-72 and
cover an area of 300 metres by 270 metres that remains open to expansion. 




Table 1c: Porphyry Zone Drill Results

---------------------------------------------------------------------------
                           length      Ag      Au                     Ag Eq.
HoleID    from (m)  to (m)     (m)   (g/T)   (g/T)   Zn %    Pb %   (g/T)(i)
---------------------------------------------------------------------------
C10-90         84     108      24    25.9   0.057    0.27    0.25     44.82
---------------------------------------------------------------------------
C10-90        124     136      12    21.2   0.390    0.17    0.14     32.80
---------------------------------------------------------------------------
C10-90        166     212      46    29.6   0.049    0.35    0.20     49.15
---------------------------------------------------------------------------
C10-90        240     284      44    19.6   0.060    0.26    0.22     37.74
---------------------------------------------------------------------------
C10-90        342     354      12    21.9   0.096    0.47    0.12     45.57
---------------------------------------------------------------------------
C10-90        630     652      22    17.3   0.024    0.78    0.21     47.84
---------------------------------------------------------------------------
C10-90        664     678      14    33.9   0.032    1.93    1.30    130.39
---------------------------------------------------------------------------
C10-90        720     730      10    31.3   0.116    0.83    0.32     72.60
---------------------------------------------------------------------------
C10-92          0      52      52    26.0   0.031    0.40    0.39      50.9
---------------------------------------------------------------------------
C10-92        104     138      34    22.1   0.021    0.41    0.41      47.4
---------------------------------------------------------------------------
C10-93         82      98      16    31.5   0.047    0.23    0.42     53.64
---------------------------------------------------------------------------
C10-95        No sig results
---------------------------------------------------------------------------
C10-97         56     114      58    26.3   0.023    0.49    0.53     57.47
---------------------------------------------------------------------------
C10-97        206     220      14    37.0   0.144    0.04    0.12     51.35
---------------------------------------------------------------------------
C10-97        370     408      38    19.9   0.022    1.05    0.52     67.25
---------------------------------------------------------------------------
C10-97        460     486      26    11.3   0.036    1.01    0.17     48.10
---------------------------------------------------------------------------
C10-97        558     642      84    29.1   0.050    1.38    0.35     83.14
---------------------------------------------------------------------------
C10-97        668     692      24    17.1   0.044    0.56    0.41     48.34
---------------------------------------------------------------------------
C11-102        18      24       6    16.2   0.164    0.74    0.03     49.61
---------------------------------------------------------------------------
C11-102       216     338     122    22.9            0.90    0.40      62.3
---------------------------------------------------------------------------
C11-102       216     272      56    39.7   0.040    1.31    0.74    102.60
---------------------------------------------------------------------------
C11-102       292     308      16    14.7   0.030    0.59    0.23     40.61
---------------------------------------------------------------------------
C11-102       320     338      18     9.1   0.013    0.82    0.18     39.10
---------------------------------------------------------------------------
C11-102       526     532       6    26.0   0.034    1.21    0.43     76.13
---------------------------------------------------------------------------
C11-106       176     188      12    25.8   0.001    1.61    0.27     80.82
---------------------------------------------------------------------------



Molina de Viento and Dos Mils Diez Diatreme Complexes

Reconnaissance style drilling of a number of outlying targets returned low
values. Targets drilled included the Molina de Viento Diatreme complex located 8
kilometres west of Pozo de Plata where covered chargeability anomalies were cut
by three widely spaced holes. Although metal values were low, core exhibited
pervasive propylitic alteration with some lead and zinc veins with phyllic
alteration selvages. Additional exploration is planned in this un-prospected
area. 




Table 1d: Other Zone Drill Results

---------------------------------------------------------------------------
HoleID         Zone                                                        
---------------------------------------------------------------------------
C10-94         Molina de Viento              No significant assays         
---------------------------------------------------------------------------
C10-96         Molina de Viento              No significant assays         
---------------------------------------------------------------------------
C11-99                                       No significant assays         
---------------------------------------------------------------------------
C11-100        Dos Mil Diez                  No significant assays         
---------------------------------------------------------------------------
C11-101        Molina de Viento              No significant assays         
---------------------------------------------------------------------------



Discussion of Results

In general, silver, gold, zinc and lead mineralization occur in three main
styles within the central area of the Cordero property. The Pozo de Plata
Diatreme hosts a bulk tonnage deposit comprised dominantly of broken massive
sulfide clasts, replacements and disseminated and vein controlled sphalerite and
galena within a diatreme breccia. To the east, the Porphyry zone is a loosely
defined area wherein mineralization is hosted by high-level stocks and related
breccias and contact hornfels altered zone where mineralization is comprised of
disseminated, stockwork and vein controlled sphalerite and galena. The
intermediary Josefina Zone is a transitional area between the Pozo de Plata
Diatreme and Porphyry Zone and hosts mineralization with the character of both
areas. The discoveries are also cut by high grade sphalerite and galena veins
currently being mined by artisan shaft operations to the water table and the
surrounding sedimentary country rocks are potential hosts for high grade contact
replacement mineralization. Replacement style mineralization is indicated from
drill results in holes C11-105 and C10-31 (news release of May 13/10). This
style of high grade contact mineralization is increasingly an important target
type at Cordero.


Drill results in the Pozo de Plata Diatreme and Porphyry Zones have been
forwarded to IMC Engineering of Tucson, Arizona who is conducting an analysis of
the results for a first 43-101 resource calculation. M3 Engineering of Tucson,
Arizona has initiated metallurgical testing and the engineering studies required
for a 43-101 preliminary economic assessment (PEA) of Cordero. The southerly
extension of the Porphyry Zone is not yet defined and is currently being
drilled. A newly recognized centre of mineralization at the north end of the
Porphyry Zone continues to return encouraging bulk tonnage results and is the
focus of additional drilling. The Josefina Zone located midway between these two
discoveries potentially hosts bulk tonnage mineralization as well as high grade
contact replacement mineralization at depth, an increasingly important target
type at Cordero.


QA/QC Procedures

All drill holes are started with HQ diameter core and then when necessary
reduced to NQ diameter core depending on drilling conditions. The drill core is
sawed through its length and samples collected in continuous two-metre
intervals. All drill intercepts reported are core lengths and not true widths,
which are unknown. All of the samples are prepared and analyzed by ALS Chemex at
its labs in Chihuahua, Mexico, and Vancouver, Canada respectively. Gold analyses
are being performed by 30-gram fire assay with an atomic absorption finish.
Silver, zinc and lead were analyzed as part of a multi-element inductively
coupled argon plasma ("ICP") package using a four-acid digestion with over-limit
results being reanalyzed with assay procedures using ICP-AES. The company
employs a rigorous quality assurance and quality control program that include
standardized material, blanks and duplicates. AMEC Americas Ltd. has designed
the QAQC protocol from a study and review of information provided by the Joint
Venture to AMEC. Independent Mining Consultants (IMC), Tucson, Arizona reviews
the QA/QC data. 


The project is under the direct supervision of Vic Chevillon, MA, CPG, and Vice
President of Exploration for Levon who is a qualified person within the context
of National Instrument 43-101. Robert Cameron, PGeo, who is a qualified person
within the context of National Instrument 43-101, has read and takes
responsibility for this News Release. 


(i) Silver equivalent grade, based on assumed recoveries, is calculated using
the following metal prices: silver at $15 per ounce, gold at $1,000 per ounce,
zinc at 90 cents per pound, lead at 90 cents per pound and assumed recoveries
(metallurgical and smelter deductions) of 70% for silver and gold and 50% for
zinc and lead. Actual metal recoveries have not been determined. Summary assay
intervals as reported above were selected based on a 22.64 g/T Ag equivalent
cut-off over significant widths that by inspection show geochemical consistency
down the hole among the 2 m sample intervals


About Valley High Ventures Ltd.:

Valley High is a Canadian based precious and base metal exploration company with
projects located in Mexico, British Columbia and Yukon. As previously announced
on January 17, 2011, Valley High and Levon Resources Ltd. ("Levon") have entered
into a definitive arrangement agreement under which Levon will acquire 100% of
the outstanding common shares of Valley High by way of a plan of arrangement
("Arrangement"). Under the Arrangement, Valley High shareholders will receive
1.0 share of Levon and 0.125 of a share in a new exploration company, Bearing
Resources Ltd. ("Bearing"), for each Valley High share. The Cordero project in
Mexico (49% interest) is being evaluated for large bulk mineable silver, gold,
zinc and lead deposits. Upon completion of the Arrangement Levon will own a 100%
interest in the Cordero Project.


About Bearing Resources

Bearing will be a Canadian based precious and base metal exploration company
with projects located in British Columbia and Yukon. The Mount Polley and
October Dome projects are located in British Columbia adjacent to Imperial
Metals Corporation's ("Imperial") Mt. Polley copper-gold mine and includes a
production royalty on the Boundary property, with Imperial. In the Yukon,
Bearing will have an option to acquire a 100% interest in the Flume gold
property which is located within the newly recognized White Gold District. Ryan
Gold Corp. has been granted a right to earn up to 75% interest in VHV's interest
in the Flume property. In addition, Bearing will hold additional Yukon
exploration properties located near Golden Predator's Clear Creek gold project
and Northern Tiger's 3Ace gold project.


VALLEY HIGH VENTURES LTD.

Geoff Chater, President

This news release includes certain "forward-looking statements" under applicable
Canadian securities legislation. Such forward-looking statements or information,
including but not limited to those with respect to the prices of copper,
estimated future production, estimated costs of future production, permitting
time lines, involve known and unknown risks, uncertainties, and other factors
which may cause the actual results, performance or achievements of Valley High
to be materially different from any future results, performance or achievements
expressed or implied by such forward-looking statements or information. Such
factors include, among others, the actual prices of copper, the factual results
of current exploration, development and mining activities, changes in project
parameters as plans continue to be evaluated, as well as those factors disclosed
in documents filed from time to time with the securities regulators in the
applicable Provinces of British Columbia and Alberta.


To view Figure 1 please visit the following link:
http://media3.marketwire.com/docs/VHVFig1.pdf




Table 2. Reported drill hole locations (UTM Conus Nad 72, Zone 13).

---------------------------------------------------------------------------
HoleID                  X         Y         Z       TDm   Azimuth       Dip
---------------------------------------------------------------------------
C10-90             443702   3014551      1599    862.95         0       -90
---------------------------------------------------------------------------
C10-92             443558   3015101      1591     936.6         0       -90
---------------------------------------------------------------------------
C10-93             443296   3014998      1611     446.9         0       -60
---------------------------------------------------------------------------
C10-94             434549   3011002      1618       151         0       -60
---------------------------------------------------------------------------
C10-95             443304   3013901      1586    409.55         0       -60
---------------------------------------------------------------------------
C10-96             434650   3012050      1617       423         0       -90
---------------------------------------------------------------------------
C10-97             443299   3014994      1609     706.9         0       -60
---------------------------------------------------------------------------
C11-98             443285   3014110      1605     526.8         0       -90
---------------------------------------------------------------------------
C11-99             441430   3013932      1566     287.2         0       -60
---------------------------------------------------------------------------
C11-100            440570   3012772      1570    158.85       150       -60
---------------------------------------------------------------------------
C11-101            436082   3010358      1631     185.3         0       -90
---------------------------------------------------------------------------
C11-102            443500   3015196      1594     602.6       105       -60
---------------------------------------------------------------------------
C11-103            442796   3013815      1565    537.95         0       -90
---------------------------------------------------------------------------
C11-104            442806   3014151      1586       497         0       -60
---------------------------------------------------------------------------
C11-105            443285   3014111      1605     437.9         0       -60
---------------------------------------------------------------------------
C11-106            443498   3014697      1606     392.8         0       -60
---------------------------------------------------------------------------
C11-108            442809   3014146      1586    535.15         0       -60
---------------------------------------------------------------------------
C11-109            442778   3013967      1578     551.2         0       -60
---------------------------------------------------------------------------

IC Potash Corp. (TSXV:ICP)
과거 데이터 주식 차트
부터 4월(4) 2024 으로 5월(5) 2024 IC Potash Corp. 차트를 더 보려면 여기를 클릭.
IC Potash Corp. (TSXV:ICP)
과거 데이터 주식 차트
부터 5월(5) 2023 으로 5월(5) 2024 IC Potash Corp. 차트를 더 보려면 여기를 클릭.