Editors note: There is one video associated with this press release.

Golden Touch Resources Corp. ("Golden Touch" or the "Company") (TSX
VENTURE:GOT)(FRANKFURT:0GT) is pleased to announce further assays from its
initial drilling program on its Rubik Gold Project in Albania. 


The assays included herein are from Holes 13 to 20. The samples were assayed by
ALS Laboratories in Romania. Holes 16, 17 and 19 appear to have intersected the
same gold mineralisation envelope previously encountered in Holes 5, 8, 10, 11
and 12. 


Significant Intersections in Holes 16, 17 and 19 are as follows: 



--------------------------------------------------------------------
Hole            Drill Hole Interval       Thickness            Grade
--------------------------------------------------------------------
16                  41 to 64 metres       23 metres      0.87 g/t Au
               -----------------------------------------------------
Including           43 to 44 metres        1 metres     12.85 g/t Au
--------------------------------------------------------------------
17                  85 to 88 metres        3 metres      14.6 g/t Au
               -----------------------------------------------------
Including           86 to 87 metres        1 metres      39.4 g/t Au
--------------------------------------------------------------------
19                  59 to 69 metres       10 metres      2.65 g/t Au
               -----------------------------------------------------
Including           59 to 62 metres        3 metres      6.64 g/t Au
--------------------------------------------------------------------



These holes have now evaluated the main gold mineralized envelope, over about
200 metres of strike and the gold intersections in the 8 holes that have
intersected the main envelope over an interval averaging 23 metres at 1.8 g/t
Au. The envelope is open both along strike and at depth. The results of another
8 holes drilled within the first phase program are awaited and many of these
holes test the area along strike to the west and north-west. 


The area tested to date covers a strike length over 1,000 metres where previous
drilling and recent surface sampling have encountered gold mineralization. 


As the results of the first drilling program are received it is now becoming
increasing clear that the better gold mineralization is at the top of the gold
envelope. 




The results at the top of the envelope are as follows:                      
                                                                            
Hole 5:     9 metres @ 5.1 g/t Au from 63 to 71 metres                      
                                                                            
Hole 8:     7 metres @ 4.0 g/t Au from 47 to 51 metres                      
                                                                            
Hole 10:    2 metres @ 8.0 g/t Au from 40 to 42 metres                      
                                                                            
Hole 11:    6 metres @ 7.0 g/t Au from 24 to 30 metres                      
                                                                            
(includes 1 metre at 29.8 g/t Au from 28 to 29 metres)                      
                                                                            
Hole 12:    8 metres @ 2.3 g/t Au from 39 to 47 metres.                     
                                                                            
Hole 16:    2 metres @ 6.8 g/t Au from 41 to 43 metres                      
                                                                            
Hole 17:    3 metres @ 14.6 g/t Au from 85 to 88 metres                     
                                                                            
(includes 1 metre at 39.4 g/t Au from 86-87 metres)                         
                                                                            
Hole 19:    3 metres @ 6.6 g/t Au from 59 to 62 metres                      
                                                                            
Average intersection at the top of the envelope: 5 metres @ 5.7 g/t Au.     



In addition, a second gold zone has been encountered near the base of the
envelope in holes 5, 8.10 and 11. Over those 5 holes, the gold zone averaged 6.0
metres @ 2.2 g/t Au. 


Whilst the first phase of drilling is evaluating an area where previous drilling
and surface sampling located significant grades of gold mineralization, like
most areas where gold occurs, the geometry and structure of the mineralization
is complex. Hence, not all the holes drilled in this program will encounter the
main gold mineralization envelope. 


For example, holes 13, 14, 15 and 20 seemed to have intersected narrower and/or
low grade gold mineralization, which we do not know at this time whether it is
part of the main gold mineralization envelope or secondary deposits, in parallel
or cross cutting structural dilations. 


The best results obtained in holes 13, 14, 15 and 20 were as follows: 



-------------------------------------------------------------
Hole    Drill hole Interval       Thickness             Grade
-------------------------------------------------------------
14        117 to 118 metres         1 metre       8.15 g/t Au
-------------------------------------------------------------
13          72 to 73 metres         1 metre       1.12 g/t Au
-------------------------------------------------------------
18          72 to 75 metres        3 metres       0.12 g/t Au
-------------------------------------------------------------
20          88 to 90 metres        2 metres       1.61 g/t Au
-------------------------------------------------------------



The President of Golden Touch, Mr. Rob Murdoch, stated that, "The new assay
results continue to provide superior grade over width and the Company continues
to be excited about the findings to date. Further samples are currently being
prepared for dispatch to the laboratory (more assays pending) and those results
should be announced within the next month." 


Mineralogy tests show that the gold occurs with sulphides that have invaded the
host shear zone late with in its hydrothermal history and is contained in fine
to medium grained variably exposed grains. Preliminary metallurgical test work
show that 94.6% of the gold mineralization within the samples tested was
recoverable to a rougher cell float concentrate.  


Further background information on the gold project can be obtained from a
National Instrument 43-101 ("NI 43-101") compliant technical report on the
Livadheza Gold Project (EC 1124) prepared by Ian Mathison, Bsc (Hons Geol),
MAusIMM, as posted under the Company's profile on SEDAR at www.sedar.com. 


Robert Murdoch, President of Golden Touch, a Fellow of the Australasian
Institute of Mining and Metallurgy and also a Fellow of the Australian Institute
of Geoscientists and hence a qualified person under the meaning of Canadian
National Instrument 43-101, is responsible for the technical content of this
news release.


On Behalf of the Board of Directors 

Golden Touch Resources Corp.

Rob Murdoch, Chairman and President 

To view the video "Exclusively Albanian - Intimately Precious" which is
associated with this press release, please visit the following link:
http://www.youtube.com/watch?v=U_sEcHFQfgs


Goliath Resources (TSXV:GOT)
과거 데이터 주식 차트
부터 5월(5) 2024 으로 6월(6) 2024 Goliath Resources 차트를 더 보려면 여기를 클릭.
Goliath Resources (TSXV:GOT)
과거 데이터 주식 차트
부터 6월(6) 2023 으로 6월(6) 2024 Goliath Resources 차트를 더 보려면 여기를 클릭.