TORONTO,
ON, May 17, 2022 /PRNewswire/ - Talisker
Resources Ltd. ("Talisker" or the "Company") (TSX:
TSK) (OTCQX: TSKFF) is pleased to announce high-grade results on a
shallow portion of the 55 Vein within the Bralorne West block.
Key Points:
- Hole SB-2022-013 is located within the Bralorne West block and
focuses on near surface mineralization within the 55 vein.
- Highlighted by 31.44 g/t Au over 3.9 metres within a larger
mineralized envelope of 11.84 g/t Au over 12.45 metres.
- The vein intersection is from 85.55 metres to 98 metres below
the surface and increases the known mineralized envelope on the 55
vein (>3 gram x metres) to 450 metres x 480 metres.
- The total mineralized drill intercepts on the 55 vein to date
is 29.
- Talisker drilling to date at the Bralorne Gold Project has
produced 367 vein intersections with a combined weighted average
diluted grade of 9.01 g/t over an average intersection length of
1.75 metres.
Matt Filgate, Vice President,
Corporate Development of Talisker, commented, "Today's results
highlight the growth potential of the current veins, demonstrating
the excellent grade continuity and the ability for rapid resource
expansion within the known veins. As we continue to expand our
drilling along strike and down plunge of known mineralization, we
expect to see the mineralizing footprint grow rapidly."
Three diamond drills are now operating at the Bralorne Gold
Project. A total of 138,741 metres (284 holes) has been drilled
since Talisker initiated drilling at the Project in February 2020. Currently, there are 2420 samples
at the assay laboratory, which are expected to be received by the
Company shortly.
SB-2022-013 Hole
Description:
- Complete assay results received.
- Located in the Bralorne West block and hosted in dioritic
intrusive and ultramafics.
- 55 vein intersected from 90.6 to 98.0 metres with visible gold
and a mineralized hanging wall halo from 85.55 to 90.60
metres.
Major vein structures intersected are considered classic
Bralorne crack-seal quartz-carbonate veins with densely banded
sulphide septae. Crack-seal septae host fine-grained arsenopyrite
and pyrite mineralization. Alteration halos consist of strong
silica-sericite±mariposite alteration halos.
All reported drill assay results are available on the Company's
website at the following link:
https://taliskerresources.com/bralorne-gold-project-released-drill-results/.
Table 1: Bralorne
Gold Project - Drill Hole SB-2022-013
|
Diamond Drill
Hole Name
|
From
(m)
|
To
(m)
|
|
Interval (m)
|
Au
(g/t)
|
Interpreted
Structure
|
Method
Reported
|
SB-2022-013
|
85.55
|
86.05
|
0.5
|
3.23
|
55 Vein Halo
|
Au-AA26
|
SB-2022-013
|
86.05
|
86.95
|
0.9
|
15.95
|
Au-AA26
|
SB-2022-013
|
86.95
|
88.15
|
1.2
|
2.84
|
Au-AA26
|
SB-2022-013
|
88.15
|
89
|
0.85
|
0.19
|
Au-AA26
|
SB-2022-013
|
89
|
90.6
|
1.6
|
0.00
|
Lost Core
|
|
SB-2022-013
|
90.6
|
91.1
|
0.5
|
2.57
|
55 Vein
|
Au-AA26
|
SB-2022-013
|
91.1
|
91.6
|
0.5
|
1.32
|
Au-AA26
|
SB-2022-013
|
91.6
|
92.1
|
0.5
|
1.61
|
Au-AA26
|
SB-2022-013
|
92.1
|
92.6
|
0.5
|
1.66
|
Au-AA26
|
SB-2022-013
|
92.6
|
93.3
|
0.7
|
3.86
|
Au-AA26
|
SB-2022-013
|
93.3
|
94
|
0.7
|
2.57
|
Au-AA26
|
SB-2022-013
|
94
|
94.5
|
0.5
|
2.78
|
Au-AA26
|
SB-2022-013
|
94.5
|
95
|
0.5
|
6.48
|
Au-AA26
|
SB-2022-013
|
95
|
95.5
|
0.5
|
16.65
|
Au-AA26
|
SB-2022-013
|
95.5
|
96
|
0.5
|
203.00
|
Au-GRA22
|
SB-2022-013
|
96
|
96.5
|
0.5
|
7.33
|
Au-AA26
|
SB-2022-013
|
96.5
|
97
|
0.5
|
0.88
|
Au-AA26
|
SB-2022-013
|
97
|
97.5
|
0.5
|
1.73
|
Au-AA26
|
SB-2022-013
|
97.5
|
98
|
0.5
|
0.73
|
Au-AA26
|
Notes: Diamond
drill hole SB-2022-013 has a collar
orientation of Azimuth 255; Dip -72. True widths are estimated
at 40 - 90% of intercept lengths and are based on oriented core
measurements where available. Method Reported
includes the most up-to-date information as of the date of this
press release.
|
Qualified Person
The technical information contained in this news release
relating to the drill results at the Bralorne Gold Project has been
approved by Leonardo de Souza (BSc,
AusIMM (CP) Membership 224827), Talisker's Vice President,
Exploration and Resource Development, who is a "qualified person"
within the meaning of National Instrument 43-101, Standards of
Disclosure for Mineral Projects.
About Talisker Resources
Ltd.
Talisker (taliskerresources.com) is a junior resource company
involved in the exploration of gold projects in British Columbia, Canada. Talisker's projects
include two advanced stage projects, the Bralorne Gold Complex and
the Ladner Gold Project, both advanced stage projects with
significant exploration potential from historical high-grade
producing gold mines, as well as its Spences Bridge Project where
the Company holds ~85% of the emerging Spences Bridge Gold Belt and
several other early-stage Greenfields projects. With its properties
comprising 304,931 hectares over 500 claims, three leases and 197
crown grant claims, Talisker is a dominant exploration player in
the south-central British
Columbia.
Sample Preparation and
QAQC
Drill core at the Bralorne Gold Project is drilled in HQ to NQ
size ranges (63.5mm and 47.6mm, respectively). Drill core samples
are a minimum of 50 cm and a maximum of 160 cm long along the core
axis. Samples are focused on an interval of interest, such as a
vein or zone of mineralization. Shoulder samples bracket the
interval of interest such that a total sampled core length of not
less than 3m both above and below the
interval of interest must be assigned. Sample QAQC measures of
unmarked certified reference materials (CRMs), blanks, and
duplicates are inserted into the sample sequence and makeup 9% of
the samples submitted to the lab for holes reported in this
release. ALS Global performs sample preparation and analyses in
North Vancouver, British
Columbia. Drill core sample preparation includes drying in an
oven at a maximum temperature of 60°C, fine crushing of the sample
to at least 70% passing less than 2 mm, sample splitting using a
riffle splitter, and pulverizing a 250 g split to at least 85%
passing 75 microns (ALS code PREP-31). Gold in diamond drill core
is analyzed by fire assay and atomic absorption spectroscopy (AAS)
of a 50g sample (ALS code Au-AA26), while multi-element chemistry
is analyzed by 4- Acid digestion of a 0.25 g sample split with
detection by inductively coupled plasma mass spectrometer (ICP-MS)
for 48 elements (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs,
Cu, Fe, Ga, Ge, Hf, In, K, La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb,
Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te, Th, Ti, Tl, U, V, W, Y, Zn,
Zr). Gold assay technique (ALS code Au-AA26) has an upper detection
limit of 100 ppm. Any sample that produces an over-limit gold value
via the gold assay technique is sent for gravimetric finish (ALS
method Au-GRA22) which has an upper detection limit of 10,000 ppm
Au.
Caution Regarding Forward Looking
Statements
Certain statements contained in this press release constitute
forward-looking information. These statements relate to future
events or future performance. The use of any of the words "could",
"intend", "expect", "believe", "will", "projected", "estimated" and
similar expressions and statements relating to matters that are not
historical facts are intended to identify forward-looking
information and are based on Talisker's current belief or
assumptions as to the outcome and timing of such future events.
Actual future results may differ materially. In particular, this
release contains forward-looking information relating to, among
other things, the Company's plans and future intentions with
respect to its investment in TDG and exercise of its board
nomination rights. Various assumptions or factors are typically
applied in drawing conclusions or making the forecasts or
projections set out in forward-looking information. Those
assumptions and factors are based on information currently
available to Talisker. Although such statements are based on
reasonable assumptions of Talisker's management, there can be no
assurance that any conclusions or forecasts will prove to be
accurate.
Forward looking information involves known and unknown risks,
uncertainties and other factors which may cause the actual results,
performance or achievements to be materially different from any
future results, performance or achievements expressed or implied by
the forward-looking information. Such factors include risks
inherent in the exploration and development of mineral deposits,
including risks relating to changes in project parameters as plans
continue to be redefined, risks relating to variations in grade or
recovery rates, risks relating to changes in mineral prices and the
worldwide demand for and supply of minerals, risks related to
increased competition and current global financial conditions,
access and supply risks, reliance on key personnel, operational
risks regulatory risks, including risks relating to the acquisition
of the necessary licenses and permits, financing, capitalization
and liquidity risks, title and environmental risks and risks
relating to the failure to receive all requisite shareholder and
regulatory approvals.
The forward-looking information contained in this release is
made as of the date hereof, and Talisker is not obligated to update
or revise any forward-looking information, whether as a result of
new information, future events or otherwise, except as required by
applicable securities laws. Because of the risks, uncertainties and
assumptions contained herein, investors should not place undue
reliance on forward-looking information. The foregoing statements
expressly qualify any forward-looking information contained
herein.
View original content to download
multimedia:https://www.prnewswire.com/news-releases/talisker-intersects-11-84-gt-au-over-12-45-metres-near-surface-on-the-55-vein-at-the-bralorne-gold-project-301548757.html
SOURCE Talisker Resources Ltd