Indicate the number
of outstanding shares of each of the issuer’s classes of capital or common stock as of the close of the period covered by
the Annual Report.
As of December 31,
2015, the Registrant had outstanding 93,232,920 ordinary shares, par value $0.05 per share.
Indicate by check
mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
x
Yes
¨
No
If the report is an
annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13
or 15(d) of the Securities Exchange Act of 1934.
¨
Yes
x
No
Indicate by check
mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange
Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports),
and (2) has been subject to such filing requirements for the past 90 days.
x
Yes
¨
No
Indicate by check
mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File
required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding
12 months (or for such shorter period that the registrant was required to submit and post such files).
¨
Yes
¨
No
Indicate by check
mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of “accelerated
filer and large accelerated filer” in Rule 12b-2 of the Exchange Act. (Check one):
Indicate by check mark which basis of accounting
the registrant has used to prepare the financial statements included in this filing:
If “Other” has been checked
in response to the previous question, indicate by check mark which financial statement item the registrant has elected to follow.
¨
Item 17
¨
Item
18
If this is an annual report, indicate by
check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
¨
Yes
x
No
The following explanations are not intended
as technical definitions, but rather are intended to assist the reader in understanding some of the terms as used in this annual
report (Annual Report).
We are incorporated
under the laws of Jersey, Channel Islands with the majority of our operations located in West and Central Africa. Our books of
account are maintained in US dollars and our annual and interim financial statements are prepared on a historical cost basis, except
as otherwise required under International Financial Reporting Standards as issued by International Accounting Standards Board (IFRS),
and in accordance with IFRS. IFRS differs in significant respects from generally accepted accounting principles in the United States,
or US GAAP. This Annual Report includes our audited consolidated financial statements prepared in accordance with IFRS. The financial
information included in this Annual Report has been prepared in accordance with IFRS and, except where otherwise indicated, is
presented in US dollars. For a definition of cash costs and other non-GAAP information, please see “PART I. Item 3.
Key Information—A. Selected Financial Data.”
Unless the context
otherwise requires, “us”, “we”, “our”, “company”, “group” or words
of similar import, refer to Randgold Resources Limited and its subsidiaries and affiliated companies.
Unless the context
otherwise requires, “Morila” refers to Société des Mines de Morila SA, “Loulo” refers to
Société des Mines de Loulo SA, “Gounkoto” refers to Société des Mines de Gounkoto SA, “Tongon”
refers to Société des Mines de Tongon SA, “Kibali” refers to Kibali Goldmines SA and “Massawa”
refers to the Massawa feasibility project.
Part I
Item 1. Identity of Directors, Senior
Management and Advisers
Not applicable.
Item 2. Offer Statistics and Expected
Timetable
Not applicable.
Item 3. Key Information
A. SELECTED FINANCIAL DATA
The following selected
historical consolidated financial data has been derived from, and should be read in conjunction with, the more detailed information
and financial statements, including our audited consolidated financial statements for the years ended December 31, 2015, 2014 and
2013 and as at December 31, 2015 and December 31, 2014, which appear elsewhere in this Annual Report. The historical consolidated
financial data as at December 31, 2013, 2012 and 2011, and for the years ended December 31, 2012 and 2011 have been derived from
our audited consolidated financial statements not included in this Annual Report.
The financial data have been prepared in
accordance with IFRS, unless otherwise noted.
|
|
Year Ended
December
31,
2015
|
|
|
Year Ended
December
31,
2014
|
|
|
Year Ended
December
31,
2013
|
|
|
Year Ended
December
31,
2012
|
|
|
Year Ended
December
31,
2011
|
|
$000:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME DATA:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Amounts in accordance with IFRS unless otherwise stated
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues
|
|
|
1,001,420
|
|
|
|
1,086,756
|
|
|
|
1,137,690
|
|
|
|
1,183,127
|
|
|
|
970,315
|
|
Profit from operations
1
|
|
|
187,774
|
|
|
|
281,267
|
|
|
|
354,699
|
|
|
|
505,845
|
|
|
|
429,908
|
|
Share of profits of equity accounted joint ventures
|
|
|
77,303
|
|
|
|
75,942
|
|
|
|
54, 257
|
|
|
|
40, 927
|
|
|
|
44,119
|
|
Net profit attributable to owners of the parent
|
|
|
188,677
|
|
|
|
234,974
|
|
|
|
278,382
|
|
|
|
431,801
|
|
|
|
383,860
|
|
Basic earnings per share ($)
|
|
|
2.03
|
|
|
|
2.54
|
|
|
|
3.02
|
|
|
|
4.70
|
|
|
|
4.20
|
|
Diluted earnings per share ($)
|
|
|
2.01
|
|
|
|
2.51
|
|
|
|
2.98
|
|
|
|
4.65
|
|
|
|
4.16
|
|
Weighted average number of shares used in computation of basic earnings per share
|
|
|
93,093,692
|
|
|
|
92,603,191
|
|
|
|
92,213,511
|
|
|
|
91,911,444
|
|
|
|
91,337,712
|
|
Weighted average number of shares used in computation of fully diluted earnings per share
|
|
|
93,093,803
|
|
|
|
93,513,661
|
|
|
|
93,346,109
|
|
|
|
92,824,926
|
|
|
|
92,276,517
|
|
Dividends declared per share
2
|
|
|
0.60
|
|
|
|
0.50
|
|
|
|
0.50
|
|
|
|
0.40
|
|
|
|
0.20
|
|
Other data
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total cash costs ($ per ounce sold)
3
|
|
|
679
|
|
|
|
698
|
|
|
|
715
|
|
|
|
735
|
|
|
|
688
|
|
1
|
Profit from operations is calculated as profit before income tax under IFRS, excluding net finance income/(costs) and share of profits of equity accounted joint ventures. Profit from operations all arises from continuing operations.
|
2
|
Dividend distribution to the company’s shareholders is recognized as a liability in the group’s financial statements in the period in which the dividends are approved by the board of directors and declared to shareholders.
|
3
|
Refer to explanation of non-GAAP information provided in the section “—Non-GAAP information” below.
|
Following the introduction and adoption
of IFRS 11 Joint arrangements in 2013, the group changed its accounting policy on joint ventures from January 1, 2013 with prior
periods 2011 and 2012 restated accordingly (refer to the 2013 Annual Report on Form 20-F).
|
|
At
December
31,
2015
|
|
|
At
December
31,
2014
|
|
|
At
December
31,
2013
|
|
|
At
December
31,
2012
|
|
|
At
December
31,
2011
|
|
$000:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONSOLIDATED STATEMENT OF FINANCIAL POSITION AMOUNTS:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Amounts in accordance with IFRS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total assets
|
|
|
3,737,320
|
|
|
|
3,533,083
|
|
|
|
3,376,513
|
|
|
|
3,008,891
|
|
|
|
2,477,267
|
|
Share capital
|
|
|
4,662
|
|
|
|
4,634
|
|
|
|
4,612
|
|
|
|
4,603
|
|
|
|
4,587
|
|
Share premium
|
|
|
1,493,781
|
|
|
|
1,450,984
|
|
|
|
1,423,513
|
|
|
|
1,409,144
|
|
|
|
1,386,939
|
|
Retained earnings
|
|
|
1,708,151
|
|
|
|
1,575,518
|
|
|
|
1,386,518
|
|
|
|
1,154,273
|
|
|
|
759,209
|
|
Other reserves
|
|
|
67,005
|
|
|
|
67,254
|
|
|
|
64,398
|
|
|
|
50,994
|
|
|
|
40,531
|
|
Equity attributable to the owners of the parent
|
|
|
3,273,599
|
|
|
|
3,098,090
|
|
|
|
2,879,041
|
|
|
|
2,619,014
|
|
|
|
2,191,266
|
|
Non-GAAP information
We have identified
certain measures that we believe will assist understanding of the performance of the business. As the measures are not defined
under IFRS they may not be directly comparable with other companies’ adjusted measures. The non-GAAP measures are not intended
to be a substitute for, or superior to, any IFRS measures of performance but management has included them as these are considered
to be important comparables and key measures used within the business for assessing performance.
These measures are
explained further below:
Total cash costs
and cash cost per ounce
are non-GAAP measures. Total cash costs and total cash cost per ounce are calculated using guidance
issued by the Gold Institute. The Gold Institute was a non-profit industry association comprising leading gold producers, refiners,
bullion suppliers and manufacturers. This institute has now been incorporated into the National Mining Association. The guidance
was first issued in 1996 and revised in November 1999. Total cash costs, as defined in the Gold Institute’s guidance, include
mine production, transport and refinery costs, general and administrative costs, movement in production inventories and ore stockpiles,
transfers to and from deferred stripping where relevant and royalties. Total cash costs and cash per ounce also include our share
of equity accounted joint ventures’ total cash costs and cash cost per ounce.
Total cash cost
per ounce
is calculated by dividing total cash costs, as determined using the Gold Institute guidance, by gold ounces sold
for the periods presented. Total cash costs and total cash cost per ounce are calculated on a consistent basis for the periods
presented. Total cash costs and total cash cost per ounce should not be considered by investors as an alternative to operating
profit or net profit attributable to shareholders, as an alternative to other IFRS measures. The data does not have a meaning prescribed
by IFRS and therefore amounts presented may not be comparable to data presented by gold producers who do not follow the guidance
provided by
the Gold Institute. In particular depreciation
and amortization would be included in a measure of total costs of producing gold under IFRS, but are not included in total cash
costs under the guidance provided by the Gold Institute. Furthermore, while the Gold Institute has provided a definition for the
calculation of total cash costs and total cash cost per ounce, the calculation of these numbers may vary from company to company
and may not be comparable to other similarly titled measures of other companies. However, we believe that total cash cost per ounce
is a useful indicator to investors and management of a mining company’s performance as it provides an indication of a company’s
profitability and efficiency, the trends in cash costs as the company’s operations mature, and a benchmark of performance
to allow for comparison against other companies.
Cash operating costs
and cash operating cost per ounce
are calculated by deducting royalties from total cash costs. Cash operating cost per ounce
is calculated by dividing cash operating costs by gold ounces sold for the periods presented. Total cash operating costs and cash
operating cost per ounce include our share of joint ventures’ total operating cash costs and operating cash cost per ounce.
Gold sales
is
a non-GAAP measure. It represents the sales of gold at spot and the gains/losses on hedge contracts which have been delivered into
at the designated maturity date. It excludes gains/losses on hedge contracts which have been rolled forward to match future sales.
This adjustment is considered appropriate because no cash is received/paid in respect of these contracts. We currently do not have
any hedge positions. Gold sales include our share of our equity accounted joint ventures’ gold sales.
Profit from mining
activity
is calculated by subtracting total cash costs from gold sales for all periods presented. Profit from mining includes
our share of our equity accounted joint ventures.
Gold on hand
represents gold in doré
at the mines multiplied by the prevailing spot gold price at the end of the period. Gold on hand includes our share of our equity
accounted joint ventures’ gold on hand.
The following table
reconciles total cash costs and profit from mining activity as non-GAAP measures, to the information provided in the statement
of comprehensive income, determined in accordance with IFRS, for each of the periods set out below.
$000:
|
|
Year Ended
December
31,
2015
|
|
|
Year Ended
December
31,
2014
|
|
|
Year Ended
December
31,
2013
|
|
|
Year Ended
December
31,
2012
|
|
|
Year Ended
December
31,
2011
|
|
Gold Sales
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Gold sales per IFRS
|
|
|
1,001,420
|
|
|
|
1,086,756
|
|
|
|
1,137,690
|
|
|
|
1,183,127
|
|
|
|
970,315
|
|
Gold sales adjustment for joint ventures
|
|
|
393,469
|
|
|
|
348,117
|
|
|
|
129,022
|
|
|
|
134,703
|
|
|
|
156,771
|
|
Gold sales
2
|
|
|
1,394,889
|
|
|
|
1,434,873
|
|
|
|
1,266,712
|
|
|
|
1,317,830
|
|
|
|
1,127,086
|
|
Costs
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mine production costs
|
|
|
498,779
|
3
|
|
|
525,909
|
3
|
|
|
538,892
|
3
|
|
|
441,049
|
3
|
|
|
339,927
|
3
|
Depreciation and amortization
|
|
|
150,902
|
|
|
|
146,762
|
|
|
|
130,638
|
|
|
|
117,991
|
|
|
|
65,562
|
|
Other mining and processing costs
|
|
|
60,007
|
|
|
|
64,762
|
|
|
|
61,319
|
|
|
|
75,770
|
|
|
|
62,758
|
|
Cash cost adjustment for joint ventures
|
|
|
195,105
|
|
|
|
169,260
|
|
|
|
49,055
|
|
|
|
50,511
|
|
|
|
69,532
|
|
Depreciation and amortization adjustment for joint ventures
|
|
|
105,677
|
|
|
|
86,183
|
|
|
|
19,322
|
|
|
|
13,750
|
|
|
|
16,498
|
|
Royalties
|
|
|
51,673
|
|
|
|
56,490
|
|
|
|
58,415
|
|
|
|
59,710
|
|
|
|
44,414
|
|
Movement in production inventory and ore stockpiles
|
|
|
17,109
|
|
|
|
24,665
|
|
|
|
(49,730
|
)
|
|
|
(43,716
|
)
|
|
|
(21,907
|
)
|
$000:
|
|
Year Ended
December
31,
2015
|
|
|
Year Ended
December
31,
2014
|
|
|
Year Ended
December
31,
2013
|
|
|
Year Ended
December
31,
2012
|
|
|
Year Ended
December
31,
2011
|
|
Total cost of producing gold
|
|
|
1,079,252
|
|
|
|
1,024,701
|
|
|
|
807,911
|
|
|
|
715,065
|
|
|
|
576,784
|
|
Less: Non-cash costs included in total cost of producing gold: Depreciation and amortization under IFRS
|
|
|
(150,902
|
)
|
|
|
(146,762
|
)
|
|
|
(130,638
|
)
|
|
|
(117,991
|
)
|
|
|
(65,562
|
)
|
Less: Non-cash costs included in total cost of producing gold: Depreciation and amortization for joint ventures
|
|
|
(105,677
|
)
|
|
|
(86,183
|
)
|
|
|
(19,322
|
)
|
|
|
(13,750
|
)
|
|
|
(16,498
|
)
|
Total cash costs using the Gold Institute’s guidance
2
|
|
|
822,673
|
|
|
|
791,756
|
|
|
|
657,951
|
|
|
|
583,324
|
|
|
|
494,724
|
|
Ounces sold
1
|
|
|
1,210,844
|
|
|
|
1,134,941
|
|
|
|
920,248
|
|
|
|
793,852
|
|
|
|
718,762
|
|
Total cost of producing gold per ounce ($ per ounce)
|
|
|
891
|
|
|
|
903
|
|
|
|
878
|
|
|
|
901
|
|
|
|
802
|
|
Total cash costs per ounce ($ per ounce)
2
|
|
|
679
|
|
|
|
698
|
|
|
|
715
|
|
|
|
735
|
|
|
|
688
|
|
1
|
40% share of Morila, 45% share of Kibali and 100% share of Loulo, Tongon and Gounkoto
|
2
|
Refer to explanation of non-GAAP information provided in the section “—Non-GAAP information” above. Randgold consolidates 100% of Loulo, Gounkoto and Tongon, 40% of Morila and 45% of Kibali in the consolidated non-GAAP measures.
|
3
|
Comparative figures for 2013, 2012 and 2011 excluded transport and refining costs from mine production costs and disclosed such costs separately. Given its immateriality, it has been included in mine production costs in 2014 and 2015. Transport and refining costs total $2.9 million for 2015 (2014:$3.0 million; 2013:$2.7 million; 2012:$2.7 million; 2011: $2.4 million) and are now included in mine production costs.
|
B. CAPITALIZATION AND INDEBTEDNESS
Not applicable.
C. REASONS FOR THE OFFER AND USE OF PROCEEDS
Not applicable.
D. RISK FACTORS
In addition to the
other information included in this Annual Report, you should carefully consider the following factors, which individually or in
combination could have a material adverse effect on our business, financial condition and results of operations. There may be additional
risks and uncertainties not presently known to us, or that we currently see as immaterial, which may also harm our business. If
any of the risks or uncertainties described below or any such additional risks and uncertainties actually occur, our business,
results of operations and financial condition could be materially and adversely affected. In this case, the trading price of our
ordinary shares and American Depositary Shares, or ADS, could decline and you might lose all or part of your investment.
Risks Relating to Our Operations
The profitability
of our operations, and the cash flows generated by our operations, are affected by changes in the market price for gold which in
the past has fluctuated widely.
Substantially all
of our revenue and cash flows have come from the sale of gold. Historically, the market price for gold has fluctuated widely and
has been affected by numerous factors, over which we have no control, including:
|
•
|
the demand for gold for investment purposes including exchange traded funds, industrial uses and
for use in jewelry;
|
|
•
|
international or regional political and economic trends;
|
|
•
|
the strength of the US dollar, the currency in which gold prices generally are quoted, and of other
currencies;
|
|
•
|
market expectations regarding inflation rates;
|
|
•
|
speculative activities;
|
|
•
|
actual or expected purchases and sales of gold bullion holdings by central banks, the International
Monetary Fund, or other large gold bullion holders or dealers;
|
|
•
|
hedging activities by gold producers; and
|
|
•
|
the production and cost levels for gold in major gold-producing nations.
|
The volatility of
gold prices is illustrated in the following table, which shows the approximate annual high, low and average of the afternoon London
Bullion Market fixing price of gold in US dollars for the past ten years.
|
|
Price Per Ounce
($)
|
|
Year
|
|
High
|
|
|
Low
|
|
|
Average
|
|
2006
|
|
|
725
|
|
|
|
525
|
|
|
|
604
|
|
2007
|
|
|
841
|
|
|
|
608
|
|
|
|
695
|
|
2008
|
|
|
1,011
|
|
|
|
712
|
|
|
|
871
|
|
2009
|
|
|
1,213
|
|
|
|
810
|
|
|
|
972
|
|
2010
|
|
|
1,421
|
|
|
|
1,058
|
|
|
|
1,224
|
|
2011
|
|
|
1,895
|
|
|
|
1,319
|
|
|
|
1,571
|
|
2012
|
|
|
1,792
|
|
|
|
1,540
|
|
|
|
1,669
|
|
2013
|
|
|
1,694
|
|
|
|
1,192
|
|
|
|
1,411
|
|
2014
|
|
|
1,385
|
|
|
|
1,142
|
|
|
|
1,266
|
|
2015
|
|
|
1,296
|
|
|
|
1,049
|
|
|
|
1,160
|
|
2016 (through February 29)
|
|
|
1,251
|
|
|
|
1,077
|
|
|
|
1,149
|
|
The market price
of gold has been and continues to be significantly volatile. In 2015, there was a 8% reduction in the average gold price.
If gold prices should fall below and remain below our cost of production for any sustained period we may experience losses, and
if gold prices should fall below our cash costs of production we may be forced to re-plan and mine higher grade ore which will
have a negative impact on our reserves and life of mine plans. Low gold prices for an extended period could result in us having
to curtail or suspend some or all of our mining operations. In addition, we would also have to assess the economic impact of low
gold prices on our ability to recover from any losses we may incur during that period and on our ability to maintain adequate
reserves. Our total cash cost of production per ounce of gold sold was $679 in the year ended December 31, 2015, $698 in the year
ended December 31, 2014 and $715 in the year ended December 31, 2013.
Our mining operations
may yield less gold under actual production conditions than indicated by our gold reserve figures, which are estimates based on
a number of assumptions, including assumptions as to mining and recovery factors, production costs and the price of gold.
The ore reserve estimates
contained in this Annual Report are estimates of the mill delivered quantity and grade of gold in our deposits. They represent
the amount of gold that we believe can be mined, processed and sold at prices sufficient to recover our estimated total cash costs
of production, remaining investment and anticipated additional capital expenditure. Our ore reserves are estimated based upon many
factors, including:
|
•
|
the results of exploratory drilling and an ongoing sampling of the orebodies;
|
|
•
|
past experience with mining properties;
|
|
•
|
depletion from past mining;
|
|
•
|
mining method and associated dilution and ore loss factors;
|
Because our ore reserve
estimates are calculated based on current estimates of future production costs and gold prices, they should not be interpreted
as assurances of the economic life of our gold deposits or the profitability of our future operations.
Reserve estimates
may require revisions based on actual production experience. Further, a sustained decline in the market price of gold may render
the recovery of ore reserves containing relatively lower grades of gold mineralization uneconomical and ultimately result in a
restatement of reserves. The failure of the reserves to meet our recovery expectations may have a material adverse effect on our
business, financial condition and results of operations.
We are subject to
various political and economic uncertainties associated with operating in Mali that could significantly affect our mines in Mali
and our results of operations and financial condition.
We are subject to
risks associated with operating gold mines in Mali. In 2015, gold produced in Mali represented approximately 56% of our consolidated
group gold production, including joint ventures. On March 21, 2012, Mali was subject to an attempted coup d’état that
resulted in the suspension of the constitution, the partial closing of the borders and the general disruption of business activities
in the country. The supply of consumables to our mines in Mali was temporarily interrupted as a result of the political situation.
The borders were reopened shortly after these events and an interim government was installed within a month. In January 2013, following
military conflicts with terrorist insurgents, the Malian State requested the assistance of the French Government to assist the
Malian army to repel the insurgents who had been occupying parts of the north of the country and beginning to move towards the
southern part of the country. During 2013, French and other foreign troops occupied the northern part of the country to assist
the Malian State in maintaining control of this region and presidential and parliamentary elections took place during the middle
of 2013. During 2015, a number of attacks by insurgents took place. Although we have continued to produce and sell gold throughout
this period, there can be no assurance that the political or security situation will not disrupt our ability to continue gold production,
or our ability to sell and ship our gold from our mines in Mali. Furthermore, there can be no assurance that the political and
security situation in Mali will not have a material adverse effect on our operations and financial condition.
Our business and
results of operations may be adversely affected if the State of Mali and the State of Democratic Republic of Congo (DRC) fail to
repay Value Added Tax (TVA), owing to the Loulo, Morila, Gounkoto and Kibali mines.
Our mining companies
operating in Mali are exonerated by their Establishment Conventions from paying TVA for the three years following first commercial
production. After that, TVA is payable and reimbursable. During
2013, 2014 and 2015 Loulo and Morila has
offset TVA reimbursements it was owed against corporate and other taxes payable to the State of Mali under the terms of its legally
binding mining conventions. At December 31, 2013, TVA owed by the State of Mali to Loulo stood at $115.6 million. This amount decreased
to $91.3 million at December 31, 2014 and to $85.7 million at December 31, 2015. As of December 31, 2013, December 31, 2014 and
December 31, 2015, TVA owed by the State of Mali to Morila amounted to $4.4 million (our 40%), $10.5 million (our 40%) and $6.3
million (our 40%), respectively. As of December 31, 2013, December 31, 2014 and December 31, 2015, TVA refunds of $10.7 million,
$14.5 million and $17.2 million, respectively, remained owing to Gounkoto by the State of Mali.
By December 31, 2013,
December 31, 2014 and December 31, 2015, TVA owing to Kibali by the DRC State amounted to $36.4 million (our 45%), $50.5 million
(our 45%) and $61.8 million (our 45%), respectively. Kibali has received TVA refunds during the year, but the process has been
slower than set out by law, due to additional administrative requirements imposed by the relevant State departments.
Our business, cash
flow and results of operations will be adversely affected to the extent the TVA amounts owing to the group are not paid.
Our business may
be adversely affected if we fail to resolve disputed tax claims with the State of Mali.
As at December 31,
2015, the group is in receipt of claims for various taxes from the State of Mali totaling $280.0 million, in particular with respect
to the Loulo, Gounkoto and Morila mines. The claims have decreased by $33.0 million during the year, substantially representing
foreign exchange movements. Having taken professional advice, the group considers the material claims to be without foundation
and remote and is strongly defending its position, including following the appropriate legal process for such disputes in Mali.
Loulo, Gounkoto and Morila have legally binding mining conventions which guarantee fiscal stability, govern the taxes applicable
for the companies and allow for international arbitration in the event that a dispute cannot be resolved in the country. Accordingly,
no provision has been made for the material claims. On November 25, 2013, Loulo instigated arbitration proceedings against the
State of Mali pursuant to the terms of Loulo’s Establishment Convention at the International Center for Settlement of Investment
Disputes in respect of $57.0 million of the tax claims. The arbitration process is ongoing. The outcome of the process is expected
to be concluded during 2016. Management continues to engage with the Malian authorities at the highest level to resolve this issue
and the other unresolved tax claims. However, it may be necessary to instigate additional arbitration proceedings to resolve these
disputes. If for any reason these disputed tax claims become due and payable the results of Morila, Gounkoto and Loulo’s
operations and financial position would be adversely affected, as would their ability to pay dividends to their shareholders. Accordingly,
our business, cash flows and financial condition will be adversely affected if anticipated dividends are not paid.
Changes in mining
legislation can have significant effects on our operations.
While we have entered
into binding mining conventions with the governments of Côte d’Ivoire, Mali and Senegal, in the DRC our Kibali
mine operates under the DRC Mining Convention and not under a mining convention. Changes in mining legislation in the countries
in which we operate could have significant adverse effects on our results of operations. In addition, changes in mining legislation
may discourage future investments in these jurisdictions, which may have an adverse impact on our ability to develop new mines
and reduce future growth opportunities. Among the jurisdictions in which we currently have major operations, there are several
proposed or recently adopted changes in mining legislation that could materially affect us. The governments in these jurisdictions
may require us to renegotiate our mining conventions. If so, there can be no assurance that the outcome of our negotiations will
not have a material adverse impact on our financial condition or operational results.
Our success may depend
on our social and environmental performance.
Our ability to operate
successfully in communities will likely depend on our ability to develop, operate and close mines in a manner that is consistent
with the health, safety and well-being of our employees, the protection of the environment, and the creation of long term economic
and social opportunities in the countries in which we operate. Mining companies are required to make a fair contribution and provide
benefits to the communities and countries in which they operate, and are subject to extensive environmental, health and safety
laws and regulations. As a result of public concern about the real or perceived detrimental effects of economic globalization and
global
climate impacts, businesses generally and
large multinational corporations in natural resources industries, in particular, face increasing public scrutiny of their activities.
These businesses are under pressure to demonstrate that, as they seek to generate satisfactory returns on investment to shareholders,
other stakeholders, including employees, governments, communities surrounding operations and the countries in which they operate,
benefit and will continue to benefit from their commercial activities. Such pressures tend to be particularly focused on companies
whose activities relate to non-renewable resources and are perceived to have a high impact on their social and physical environment.
The potential consequences of these pressures include reputational damage and legal suits.
Certain non-governmental
organizations oppose globalization and resource development and are often vocal critics of the mining industry and its practices.
Adverse publicity by such non-governmental agencies could have an adverse effect on our reputation and financial condition and
could have an impact on the communities within which we operate.
In addition, our ability
to successfully obtain key permits and approvals to explore for, develop and operate mines and to successfully operate in communities
around the world will likely depend on our ability to develop, operate and close mines in a manner that is consistent with the
creation of social and economic benefits in the surrounding communities, which may or may not be required by law. Mining operations
should be designed to minimize the negative impact on such communities and the environment, for example, by modifying mining plans
and operations or by relocating those affected to an agreed location. The cost of these measures could increase capital and operating
costs and therefore could have an adverse impact upon our financial conditions and operations. We seek to promote improvements
in health and safety, environmental performance and community relations. However, our ability to operate could be adversely impacted
by accidents or events detrimental (or perceived to be detrimental) to the health, safety and well-being of our employees, the
environment or the communities in which we operate.
Any appreciation
of the currencies in which we incur costs against the US dollar could adversely affect our results of operations and financial
condition.
While our revenue
is derived from the sale of gold in US dollars, a significant portion of our input costs are incurred in currencies other than
the dollar, primarily Euro, Communauté Financière Africaine Franc and South African Rand. Accordingly, any appreciation
in such other currencies could adversely affect our results of operations.
The profitability
of our operations and the cash flows generated by these operations are significantly affected by the fluctuations in the price,
cost and supply of fuel and other inputs, and we would be adversely affected by future increases in the prices of fuel and other
inputs or a disruption in our supply chain.
Fuel, power and consumables,
including diesel, steel, chemical reagents, explosives and tires, form a relatively large part of our operating costs. The cost
of these consumables is impacted to varying degrees by fluctuations in the price of oil, exchange rates and availability of supplies.
Such fluctuations have a significant impact upon our operating costs and capital expenditure estimates and, in the absence of other
economic fluctuations, could result in significant changes in the total expenditure estimates for mining projects, new and existing,
and could even render certain projects non-viable.
Fuel is the primary
input utilized in our mining operations, and our results are significantly affected by the price and availability of fuel, which
are in turn affected by a number of factors beyond our control. Historically, fuel costs have been subject to wide price fluctuations
based on geopolitical factors and supply and demand. Political unrest in certain oil producing countries has in the past led to
an increase in the cost of fuel. If there are additional outbreaks of hostilities or other conflicts in oil producing areas or
elsewhere, or a reduction in refining capacity (due to weather events, for example), or governmental limits on the production or
sale of fuel, or restrictions on the transport of fuel, there could be reductions in the supply of fuel and significant increases
in the cost of fuel.
During 2015, the average
price of our landed fuel was lower than 2014. In the year ended December 31, 2015, the cost of fuel and other power generation
costs comprised approximately 18% of our operating costs (2014: 23%; 2013: 20%).
While we do not currently
anticipate a significant reduction in fuel availability, factors beyond our control make it impossible to predict the future availability
of fuel. We are not parties to any agreements that protect us against price increases or guarantee the availability of fuel. Extended
disruptions to our supply chain would have a material impact on the mines’ ability to operate. Major reductions in the availability
of fuel or significant increases in its cost for a significant period of time, would adversely affect our results of operations
and profitability.
Our underground
mines at Loulo and Kibali are subject to all of the risks associated with underground mining.
The business of underground
mining by its nature involves significant risks and hazards. In particular, our underground mining operations could be subject
to:
|
•
|
cave-ins or falls of ground;
|
|
•
|
discharges of gases or toxic chemicals and other environmental hazards;
|
|
•
|
other conditions resulting from drilling, blasting and the removal of material from an underground
mine.
|
We are at risk of
experiencing any and all of these hazards. The occurrence of any of these hazards could delay the development of the mine, production,
increase cash operating costs and result in additional financial liability for us.
The use of mining
contractors at certain of our operations may expose it to delays or suspensions in mining activities.
Mining contractors
are used at Tongon, Gounkoto, Kibali and Morila to mine and deliver ore to processing plants and at Kibali to develop the underground
mine. As a result of our use of mining contractors, our operations are subject to a number of risks, some of which are outside
our control, including:
|
•
|
Negotiating agreements with contractors on acceptable terms;
|
|
•
|
The inability to replace a contractor and its operating equipment in the event that either party
terminates the agreement;
|
|
•
|
Reduced control over those aspects of operations which are the responsibility of the contractor;
|
|
•
|
Failure of a contractor to perform under its agreement;
|
|
•
|
Interruption of operations or increased costs in the event that a contractor ceases its business
due to insolvency or other unforeseen events;
|
|
•
|
Failure of a contractor to comply with applicable legal and regulatory requirements, to the extent
it is responsible for such compliance; and
|
|
•
|
Problems of a contractor with managing its workforce, labor unrest or other employment issues.
|
In addition, we may
incur liability to third parties as a result of the actions of our contractors. The occurrence of one or more of these risks could
adversely affect our results of operations and financial position.
Actual cash costs
of production, production results, capital expenditure costs and economic returns may differ significantly from those anticipated
by our feasibility studies for new development projects.
Feasibility studies
and other project evaluation activities necessary to determine the current or future viability of a mining operation are often
not economically beneficial. Activities often require substantial expenditure on exploration drilling to determine the extent and
grade of mineralized material. It typically takes a number of years from initial feasibility studies of a mining project until
development is completed and, during that time, the economic feasibility of production may change. The economic feasibility of
development projects is based on many factors, including the accuracy of estimated reserves, metallurgical recoveries, capital
and operating costs and future gold prices. The capital expenditure and time required to develop new mines or other projects are
considerable, and changes in costs or construction schedules can affect project economics. Thus it is possible that actual costs
and economic returns may differ materially from our estimates.
In addition, there
are a number of uncertainties inherent in the development and construction of any new mine, including:
|
•
|
the availability and timing of necessary environmental and governmental permits;
|
|
•
|
the timing and cost necessary to construct mining and processing facilities, which can be considerable;
|
|
•
|
the availability and cost of skilled labor, power, water and other materials;
|
|
•
|
the accessibility of transportation and other infrastructure, particularly in remote locations;
and
|
|
•
|
the availability of funds to finance construction and development activities.
|
At Massawa (Senegal),
a technical and financial study was completed on the open pit enabling us to declare mineral reserves in 2010. In 2012 it was decided
to focus on understanding the geological and metallurgical controls of the project. The current plan is to progress the Massawa
project review and update the feasibility study in 2016. There can be no assurance that the Massawa project will ultimately result
in a new commercial mining operation, or that such new commercial mining operations would be successful.
The underground feasibility
study on Gounkoto was successfully completed at the end of 2014. Work on the portal in the south of the pit is planned to start
in 2018 with access to ore anticipated in 2019. However, there can be no assurance that the Gounkoto underground project will not
be subject to the risks and uncertainties listed in this section, all of which could have a material adverse effect on our operating
results and financial condition.
We conduct mining,
development and exploration activities in countries with developing economies and are subject to the risks of political and economic
instability associated with these countries.
We currently conduct
mining, development and exploration activities in countries with developing economies. These countries and other emerging markets
in which we may conduct operations have, from time to time, experienced economic or political instability. It is difficult to predict
the future political, social and economic direction of the countries in which we operate, and the impact government decisions may
have on our business. Any political or economic instability in the countries in which we currently operate could have a material
adverse effect on our business and results of operations.
The countries of Mali,
Senegal, DRC and Côte d’Ivoire have, since independence, experienced some form of political upheaval with varying forms
of changes of government taking place.
Goods are supplied
to our operations in Mali primarily by road through Senegal and Côte d’Ivoire, which at times have been disrupted by
geopolitical issues. Any present or future policy changes in the countries in which we
operate, or through which we are supplied,
may in some way have a significant effect on our operations and interests.
The mining laws of
Mali, Côte d’Ivoire, Senegal and DRC stipulate that, should an economic orebody be discovered on a property subject
to an EP, a permit that allows processing operations to be undertaken must be issued to the holder. Legislation in certain countries
currently provides for the relevant government to acquire a free ownership interest in any mining project. The requirements of
the various governments as to the foreign ownership and control of mining companies may change in a manner which adversely affects
us.
In addition, unforeseen
events, including war, terrorism and other international conflicts could disrupt our operations and disrupt the operations of our
suppliers. Such events could make if difficult or impossible for us to conduct our mining operations, including delivering our
products and receiving materials from suppliers.
We are subject to
various political and economic uncertainties associated with operating in the DRC, and the success of the Kibali mine will depend
in large part on our ability to overcome significant challenges.
We are subject to
risks associated with operating the Kibali mine in the DRC. The Kibali mine is located in the north-east region of the DRC and
is subject to various levels of political, economic and other risks and uncertainties associated with operating in the DRC. Some
of these risks include political and economic instability, high rates of inflation, severely limited infrastructure, lack of law
enforcement, labor unrest, and war and civil conflict. In addition, the Kibali mine is subject to the risks inherent in operating
in any foreign jurisdiction including changes in government policy, restrictions on foreign exchange, changes in taxation policies,
and renegotiation or nullification of existing concessions, licenses, permits and contracts.
The DRC is an impoverished
country with physical and institutional infrastructure that is in a poor condition. It is in transition from a largely state-controlled
economy to one based on free market principles, and from a non-democratic political system with a centralized ethnic power base
to one based on more democratic principles. There can be no assurance that these changes will be effected or that the achievement
of these objectives will not have material adverse consequences for the Kibali mine.
Any changes in mining
or investment policies or shifts in political attitude in the DRC may adversely affect operations and/or profitability of the Kibali
mine. Operations may be affected in varying degrees by government regulations with respect to, but not limited to, restrictions
on production, price controls, export controls, currency remittance, income taxes, foreign investment, maintenance of claims, environmental
legislation, land use, land claims of local people, water use and mine safety. These changes may impact the profitability and viability
of the Kibali mine.
Moreover, the northeast
region of the DRC has undergone civil unrest and instability that could have an impact on political, social or economic conditions
in the DRC generally. There has been turmoil in the Eastern DRC, to the south of Kibali, following the defeat of the M23 rebel
group in late 2013. A sufficient level of stability must be maintained in order for us to continue to operate the Kibali mine.
The impact of unrest and instability on political, social or economic conditions in the DRC could result in the impairment of the
exploration, development and operations at the Kibali mine.
Some of our operations
are carried out in geographical areas which lack adequate infrastructure.
Mining, processing,
development and exploration activities depend, in some part, on adequate infrastructure. Reliable roads, power sources and water
supply are important factors which affect our operating costs. A lack of infrastructure or varying weather phenomena, sabotage,
terrorism or other interferences in the maintenance or provision of such infrastructure could affect our operations and financial
condition.
The Kibali mine is
located in a remote area of the DRC, which lacks basic infrastructure, including adequate roads and other transport, sources of
power, water, housing, food and transport. In order to develop any of the mineral interests, facilities and material necessary
to support operations in the remote locations in which they are situated must be established. The remoteness of the mineral interests
would affect the potential viability of mining operations, as we would also need to establish substantially greater sources of
power, water, physical plant, roads
and other transport infrastructure than
are currently present in the area. Hydropower stations are utilized at Kibali, which necessarily involve maintaining existing stations
and building new hydropower stations and also obtaining certain government licenses relating to their operation. The first of three
hydropower stations was completed in 2014 and a further additional two hydropower stations are still to be completed.
Establishing infrastructure
for our development projects requires significant resources, identification of adequate sources of raw materials and supplies,
and necessary cooperation from national and regional governments, none of which can be assured.
Certain factors
may affect our ability to support the carrying value of our property, plant and equipment, and other assets on our consolidated
statement of financial position.
We review and test
the carrying amount of our assets on an annual basis when events or changes in circumstances suggest that the net book value may
not be recoverable. If there are indications that impairment may have occurred, we prepare estimates of expected future discounted
cash flows for each group of assets. Assets are grouped at the lowest levels for which there are separately identifiable cash flows
(cash-generating units) for purposes of assessing impairment. Expected future cash flows are inherently uncertain, and could materially
change over time. Such cash flows are significantly affected by reserve and production estimates, together with economic factors
such as spot and forward gold prices, discount rates, currency exchange rates, estimates of costs to produce reserves and future
capital expenditure to extract reserves under the approved life of mine plan.
We may incur losses
or lose opportunities for gains as a result of any future use of derivative instruments to protect us against low gold prices.
We have from time
to time used derivative instruments to protect the selling price of some of our anticipated gold production. The intended effect
of our derivative transactions was to lock in a fixed sale price for some of our future gold production to provide some protection
against a subsequent fall in gold prices. Although we currently do not use derivative instruments to protect us against low gold
prices at our operations, we may in the future determine to implement the use of derivatives in connection with a portion of our
anticipated gold production.
Derivative transactions
can result in a reduction in revenue if the instrument price is less than the market price at the time the hedged sales are recognized.
Moreover, our decision to enter into a given instrument would be based upon market assumptions. If these assumptions are not ultimately
met, significant losses or lost opportunities for significant gains may result. In all, the use of these instruments may result
in significant losses which would prevent us from realizing the positive impact of any subsequent increase in the price of gold
on the portion of production covered by the instrument.
Under our joint venture
agreements with AngloGold Ashanti Limited, or AngloGold Ashanti, we operate the Morila mine and the Kibali mine by means of a joint
venture committee, and any disputes with AngloGold Ashanti over the management of the Morila mine or the Kibali mine could adversely
affect our business.
We jointly control
Morila, the owner of the Morila mine, and Kibali, the owner of the Kibali mine, with AngloGold Ashanti under joint venture agreements.
We are responsible for the day-to-day operations of Morila and Kibali, subject to the overall management control of Morila and
Kibali boards, respectively. Substantially all major management decisions, including approval of a budget for the Morila mine and
the Kibali mine, must be approved by the Morila and Kibali boards, respectively. We and AngloGold Ashanti retain equal representation
on the boards, with neither party holding a deciding vote. If a dispute arises between us and AngloGold Ashanti with respect to
the management of Morila or Kibali, and we are unable to amicably resolve the dispute, we may have to participate in arbitration
or other proceedings to resolve the dispute, which could materially and adversely affect our business.
Our mines and projects
face many risks related to their present or future operations that may impact cash flows and profitability.
Our mines and projects
are subject to all of the operating hazards and risks normally incident to exploring for, developing and operating mineral properties
and mines, such as:
|
•
|
encountering unusual or unexpected formations;
|
|
•
|
environmental pollution;
|
|
•
|
safety-related stoppages;
|
|
•
|
work stoppages or other disruptions in labor force;
|
|
•
|
electrical power and fuel supply interruptions;
|
|
•
|
unanticipated ground conditions; and
|
|
•
|
personal injury and flooding.
|
During 2012, the
Tongon mine was plagued by a series of operational challenges, including underperformance in the mining of the open pit as the
mine struggled to manage the transition from softer oxide material to fresh rock. In 2015 the mine experienced frequent
outages of grid power which disrupted the processing plant. Additionally, during December 2012 there was a fire in the milling
circuits which resulted in both mills being offline for one week followed by lower throughput and recoveries. These issues led
to gold production at Tongon missing its target by 26%. The plant was restored to full production by the end of January 2013 and
the power problems were addressed during 2013. The mine continued to experience problems with recovery in 2013 and 2014 which
contributed to Tongon missing its production target by 17% in 2013 and 13% in 2014, as well as issues associated with the crushing
circuit, which required certain of the installed crushers to be replaced in 2014.
The mine continued
to engineer out key process deficiencies and improve operator skills and plant maintenance in 2015, and missed its production target
by 7%. Upgrades to the crushing circuits at the mine are forecasted for completion in the first quarter of 2016. In the third quarter
of 2015, production was impacted by flooding of the decline after pump failures following a particularly heavy rainy period. This
impacted the mine’s ability to deliver the higher grade ore feed that had been planned for the quarter.
There can be no assurance
that similar operational issues will not happen in the future, or that such events will not adversely affect our results of operations.
Mining operations
and projects are vulnerable to supply chain disruption and our operations could be adversely affected by shortages of, as well
as lead times to deliver fuel, strategic spares, critical consumables, mining equipment or metallurgical plant.
Our operations could
be adversely affected by both shortages and long lead times to deliver fuel, strategic spares, critical consumables, mining equipment
and metallurgical plant. We have limited influence over suppliers and manufacturers of these items. In certain cases there are
a limited number of suppliers for fuel, certain strategic spares, critical consumables, mining equipment or metallurgical plant
who command superior bargaining power relative to us. We could at times face limited supply or increased lead time in the delivery
of such items. There can be no assurance that such limited supply or increased lead time in the delivery of items will not happen
in the future, or that such events will not adversely affect our results of operations.
Failure to comply
with the U.S. Foreign Corrupt Practices Act, Corruption (Jersey) Law and the UK Bribery Act could subject us to penalties and other
adverse consequences. We could suffer losses from corrupt or fraudulent business practices.
We abide by the provisions
of the US Foreign Corrupt Practices Act, Corruption (Jersey) Law and the UK Bribery Act, which generally prohibit companies and
their intermediaries from making improper payments to officials for the purpose of obtaining or retaining business. In addition,
we are required to maintain records that represent our transactions and have an adequate system of internal accounting controls.
The compliance mechanisms and monitoring programs that we have in place may not adequately prevent or detect possible violations
under
applicable anti-bribery and corruption
legislation. There can be no assurance that our internal control policies and procedures always will protect us from recklessness,
fraudulent behavior, dishonesty or other inappropriate acts committed by our affiliates, employees or agents. As such, our corporate
policies and processes may not prevent all potential breaches of law or other governance practices. Failure to comply with such
legislation may result in severe criminal or civil sanctions, and we may be subject to other liabilities, including fines, prosecution,
potential debarment from public procurement and reputational damage, all of which could have a material adverse effect on our business,
consolidated results of operations, and consolidated financial condition. In addition, investigations by governmental authorities
could have a material adverse effect on our business, consolidated results of operations, and consolidated financial condition.
We are also subject to the risks that our employees, joint venture partners, and agents may fail to comply with other applicable
laws.
We may be required
to seek funding from the global credit and capital markets to develop our properties, and weakness in those markets could adversely
affect our ability to obtain financing and capital resources.
We require substantial
funding to develop our properties, and may be required to seek funding from the credit and capital markets to finance these activities.
Our ability to obtain outside financing will depend upon the price of gold and the market’s perception of its future price,
and other factors outside of our control. We may not be able to obtain funding on acceptable terms when required, or at all.
The credit and capital
markets in respect of the commodity sector experienced serious deterioration in 2015, and the conditions in these markets have
continued to be difficult since then and may continue to be difficult in the future, which could have an impact on the availability
and terms of credit and capital in the near term. The deteriorating financial condition of certain government authorities
has significantly increased the potential for sovereign defaults in a number of jurisdictions, including within the European Union.
If uncertainties in these markets continue, or these markets deteriorate further, it could have a material adverse effect on our
ability to raise capital. Failure to raise capital when needed or on reasonable terms may have a material adverse effect on our
business, financial condition and results of operations. A continued or worsened slowdown in the financial markets or other economic
conditions, including but not limited to consumer spending, employment rates, inflation, fuel and energy costs, lack of available
credit, the state of the financial markets, interest rates and tax rates may affect our growth and profitability.
To ensure additional
liquidity, in 2013 we entered into a $200.0 million unsecured revolving credit facility with HSBC and a syndicate of three other
banks. In 2014 we cancelled the existing credit facility, which was undrawn at that time, and entered into a new $400.0 million
unsecured revolving credit facility with HSBC and an extended banking syndicate. If any of the lenders are unable to fulfill their
future commitments, our liquidity could be impacted, which could have a material unfavorable impact on our results of operations
and financial condition.
If we draw down
on our credit facility,
o
ur indebtedness could adversely impact our business
.
Under the terms of
the credit facility we entered into in 2014 we are obligated to meet certain financial and other covenants. Our ability to meet
these covenants and to service our debt (should the credit facility be drawn down) will depend on our future financial performance
which will be affected by our operating performance as well as by financial and other factors, some of which are beyond our control.
Our operations
are located in countries where tax laws and policies may change rapidly and unpredictably and such changes and policies may adversely
affect our financial condition and results of operations.
Our failure to adapt
to changes in tax regimes and regulations in the countries in which we operate may result in fines, financial losses and have a
negative impact on our corporate reputation. In addition, if we fail to react to tax notifications from authorities, we could incur
financial losses or the seizure of our assets. If we are unable to enforce existing tax legislation or incorrectly applied tax
legislation, we may pursue arbitration or other proceedings to resolve the matter, all of which could materially and adversely
affect our business.
The failure of
any bank in which we deposit our funds could reduce the amount of cash we have available for operations.
Most of our cash deposited
with banks is not insured and would be subject to the risk of bank failure. If any of the banking institutions in which we have
deposited funds ultimately fails, we may lose our deposits. The loss of our deposits would reduce the amount of cash we have available
for operations and additional investments in our business, and would have a material adverse effect on our financial condition.
The SEC has adopted
rules that may affect mining operations in the DRC.
The SEC adopted final
rules pursuant to the Dodd Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) regarding disclosure on potential
conflict minerals that are necessary to the functionality or production of a product manufactured by a company that files reports
with the SEC. Under the final rules, an issuer that mines conflict minerals, such as Randgold, is not deemed to be manufacturing
or contracting to manufacture those minerals, unless the issuer also engages in manufacturing, whether directly or indirectly through
contract. Though we are not subject to the disclosure requirements of the final rules, we may be called upon by other entities
we contract with to provide information to them for their own supply-chain due diligence investigations. This may result in the
increased cost of demonstrating compliance in connection with the sale of gold emanating from the DRC and its neighbors. The complexities
of the gold supply chain, especially as they relate to ‘scrap’ or recycled gold, and the fragmented and often unregulated
supply of artisanal and small-scale mined gold are such that there may be significant uncertainties at each stage in the chain
as to the origin of the gold, and as a result of uncertainties in the process, the costs of due diligence and audit, or the reputational
risks of defining their product or a constituent part as containing a ‘conflict mineral’ may be too burdensome for
the buyers of our gold. Accordingly, they may decide to switch supply sources. This could have a material negative impact on the
gold industry, our relationship with the buyers of our gold, and our financial results.
Inflation may have
a material adverse effect on our operations.
Some of our operations
are located in countries that have and may continue to experience high rates of inflation during certain periods. It is possible
that significantly higher future inflation in countries in which we operate may result in increased future operational costs in
local currencies. This could have a material adverse effect upon our operations and financial conditions.
Regulations and pending
legislation governing issues involving climate change could result in increased operating costs which could have a material adverse
effect on our business.
A number of governments
or governmental bodies have introduced or are contemplating regulatory changes in response to various climate change interest groups
and the potential impact of climate change. Legislation and increased regulation regarding climate change could impose significant
costs on us, our venture partners and our suppliers, including increased energy, capital equipment, environmental monitoring and
reporting and other costs to comply with such regulations. Any adopted future climate change regulations could also negatively
impact our ability to compete with companies situated in areas not subject to such limitations. Given the political significance
and uncertainty around the impacts of climate change and how it should be dealt with, we cannot predict how legislation and regulation
will affect our financial condition, operating performance and ability to compete. Furthermore, even without such regulation, increased
awareness and any adverse publicity in the global marketplace about potential impacts on climate change by us or other companies
in our industry could harm our reputation. The potential physical impacts of climate change on our operations are highly uncertain,
and would be particular to the geographic circumstances in areas in which we operate. These may include changes in rainfall and
storm patterns and intensities, water shortages, changing sea levels and changing temperatures. These impacts may adversely impact
the cost, production and financial performance of our operations.
We are subject
to various political and economic uncertainties associated with operating in Côte d’Ivoire, that could significantly
affect the success of the Tongon mine.
We have been subject
to risks associated with operating the Tongon mine in Côte d’Ivoire. Côte d’Ivoire has in prior years experienced
political disruptions, including an attempted coup d’état and civil war. There can be no assurance that similar events
may not occur in the future which would have a material adverse effect on our gold
production and financial results. Our operations
and financial conditions could be impacted by future political and economic instabilities.
The Ebola virus
poses a risk to our operations.
In 2014 and 2015, Ebola
virus cases were identified in Mali and Senegal along with epidemics in neighboring countries which have now been largely contained.
We formed a crisis management team to spearhead a major campaign to safeguard our employees and host communities. If the incidence
of the Ebola virus re-emerges and spreads, it could pose risks to us in terms of potentially reduced productivity and increased
medical and insurance costs. An Ebola virus outbreak could cause the closing of borders of the countries in which we operate, or
neighboring countries, which poses a risk in operation of our supply chain.
We may not pay dividends
to shareholders in the future.
We paid our ninth
dividend to ordinary shareholders in 2015. It is our policy to pay dividends if profits and funds are available for that purpose.
Whether or not funds are available depends on a variety of factors, including capital expenditure. We cannot guarantee that dividends
will be paid in the future.
If we are unable
to attract and retain key personnel our business may be harmed.
Our ability to bring
additional mineral properties into production and explore our extensive portfolio of mineral rights will depend, in large part,
upon the skills and efforts of a small group of management and technical personnel, including D. Mark Bristow, our Chief Executive
Officer. If we are not successful in retaining, developing or attracting highly qualified individuals in key management positions
our business may be harmed. The loss of any of our key personnel could adversely impact our ability to execute our business plan.
Our insurance coverage
may prove inadequate to satisfy future claims against us.
We may become subject
to liabilities, including liabilities for pollution or other hazards, against which we have not insured adequately or at all, or
cannot insure. Our insurance policies contain exclusions and limitations on coverage. Our current insurance policies provide worldwide
indemnity of $100.0 million in relation to legal liability incurred as a result of death, injury, disease of persons and/or loss
of or damage to property. Main exclusions under this insurance policy, which relates to our industry, include war, nuclear risks,
silicosis, asbestosis or other fibrosis of the lungs or diseases of the respiratory system with regard to employees, and gradual
pollution. In addition, our insurance policies may not continue to be available at economically acceptable premiums. As a result,
in the future our insurance coverage may not cover the extent of claims against us.
It may be difficult
for you to effect service of process and enforce legal judgments against us or our affiliates.
We are incorporated
in Jersey, Channel Islands and a majority of our directors and senior executives are not residents of the United States. Virtually
all of our assets and the assets of those persons are located outside the United States. As a result, it may not be possible for
you to effect service of process within the United States upon those persons or us. Furthermore, the United States and Jersey currently
do not have a treaty providing for the reciprocal recognition and enforcement of judgments (other than arbitration awards) in civil
and commercial matters. Consequently, it may not be possible for you to enforce a final judgment for payment rendered by any federal
or state court in the United States based on civil liability, whether or not predicated solely upon United States Federal securities
laws against those persons or us.
In order to enforce
any judgment rendered by any Federal or state court in the United States in Jersey, proceedings must be initiated by way of common
law action before a court of competent jurisdiction in Jersey. The entry of an enforcement order by a court in Jersey is conditional
upon the following:
|
•
|
that the court which pronounced the judgment has jurisdiction to entertain the case according to
the principles recognized by Jersey law with reference to the jurisdiction of the foreign courts;
|
|
•
|
that the judgment is final and conclusive – it cannot be altered by the courts which pronounced
it;
|
|
•
|
that there is payable pursuant to a judgment a sum of money, not being a sum payable in respect
of tax or other charges of a like nature or in respect of a fine or other penalty;
|
|
•
|
that the judgment has not been prescribed;
|
|
•
|
that the courts of the foreign country have jurisdiction in the circumstances of the case;
|
|
•
|
that the judgment was not obtained by fraud; and
|
|
•
|
that the recognition and enforcement of the judgment is not contrary to public policy in Jersey,
including observance of the rules of natural justice which require that documents in the United States proceeding were properly
served on the defendant and that the defendant was given the right to be heard and represented by counsel in a free and fair trial
before an impartial tribunal.
|
Furthermore, it is
doubtful whether you could bring an original action based on United States Federal securities laws in a Jersey court.
We are subject to
significant corporate regulation as a public company and failure to comply with all applicable regulations could subject us to
liability or negatively affect our share price.
As a publicly traded
company we are subject to a significant body of regulation. While we have developed and instituted a corporate compliance program
based on what we believe are the current best practices in corporate governance and continue to update this program in response
to newly implemented or changing regulatory requirements, there can be no assurance that we are or will be in compliance with all
potentially applicable corporate regulations. For example, there can be no assurance that in the future our management will not
find a material weakness in connection with its annual review of our internal control over financial reporting pursuant to Section
404 of the US Sarbanes-Oxley Act of 2002. If we fail to comply with any of these regulations, we could be subject to a range of
regulatory actions, fines or other sanctions or litigation. If we must disclose any material weakness in our internal control over
financial reporting, our share price could decline.
We utilize information
technology and communications systems, the failure of which could significantly impact our operations and business.
We are dependent upon
information technology systems in the conduct of our operations. Our information technology systems are subject to disruption,
damage or failure from a variety of sources, including, without limitation, computer viruses, security breaches, cyber-attacks,
natural disasters and defects in design. Cybersecurity incidents, in particular, are evolving and include, but are not limited
to, malicious software, attempts to gain unauthorized access to data and other electronic security breaches that could lead to
disruptions in systems, unauthorized release of confidential or otherwise protected information and the corruption of data. Various
measures have been implemented to manage our risks related to information technology systems and network disruptions. However,
given the unpredictability of the timing, nature and scope of information technology disruptions, we could potentially be subject
to production downtimes, operational delays, the compromising of confidential or otherwise protected information, destruction or
corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from
remedial actions, any of which could have a material adverse effect on our cash flows, competitive position, financial condition
or results of operations.
We maintain global
information technology and communication networks and applications to support our business activities. Information technology security
processes may not prevent future malicious actions, denial-of-service attacks, or fraud, resulting in corruption of operating systems,
theft of commercially sensitive data, misappropriation of funds and business and operational disruption. Material system breaches
and failures could result in significant interruptions that could in turn affect our operating results and reputation.
Risks Relating to Our Industry
The exploration of
mineral properties is highly speculative in nature, involves substantial expenditures, and is frequently unproductive.
We must continually
seek to replace our ore reserves depleted by production to maintain production levels over the long term. Ore reserves can be replaced
by expanding known orebodies or exploring for new deposits. Exploration for gold is highly speculative in nature. Our future growth
and profitability will depend, in part, on our ability to identify and acquire additional mineral rights, and on the costs and
results of our continued exploration and development programs. Many exploration programs, including some of ours, do not result
in the discovery of mineralization and any mineralization discovered may not be of sufficient quantity or quality to be profitably
mined. Our mineral exploration rights may not contain commercially exploitable reserves of gold. Uncertainties as to the metallurgical
recovery of any gold discovered may not warrant mining on the basis of available technology.
If we discover a viable
deposit, it usually takes several years from the initial phases of exploration until production is possible. During this time,
the economic feasibility of production may change.
Moreover, we will
use the evaluation work of professional geologists, geophysicists, and engineers for estimates in determining whether to commence
or continue mining. These estimates generally rely on scientific and economic assumptions, which in some instances may not be correct,
and could result in the expenditure of substantial amounts of money on a deposit before it can be determined whether or not the
deposit contains economically recoverable mineralization. As a result of these uncertainties, we may not successfully acquire additional
mineral rights, or identify new proven and probable reserves in sufficient quantities to justify commercial operations in any of
our properties.
If management determines
that capitalized costs associated with any of our gold interests are not likely to be recovered, we would recognize an impairment
provision against the amounts capitalized for that interest. All of these factors may result in losses in relation to amounts spent
which are found not to be recoverable.
Title to our mineral
properties may be challenged which may prevent or severely curtail our use of the affected properties.
Title to our properties
may be challenged or impugned, and title insurance is generally not available. Each sovereign state is the sole authority able
to grant mineral property rights, and our ability to ensure that we have obtained secure title to individual mineral properties
or mining concessions may be severely constrained. Our mineral properties may be subject to prior unregistered agreements, transfers
or claims, and title may be affected by, among other things, undetected defects. In addition, we may be unable to operate our properties
as permitted or to enforce our rights with respect to our properties.
Our ability to obtain
desirable mineral exploration projects in the future may be adversely affected by competition from other exploration companies.
We compete with other
mining companies in connection with the search for and acquisition of properties producing or possessing the potential to produce
gold. Existing or future competition in the mining industry could materially and adversely affect our prospects for mineral exploration
and success in the future.
In addition, we compete
with other mining companies to attract and retain key executives, skilled labor, contractors and other employees. We also compete
with other mining companies for specialized equipment, components and supplies necessary for exploration and development, as well
as for rights to mine properties. If we are unable to continue to attract and retain skilled and experienced employees, obtain
the services of skilled personnel and contractors or specialized equipment or supplies, or acquire additional rights to mine properties,
our competitive position or results of operations could be adversely impacted.
Artisanal mining
can disrupt our business and expose us to liability.
Artisanal miners are
active on, or adjacent to, many of our properties. Artisanal mining is associated with a number of negative impacts, including
environmental degradation, human rights abuse and funding of conflict. We do not purchase any gold from artisanal miners. There
is a misconception that artisanally-mined gold is channeled through large-scale mining operators and such misconceptions have a
negative impact on the reputation of the mining industry. The activities of illegal miners could cause damage to our properties,
including pollution, underground fires, or personal injury or death. We could potentially be held responsible. Illegal mining and
theft could result in lost gold reserves, mine stoppages, and have a material adverse effect on our operations and financial condition.
Our operations are
subject to extensive governmental and environmental regulations, which could cause us to incur costs that adversely affect our
results of operations.
Our mining facilities
and operations are subject to substantial government laws and regulations, concerning mine safety, land use and environmental protection.
We must comply with requirements regarding exploration operations, public safety, employee health and safety, use of explosives,
air quality, water pollution, noxious odor, noise and dust controls, reclamation, solid waste, hazardous waste and wildlife as
well as laws protecting the rights of other property owners and the public.
Any failure on our
part to be in compliance with these laws, regulations, and requirements with respect to our properties could result in us being
subject to substantial penalties, fees and expenses, significant delays in our operations or even the complete shutdown of our
operations. We provide for estimated environmental rehabilitation costs when the related environmental disturbance takes place.
Estimates of rehabilitation costs are subject to revision as a result of future changes in regulations and cost estimates. The
costs associated with compliance with government regulations may ultimately be material and adversely affect our results of operations
and financial condition.
If our environmental
and other governmental permits are not renewed or additional conditions are imposed on our permits, our financial condition and
results of operations may be adversely affected.
Generally, compliance
with environmental and other government regulations requires us to obtain permits issued by governmental agencies. Some permits
require periodic renewal or review of their conditions. We cannot predict whether we will be able to renew these permits or whether
material changes in permit conditions will be imposed. Non-renewal of a permit may cause us to discontinue the operations requiring
the permit, and the imposition of additional conditions on a permit may cause us to incur additional compliance costs, either of
which could have a material adverse effect on our financial condition and results of operations.
Labor disruptions
could have an adverse effect on our operating results and financial condition.
Our operations are
highly unionized, and strikes are legal in the countries in which we operate. Therefore, our operations are at risk of having work
interrupted for indefinite periods due to industrial action, such as strikes by employee collectives. Should long disruptions take
place on our operations, the results from our operations and their financial condition could be materially and adversely affected.
AIDS and tropical
disease outbreaks pose risks to us in terms of productivity and costs.
The incidence of AIDS
in the DRC, Mali, Côte d’Ivoire and Senegal, which has been forecast to increase over the next decade, poses risks
to us in terms of potentially reduced productivity and increased medical and insurance costs. The exact extent to which our workforce
is infected is not known at present. The prevalence of AIDS in the countries in which we operate and among our workforce could
become significant. Significant increases in the incidence of AIDS infection and AIDS-related diseases among members of our workforce
in the future could adversely impact our operations and financial condition.
Malaria and other
tropical diseases pose significant health risks at all of our operations in West Africa and Central Africa where such diseases
may assume epidemic proportions. Malaria is a major cause of death and also gives rise to absenteeism in employees and contractors.
Consequently, if uncontrolled, the disease could adversely impact our operations and financial condition.
Item 4. Information on the Company
A. HISTORY AND DEVELOPMENT OF THE COMPANY
Randgold Resources
Limited was incorporated under the laws of Jersey, Channel Islands in August 1995, to engage in the exploration and development
of gold deposits in Sub-Saharan Africa. Our principal executive offices are located at 3rd Floor Unity Chambers, 28 Halkett Street,
St. Helier, Jersey, JE2 4WJ Channel Islands and our telephone number is (011 44) 1534,735-333. Our agent in the United States is
CT Corporation System, 111 Eighth Avenue, New York, New York 10011.
We discovered the
Morila deposit during December 1996 and we subsequently financed, built and commissioned the Morila mine.
During July 2000,
we concluded the sale of 50% of our interest in Morila Limited (and also a shareholder loan made by us to Morila Limited) to AngloGold
Ashanti for $132.0 million in cash.
We have an 80% controlling
interest in Loulo through a series of transactions culminating in April 2001. In February 2004, we announced that we would develop
a new mine at Loulo in western Mali. The Loulo mine commenced operations in October 2005 and mines the Gara (formerly Loulo 0)
and Yalea deposits. In addition, the board agreed to proceed with the development of the underground mine and, after the award
of the development contract, work commenced with the construction of the boxcut at the Yalea mine in August 2006. We accessed first
ore at Yalea in April 2008 with full production beginning in 2010. We commenced development of Loulo’s second underground
mine, Gara, and started mining in 2011. We discovered the Yalea deposit in 1997.
We have an 80% controlling
interest in Gounkoto, which owns the Gounkoto mine. The Gounkoto mine commenced mining in January 2011 and processes its ore by
way of a toll treatment agreement with the Loulo mine, in June 2011.
We have an 89% controlling
interest in Tongon, which owns the Tongon mine. The Tongon mine commenced mining in April 2010 and first gold was produced in 2010.
In April 2004, Resolute
Mining Limited, or Resolute, acquired the Syama mine from us. The agreement entered into in June 2004 between the parties provides
for the payment of a production royalty by Resolute to us relating to Syama’s production equal to $10/oz on the first million
ounces produced by Syama and $5/oz on the next 3Moz produced by Syama. This royalty payment is capped at $25.0 million. We received
our first royalties in 2009. During 2015, quarterly royalty payments were received from Resolute throughout the year.
Effective on June 11,
2004, we undertook a split of our ordinary shares, which increased our issued share capital from 29,263,385 to 58,526,770 ordinary
shares. In connection with this share split, our ordinary shareholders of record on June 11, 2004 received two $0.05 ordinary
shares for every one $0.10 ordinary share they held. Following the share split, each shareholder held the same percentage interest
in us; however, the trading price of each share was adjusted to reflect the share split. ADS holders were affected the same way
as shareholders and the ADS ratio remains one ADS to one ordinary share.
On October 15,
2009, we completed the acquisition of 50% of Moto Goldmines Limited (Moto Goldmines), in a joint venture with AngloGold Ashanti,
which resulted in joint control of a 70% interest in the Kibali mine in the DRC. On December 22, 2009 we completed a further
acquisition of a 20% interest, on behalf of the joint venture, from Société des Mines d’Or de Kilo-Moto SA
(SOKIMO), the parastatal mining company of the DRC, resulting in an effective interest in the Kibali mine of 45%. The Kibali mine
commenced mining in 2012 and first gold was produced in 2013.
During November 2009,
we completed the sale of our Kiaka gold project to Volta Resources Inc., for CAD$4.0 million in cash and 20 million Volta
Resources Inc. shares. During 2010, we sold 15.5 million Volta Resources Inc. shares for a net profit of $19.3 million. We
had received CAD$4.0 million in full by the end of 2011.
Effective December
19, 2013, Volta Resources Inc. and B2 Gold Corp completed a Canadian law combination which resulted in Volta Resources Inc. becoming
a wholly-owned subsidiary of B2 Gold Corp. As a result of this combination we received 898,003 shares in B2 Gold Corp in exchange
for our Volta Resources Inc. shares.
We conduct
our mining operations through:
|
•
|
a 50% joint venture interest in Morila Limited (which in turn owns an 80% interest in the Morila
mine);
|
|
•
|
an 80% interest in Loulo;
|
|
•
|
an 80% interest in Gounkoto;
|
|
•
|
an 89% interest in Tongon; and
|
|
•
|
a 50% joint venture interest in Kibali (Jersey) Limited (which in turn indirectly owns a 90% interest
in the Kibali mine).
|
We also have an 83.25%
interest in the Massawa feasibility project.
Principal Capital Expenditure
Capital expenditure
incurred for the year ended December 31, 2015 totaled $216.0 million compared to $179.3 million for the year ended December 31,
2014, and $303.1 million for the year ended December 31, 2013. Significant capital expenditure is forecasted to be incurred across
the group during 2016 to support the planned continued growth in production, especially at Kibali, of approximately $80 million
(45% of the project), and the ongoing development of the underground mines at Loulo, where total capital at the Loulo-Gounkoto
complex is forecast at $141 million. Capital at Tongon, including completion of the crusher expansion, is estimated at $10 million,
and $1 million will be spent at Morila (40% of the project), with Massawa capital expenditure estimated at $6 million. Consequently,
total group capital expenditure for 2016 is expected to be approximately $240 million (including attributable share of joint ventures).
The capital expenditure is projected to be financed out of internal funds.
B. BUSINESS OVERVIEW
Overview
We engage in gold
mining, exploration and related activities. Our activities are focused on West and Central Africa, some of the most promising areas
for gold discovery in the world. In Mali, we have an 80% controlling interest in the Loulo mine through Loulo. The Loulo mine is
currently mining from two underground mines. We also have an 80% controlling interest in the Gounkoto mine through Gounkoto. We
own 50% of Morila Limited, which in turn owns 80% of Morila, the owner of the Morila mine in Mali. In addition, we own an effective
89% controlling interest in the Tongon mine located in the neighboring country of Côte d’Ivoire, which was commissioned
in November 2010. We also own an effective 83.25% controlling interest in the Massawa project in Senegal where we completed a technical
and financial study in December 2009. In 2009, we acquired an effective 45% interest in the Kibali mine, which is located in the
DRC. Since that time we have updated the feasibility study and constructed the mine such that we commissioned the first mill stream
in 2013 and commissioned the second mill stream in 2014. We also have exploration permits and licenses covering substantial areas
in Côte d’Ivoire, DRC, Mali, and Senegal. At December 31, 2015, we declared proven and probable reserves of 15Moz attributable
to our percentage ownership interests in Loulo, Morila, Tongon, Gounkoto, Massawa and Kibali.
Our strategy is to
create value for all our stakeholders by finding, developing and operating profitable gold mines. We seek to discover significant
gold deposits, either from our own phased exploration programs or the acquisition of early stage to mature exploration programs.
We actively manage both our portfolio of exploration and
development properties and our risk exposure
to any particular geographical area. We also routinely review opportunities to acquire development projects and existing mining
operations and companies.
Loulo
In February 2004,
we announced that we would develop a new mine at Loulo in western Mali. In 2005, we commenced open pit mining operations at the
Gara and Yalea pits. In 2010, an application was made to split the Loulo and Gounkoto permits. In 2011 mining ceased in the Gara
open pit. In 2015, its tenth year of production, the Loulo mine produced 350,604 oz of gold at a total cash cost of $739/oz. We
currently anticipate that mining at Loulo will continue through 2028.
We commenced development
of the Yalea underground mine in August 2006, where first ore was accessed in April 2008. We commenced development of Loulo’s
second underground mine, Gara, in 2010 with first ore being intersected during the second quarter of 2011 and stoping began in
November 2011. From June 2011, ore from Gounkoto was processed through the Loulo processing plant following the conclusion of a
toll-treatment agreement between the two mines. The commencement of the toll-treatment of ore from Gounkoto resulted in a reduction
of ore processing with respect to the Loulo mine. Mining of the Yalea South pushback pit was completed in 2013. The Yalea and Gara
underground mines are now in full production and paste backfill plants at both mines have been commissioned and are operational.
The focus of exploration
at Loulo is to continue to explore and discover additional orebodies within the Loulo permit.
Gounkoto
The Gounkoto mine
is located approximately 25km south of Loulo’s plant. Following the completion of the feasibility study in 2010, construction
of the mine commenced in late 2010.
In January 2011, mining
commenced at Gounkoto. In June 2011, the Loulo plant started to treat Gounkoto ore. 2012 represented the first full year of production
for Gounkoto. During 2015 a total of 1.97Mt of Gounkoto ore at a grade of 4.9g/t was fed to the Loulo plant and 279,563oz were
produced at a total cash cost of $594/oz. We currently anticipate that mining at Gounkoto will continue through 2025.
The underground feasibility
study on Gounkoto was successfully completed at the end of 2014 and updated in 2015. A trade-off study between a large open pit
option and the current underground project is expected to be completed by the end of the year.
The focus of exploration
at Gounkoto is to continue to explore and discover additional orebodies within the Gounkoto permit.
Morila
In 1996, we discovered
the Morila deposit, which we financed and developed and was our major gold producing asset through 2009. Morila’s total production
for 2015 was 122,374oz at a cash cost of $674/oz. Consistent with the mine plan, Morila ceased open pit mining in April 2009 and
is currently processing mineralized waste and preparing to process TSF material. During 2010 a study of the reprocessing of the
Morila Tailings Storage Facility (TSF) was completed and in 2011 a feasibility study on the viability of treating the TSF material,
marginal ore and mineralized waste stockpiles was completed and approved by the board in January 2012. During 2012, a feasibility
study on the viability of the Pit 4S pushback was completed, and approved by the board in January 2013. Closure of the operation
was originally scheduled for 2013, but, together with the Pit 4S pushback, which was completed in 2015, and the tailings treatment
projects, processing of the marginal ore and mineralized waste should extend its life to 2019.
Tongon
The Tongon mine is
located within the Nielle exploitation permit in the north of Côte d’Ivoire, approximately 55km south of the border
with Mali.
We commenced construction
of the Tongon mine at the end of 2008, and commissioned the first stream in the fourth quarter of 2010, with first gold production
being recorded. We completed and commissioned the second stream including secondary and tertiary crushing circuit and the sulfide
circuit of the processing plant in 2011. Tongon has two main pits, South Zone (SZ) and the smaller North Zone (NZ). In 2015, we
produced 242,948oz at a total cash cost of $836/oz. The Tongon mine has a remaining mine life of 7 years (to 2021) but has the
potential to extend this with nearby discoveries and satellite pits.
The focus of exploration
at Tongon is to evaluate near-mine targets with a 15km radius and Greenfield programs beyond the near-mine 15km radius.
Kibali
Our interest in the
Kibali mine was acquired in 2009 following the acquisition of Moto Goldmines, in conjunction with AngloGold Ashanti, and the further
acquisition of a 20% interest from Sokimo on behalf of the joint venture. The Kibali mine is located approximately 560km northeast
of the city of Kisangani and 180km west of the Ugandan border town of Arua in the northeast of the DRC. We are managing the development
and operation of the Kibali mine.
First gold production
at the Kibali mine was recorded in the third quarter of 2013. In 2015, we produced 642,720oz at a total cash cost of $604/oz.
The Kibali mine is
being developed in two phases. Phase 1, which includes the KCD open pit operation and processing plant, the mine infrastructure
and the first of three hydropower stations was completed in December 2014. Phase 2 comprises the underground mine development and
two additional hydropower stations. A key achievement in 2014 was the commissioning of the sulphide circuit and subsequent ramp
up to design production level by the end of 2014. In 2015, the mine commenced processing underground ore from the decline development,
while continuing to progress the construction of the vertical shaft which is expected to be completed in 2017. The mine is expected
to operate through to 2031.
The focus of exploration
at Kibali is to evaluate extension to the known deposits, especially KCD where mineralization has been confirmed.
Exploration
We are exploring in
four African countries (Mali, Senegal, Côte d’Ivoire and the DRC) with a portfolio of 141 targets on 12,307km of ground
holding, of these 99 are satellite targets located near existing operations while 42 are potential stand-alone operations. We target
profitable gold deposits that have the potential to host mineable gold reserves. Our business strategy of organic growth through
exploration has been validated by our discovery and development track record, including the Morila mine, Loulo mine, Gounkoto mine,
Tongon mine and the Kibali mine and the Massawa discovery.
In 2015, the exploration
focus was sustained on the priority areas: the MTZ in Senegal, the Senegal-Mali Shear in Mali, the Boundiali and Senefou belts
in Côte d’Ivoire and the KZ Structure in NE DRC. The group’s portfolio of mineral rights was expanded through
the acquisition of new permits as well as additional joint ventures.
OWNERSHIP OF MINES AND SUBSIDIARIES
The Morila mine is
owned by Morila, which in turn is owned 80% by Morila Limited and 20% by the State of Mali. Morila Limited is jointly owned by
us and AngloGold Ashanti and the mine is controlled by a 50:50 joint venture management committee. Responsibility for the day-to-day
operations rests with us.
The Loulo mine is
owned by a Malian Company, Loulo, which is owned 80% by us and 20% by the State of Mali.
The Gounkoto mine
is owned by a Malian company, Gounkoto, which is owned 80% by us and 20% by the State of Mali.
The Tongon mine is
owned by an Ivorian company, Tongon, in which we have an 89% interest, the State of Côte d’Ivoire 10% and 1% is held
by a local Ivorian company.
The Kibali mine is
controlled by a 50:50 joint venture, between ourselves and AngloGold Ashanti, which holds an effective 90% interest in Kibali.
The remaining 10% of the shares are held by SOKIMO, the parastatal mining company of DRC. We thus have an effective 45% interest
in the Kibali mine.
We hold an effective
83.25% interest in the Massawa project. The government of Senegal retains a 10% carried interest in the project, with the balance
held by our Senegalese joint venture partner.
GEOLOGY
West Africa is one
of the more geologically prospective regions for gold deposits in the world. Lower Proterozoic rocks are known to contain significant
gold occurrences and exist in West Africa in abundance. The Birimian greenstone belts, part of the Lower Proterozoic, which are
younger than the Archaean greenstones of Canada, Australia and South Africa, contain similar types of ore deposits and are located
in Ghana, Côte d’Ivoire, Burkina Faso, Guinea, Mali, Senegal and Niger. Although a significant amount of geological
information has been collected by government and quasi-government agencies in West Africa, the region has largely been under-explored
by mining and exploration companies using modern day technology. Most of our exploration properties are situated within the Birimian
Formation, a series of Lower Proterozoic volcanic and sedimentary rocks. The West African Birimian sequences host a number of world
class gold deposits and producing gold mines.
The Central African
gold belts have a long history of gold production, particularly during the colonial era but due to regional instability they have
seen little modern exploration. The Kibalian greenstone belts of northeastern DRC are comprised of Archaean Kibalian (Upper and
Lower) volcanisedimentary rocks and ironstone-chert horizons metamorphosed to greenschist facies. They are cut by regional-scale
north, east, northeast and northwest trending faults and are bounded to the north by the Middle Achaean West Nile granite-gneiss
complex and cut to the south by the Upper Congo granitic complex. Our Kibali mine is located within the Moto greenstone.
Our strategy was initiated
before the current entry of our competitors into West Africa and we believe that this enabled us to secure promising exploration
permits in the countries of Côte d’Ivoire, Mali, Burkina Faso, and Senegal at relatively low entry costs.
ORE RESERVES
Only those reserves
which qualify as proven and probable reserves for purposes of the SEC’s Industry Guide Number 7 are presented. Pit optimization
is carried out at a gold price of $1,000/oz. Underground reserves are also based on a gold price of $1,000/oz.
The Morila, Loulo,
and Tongon open pit ore reserves were calculated by Mr. Shaun Gillespie, an officer of the company and competent person. The
Kibali open pit ore reserves were calculated by Mr. Nicholas Coomson, an officer of the company and competent person, while
the underground ore reserves were calculated by Mr. Tim Peters, an external consultant and competent person. The Loulo underground
ore reserves were calculated by Mr. Andrew Fox, an external consultant and competent person. The Gounkoto open pit ore reserves
were calculated by Mr. Philemon Frimpong, an officer of the company, under the supervision of Mr. Shaun Gillespie, an officer of
the company and competent person. The Gounkoto underground ore reserves were calculated by Mr. Tim Peters, an external consultant
and competent person. Total reserves as of December 31, 2015 amounted to 194Mt at an average grade of 3.6g/t, for 23Moz of gold
of which 15Moz are attributable to us.
In calculating proven
and probable reserves, current industry standard estimation methods are used. The geological estimates were calculated using classical
geostatistical techniques, following geological modeling of the
borehole information. The sampling and
assaying is done to internationally acceptable standards and routine quality control procedures are in place.
All reserves are based
on technical and financial studies. Factors such as grade distribution of the orebody, planned production rates, forecast working
costs, dilution and mining recovery factors, geotechnical parameters and metallurgical factors as well as current forecast gold
price are all used to determine a cut-off grade from which a life of mine plan is developed in order to optimize the profitability
of the operation.
The following table summarizes the declared
reserves at our mines as of December 31, 2015:
|
|
Proven Reserves
|
|
|
Probable Reserves
|
|
|
Total Reserves
|
|
|
|
Tonnes
|
|
|
Grade
|
|
|
Gold
|
|
|
Tonnes
|
|
|
Grade
|
|
|
Gold
|
|
|
Tonnes
|
|
|
Grade
|
|
|
Gold
|
|
Operation/Project
2
|
|
(Mt)
|
|
|
(g/t)
|
|
|
(Moz)
|
|
|
(Mt)
|
|
|
(g/t)
|
|
|
(Moz)
|
|
|
(Mt)
|
|
|
(g/t)
|
|
|
(Moz)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Morila
1
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
15
|
|
|
|
0.6
|
|
|
|
0.3
|
|
|
|
15
|
|
|
|
0.6
|
|
|
|
0.3
|
|
Loulo
1
|
|
|
8.6
|
|
|
|
4.5
|
|
|
|
1.2
|
|
|
|
23
|
|
|
|
4.7
|
|
|
|
3.4
|
|
|
|
32
|
|
|
|
4.6
|
|
|
|
4.7
|
|
Tongon
1
|
|
|
8.2
|
|
|
|
2.3
|
|
|
|
0.6
|
|
|
|
18
|
|
|
|
2.4
|
|
|
|
1.4
|
|
|
|
26
|
|
|
|
2.4
|
|
|
|
2.0
|
|
Gounkoto
1
|
|
|
4.1
|
|
|
|
3.1
|
|
|
|
0.4
|
|
|
|
16
|
|
|
|
5.2
|
|
|
|
2.7
|
|
|
|
20
|
|
|
|
4.8
|
|
|
|
3.1
|
|
Massawa
1
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
21
|
|
|
|
3.1
|
|
|
|
2.0
|
|
|
|
21
|
|
|
|
3.1
|
|
|
|
2.0
|
|
Kibali
1
|
|
|
4.0
|
|
|
|
1.8
|
|
|
|
0.2
|
|
|
|
76
|
|
|
|
4.3
|
|
|
|
10
|
|
|
|
80
|
|
|
|
4.1
|
|
|
|
11
|
|
Total
|
|
|
25
|
|
|
|
3.1
|
|
|
|
2.5
|
|
|
|
170
|
|
|
|
3.7
|
|
|
|
20
|
|
|
|
194
|
|
|
|
3.6
|
|
|
|
23
|
|
|
1
|
Our attributable share of Morila is 40%, Loulo 80%, Gounkoto 80%, Tongon 89%, Massawa 83.25%
and Kibali
|
|
|
45%. The figures stated above represent the 100% values.
|
|
2
|
The reporting of ore reserves is in accordance with SEC Industry Guide 7. Open pit reserves
are calculated at a weighted average cut off of 1.05g/t and within an $1,000/oz open pit designs. Underground reserves are reported
at a weighted average cutoff of 2.51g/t, calculated at $1,000/oz gold price. Dilution and ore loss are incorporated into the calculation
of reserves. Addition of individual line items may not sum to sub totals because numbers are reported to the second significant
digit.
|
At Loulo, Gounkoto,
Kibali and Massawa open pit reserves, a 10% mining dilution at zero grade and an ore loss of 3% has been incorporated into the
estimates of reserves and are reported as mill delivered tonnes and head grades. At the Tongon project a dilution of 13% at zero
grade and 2% ore loss, with selected portions of the pushback containing very narrow ore body, of 18% at zero grade and an ore
loss of 12%, has been modelled for the Southern Zone and 10% dilution and 2% oreloss for the Northern Zone. Kibali underground
dilution varies between 1% and 6.7% depending on stope design and ore loss of 3%. For Morila a 5% dilution has been applied to
the TSF mining with 0% ore loss. Metallurgical recovery factors have not been applied to the reserve figures since these are the
estimates of the material to be delivered to the mill. Operating costs, metallurgical recovery, royalties, dilution and ore loss
factors are used to determine the cut-off grade at which to report ore reserves. The weighted average metallurgical recovery factors
used are 57% for the Morila mine, 93.5% for the Loulo open pit material and 91.9% for Loulo underground material, 86% for the Tongon
mine, 92% for the Gounkoto underground material, 89% for the Massawa open pit material and 88.2% for the Kibali mine.
MINING OPERATIONS
Loulo-Gounkoto Mine Complex
The Loulo and Gounkoto
mines, known as the Loulo-Gounkoto complex, are located in the west of Mali, bordering Senegal, adjacent to the Falémé
River. The complex lies within the Kedougou-Kéniéba inlier of Birimian rocks which hosts a number of major gold deposits
in Mali, including Gara, Yalea and Gounkoto, Sadiola, Segala and Tabakoto as well as Sabodala across the border in Senegal. The
Loulo mine officially opened in November 2005 with the approval for an underground feasibility study in the same year and underground
mine development started in 2006. Gounkoto was discovered in 2009. Open pit mining commenced in January 2011 and first ore was
delivered to Loulo plant, under a toll treating agreement in June 2011.
The complex is owned
80% by us and 20% by the State of Mali. In 2010, an application was made to split the Loulo and Gounkoto permits, and a separate
company was created for Gounkoto in December 2010 with the same
corporate structure and shareholding as
Loulo. A new mining convention, which dictates the fiscal and regulatory environment applicable to the mine, was negotiated with
the State of Mali and signed in March 2012. The convention included an initial two year corporate tax holiday starting from the
date of first production, and a further tax holiday, up to a maximum of five years in total, in the event of further investment
such as an underground mine. It also includes royalties of 6% of revenues and a 10% priority dividend payment for the State of
Mali.
In 2015, gold sales
totaled $724.2 million for the year. Total royalties paid to the state amounted to $47.9 million and cash operating costs totaled
$376.8 million, resulting in profit from mining activities of $298.4 million.
Gold production at the
Loulo-Gounkoto complex was 630,167oz, 1% down on the prior year. The small decrease in production was due to a 4% decrease in head
grade milled to 4.8g/t, offset by a 3% increase in tonnes processed, while the recoveries were in line with the prior year at 90.1%.
Total cash costs per ounce were in line with the prior year at $675/oz and well contained, notwithstanding the lower production
and head grade milled, aided by a lower fuel price and favorable euro/dollar exchange rate.
Gold sales of $724.2
million were 9% lower than the previous year due to the 9% drop in the average gold price received. Profit from mining activity
(before interest, tax and depreciation) decreased by 20% to $298.4 million due to the lower sales.
Tonnes processed at
4,543kt for the year were 3% above 2014 despite a mill motor failure in the first quarter, a mill motor replacement in the third
quarter and the integration of the paste plant with the processing plant. Further modifications including the launders installation
at the CIL in 2016 is expected to boost throughput to 4,600kt for the year.
Production results for the 12 months
ended December 31
|
|
2015
|
|
|
2014
|
|
MINING
|
|
|
|
|
|
|
|
|
Tones mined (000)
|
|
|
31,360
|
|
|
|
27,025
|
|
Ore tonnes mined (000)
|
|
|
4,513
|
|
|
|
4,539
|
|
MILLING
|
|
|
|
|
|
|
|
|
Tonnes processed (000)
|
|
|
4,543
|
|
|
|
4,396
|
|
Head grade milled (g/t)
|
|
|
4.8
|
|
|
|
5.0
|
|
Recovery (%)
|
|
|
90.1
|
|
|
|
90.2
|
|
Ounces produced
|
|
|
630,167
|
|
|
|
639,219
|
|
Ounces sold
|
|
|
630,627
|
|
|
|
631,124
|
|
Average price received ($/oz)
|
|
|
1,148
|
|
|
|
1,267
|
|
Cash operating costs
1
($/oz)
|
|
|
606
|
|
|
|
597
|
|
Total cash costs
1
($/oz)
|
|
|
675
|
|
|
|
672
|
|
Gold on hand at period end
2
($000)
|
|
|
8,133
|
|
|
|
9,708
|
|
Profit from mining activity
1
($000)
|
|
|
298,396
|
|
|
|
375,293
|
|
Gold sales
1
($000)
|
|
|
724,167
|
|
|
|
799,718
|
|
|
1
|
Refer to explanation of non-GAAP information provided in the section “—Non-GAAP
information” above.
|
|
2
|
Gold on hand represents gold in doré at the mines multiplied by the prevailing spot gold
price at the end of the period.
|
LOULO
Operations
Gold production at Loulo
decreased by 8% to 350,604oz due to a 5% decrease in tonnes processed (2,570kt) and a 4% drop in head grade milled (4.7g/t). Notwithstanding
the drop in production, total cash costs were contained at $739/oz, a 4% increase on the prior year. The grade was negatively impacted
by a slower build-up in underground mining which delayed access to higher grade areas, in part due to the impact of the flooding
in the third quarter as well as the transition to owner mining. There was a marked improvement in the latter half of the fourth
quarter.
Gold sales of $406.6
million were lower than the previous year due to the 9% drop in the average gold price received. Profit from mining activity (before
interest, tax and depreciation) decreased to $145.9 million for the year.
Capital expenditure
for the year of $181.7 million included the development of Yalea and Gara underground mines as well as the acquisition of a new
underground mining fleet as part of the transition from contract mining to owner mining. Expenditure also covered the replacement
of ten aging Cat 3512B generators, as well the addition of a carbon regeneration kiln and upgrades to the gravity and elution circuits
to increase the gold stripping capacity.
Work continues on the
underground refrigeration plants, upgrading of the medium voltage distribution system as well as a new elution column and electrowinning
section to expand the gold stripping capacity in the process plant.
Two additional medium
speed generators are due to be installed in 2016 to provide the additional power requirements for the two new refrigeration plants
at Yalea and Gara.
Mining and Production
During 2015, 16,642
development meters were completed and 2,460kt of ore at 5.57g/t was hoisted to surface. The improved backfill performance during
2015 had a positive impact on the availability of stopes, mining sequence and delivery of ore at both Yalea and Gara.
Loulo successfully transitioned
from contract mining to owner mining in the last quarter of 2015. The transition included the implementation of remote control
mining technologies at both Yalea and Gara. The automated loading guidance system is expected to reduce loader damage and increase
productivity.
As part of its commitment
to provide a productive, safe and healthy working environment, Loulo started the construction of two refrigeration and air-cooling
plants for both underground mines. Given the hot and at times humid climate in Mali, and with the increasing depth of the mining
levels, the refrigeration plants are designed to cool the ambient air to a wet bulb temperature of approximately 28°C at the
working face.
Production results for the 12 months
ended December 31
|
|
2015
|
|
|
2014
|
|
MINING
|
|
|
|
|
|
|
|
|
Tones mined (000)
|
|
|
2,598
|
|
|
|
2,819
|
|
Ore tonnes mined (000)
|
|
|
2,520
|
|
|
|
2,699
|
|
MILLING
|
|
|
|
|
|
|
|
|
Tonnes processed (000)
|
|
|
2,570
|
|
|
|
2,711
|
|
Head grade milled (g/t)
|
|
|
4.7
|
|
|
|
4.9
|
|
Recovery (%)
|
|
|
90.1
|
|
|
|
90.1
|
|
Ounces produced
|
|
|
350,604
|
|
|
|
382,263
|
|
Ounces sold
|
|
|
352,927
|
|
|
|
376,490
|
|
Average price received ($/oz)
|
|
|
1,152
|
|
|
|
1,264
|
|
Cash operating costs
1
($/oz)
|
|
|
670
|
|
|
|
637
|
|
Total cash costs
1
($/oz)
|
|
|
739
|
|
|
|
713
|
|
Gold on hand at period end
2
($000)
|
|
|
3,678
|
|
|
|
6,922
|
|
Profit from mining activity
1
($000)
|
|
|
145,875
|
|
|
|
207,496
|
|
Gold sales
1
($000)
|
|
|
406,643
|
|
|
|
475,861
|
|
Randgold owns 80% of Loulo and the State
of Mali 20%. Randgold has funded the whole investment in Loulo by way of shareholder loans and therefore controls 100% of the cash
flows from Loulo until the shareholder loans are repaid.
Randgold consolidates 100% of Loulo
and shows the non-controlling interest separately.
|
1
|
Refer to explanation of non-GAAP information provided in the section “—Non-GAAP
information” above.
|
|
2
|
Gold on hand represents gold in doré at the mines multiplied by the prevailing spot gold
price at the end of the period.
|
Ore Reserves
Total ore reserves were
marginally down year on year, as depletion of ore reserves was partially replenished from infill grade control drilling of the
principal deposits.
|
|
|
|
Tonnes
(Mt)
|
|
|
Grade
(g/t)
|
|
|
Gold
(Moz)
|
|
|
Attributable
Gold
2
(Moz)
|
|
at December 31
|
|
Category
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ORE RESERVES
1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
■ Stockpiles
|
|
Proved
|
|
|
1.9
|
|
|
|
2.2
|
|
|
|
1.7
|
|
|
|
1.8
|
|
|
|
0.1
|
|
|
|
0.1
|
|
|
|
0.08
|
|
|
|
0.1
|
|
■ Open pits
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
■ Underground
|
|
Probable
|
|
|
5.3
|
|
|
|
4.2
|
|
|
|
3.4
|
|
|
|
2.5
|
|
|
|
0.6
|
|
|
|
0.3
|
|
|
|
0.5
|
|
|
|
0.3
|
|
|
|
Proved
|
|
|
6.7
|
|
|
|
-
|
|
|
|
5.3
|
|
|
|
-
|
|
|
|
1.1
|
|
|
|
-
|
|
|
|
0.9
|
|
|
|
-
|
|
TOTAL ORE RESERVES
|
|
Probable
|
|
|
18
|
|
|
|
27
|
|
|
|
5.0
|
|
|
|
5.1
|
|
|
|
2.9
|
|
|
|
4.4
|
|
|
|
2.3
|
|
|
|
3.5
|
|
|
|
Proved and probable
|
|
|
32
|
|
|
|
33
|
|
|
|
4.6
|
|
|
|
4.6
|
|
|
|
4.7
|
|
|
|
4.9
|
|
|
|
3.7
|
|
|
|
3.9
|
|
|
1
|
Open pit ore reserves are reported at a gold price of $1,000/oz and an average cut-off of 1.1g/t
and include dilution and ore loss factors. Open pit ore reserves were calculated by Mr. Shaun Gillespie, an officer of the company
and competent person. Underground ore reserves are reported at a gold price of $1,000/oz and a cut-off of 2.6g/t for Yalea underground
and 2.2g/t for Gara underground and includes dilution and ore loss factors. Underground ore reserves were calculated by Mr. Andrew
Fox, an external consultant and competent person.
|
|
2
|
Attributable gold (Moz) refers to the quantity attributable to Randgold based on its 80% interest
in Loulo.
|
Processing, Plant and Engineering
Processing
A total of 4,543kt at
4.8g/t, which includes 1,973kt from Gounkoto, was treated and milled at the Loulo plant during the year, compared to 4,396kt at
5.0g/t in 2014. Further modifications in 2016, including the launders installation at the CIL, are expected to expand the throughput
capability to 4.6Mtpa.
Overall gold recovery
of 90.1% was in line with the prior year, while plant utilization of 92.3% increased from 91.7% in 2014. Gold recovery of plus
91.0% is being targeted for 2016 on the back of the upgrades to the gravity, elution and regeneration circuits, along with other
improvement initiatives, including an upgrade to the Aachen reactors to increase oxygen availability in the CIL.
Loulo contributed 57%
(23% Gara underground; 28% Yalea underground; 4% Yalea OC; 1% Gara OC) and Gounkoto 43% of the ore to the plant, almost in line
with the 60:40 plan to balance the mines’ respective reserves.
Engineering and power supply
In the metallurgical
plant the availability of the mills and crusher was 94.8% (2014: 93.2%) and 87.9% (2014: 88.9%) respectively.
Despite improvement
in the mills’ runtime, availability was negatively impacted by the premature failure of the primary mill gearbox float bearing,
power interruptions in the first quarter of 2015 and Mill 2 motor lube system failures. The crushing plant will be reconfigured
in the second quarter of 2016 to add an additional tertiary crusher (currently three tertiary units are in operation) allowing
a finer gap setting to deliver a finer crush product which will raise the milling throughput.
The power plant produced
a total of 331.6GWh of electricity (2014: 287.7GWh), a 15% increase on the prior year. This reflects the additional underground
demand, including increased usage of the paste backfill plants and primary ventilation upgrades.
The mine is currently
busy with a power stability upgrade to the medium voltage switching system scheduled for completion by the end of 2016 and designed
to enhance the efficiency and reticulation of its power. This will be followed by an advanced power management system upgrade during
the first quarter of 2017. Ten medium speed generators, which are more efficient than high speed units, can now run on cheaper
heavy fuel oil (HFO) which, together with the lower diesel price during the year, contributed to a significant improvement in power
costs of $0.151/kWh against $0.246/kWh in 2014. This trend is expected to continue in 2016 given the favorable oil price and the
addition of two HFO medium speed generators.
Exploration
Greenfields activity
has refocused the exploration effort with an updated, project-wide geological interpretation utilizing all mapping, drilling, geochemical
and geophysical datasets. This work has delivered 56 new areas of interest which have been ranked and prioritized. Several targets
have been advanced with new geological models, including Baboto North, Yalea Ridge South, and the near surface mineralization potential
at Gara South. Going forward, priority targets along regional scale structures such as the Far West structure and Yalea structure
will be investigated further in 2016. A detailed summary of the exploration work completed during the year can be found in the
section entitled “—Exploration Review.”
Health and Safety
Five lost time injury
(LTI) cases were recorded during the year, representing a lost time injury frequency rate (LTIFR) of 0.87 per million hours worked
compared to 0.62 in the previous year. However, the annual total injury frequency rate (TIFR) decreased from 10.76 per million
hours worked in 2014 to 7.28, in 2015. A new safety management software system (Myosh) was installed during the year to assist
in the management of the mines safety improvement projects. The mine retained its OHSAS 18001 certification.
1,274 malaria cases
were treated during the year, an incidence rate of 44% which is a 32% increase on 2014. The mine is focusing on a program to reduce
the incidence rate in 2016.
Overall, 2,358 Voluntary
Counselling and Testing (VCT) cases were seen during the year with an HIV positivity rate of 1.8%. The rise in the number of VCT
cases, compared to the previous year, is attributable to increased awareness of the disease following the activities of the local
NGO, Soutoura. The organization partnered with the mine to focus on sensitizing employees and the community to the prevention of
HIV/AIDS.
Following the declaration
of the end of Ebola in West Africa on December 29, 2015, the temperature screening at mine sites has been discontinued, while the
hand washing initiative and the infection control protocols have been maintained as best practice. Mali Ebola Private Sector Mobilization
Group (EPSMG) has reviewed its agenda to include occupational health, HIV/AIDS and malaria management and meetings have been rescheduled
to take place on a monthly basis.
Environment
The mine retained its
environmental management system (EMS) certification for ISO 14001 following the surveillance audit during the year, while management
reviews and inspections were also undertaken.
A water balance review
was undertaken to assess water reticulation and to explore additional ways to save water as well as recycling opportunities. The
TSF water recycling rate decreased to 70% against 78% in 2014. Actions were taken to consume more recycled water and by year end
had started showing positive results with above 80% recycled.
During the year the
sludge treatment plant at Gara was commissioned and, within one month of commissioning, the total suspended solids level in the
discharge dropped from above 300-400mg/l to 16mg/l vs 30mg/l as per the legal requirement.
An action plan has been
put in place to protect and enhance biodiversity onsite (BAP) of which 90% has been implemented. Fauna and flora awareness has
increased and protected fauna species identified. During the year a fishing event was organized in the mine cofferdam with the
local community; a total of 27kg of fish was harvested. In 2016, the mine plans to evaluate the opportunity to again assist with
the Mali elephant project.
Further details are
provided in the section entitled “—Social Responsibility and Environmental Sustainability.”
Human Resources and Industrial Relations
The operational labor
complement at Loulo comprises 2,896 employees (including personnel employed by contractors and temporary laborers) in line with
the prior year, of which 94% are Malians. The mine has seen an increase in employees following its transition to underground owner
mining and a corresponding decrease in contractors. Notwithstanding this transition, the total number of expatriates at the mine
has reduced by a further 7% due to the continuation of the localization program designed to promote employment of host country
nationals.
Industrial relations
were generally stable through most of the year, although a 72 hour strike was undertaken by Union Nationale des travailleurs du
Mali (UNTM) affiliated employees in the third quarter of the year. The strike action did not affect production.
Loulo Manpower
|
|
2015
|
|
|
2014
|
|
at December 31
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
Employees
|
|
|
153
|
|
|
|
1,775
|
|
|
|
1,928
|
|
|
|
68
|
|
|
|
877
|
|
|
|
945
|
|
Contractors
|
|
|
31
|
|
|
|
937
|
|
|
|
968
|
|
|
|
133
|
|
|
|
1,783
|
|
|
|
1,916
|
|
TOTAL
|
|
|
184
|
|
|
|
2,712
|
|
|
|
2,896
|
|
|
|
201
|
|
|
|
2,660
|
|
|
|
2,861
|
|
Community
We continue to engage
actively with the community through monthly community development committee meetings and ad hoc meetings. The annual sustainability
report of the company was presented to the local, regional and national authorities and the community at the beginning of this
year. The CEO had constructive meetings with the chiefs of the different villages. It was decided to assist the community in constructing
a hotel close to the Senegal-Mali border to provide additional economic activity in the region and to devise a bursary program
for the local students. The mine, together with the community committee and the local authorities, is working to implement these
projects this year.
GOUNKOTO
Mining at Gounkoto
started in January 2011, although first ore was fed to the Loulo plant in June 2011 and 2012 represented the first full year of
production from the mine. Total material mined during 2015 was 28.8Mt compared to 24.2Mt in 2014.
Operations
Gounkoto produced 279,563oz
of gold, 9% more than in the previous year. Tonnes processed increased to 1,973kt while the head grade milled reduced by 8% to
4.9g/t. With the recovery in line with the prior year at 90.1%, and due to good cost control assisted by a lower fuel price, total
cash costs decreased to $594/oz.
Gold sales of $317.5
million were lower than the previous year due to the 10% drop in the average gold price received, resulting in profit from mining
activities (before interest, tax and depreciation) of $152.5 million. Capital expenditure totaled $2.7 million, most of which was
related to the underground feasibility study and exploration.
During the year, Gounkoto
paid a total of $51.9 million in dividends to its shareholders.
Mining and Production
A total of 28.8Mt was
mined, including 2.0Mt of ore at an average grade of 4.9g/t, compared to 24.2Mt including 1.8Mt of ore at 4.4g/t in 2014. The increase
in grade reflects the current improved grade profile in the pit.
A total of 1,973kt of
ore was fed from Gounkoto to the Loulo plant at an average head grade of 4.9g/t compared to 1,686kt of ore at 5.3g/t in 2014.
The strip ratio was
13.4 in 2015 compared to 12.2 in 2014, slightly higher than the LoM strip ratio of 10.2, although in line with the plan which anticipated
higher strip ratios in 2015 and again in 2016.
The Gounkoto main pit
is scheduled to be mined until 2024, based on a revised mine plan that focuses on sustainable production over a ten year period
and reducing lock-up of working capital within low grade stockpiles, thus maximizing cash flow. The Gounkoto pit will interface
with mining from the Faraba satellite pit from 2022 through to 2024.
12 months ended December 31
|
|
2015
|
|
|
2014
|
|
MINING
|
|
|
|
|
|
|
|
|
Tones mined (000)
|
|
|
28,762
|
|
|
|
24,206
|
|
Ore tonnes mined (000)
|
|
|
1,992
|
|
|
|
1,841
|
|
MILLING
|
|
|
|
|
|
|
|
|
Tonnes processed (000)
|
|
|
1,973
|
|
|
|
1,686
|
|
Head grade milled (g/t)
|
|
|
4.9
|
|
|
|
5.3
|
|
Recovery (%)
|
|
|
90.1
|
|
|
|
90.2
|
|
Ounces produced
|
|
|
279,563
|
|
|
|
256,957
|
|
Ounces sold
|
|
|
277,700
|
|
|
|
254,634
|
|
Average price received ($/oz)
|
|
|
1,143
|
|
|
|
1,272
|
|
Cash operating costs
1
($/oz)
|
|
|
526
|
|
|
|
537
|
|
Total cash costs
1
($/oz)
|
|
|
594
|
|
|
|
613
|
|
Gold on hand at period end
2
($000)
|
|
|
4,455
|
|
|
|
2,786
|
|
Profit from mining activity
1
($000)
|
|
|
152,521
|
|
|
|
167,797
|
|
Gold sales
1
($000)
|
|
|
317,524
|
|
|
|
323,857
|
|
Randgold owns 80% of Gounkoto and the
State of Mali 20%. Randgold consolidates 100% of Gounkoto and shows the non-controlling interest separately.
|
1
|
Refer to explanation of non-GAAP information provided in the section “—Non-GAAP
information” above.
|
|
2
|
Gold on hand represents gold in doré at the mine multiplied by the prevailing spot gold
price at the end of the period.
|
Ore Reserves
Drilling and updated
modelling of the open pit reserves have resulted in the replenishment of reserves depleted during the year, while the update of
the Gounkoto underground feasibility study has increased the underground reserve to 4.7Mt at 7.20g/t for 1.1 million probable ore
reserve ounces. Total ore reserves for Gounkoto remain above 3Moz.
|
|
|
|
Tonnes (Mt)
|
|
|
Grade (g/t)
|
|
|
Gold (Moz)
|
|
|
Attributable
Gold
2
(Moz)
|
|
at December 31
|
|
Category
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ORE RESERVES
1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
■ Stockpiles
|
|
Proved
|
|
|
1.9
|
|
|
|
1.7
|
|
|
|
1.9
|
|
|
|
1.9
|
|
|
|
0.1
|
|
|
|
0.1
|
|
|
|
0.09
|
|
|
|
0.08
|
|
■ Open Pits
|
|
Proved
|
|
|
2.2
|
|
|
|
2.7
|
|
|
|
4.2
|
|
|
|
4.9
|
|
|
|
0.3
|
|
|
|
0.4
|
|
|
|
0.2
|
|
|
|
0.3
|
|
|
|
Probable
|
|
|
12
|
|
|
|
13
|
|
|
|
4.4
|
|
|
|
4.0
|
|
|
|
1.6
|
|
|
|
1.7
|
|
|
|
1.3
|
|
|
|
1.4
|
|
■ Underground
|
|
Probable
|
|
|
4.7
|
|
|
|
4.7
|
|
|
|
7.2
|
|
|
|
6.0
|
|
|
|
1.1
|
|
|
|
0.9
|
|
|
|
0.9
|
|
|
|
0.7
|
|
TOTAL ORE RESERVES
|
|
Proved and probable
|
|
|
20
|
|
|
|
22
|
|
|
|
4.8
|
|
|
|
4.4
|
|
|
|
3.1
|
|
|
|
3.2
|
|
|
|
2.5
|
|
|
|
2.5
|
|
|
1
|
Open pit ore reserves are reported at a gold price of $1,000/oz and 1.3g/t cut-off and include
dilution and ore loss factors. Open pit ore reserves were calculated by Mr. Shaun Gillespie, an officer of the company and competent
person. Underground ore reserves are reported at a gold price of $1,000/oz and a cut-off of 3.0g/t and include dilution and ore
loss factors. Underground ore reserves were calculated by Mr. Tim Peters, an external consultant and a competent person.
|
|
2
|
Attributable gold (Moz) refers to the quantity attributable to Randgold based on its 80% interest
in Gounkoto.
|
Gounkoto Underground Project
The underground feasibility
has been updated on the back of a revised resource model which incorporates the drill results from 2015. Work on the portal in
the south of the pit is planned to start in 2018 with access to ore anticipated in 2019. A ramp-up to steady state production is
scheduled by 2020, as mining in the south of the pit comes to an end. The proposed mining method comprises longhole open stoping
with backfill to support a 60 to 70ktpm operation over an eight year period.
An economic assessment
on the financial viability of the Gounkoto project underground reserve has been carried out based on the parameters summarized
below:
|
·
|
A flat gold price of $1,000/oz;
|
|
·
|
Total ore mined of 4.7Mt containing 1.07Moz of gold at an average grade of 7.2g/t;
|
|
·
|
Mining costs average $81/ore tonne delivered to the Gounkoto RoM pad;
|
|
·
|
Crushing and haulage costs average $5.90/t ore;
|
|
·
|
Mill throughput of an average of 585kt per year to be treated at the Loulo plant over eight years;
|
|
·
|
Plant processing costs at an average of $20.60/ore tonne milled;
|
|
·
|
G&A cost at $9.27/ore tonne processed over Life of Mine (LoM), including outside engineering
costs; and
|
|
·
|
LoM capital of $156 million.
|
A financial model using
a $1,000/oz gold price together with a 30% tax rate and a 6% royalty, produced a nine year project with a total after tax cash
flow of $210 million and an internal rate of return of 35%.
The Gounkoto underground
mine schedule is integrated into that of the Loulo-Gounkoto complex operational schedule which forecasts more than 600,000oz per
year until 2025 on current reserves. This excludes further
opportunities currently being explored
to expand the resources at the three principal orebodies of Yalea, Gara and Gounkoto.
Underground Mine versus Superpit Trade-Off
Given the decrease
in mining and processing costs as a result of lower fuel prices and mining contractor efficiency, a superpit option is
being considered to optimize the mining of the remaining Gounkoto orebody at the end of the current pit. A full trade-off between
the large open pit option and the current underground project is expected to be completed by the end of the year.
The larger pit design
will be beneficial in extending the life of the open pit to 2023 which brings total cash flow forward and adds operational flexibility.
It will also allow for the crown pillar in the underground design to be mined out and still provide an opportunity to mine the
remaining underground reserves, accessed from the deeper pit.
Exploration
Newly identified
geological controls to high grade mineralization at P64W have delivered gains to the overall Gounkoto mineral resource which partially
offset depletion. At Mz1, underground feasibility drilling showed limited potential for extending the underground target to this
portion of the orebody. The potential of the larger open pit potential will be tested in 2016.
As at Loulo, an updated
project-wide geological interpretation utilizing all datasets has generated 28 new areas of interest, which have been ranked and
prioritized. An increased understanding of cover thickness across the permit has been combined with gradient array IP geophysics
to identify several blind targets. During the year work at Minan, Toronto south, and Gounkoto NW confirmed the limited ability for these targets to pass
our strategic filters, and they were removed from the resource triangle. In 2016, priority targets along the regional scale Gounkoto
and Faraba structures will be investigated further. A detailed summary of the exploration work completed during the year can be
found in the section entitled “—Exploration Review.”
Health and Safety
2015 marked the third
consecutive year that the Gounkoto mine has been LTI free, an excellent achievement with the mine recording over 6.6 million LTI
free hours. The mine retained its OHSAS 18001 certification.
During the year, a compliance
audit was conducted on the safety management system to further enhance the performance of the mine:
|
·
|
512 malaria cases were treated during the year representing an incidence of 48%, a 6% decrease
from 2014.
|
|
·
|
650 VCTs were conducted during the year with a HIV positivity rate of 0.46%. The increase in the
number of VCT cases compared to the previous year was attributable to the activities of the local NGO, Soutoura, which partnered
with the mine to focus on sensitizing employees and the community on the prevention of HIV/AIDS.
|
Best practices of infection
control and prevention inherited from the Ebola crisis management were introduced into the health service.
Environment
The mine retained
its environmental management system certification to ISO 14001 following the surveillance audit at the beginning of the year and
will undergo a recertification audit early in 2016. A management
review forum and environmental inspections
were undertaken to ensure continued improvement. No major environmental incidents occurred during the year.
The mine water balance
was reviewed by an independent consultant to identify gaps to improve the mine water efficiency. The main focus is to reduce the
inflow of water from the Faleme River into the pit by establishing an effective dewatering network.
A total of 1,387 trees
from 356 plants species are growing in the tree nursery. The opportunity to once again assist in the Mali elephant project is being
evaluated.
The environmental
permit for the future underground mine was granted by the Ministry of Environment.
Human Resources and Industrial Relations
Mine employees decreased
to 132, excluding contractors, after a rightsizing exercise was undertaken. The total operational complement is now 1,040, including
personnel employed by contractors, of which 97% are Malian. Industrial relations were generally stable through most of the year,
although a 72 hour strike was undertaken by UNTM affiliated employees in the third quarter of the year. The strike action did not
affect the production.
A total of 34 employees
received formal training during the year in line with the company’s employee development program.
Gounkoto Manpower
|
|
2015
|
|
|
2014
|
|
at December 31
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
Employees
|
|
|
4
|
|
|
|
128
|
|
|
|
132
|
|
|
|
7
|
|
|
|
144
|
|
|
|
151
|
|
Contractors
|
|
|
29
|
|
|
|
879
|
|
|
|
908
|
|
|
|
28
|
|
|
|
834
|
|
|
|
862
|
|
TOTAL
|
|
|
33
|
|
|
|
1,007
|
|
|
|
1,040
|
|
|
|
35
|
|
|
|
978
|
|
|
|
1,013
|
|
Community
The company’s
annual sustainability report was presented to the relevant authorities as well as the community, and it continued to engage with
the community through monthly development committee meetings. During the year the CEO met with village chiefs to discuss and decide
on a number of development projects, including a bursary program for local students. The mine is working on the implementation
of these projects in cooperation with the community committee and the local authorities.
MORILA
The Morila mine is
situated 280km south-east of Bamako, the capital of Mali. The Morila mine is owned by a Malian company, Morila, which in turn is
owned 80% by Morila Limited and 20% by the State of Mali. Morila Limited is jointly owned by ourselves and AngloGold Ashanti Limited
and the mine is controlled by a 50:50 joint venture management committee. Responsibility for the day-to-day operations rests with
us. Under its stewardship the mine was successfully converted from open pit mining to a stockpile treatment operation during 2009.
Closure of operations
at Morila was originally scheduled for 2013 but, together with the Pit 4S pushback, completed in 2015, the Domba satellite
deposit and the re-tailings treatment projects, processing of the marginal ore and mineralized waste should extend
its life to 2019.
Operations
Morila produced 122,374oz
for the year, an 11% improvement on the previous year’s production (2014: 110,272oz). The higher grade pit 4S ore was processed
in the first half of the year and complemented by additional mineralized waste material from waste dumps deposited earlier in the
life of the mine when the highest grades from the pit were being mined. The gold production increase resulted from a 17% rise in
the head grade milled, partially
offset by slightly lower throughput. Total
cash costs were significantly lower at $674/oz, a 41% decrease on the prior year, on the back of the increased production and lower
mining costs.
Gold sales, at $143.0
million (100% basis), were 3% higher than the previous year due to the increased production, notwithstanding the 7% drop in the
average gold price received. Profit from mining activity (before interest, tax and depreciation) increased to $60.5 million for
the year.
Capital expenditure
for the year of $11.0 million mainly related to the preparation for the treatment of the TSF. During the year, Morila paid a total
of $25.7 million in dividends to its shareholders.
Mining and Production
Mining and processing
of pit 4S was successfully completed at the end of March 2015 as planned. Waste was dumped in both pit 4N and pit 5 to reduce the
hauling cost. Total tonnes mined in 2015 was 3.4Mt including 939kt of ore at 2.85g/t.
Morila is planning
to mine ore from the Domba pit during 2016, subject to agreement with the community and government on relocation of a part of the
village. Timeous approval by the Malian authorities should result in first ore from the Domba pit being delivered in the second
quarter of 2016, after which the mine is planning to switch to tailings retreatment.
12 months ended December 31
|
|
2015
|
|
|
2014
|
|
MINING
|
|
|
|
|
|
|
|
|
Tonnes mined (000)
|
|
|
3,425
|
|
|
|
18,405
|
|
Ore tonnes mined (000)
|
|
|
939
|
|
|
|
1,035
|
|
MILLING
|
|
|
|
|
|
|
|
|
Tonnes processed (000)
|
|
|
3,063
|
|
|
|
3,242
|
|
Head grade milled (g/t)
|
|
|
1.4
|
|
|
|
1.2
|
|
Recovery (%)
|
|
|
91.1
|
|
|
|
89.8
|
|
Ounces produced
|
|
|
122,374
|
|
|
|
110,272
|
|
Ounces sold
|
|
|
122,374
|
|
|
|
110,272
|
|
Average price received ($/oz)
|
|
|
1,168
|
|
|
|
1,258
|
|
Cash operating costs
1
($/oz)
|
|
|
645
|
|
|
|
1,109
|
|
Total cash costs
1
($/oz)
|
|
|
674
|
|
|
|
1,143
|
|
Profit from mining activity
1
($000)
|
|
|
60,487
|
|
|
|
12,631
|
|
ATTRIBUTABLE (40% PROPORTIONATELY CONSOLIDATED)
|
|
|
|
|
|
|
|
|
Gold sales
1
($000)
|
|
|
57,197
|
|
|
|
55,489
|
|
Ounces produced
|
|
|
48,950
|
|
|
|
44,109
|
|
Ounces sold
|
|
|
48,950
|
|
|
|
44,109
|
|
Gold on hand at period end
2
($000)
|
|
|
-
|
|
|
|
-
|
|
Profit from mining activity
1
($000)
|
|
|
24,195
|
|
|
|
5,052
|
|
Randgold owns 40% of Morila with the
State of Mali and joint venture partner owning 20% and 40% respectively. The group equity accounts for its 40% joint venture holding
in Morila.
|
1
|
Refer to explanation of non-GAAP information provided in the section “—Non-GAAP
information” above.
|
|
2
|
Gold on hand represents gold in doré at the mines multiplied by the prevailing spot gold
price at the end of the period.
|
Ore Reserves
Only the higher grade
portion of the TSF is reported as ore reserves and forms the bulk of the feed for the current LoM plan.
|
|
|
|
Tonnes (Mt)
|
|
|
Grade(g/t)
|
|
|
Gold (Moz)
|
|
|
Attributable
Gold
2
(Moz)
|
|
at December 31, 2015
|
|
Category
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
ORE RESERVES
1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
■ Stockpiles
|
|
Proved
|
|
|
-
|
|
|
|
0.02
|
|
|
|
-
|
|
|
|
4.0
|
|
|
|
-
|
|
|
|
0.003
|
|
|
|
-
|
|
|
|
0.001
|
|
■ Open pit
|
|
Probable
|
|
|
-
|
|
|
|
0.6
|
|
|
|
-
|
|
|
|
3.0
|
|
|
|
-
|
|
|
|
0.06
|
|
|
|
-
|
|
|
|
0.02
|
|
■ TSF
|
|
Probable
|
|
|
15
|
|
|
|
12
|
|
|
|
0.6
|
|
|
|
0.5
|
|
|
|
0.3
|
|
|
|
0.2
|
|
|
|
0.1
|
|
|
|
0.08
|
|
TOTAL ORE
reserves
|
|
Proved and probable
|
|
|
15
|
|
|
|
13
|
|
|
|
0.6
|
|
|
|
0.7
|
|
|
|
0.3
|
|
|
|
0.3
|
|
|
|
0.1
|
|
|
|
0.1
|
|
|
1
|
TSF ore reserves are reported at a $1,000/oz cut-off grade of 0.49g/t. Ore reserves were calculated
by Mr. Shaun Gillespie, an officer of the company and competent person.
|
|
2
|
Attributable gold (MOZ refers to the quantity attributed to Randgold based in its 40% interest
in Morila.
|
TSF Project
The TSF retreatment
model and reclamation schedule were updated during the year and integrated into the LoM. The TSF mining project is being managed
by Fraser Alexander Tailings, a specialized TSF retreatment operator.
The 2016 LoM plan
includes:
|
·
|
36.9Mt of low grade material stripped and pumped directly into the pit from 2016 through to 2020;
and
|
|
·
|
15.5Mt of higher grade material processed through the plant, with the tailings
also being deposited in the pit from 2016 through to 2019.
|
The TSF decapping
activity commenced in April 2015 with a total of 3.5Mt of waste discharged directly into the pit during the year.
Domba Project
The Domba project
consists of a satellite deposit located 6km to the northwest of the main Morila open pit. The mineralization is very different
to that of the Morila orebody, consisting of multiple subparallel lodes along a north south corridor. The lodes vary in width from
1m to 15m and have been delineated in the saprolite to an average depth of 50m. The mineralization intersected in the fresh rock
is narrow, erratic and typically lower grade.
Grade control drilling
was completed over the majority of the proposed pit to confirm the mineral content and a feasibility study was completed. This
identified 454kt of ore at 3.1g/t, within a $1,000/oz pit design, to be mined.
A Malian contractor
has been identified to complete the mining and haulage activities over a four month period. The mining sequence requires that the
southern portion of the pit be mined first, followed by the north. This allows for the waste from the north to be backfilled into
the southern portion of the pit, reducing the surface impact of the mine. The waste is planned to be used to construct a safety
berm between the pit and the village and to be shaped to ensure access to the pit as a surface water source for the community,
post mining. Metallurgical recoveries, based on test work, are good at 91%.
A full environmental
and social impact assessment (ESIA) was completed, addressing key community concerns through public consultations, including the
Resettlement Action Plan which specifically caters and compensates for the 26 households, three public infrastructures and 26 fields
that will be affected by mining activities. Community development projects targeting farming, water supply, street lighting, the
school, the clinic and mosque have been agreed with the community. Final agreement with the community and the government for the
project to proceed is awaited.
Exploration
Generative work around
the Morila deposit continued during the year with a relogging program focusing on the key structural and alteration features associated
with the Morila mineralization. However, this work did not lead to the generation of any new targets due to the lack of any visible
controls on the features.
At Samacline, a review
of the deep zone of mineralization located to the immediate west of Morila identified open, high grade mineralization within a
wide, low grade envelope of up to 80m in width. The untested area down dip to the west of Samacline is large enough to hold a Morila-type
deposit and is now the target of a diamond drill hole being planned to test the model that samacline could be the eastern edge
of a large deposit.
Health and Safety
No LTIs were recorded
during the year and the associated LTIFR of zero compared favorably to 1.11 in the previous year. The TIFR also decreased from
4.81 in 2014 to 4.21 per million hours worked in 2015.
A review of the health
and safety management system was completed during the year and the scope of the safety policy has been extended to capture the
new TSF reclamation activities and ensure the risk assessment of the TSF project is applied to mitigate any safety risks in this
new activity.
The malaria incidence
rate for the year was 22.5%, a 14% decrease from the previous year.
The mine maintained
its OHSAS 18001 certification.
Environment
The mine remains compliant
under ISO 14001 and recertification is scheduled for the first quarter of 2016. No major environmental incidents occurred during
the year.
The mine closure plan
was updated in November 2015 to meet the requirements of the government and the communities and to prevent or minimize any adverse
long term environmental and social impacts while creating a self-sustaining natural ecosystem. High risk infrastructure, such as
the processing plant and the tailings dam with piping, will be removed and the footprint rehabilitated. Waste rock dumps will be
profiled to fit in with the natural landscape and revegetated, and other infrastructure will be left and used to develop an agro
industrial center for the benefit of the communities, former workers and the country (more information is included in the agribusiness
section).
Environmental monitoring
will continue for five years after the mine closes to ensure compliance with the closure targets.
Further details are
provided in the section entitled “—Social Responsibility and Environmental Sustainability.”
Human Resources and Industrial Relations
Total manpower recorded
at the end of the year was 781 (including 422 persons employed by contractors) of which 99% are Malian. During the year the industrial
relations climate was stable and the mine continued with its
downsizing exercise, in line with the cessation
of mining activities. Several training and employee capacity building activities took place.
Morila Manpower
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2015
|
|
|
2014
|
|
at December 31
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
Employees
|
|
|
2
|
|
|
|
357
|
|
|
|
359
|
|
|
|
7
|
|
|
|
295
|
|
|
|
302
|
|
Contractors
|
|
|
4
|
|
|
|
418
|
|
|
|
422
|
|
|
|
11
|
|
|
|
967
|
|
|
|
978
|
|
TOTAL
|
|
|
6
|
|
|
|
775
|
|
|
|
781
|
|
|
|
18
|
|
|
|
1,262
|
|
|
|
1,280
|
|
Community
During the year,
community relations remained good and regular meetings were held with the local development committee (LDC). In conjunction with
the LDC, a number of infrastructure development projects were undertaken for the benefit of the community, including:
|
·
|
Solar pumping system for market gardens;
|
|
·
|
Manufacturing and installation of biohazard incinerators at Sanso and Domba medical centers;
|
|
·
|
Domba Youth Cultural Centre upgrade with solar power and a borehole;
|
|
·
|
Additional boreholes at Fingola; and
|
|
·
|
Upgrade of the bridge between the Morila and Sokela villages.
|
The microfinance
project (CAMIDE) has now funded 79 projects with 82% of the amounts advanced having been repaid.
Agribusiness
In line with the closure
plan and strategy, the mine is continuing to establish a viable and sustainable agricenter, with the feasibility study having been
completed during the year together with the Ministry of Mines.
Assumptions and salient
points:
|
·
|
Available surface land offered by the center is 30ha in 2017 and 2018, increasing to 50 ha in 2019
and 2020 and then to 100ha in 2021.
|
The model has been submitted
to potential operators for review and to propose an operational plan.
This project aims
to:
|
·
|
Provide an alternative income source to former mineworkers and the surrounding communities;
|
|
·
|
Contribute towards ensuring food security in the community and the country;
|
|
·
|
Promote local economic development; and
|
|
·
|
Improve the community’s economic welfare.
|
TONGON
The Tongon mine is
located within the Nielle exploration permit in the north of Côte d’lvoire, 55km south of the border with Mali. The
Tongon mine is owned by an Ivorian company, Tongon, of which Randgold has an 89% interest, the government of Côte d’lvoire
10% and 1% is held by a local company. Tongon is an open pit mining operation and employs the four standard mining practices of
drill, blast, load and haul.
Operations
The mine produced 242,948oz
of gold in 2015, a 7% increase year on year as a result of a 6% improvement in recovery and a 1% improvement in mill throughput.
The underperforming Vibrocone crushers were replaced with upgraded CH660 Hydrocone crushers in the fourth quarter of 2014
and their optimization continued into the first quarter of 2015. An additional new 4th stage CH440 Hydrocone circuit was designed,
fabricated and procured in 2015 for complete installation and commissioning in the first quarter of 2016.
By the first quarter
of 2015, the mine had completed the installation of the flotation circuit upgrade, designed to increase recovery into the upper
80s percentile. After commissioning, the mine continued to improve gold recovery by engineering out key processing deficiencies
and optimizing the rougher flotation circuit, ultrafine grinding VXP2500 mills and treatment of the flotation concentrates in the
CIL circuit. Gold recovery improved to 84% by year end. Improvement of the operator skills is key to performance as the mine increases
the localization of its workforce.
The electricity grid
supply issues, which had challenged the mine in 2014, resurfaced in the second and third quarters of 2015 necessitating the use
of a larger proportion of diesel generated power at a higher cost. The supply issues were resolved at the end of the third quarter,
resulting in a ‘grid-to-generated’ power ratio at the targeted 97:3 in the fourth quarter of 2015.
Gold sales amounted
to $277.3 million at a total cash cost of $836/oz, resulting in a profit from mining activity (before interest, tax and depreciation)
of $75.4 million. Capital expenditure for the year totaled $16.2 million, related primarily to the flotation circuit upgrade and
the new 4th stage crushing circuit.
Mining and Production
Mining continued in
the SZ pit mainly in the pushback of the eastern and southern walls supplying fresh sulphide ore to the plant. Waste mining in
the NZ pit was started and ramped up in the first quarter and the second quarter exposing the ore blocks for the third quarter
and the fourth quarter ore mining. As in 2015, mining activities in 2016 will focus evenly on both NZ and SZ pits, mining both
ore and waste.
The LoM schedule is
summarized as follows:
|
·
|
Mining in the SZ pit started in 2010 and will continue to 2019;
|
|
·
|
Mining in the NZ pit, started in 2011, ramped up in the second quarter of 2015, continued during
the wet season and ramped up further in the fourth quarter of 2015. NZ pit ore mining continues in 2016 to 2020; and
|
|
·
|
SZ and NZ satellite pits have been included in the mine plan and the SZ oxide pit will be mined
from 2020 and NZ east pit from 2020.
|
Total material mined
in 2015 at 28.8Mt was 10% above the prior year. Total ore mined at 3,563kt was in line with the previous year despite the added
challenge of mining in the SZ pit cut-back areas, consisting of multiple thin orebody sections, found predominantly in this pit.
Ore dilution control in the SZ pit is of paramount importance.
The strip ratio for
the year at 7.1 was 13% above the prior year, in line with the LoM plan. SZ pit mining activities centered on cut-back hard rock
mining (ore and waste) with an oxide/saprolite pushback which started in the first quarter of 2015 in the northern side of the
SZ pit. Mining production started improving from the first quarter of 2015, reduced in the second quarter as per plan and picking
up once more in the third quarter and fourth quarter.
Groundwater and surface
water management received continued attention and was well controlled during the year. The SZ pit 260RL stage, installed in the
fourth quarter of 2014, continued to serve as the main pumping station.
The rainy season preparation
for 2016 is already in place, with the required deep sumps developed in 2015 below 200RL in the northern and southern parts of
the SZ pit. In the NZ pit, eight borehole pumps are permanently pumping on the perimeter of the pit together with a deep sump below
290RL, which will be established in the first quarter of 2016 for the pit dewatering system.
Dewatering remains an
integral part of the mining strategy in Tongon as the pit lies in the catchment area of the old river system and is downstream
of the water storage dam. Mining schedules and plans are developed with a view to ensuring two low spots (sumps) in the pit at
any time ahead in the mining cycle, to allow mining to take place in dry ground while the water is pumped away from the sumps.
Production
results for the 12 months ended December 31
|
|
2015
|
|
|
2014
|
|
MINING
|
|
|
|
|
|
|
|
|
Tonnes mined (000)
|
|
|
28,826
|
|
|
|
26,126
|
|
Ore tonnes mined (000)
|
|
|
3,563
|
|
|
|
3,566
|
|
MILLING
|
|
|
|
|
|
|
|
|
Tonnes processed (000)
|
|
|
4,018
|
|
|
|
3,984
|
|
Head grade milled (g/t)
|
|
|
2.3
|
|
|
|
2.3
|
|
Recovery (%)
|
|
|
82.6
|
|
|
|
78.0
|
|
Ounces produced
|
|
|
242,948
|
|
|
|
227,103
|
|
Ounces sold
|
|
|
241,478
|
|
|
|
227,103
|
|
Average price received ($/oz)
|
|
|
1,148
|
|
|
|
1,264
|
|
Cash operating costs
1
($/oz)
|
|
|
801
|
|
|
|
834
|
|
Total cash costs
1
($/oz)
|
|
|
836
|
|
|
|
872
|
|
Gold on hand at period end
2
($000)
|
|
|
1,576
|
|
|
|
-
|
|
Profit from mining activity
1
($000)
|
|
|
75,444
|
|
|
|
88,963
|
|
Gold sales
1
($000)
|
|
|
277,253
|
|
|
|
287,026
|
|
Randgold owns 89% of Tongon with the
State of Côte d’Ivoire and outside shareholders owning 10% and 1% respectively. Randgold funded all the investments
in Tongon by way of shareholder loans and therefore controlled 100% of the cash flows from Tongon until the shareholder loans were
repaid at the end of the third quarter of 2015.
Randgold consolidates 100% of Tongon
and shows the non-controlling interest separately.
|
1
|
Refer to explanation of non-GAAP information provided in the section “—Non-GAAP
information” above.
|
|
2
|
Gold on hand represents gold in doré at the mine multiplied by the prevailing spot gold
price at the end of the period.
|
Ore Reserves
Both Tongon Southern
Zone (SZ) and Northern Zone (NZ) resource models and open pit designs have been updated during the year, using a significant quantity
of new data from grade control, advanced grade control and resource drilling.
Depletion of ore reserves
was partially replenished in the year, principally from grade control gains within the SZ, while ore reserve reductions were identified
in the NZ from mining depletion and model changes. Total ore reserves were thus slightly down year on year. Drilling continues
on both the NZ and SZ to test the orebodies below the current pits for possible extensions.
|
|
|
|
Tonnes (Mt)
|
|
|
Grade (g/t)
|
|
|
Gold (Moz)
|
|
|
Attributable
gold
2
(Moz)
|
|
at December 31
|
|
Category
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
ORE RESERVES
1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
■ Stockpiles
|
|
Proved
|
|
|
2.4
|
|
|
|
3.0
|
|
|
|
1.3
|
|
|
|
1.3
|
|
|
|
0.1
|
|
|
|
0.1
|
|
|
|
0.1
|
|
|
|
0.1
|
|
■ Open pits
|
|
Proved
|
|
|
5.8
|
|
|
|
4.2
|
|
|
|
2.7
|
|
|
|
2.8
|
|
|
|
0.5
|
|
|
|
0.4
|
|
|
|
0.4
|
|
|
|
0.3
|
|
|
|
Probable
|
|
|
18
|
|
|
|
23
|
|
|
|
2.4
|
|
|
|
2.4
|
|
|
|
1.4
|
|
|
|
1.7
|
|
|
|
1.3
|
|
|
|
1.5
|
|
TOTAL ORE RESERVES
|
|
Proved and probable
|
|
|
26
|
|
|
|
30
|
|
|
|
2.4
|
|
|
|
2.3
|
|
|
|
2.0
|
|
|
|
2.2
|
|
|
|
1.8
|
|
|
|
2.0
|
|
|
1
|
Open pit ore reserves ore reported at a gold price of $1,000/oz and 0.84g/t cut-off and include
dilution and ore loss factors. Open pit ore reserves were calculated by Mr. Shaun Gillespie, an officer of the company and competent
person.
|
|
2
|
Attributable gold (Moz) refers to the quantity attributed to Randgold based in its 89% interest
in Tongon SA.
|
Processing, Plant and Engineering
Processing
Year on year throughput
increased by 1% with 4,018kt of fresh sulphide ore treated in 2015.
In 2014 the tertiary
Hydrocone crushers were replaced with new Vibrocone crushers with a view to crush finer and increase throughput via the ball mills.
Although the Vibrocone crushers delivered an improvement in crusher throughput and fineness of crushed product, this improvement
could not be sustained due to repeated mechanical failures.
Consequently, it was
agreed with the supplier to replace the Vibrocone crushers with upgraded CH660 Hydrocone crushers within a new circuit configuration
which was completed in the fourth quarter of 2014 with optimization continuing in the first quarter of 2015. Concurrently, an additional
new 4th stage CH440 Hydrocone circuit was designed as the final means to crush finer and increase the mill throughput. Fabrication
and procurement of the circuit and peripheral services took place in 2015 and the first phase of the installation was completed
at the end of the year.
The mine is currently
commissioning the second phase of the crushing circuit upgrade with completion scheduled for the end of the first quarter of 2016,
and is expecting to ramp up mill tonnage throughput to 4.5mtpa in 2016.
Year on year, gold recovery
improved by 6% to 82.6% and by December 2015 had improved to 84%, mainly as a result of improving and sustaining both the flash
and rougher flotation concentrate mass pull, the ultrafine grind of the concentrates and its treatment, making it more amenable
to leaching in the CIL circuit. Gold production increased 7% year on year to 242,948oz due to higher gold recovery and mill throughput.
Further recovery gains are anticipated through optimizing the flotation and ultrafine grind circuits to recover all the arsenopyrite
associated gold, with the overall recovery target being the original feasibility specification of +86%.
Engineering and power supply
Overall mill availability
for 2015 was 90.3%, a decrease of 2% compared to 2014, following the production hours lost to replace the total length of the tailings
pipeline in the third quarter after five years in operation. Mill runtime improved significantly in the fourth quarter due to less
downtime stemming from the TSF pipeline constraints, mechanical failures in the milling circuit and improved power management.
Tongon experienced a
major lack of national grid power supply from CIE in the second quarter and the third quarter when CIE experienced a lack of gas
supply to the platform and low water levels. Lower and no grid availability was absorbed by increased usage of diesel generated
power. Grid-to-generated power ratio decreased to a 65:35 ratio in the second quarter and the third quarter and thereafter increased
to the targeted 97:3 ratio in the
fourth quarter. Consequently, the cost of power
increased significantly as a result of increased usage of generated power, at $0.12/kWh for 2015 ($0.10/kWh for 2014).
Improved cooperation
between the CIE national supply authority and Tongon mine has resulted in more effective utilization and smooth synchronization
during extended power outage periods as well as improved power stability. The completion of the 225kV ring line passing from Leboa
to Ferkessedougou is a high priority for 2016. The replacement of the Leboa transformer and power line was completed by the end
of 2015 as scheduled.
Power demand consumption
from the grid increased from 18.7MW to an average 21.6MW for 2015. Total mine consumption increased in line with the raised operational
availability and utilization, and an increase in the number of process units demanding power as new projects were commissioned
during the year.
Exploration
At Tongon the team has continued
to pursue the dual strategy of working to replace depletion at the mine with further drilling in and around the Tongon pit while
also exploring for a new deposit on the Nielle permit. The work at Tongon has identified a number of high grade structures in the
footwall of the deposit which will be further tested in 2016. Infill drilling on existing satellite resources around the pit was
also carried out which confirmed their potential to supplement the Tongon ore feed. Further afield, exploration continued on the
Nielle permit, focusing on targets along the arsenic-in-soil geochemistry trend which maps the main fluid pathway along the Senefou
belt.
Health and Safety
A total of four LTIs
were recorded during the year including one fatal incident, resulting in a LTIFR of 0.82 per million hours worked compared to LTIFR
of zero for 2014. The fatal accident was fully investigated and corrective and preventive actions were implemented. The total injury
frequency rate per million hours worked, continued to decrease from 11.6 in 2014 to 7.0 in 2015.
Attention to safety remains
a priority and management, along with the entire Tongon team, continues to conduct risk assessments prior to the commencement of
each task.
The continued implementation
and maintenance of malaria control programs resulted in a reduction of the malaria incidence rate from 50.7% in 2014 to 42.2% in
2015.
The mine continued with
its Ebola awareness and preparedness campaign together with Randgold’s other West African operations as part of an industrywide
private initiative in partnership with state and regional health authorities until the World Health Organization declared Guinea
free of Ebola on December 29, 2015. The end of Ebola transmission in Guinea, the last affected country, marked the end of the recent
Ebola outbreak transmission in West Africa.
The mine maintained its
OHSAS 18001 accreditation.
Environment
Tongon mine has been
ISO 14001 recertified for another three years after successfully completing an audit in October 2015. No Class 1 environmental
incidents occurred in the year.
A total of 6km of the
worn tailings pipeline was replaced with new 450mm TSF pipeline sections in line with the recommendations of Centre Ivorien Antipollution
(CIAPOL) on the preventive and corrective measures implemented to close off the Class 1 incident that occurred in December last
year.
Tongon mine reviewed
its mine closure plan with assistance from international specialist consultants Digby Wells Environmental. Changes made include
the reduction of rates due to inflation adjustment, allocation of infrastructure to the mine agribusiness project after closure,
an increase in the final angle of waste dump slopes, and
the change in the RoM pad rehabilitation techniques
to exclude topsoil. The mine’s focus in 2016 will be to rehabilitate concurrently with mining operations.
Human Resources and Industrial Relations
Tongon’s recruitment
and localization strategy is designed to minimize the influx of outsiders into the area and any disruption to community life, while
attempting to maximize the benefits of the mine development for the communities surrounding the mine. The principle of employing
locally first and spreading recruitment between local villages followed by regionally and then nationally and finally internationally,
is fundamentally applied in the mine’s recruitment and localization strategy. This is evident in the percentage of Ivorians
employed by the mine which has increased to more than 97%. To date, 79% of the operational labor is from local villages. Overall,
the operational labor complement for Tongon comprises 1,767 personnel, including people employed by contractors.
Open and continuous engagement
between Tongon’s workforce, the union and management ensured that a constructive work environment was maintained. Towards
the end of the year, management and the union concluded a review of the Mine Level Agreement (MLA) and, as part of this review,
have agreed to adjust the salaries of the workers in the lower categories over a period of three years.
As part of Tongon’s
succession planning, training workshops were held for 833 workers. These consisted mainly of engineering employees identified for
promotion to higher levels of responsibility, and in some cases to replace expatriates.
Tongon Manpower
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2015
|
|
|
2014
|
|
at December 31
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
Employees
|
|
|
17
|
|
|
|
573
|
|
|
|
590
|
|
|
|
23
|
|
|
|
426
|
|
|
|
449
|
|
Contractors
|
|
|
30
|
|
|
|
1,147
|
|
|
|
1,177
|
|
|
|
46
|
|
|
|
1,208
|
|
|
|
1,254
|
|
TOTAL
|
|
|
47
|
|
|
|
1,720
|
|
|
|
1,767
|
|
|
|
69
|
|
|
|
1,634
|
|
|
|
1,703
|
|
Community
The mine maintained a constructive
working relationship with the surrounding communities during the year.
Two health centers and six
classrooms were constructed in the surrounding community together with a low capacity dam at Kofiple village and recreational soccer
facilities at Tongon village. Kationron village streets were also opened. As part of improving the quality of education in the
community, a number of initiatives have been implemented, one of which is rewarding the best performing pupils. This has resulted
in our community schools performing better than the national average.
KIBALI
The Kibali mine is a
gold development property which covers an area of 1,836km
2
on the Moto Goldfields in the north east of the DRC. It is
located some 560km north east of the city of Kisangani and 150km west of the Ugandan border town of Arua. Kibali is a joint venture
between Randgold (45%), AngloGold Ashanti (45%) and a Congolese parastatal, SOKIMO (10%).
The mine is being operated
by Randgold. The mine comprises an integrated open pit and underground operation. It is planned that the mine will ultimately be
supplied by four hydropower stations supported by a thermal power station for low rainfall periods and back-up.
Operations
The Kibali Mine is being
developed in two phases. Phase 1, which includes the KCD open pit operation and the construction of the processing plant,
the mine infrastructure (including a 36 unit high speed thermal power station) and the first of three hydropower stations, was
completed in December 2014. Phase 2 comprises the underground mine development,
including the vertical shaft which is scheduled
for commissioning in 2017, and the construction of two additional hydropower stations which are planned for commissioning
in 2016 and 2018, along with further satellite pits. The mine is expected to produce an average of 600koz of gold per annum over
the first 12 years of its life, which currently extends to 2031.
Open pit mining started
in July 2012 and commissioning of the oxide circuit began in the third quarter of 2013. Kibali poured its first gold in September
2013, ahead of plan, and started commercial production in the fourth quarter of 2013. Commissioning of the sulphide circuit started
at the end of the first quarter of 2014 and production has steadily ramped up since then, with the mine now processing around 600,000t/month.
In 2015, Kibali produced
642,720oz of gold at a total cash cost of $604/oz. Gold sales amounted to $742.3 million (100% basis) resulting in a profit from
mining activity (before interest, tax and depreciation) of $358.2 million.
The capital estimate for
the project (phase 1 and 2) remains in line with previous estimates at $1.83 billion excluding mining preproduction expenses. In
2015, capital expenditure totaled $251.2 million, which related principally to the Ambarau hydropower station, underground decline
and shaft development, CTSF Phase 2, backfill plant and other surface infrastructure.
During the year, Kibali
repaid a portion of its shareholder loans made available by the Kibali Joint Venture (KJV, the effective owner of the 90% interest
in Kibali) to fund the development of the mine which allowed the KJV to pay $70 million in dividends to its shareholders (Randgold
and AngloGold Ashanti).
Mining and Production
Open pit mining
A total volume of 12.4 million
BCMs was mined from the open pits, exceeding the plan, and ore tonnes mined of 6.1Mt were in line with plan.
Mining of the first open
pit satellite deposit, Mofu, was completed during the year and has started at the second, Mengu Hill. The KCD main pit and the
push back 2 north were mined out during the year, with the push back 2 south scheduled for completion in the first quarter of 2016.
Push back 3 (Durba hill) is planned for the end of open pit mine life in 2025. Bush clearing and dewatering has started in preparation
for mining of the Pakaka pit which is scheduled to begin in the first quarter of 2016.
Underground mining
During 2015, 804kt of ore
was mined from underground of which stoping contributed 72% with the remaining coming from development ore. As forecast, production
increased through the year, culminating in 296kt in the fourth quarter.
Stoping is expected to continue
to ramp up during 2016, with underground production scheduled to produce 1.3Mt of ore for the year.
Production
results for the 12 months ended December 31
|
|
2015
|
|
|
2014
|
|
MINING
|
|
|
|
|
|
|
|
|
Tonnes mined (000)
|
|
|
31,170
|
|
|
|
30,470
|
|
Ore tonnes mined (000)
|
|
|
6,862
|
|
|
|
5,632
|
|
MILLING
|
|
|
|
|
|
|
|
|
Tonnes processed (000)
|
|
|
6,833
|
|
|
|
5,568
|
|
Head grade milled (g/t)
|
|
|
3.5
|
|
|
|
3.7
|
|
Recovery (%)
|
|
|
83.8
|
|
|
|
79.3
|
|
Ounces produced
|
|
|
642,720
|
|
|
|
526,627
|
|
Production
results for the 12 months ended December 31
|
|
2015
|
|
|
2014
|
|
Ounces sold
|
|
|
643,976
|
|
|
|
516,902
|
|
Average price received ($/oz)
|
|
|
1,160
|
|
|
|
1,258
|
|
Cash operating costs
1
($/oz)
|
|
|
557
|
|
|
|
528
|
|
Total cash costs
1
($/oz)
|
|
|
604
|
|
|
|
573
|
|
Profit from mining activity
1
($000)
|
|
|
358,184
|
|
|
|
354,220
|
|
ATTRIBUTABLE (45%)
|
|
|
|
|
|
|
|
|
Gold sales
1
($000)
|
|
|
336,272
|
|
|
|
292,627
|
|
Ounces produced
|
|
|
289,224
|
|
|
|
236,982
|
|
Ounces sold
|
|
|
289,789
|
|
|
|
232,606
|
|
Gold on hand at period end
2
($000)
|
|
|
4,006
|
|
|
|
5,248
|
|
Profit from mining activity
1
($000)
|
|
|
161,183
|
|
|
|
159,399
|
|
Randgold owns 45% of Kibali with the DRC
State and joint venture partner owning 10% and 45% respectively. The group equity accounts for its 45% joint venture holding in
Kibali.
|
1
|
Refer to explanation of non-GAAP information provided in the section “—Non-GAAP
information” above.
|
|
2
|
Gold on hand represents gold in doré at the mine multiplied by the prevailing spot gold
price at the end of the period.
|
Ore Reserves
Depletion of ore reserves
was partially offset by small gains at Gorumbwa, Pakaka and the KCD underground. Drilling continues to focus on grade control drilling
of the deposits in the immediate mine plan of KCD underground, Pakaka and Mengu Hill.
|
|
|
|
Tonnes
(Mt)
|
|
|
Grade
(g/t)
|
|
|
Gold
(Moz)
|
|
|
Attributable
gold
2
(Moz)
|
|
at December 31
|
|
Category
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
ORE RESERVES
1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
■ Stockpiles
|
|
Proved
|
|
|
3.8
|
|
|
|
3.8
|
|
|
|
1.7
|
|
|
|
1.4
|
|
|
|
0.2
|
|
|
|
0.2
|
|
|
|
0.1
|
|
|
|
0.08
|
|
■ Open pits
|
|
Proved
|
|
|
0.2
|
|
|
|
1.6
|
|
|
|
3.7
|
|
|
|
2.6
|
|
|
|
0.03
|
|
|
|
0.1
|
|
|
|
0.01
|
|
|
|
0.06
|
|
|
|
Probable
|
|
|
30
|
|
|
|
33
|
|
|
|
2.2
|
|
|
|
2.4
|
|
|
|
2.2
|
|
|
|
2.5
|
|
|
|
1.0
|
|
|
|
1.1
|
|
■ Underground
|
|
Probable
|
|
|
45
|
|
|
|
44
|
|
|
|
5.6
|
|
|
|
5.7
|
|
|
|
8.2
|
|
|
|
8.2
|
|
|
|
3.7
|
|
|
|
3.7
|
|
TOTAL ORE RESERVES
|
|
Proved and probable
|
|
|
80
|
|
|
|
83
|
|
|
|
4.1
|
|
|
|
4.1
|
|
|
|
11
|
|
|
|
11
|
|
|
|
4.8
|
|
|
|
4.9
|
|
|
1
|
Open pit ore reserves are reported at a gold price of $1,000/oz and an average cut-off of 0.88g/t
and include dilution and ore loss factors. Open pit ore reserves were calculated by Mr. Nicholas Coomson, an officer of the company
and a competent person. Underground ore reserves are reported at a gold price of $1,000/oz and a cut-off of 2.5g/t and include
dilution and ore loss factors. Underground ore reserves were calculated by Mr. Tim Peters, an external consultant and a competent
person.
|
|
2
|
Attributable gold (Moz) refers to the quantity attributable to Randgold based on its 45% interest
in the Kibali gold mine.
|
Processing, Plant and Engineering
Processing
The processing plant continued
to make steady progress, with 6,833kt treated during 2015, 23% up on the prior year. The feed comprised both oxide and sulphide
material at an average grade of 3.5g/t. The average recovery
for the year was 83.8%, an improvement from
the 79.3% average in 2014. Optimization of the processing facility is expected to increase this to around 85% in 2016.
Plant enhancements during
the year included the construction and commissioning of an additional kiln, providing greater carbon regeneration capacity and
facilitating improved carbon management, as well as a de-sliming cyclone circuit, which will relieve the pressure on ultra-fine
grind throughput and allow for an increase in sulphide concentrate handling. The second phase of the lined tailings facility (CTSF)
was also completed, providing additional storage capacity for CIL tailings.
Engineering and power supply
With a continued focus on
planned maintenance, plant availability again increased throughout the year, reaching 94% in December.
At the end of 2014, the
Nzoro hydropower station was supplying 16.8MW of power with a 55/45% split between hydropower and thermal power. Further optimization
of the hydropower and synchronization of power produced from Nzoro II with the diesel power plant via a power management system
(PMS), resulted in Nzoro II running at its full 22MW capacity and a 70/30% split between hydropower and thermal power by the fourth
quarter. This is the maximum hydropower proportion anticipated with the current capacity but with the completion of Ambarau expected
in the second quarter of 2016 and Azambi in mid-2018, the hydropower share of the blend should continue to increase.
The commissioning of Nzoro
II reduced the cost of power from $0.46/kWh to $0.21/kWh. With the increase in the contribution of hydropower in 2015, assisted
by lower diesel prices, power cost dropped to $0.12/kWh by December, with an average cost for the year of $0.15kWh.
Construction and Underground Mine Development
The backfill plant was completed
and commissioned during the year in line with plan and is operating above design capacity (190m3/h). Six stopes have been backfilled
and the first secondary stope blasted without any delay in the schedule.
Construction of Ambarau,
the second 11MW hydropower station was negatively impacted when the earth coffer dam wall failed during high river flows in November
2015. This resulted in the power house flooding as well as damage to the carpi membrane on the wall. The additional repair and
rehabilitation work has delayed the completion and commissioning of the station, with first power now expected in the second quarter
of 2016. As the previously planned commissioning was scheduled for the start of the dry season, the potential power available until
March/April would have been significantly lower and thus the impact of the delay on the hydro/thermal blend is not significant
and, as mentioned above, has been offset to an extent by the lower fuel price.
Decline Development
The mining team consistently
achieved decline and underground development targets during 2015 and at a better advance rate than planned in the feasibility.
An average of 300m/month per jumbo was reached in development with the decline contractor continuing at the 900m/month reached
towards the end of the previous year.
To date, a total of 22.7km
has been developed including 10.6km in 2015.
Vertical Shaft System
Led by Randgold’s
team, the main contractor completed the shaft sinking in the second quarter of the year, ahead of schedule, reaching the shaft
bottom of 751m in July 2015. Lateral development for the production and crusher levels also progressed ahead of target. Equipping
of the shaft and headgear change-over also progressed
ahead of the program, with the planned re-opening
of the shaft to continue off-shaft development scheduled for the first quarter of 2016.
Exploration
Exploration focused on confirming
controls on mineralization to update geological models and defining potential exploration upside. Phased drilling to validate models
and test upside is planned for 2016. Extensive data compilation and relogging programs at KCD and satellite deposits formed the
base for superpit conceptual models and optimization studies which are expected to be concluded early 2016.
Activities on seven priority
targets developed from the analysis of mineralization and distribution of existing work along the KZ trend elevated the prospectivity
of two targets.
Trench results at Tete Bakangwe
identified three NE plunging mineralized lenses in BIF and metaconglomerate with down dip potential to provide mine schedule flexibility
in a low gold price environment through high grade oxide resources. Results include 13m at 15.06g/t.
At Sessenge, SW trenches
highlighted four higher grade NE plunging mineralized lenses in BIF and metaconglomerate with down dip potential to open up down
plunge and add additional resources. Results include 28m at 3.18g/t (9008 lode) and 40.5m at 3.76g/t (9003 lode).
A detailed summary of
the exploration work completed during 2015 can be found in the section entitled “—Exploration Review.”
Health and Safety
Kibali had 5 LTIs during
the year, as in 2014. However, due to the lower workforce numbers as the capital teams demobilized, the LTIFR deteriorated slightly
from 0.51 in 2014 to 0.56 in 2015. The TIFR decreased from 10.60 in 2014 to 6.11 per million hours worked in 2015. There were no
fatalities at Kibali during the year.
A concerted effort was made
during the year to address the high levels of malaria, with a commendable 46% reduction in the malaria incidence rate.
576 VCTs cases were conducted
during the year, with a HIV positivity rate of 7.29% compared to 11.26 % the previous year.
Environment
Environmental awareness
and control improved at Kibali during the year as the mine settled into stable operations, resulting in no major environmental
incidents being recorded. An increased focus on water management improved processing water recycling and the water quality guidelines
were not exceeded at any time during the year.
The biodiversity action
plan was enhanced in 2015 with extensive surveys of the aquatic habitats to identify biodiversity hotspots and develop an appropriate
management measure for these sites. Camera trapping has also been implemented to monitor movement of the larger animal species
occurring within the fence. Kibali again contributed over $250,000 to the African Parks Network as part of the continued biodiversity
offset strategy and agreement to help combat poaching in the Garamba National Park. This included the funding for collaring of
the threatened Kordofan sub-species of giraffe found in the park as well as financial support for pilots to enable aerial counts
and patrols.
Kibali was recommended for
ISO 14001 certification during the year under review.
Further details are provided
in the section entitled “—Social Responsibility and Environmental Sustainability.”
Human Resources and Industrial Relations
Although the majority of
construction laborers were demobilized during 2014, there was further downsizing of the workforce in 2015 with the number of employees,
including contractors, totaling 4,161 by year end. The employee ratios are in line with Randgold’s policy of recruitment
prioritization, sourcing primarily from local villages, then regional, followed by national and lastly looking for candidates outside
the country. 87% of Kibali employees are Congolese nationals and the intention is to continue localizing the work force during
2016.
Key appointments to the
underground mining team were made during 2015 in line with the increase in underground production.
Constructive labor relations
were maintained directly with employees and with the union, without any industrial action taking place during the year. Agreement
was reached on the excellence bonus and employee mine closure fund during the year.
Kibali Manpower
|
|
|
|
|
|
2015
|
|
|
2014
|
|
at December
31
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
|
Expats
|
|
|
Nationals
|
|
|
Total
|
|
Employees
|
|
|
96
|
|
|
|
609
|
|
|
|
705
|
|
|
|
95
|
|
|
|
606
|
|
|
|
701
|
|
Contractors
|
|
|
448
|
|
|
|
3,008
|
|
|
|
3,456
|
|
|
|
651
|
|
|
|
3,392
|
|
|
|
4,043
|
|
TOTAL
|
|
|
544
|
|
|
|
3,617
|
|
|
|
4,161
|
|
|
|
746
|
|
|
|
3,998
|
|
|
|
4,744
|
|
Community
In 2015, there was an improvement
in the mine and community relationship on the back of more structured, inclusive and informed engagements. The year ended with
all grievances resolved except for a few related to field compensation following the change in the plan to mine a satellite pit.
These have subsequently been estimated and agreed with the community.
EXPLORATION REVIEW
The team continued its
drive to replace mining depletion and find deposits which pass Randgold’s strategic filters: an IRR of 20% and the potential
for 3 million minable ounces at a long term gold price of $1,000/oz. Work during the year discovered a number of interesting targets
and more than replaced the 1.4Moz depleted by mining.
The focus was sustained
on the priority areas: the MTZ in Senegal, the Senegal-Mali Shear in Mali, the Boundiali and Senefou belts in Côte d’Ivoire
and the KZ Structure in NE DRC, a portfolio which contains 141 targets. During 2015 Randgold also developed new business functions
to ensure an equal balance between greenfields and brownfields work. By the end of the year three joint venture agreements had
been concluded in the DRC, giving Randgold control over the Ngayu Archean greenstone belt and increasing its groundholding in the
country to over 6,500km
2
, and its permit portfolio in Africa to 13,912km
2
with a further 4,299km
2
under application. Joint venture agreements on properties in western Mali have also been signed and a number of other negotiations
were in progress at year end.
SENEGAL
Massawa
At Massawa, the feasibility
study was progressed, producing strong intersections from the Sofia target, located 10km to the west of the main Northern Zone
and Central Zone (CZ) deposits.
Several large diameter,
close spaced drilling programs were completed to further improve the mineralization model and provide further samples for the large
amount of testwork required by the prefeasibility study. Both shallow and deep RC and diamond drilling programs were completed
in the more complex CZ, leading to a significant modification of the geological model which includes an early, broad, low grade
phase of refractory,
arsenic-rich mineralization, overprinted by
a later, narrow and complex set of structures containing visible gold, quartz, antimony and arsenic. Testwork on these high grade
structures towards the end of the year confirmed a high percentage of gravity recoverable (up to 68%) and leachable gold which
will improve the economics of the CZ ore, previously thought to be largely refractory.
The Massawa deposit does
not currently pass the company’s investment filters due to the high cost associated with processing refractory ore, and the
feasibility study is focused on reducing tonnes and increasing grade and recovery to pass the 20% IRR hurdle. Reserves at Massawa
are currently 20.73Mt at 2.1g/t for 2.2Moz. The study is due to be completed in 2016.
With respect to the
4km long Sophia orebody, a 200m long section contained shallow, higher grade drill intersections and was targeted by drilling
in 2015 to confirm whether the higher grades within this zone were related to supergene enrichment at the redox boundary.
During the second half of
the year, six deeper RC holes over 600m of strike length confirmed the zone of high grade mineralization, returning an average
weighted (true width) intersection of 30m at 5.18g/t at 100m vertical depth for the main zone sulphide ore and confirming a hypogene
source for the high grade mineralization. The holes also confirmed the existing hangingwall and footwall lodes. The main orezone
is located immediately beneath a mylonitic structure, and is hosted in strongly sheared gabbro and felsic intrusive units with
silica flooding and carbonate-sericite alteration. These results further highlight the potential for Sofia to provide over 1 Moz
of high grade, non-refractory, ore to the Massawa project.
The high grade mineralization is believed to plunge to the north and further drilling programs are being planned to test this open
potential in 2016.
The target is located on
the Sofia-Sabodala structure which hosts a number of the Sabodala orebodies along strike to the north and marks the western limit
of the volcanic domain in the Mako belt. Historical work on a number of targets around Sofia has returned strongly anomalous results
from near surface which form a portfolio of priority targets for follow-up work in 2016.
Bambadji joint venture
Work on the Bambadji permit
in Senegal was placed on hold in 2015 as Randgold renegotiated the terms under the joint venture with Iamgold Corporation and the
government. Work is expected to restart in 2016.
MALI
Loulo
Brownfields
At Gara, the 2015
brownfields program was highly successful, confirming the extension of the Gara system to the south, with an average true width
of 7.68m which remains open down-plunge to the south.
At Yalea, the southern
extension to the Purple Patch was tested by a number of deep drill holes with some very interesting results. YADH19 returned a
high grade intercept at the edge of the block model (11.3m at 12.1g/t from 711.9m) where a footwall structure is interpreted to
intersect the main shear, producing a plunging rod of high grade, Purple Patch type mineralization. 300m down-plunge from this
intersection, YDH277 returned two zones of high grade mineralization: Zone 1 – 13.40m at 6.50g/t, including 6.60m at 11.06g/t;
and Zone 2 – 11.86m at 4.43g/t, including 3.66m at 7.50g/t. Silica-carbonate alteration and breccia textures suggest this
hole pierced the plunge extension of the target tested by YaDH19 and highlights the considerable potential at Yalea to locate
further zones of high grade, Purple Patch type ore. To date, scout exploration drilling occurred in the south of Yalea,
in the form of four drill holes.Work is focused on locating zones of +6g/t material with sufficient size to support the
capital expenditure on a separate shaft for a new, high grade supply of ore to the plant.
Greenfields
A number of existing satellites
were reviewed (P125-Loulo 3 Gap, Baboto North and South, Loulo 2 South, Loulo 3 and Loulo 1). Exploration work focused on the advancement
of the Yalea Ridge South and Gara South targets which are not currently in resource.
Further generative work
was completed across the Loulo permit with the aim of better understanding and targeting the large structures which have acted
as strain and fluid conduits across the permit. Further structural mapping and interpretation was completed and highlighted five
principal structures which run N-S to NE-SW across the permit and form the basis of target generation and prioritization work with
priority targets located along two of these structures, Far West, around Iron hill and the Yalea structure.
Gounkoto
Brownfields
At Gounkoto, five drill
holes were completed beneath the $1,000/oz pit shell, testing narrow, high grade plunging lodes in MZ1 which form at the intersection
of differently oriented footwall and hangingwall structures. All holes intersected the target structure as modelled, but results
were weak, showing that the three higher grade shoots targeted have limited down-plunge continuity at depth. The weak results returned
from this program downgraded the MZ1 underground target.
In MZ3 in the north of the
deposit, drillhole GKDH432 returned 10.8m at 1.02g/t down-plunge to the north of the Jog Zone underground project confirming it
to be open. Northerly plunging mineralized shoots are controlled by the intersection between a brecciated structure in HW quartzite
with silica-albite-sericite alteration, and a FW shear consisting of albite with overprinting chlorite and hematite alteration.
Further work on this target is pending an evaluation of a new superpit concept at Gounkoto which would extract a large part of
the high grade underground resource.
Exploration work around
Gounkoto confirmed the P64 orebody to be a NE striking dilation zone between two reactivating north-south structures. Further studies
were carried out with the aim of updating the geological model on which a revised resource estimate will be based. This work constrained
new mineralization wireframes to sandstone with subordinate limestone and silica-albite breccia host rocks that are variably altered
with tourmaline, magnetite and chlorite.
Greenfields
At Toronto South, one diamond
hole was drilled to test the structural model of higher grade at depth within the central portion of a sinistral jog, in a zone
of maximum dilation that was not tested by previous drilling. TSDH001 intersected two weakly anomalous zones, a wide hangingwall
zone with 41.5m at 0.16g/t from 526.35m and a second zone of 8.3m at 0.42g/t from 574.3m. Consequently the target was removed from
the resource triangle.
Investigation of the strike
extents of the Gounkoto domain boundary (a key structure controlling mineralization in the Gounkoto orebody) continued in the north
of the project area at Gounkoto North as well as in the south at Faraba West and South West. Initial results confirmed the prospectivity
of the NNW extension of this structure with strongly silica-albite- tourmaline altered heterolithic breccia that returned strong
results (8.8g/t and 22.8g/t) from the banks of the Falémé River to the north of P64. Follow-up trenching returned
an intercept of 3.7m at 1.44g/t (31.7m), including 1.2m at 3.94g/t (GNWTR02) from the same breccia with silica-carbonate veinlets,
which was then confirmed in trenching 100m to the south in trench GNWTR04 (6.8m at 0.64g/t, including 1.7m at
1.29g/t). This structure will be further tested
in 2016. At Faraba West and South West pitting and trenching programs confirmed the extension of the domain boundary but failed
to intersect significant mineralization and work is ongoing along this target.
Minan is a blind target
that was identified from project wide integrated mapping and target generation work. Trenching on the target in the second quarter
intersected a discrete 3m wide ferruginous mineralized shear which graded up to 5.5g/t beneath transported alluvial material. RC
drilling on the target confirmed the presence of disseminated sulphides in bedrock which are weak but within a system which appears
to be dilating to the south. However, only sub-anomalous grades were returned (12m at 1.12g/t from 40m (GSWRC11), 28m at 0.82g/t
from 152m, including 2m at 4.61g/t (GSWRC03) and 4m at 1.59g/t from 248m (GSWRC13). The low grades are interpreted to be due to
the absence of early silica-albite and tourmaline alteration that prepares the host rocks for subsequent mineralization during
brittle-ductile deformation. Encouragingly, the work on the target confirms the efficacy of the target generation system described
above, which has also highlighted a number of other targets across the Gounkoto system and further afield, beneath transported
material at Bena and Bakolobi.
Regional
Randgold controls a portfolio
of 627km
2
along the Senegal Malian Shear (SMS) structure in western Mali. The SMS is a key regional control on gold
mineralization and is proximal to the Sadiola (AGA/ IAG), Loulo (RRS) and Fekola (B2G) ore systems.
Bakolobi (Taurus joint venture)
At Bakolobi, between Gounkoto
and Fekola, a first phase of trenching across key targets on the permit was completed. Nine trenches in total were excavated over
zones of bedrock mineralization, identified through the initial reconnaissance RC drill program. Results from these trenches included:
BKTR006 – 20.13m at 1.59g/t; BKTR004 – 23.70m at 0.61g/t; BKTR009 – 24.60m at 0.23g/t; and BKTR005 – 14.96m
at 3.83g/t including 6.25m at 7.71g/t and 11.45m at 1.94g/t (88.60m) including 3.50m at 5.39g/t. The trenching confirmed that the
mineralized structures dip uniformly to the west and that the highest grades are associated with the intersections of NW and NNE-NS
striking structures.
Follow-up pitting confirmed
the southern extension, beneath transported alluvial material, of the Koliguinda target with anomalous pits returning values up
to 0.4g/t over a 50m wide structural corridor. The Koliguinda target is interesting as it features a left hand flexure which would
be dilatational in a largely sinistral system such as the SMS and is the target which has, to date, returned the strongest results
from trenching (shown above). It is also in an area which is intersected by a major NW structure interpreted to be a transverse
fault in the original belt architecture. It also happens to be the area where transported gravels are thickest.
The other targets in the
permit are still thought to be prospective with widths at surface averaging approximately 20m with grades of between 1g/t and 2g/t.
Follow-up work on the permit was carried out including the completion of a new interpretation over the ground following a review
of all existing data. Pitting is now in progress over targets which are not covered by the thick alluvial material, a problem across
much of the permit. A drilling program which aims to test key parts of the two main mineralized trends is being prepared for 2016.
Legend joint venture
On the Legend Gold JV to
the south of Sadiola, work continues along the SMS which strikes over 18km within the permit area. Both trenching and pitting have
been ongoing through the year on targets close to the Kofi formation boundary, in the area of influence of the SMS, and have focused
on the anomalous contacts of carbonate and siliciclatic rocks which provide a key chemical and rheological contrast in this district.
This work has tested a number of targets, but many of them have been removed from the resource triangle during the year as they
have shown no potential beyond the weakly anomalous results.
At Woyanda, groove results
returned 5.60m at 0.30g/t, 8m at 0.37g/t, and 4m at 0.39g/t (95.40m). However, no significant results were returned from five lines
of exploration pits testing the strike extensions of the target, which was consequently downgraded.
The Sourokoto East target,
located at the lithological contact between volcano-sedimentary units (pyroclastic, brecciated tourmaline greywacke) in the east
and volcanics (mostly andesites) to the west, returned an encouraging pit result in early work of 2.99g/t, 1.8km along strike from
a zone of in-situ saprolite mineralization grading up to 0.89g/t. Follow-up pitting confirmed the continuity over 600m strike length
of in-situ gold anomalism within a 30m wide alteration zone with values of 0.16g/t to 11.3g/t in sheared greywackes with silica-carbonate-hematite
alteration. A trench over the alteration zone (SRTE001) returned 8.85m at 0.28g/t and confirmed that the higher grades are related
to millimetric oxidized quartz veinlets within the greywacke, an observation which downgrades the potential of the target.
Trenching is currently in
progress on the Sebesounkoto South target, where previous work defined silica-carbonate-tourmaline and chlorite alteration within
a gossanous structure over 1km strike, and lithosample values up to 1.6g/t.
Bena
The Bena project is located
to the immediate south of the Gounkoto permit. At Boulandissou, a 3km strike length target was previously generated which incorporated
a number of historical mineralized intersections and samples and this target was the sole focus of work on the project at the beginning
of the year. Historical results from the target include 26m at 3.53g/t from trench BNT02 in the north and 13m at 1.57g/t from RC
drill BORC02 in the south. A phase 1 program of three trenches and one groove was carried out over the target with the trench over
RC hole BORC02 returning 12.87m at 2.04g/t, confirming the west-dipping nature of the mineralized structure. Groove BGVO10 returned
12.6m at 1.84g/t to the immediate east of the main target structure but the other excavations along the target returned no significant
intersections restricting the known mineralization to limited strike extents. Because of this, and due to uncertainties over the
geological interpretation for the permit, an updated interpretation was carried out in parallel with the Bakolobi and Gounkoto
work, (both permits lie along strike from Bena) and a new portfolio of targets was generated. Field work on these targets is in
progress. The Bena permit is less affected by the difficult transported regolith in the Bakolobi permit and therefore more conventional
surface exploration work can be done.
Morila
Work on the near mine conceptual
targets at Morila continued through the first half of the year with the team relogging holes across the SE of the permit where
coincident features associated with the Morila deposit such as flat foliation, high temperature leucosome/quartz plagioclase veins,
tonalite intrusives, MG rich biotite and arsenopyrite mineralization were identified. The distribution of these features was mapped
but the team was unable to generate any targets for drill testing due to the lack of any visible control.
Following the completion
of the Domba grade control drilling program, the exploration team undertook a relog of the Samacline deposit which is located at
300m depth to the immediate west of Morila.
The updated interpretation
for the target has identified open, high grade mineralization within a wide, low grade envelope of up to 80m in width. The untested
area down dip to the west of Samacline is large enough to hold a Morila-type deposit and is the target of a diamond hole being
planned to test the model that Samacline could be the eastern edge of a large deposit.
CÔTE D’IVOIRE
Randgold holds, in its own
name or through joint ventures, 5,589km
2
of ground in Côte d’Ivoire (11 permits) which includes four permits
which have passed the inter-ministerial commission in 2015. Additionally, nine applications (3,592km
2
) through joint
ventures are pending.
Nielle
At Tongon, a full relog
of the deposit’s core and the modelling of the skarn system enabled the team to project and identify a number of targets
at the base of the $1,000/oz pit shell where infill drilling had the potential to increase the grade, or the number of mineralized
structures in the model. The reduced strip ratio as a result of positive results would enable the pit to access deeper ore. To
test the updated model, a program of 10 diamond holes was undertaken at Tongon with five holes in the southern pit; two in the
oxide pit and three beneath the Northern Zone pit. Results from the Northern Zone failed to extend the existing block model with
intersections from three holes being either narrower or lower grade than predicted. In the Southern Zone the holes intersected
several zones of mineralization outside the existing block model but failed to intersect mineralization in a wide area of internal
waste, which is limiting pit depth in current optimizations.
Towards the end of the year
infill drilling programs were carried out on two nearby satellite deposits. Tongon has the ability to make money from low grade
satellites and current resources in the two targets (Sekala and Seydou) have the potential to supplement the orefeed, extend Life
of Mine and protect the resource in a low gold price environment. At the time of writing, most results from these programs were
still pending.
In greenfields exploration,
the Yvette West target was prioritized within the 20km Bladonon corridor target in the SW of the Nielle permit and mapping and
sampling during the year identified silicified volcaniclastics/tuffs, sheared and locally folded argillites and carbonaceous shales
with lithosamples returning significant values up to 9.63g/t from silicified tuffs. Work will continue on this mineralized trend
in 2016.
Mankono
On the Mankono permit to
the SW of Fapoha, where the Senefou belt and the Boundiali belt structures intersect, the team discovered two styles of mineralization
on the Gbongogo target. Trenching throughout the year confirmed 400m strike of wide, low grade ore which may be amenable to bulk
mining. Trench results this year include: GBTR003 – 103m at 1.30g/t; GBTR007 – 73m at 1.80g/t; GBTR014 – 102.70m
at 1.90g/t including 73.60m at 2.36g/t, 14.20m at 3.25g/t and 6.60m at 3.84g/t; and GBTR017 – 62m at 1.59g/t including 36.50m
at 2.38g/t and 17.75m at 3.41 g/t. The mineralization is hosted in a quartz tourmaline stockwork in a silica-sericite altered coarse
grained sediment. The presence of strong silicification and sericite with associated boxworks after sulphides are indications of
the higher grade mineralization. The mineralized system is interpreted to be related in some way to the core of a fold hinge which
lunges to the NE and its potential is to be tested by drilling in 2016. Lower grades were intersected in GBTR015: 59m at 0.46g/t
and 28.50m at 0.33g/t and in trench GBTR016: 10.60m at 0.32g/t. A strong soil anomaly extends from these trenches over a strike
of 2.6km and work is ongoing to define the continuation of the vein system.
Located 800m to the NE of
the Gbongogo fold hinge target, the second style of mineralization is controlled by discrete dextral NS shears with moderate silicification
and strong magnetite and coarse grained pyrite, located on the eastern limb of the regional fold. The best intersection to date
is 23m at 1.25g/t including 7m at 3.05g/t with weaker intersections along strike, including 10.10m at 0.36g/t.
Boundiali
At Fonondara South, the
target was progressed from a soil anomaly to a drill program as a result of strong results from trenching and pitting along the
target. The mineralized shear zone, which dips steeply to the east, locates on the eastern margin of a massive andesite where it
is in contact with interbedded tuffs and argillites.
Trenching and pitting exposed
a wide zone of alteration (up to 57m) including 13m at 1.56g/t and 6m at 2.10g/t (open to the west) from FSTR011 in the south and
14m at 1.00g/t and 23m at 1.28g/t from FSTR012 in the center of the target. Follow-up work of a 2014 trench (FSTR008) which intersected
16m at 2.5g/t (including 11m at 3.49g/t) in the north of the target revealed that a flat structure appears to have placed barren
material on top of a significant, steeply dipping mineralized zone which is up to 30m wide and which returned consistent high grade
mineralization up to 16g/t. Further pitting 60m south of FSTR008 confirmed the flat structure and the high grade mineralization
beneath it. Intersections from contiguous pits at 5m spacing across the target zone beneath the flat
structure returned: FP442 – 6m at 5.36g/t
(open at depth); FP423 – 7m at 4.68g/t (open at depth); FP424 – 7m at 7.24g/t (open at depth); FP425 – 7m at
3g/t (open at depth); FP428 – 4m at 4.51g/t (open at depth); and FP434 – 6.70m at 8.71 g/t (open at depth).
This surface work at Fonondara
South defined a system which averaged 16m at 2.96g/t at surface over 1.5km strike at the margin of the Boundiali volcanic belt.
To test this structure at depth, six diamond drill holes were drilled at 300m spacing along the full strike of the target and all
intersected mineralization approximately 100m beneath the trenches. Best results were received from hole FSDH003 which returned
16.53m at 3.83g/t from 148.14m, including 7.40m at 5.88g/t in the main zone, and 8.83m at 28.62g/t from 188.07m including 4.10m
at 61.05g/t from the first of two footwall structures. Other holes intersected more moderate grades up to 1.5g/t over similar widths
within a large low grade carbonate/sericite alteration system which contains a phase of late quartz veining and extensive visible
gold in a sequence of volcaniclastic rocks and carbonaceous shales. Pyrite, pyrrhotite and arsenopyrite are present in all mineralized
zones.
Initial metallurgical test
work shows the sulphides at Fonondara to be moderately refractory. However, flotation has been shown to improve the recoveries
in the problematic shale ore to 81% from 40% through direct cyanidation. Direct cyanidation recovers 85% of the gold in the volcanic
ore and 98% of the gold in quartz ore.
Nine kilometers along strike
to the north of Fonondara, three additional diamond holes (750m) were drilled at the 3.5km long Sani target to test the wide alteration
system intersected in previous trenching which returned best results of 12m at 3.90g/t, 6m at 6.27g/t and 10m at 4.12g/t. This
drilling confirmed a wide and consistent low grade system with best results received from SNDH003: 54.41m at 1.21g/t (from 132.84m)
including 9.45m at 3.28g/t within a +200m wide anomalous zone. Mineralization is linked to coarse grained pyrite and chalcopyrite
and initial metallurgical tests conducted on the fresh material returned an average recovery of 87%. The problematic shale ore
seen at Fonondara is not present at Sani.
At Fonondara North, pit
results graded up to 5.96g/t from in-situ sheared saprolite, while fieldwork carried out during the year at Yama, (to the north
of Fonondara) identified a 750m long mineralized structure through trenching and pitting with sheared and altered samples returning
15.40m at 0.81g/t including 4m at 2.32g/t, with values up to 7.11g/t in a trench and up to 11.80g/t in pits. This structure is
part of a corridor that could extend over 4km.
A number of +10km soil anomalies
with confirmed bedrock mineralization at Yama, Sani, Fonondara and Kassere, all along strike and all located along the Boundiali
belt margin, highlight the significance of the structure as a large scale mineralized system with the potential to host world class
deposits. Given these positive results and the scale and prospectivity of the Boundiali belt margin, a VTEM (helicopter EM, Mag
and radiometric) survey over the Boundiali, Nafoun and Mankono permits was completed at the end of the year to improve the understanding
of the regional setting of the Boundiali-Bagoe Belt, generate new targets and facilitate the reprioritization of existing targets.
An earlier IP survey completed during the wet season over the 20km Fonondara-Sani corridor showed that there is significant potential
to change the existing interpretation of the key structures and identify new targets with additional remote data.
At year end, the survey
was nearing completion and is clearly confirming the extension of regional structures, including the southern extension of the
Syama and subsidiary structures, through the permit and highlighting new areas of interest along the Fonondara structure.
Fapoha
At Fapoha, work progressed
on the two main target areas, in the north of the permit and in the south, with both featuring multi kilometer long gold-in-soil
anomalies at the sediment-volcanic lithological contact. At Ouboulo in the south, trenching over the 12km target returned best
results of 27m at 1.20g/t including 6m at 2.36g/t and 5m at 2.87g/t from a brittle vein system in volcaniclastics in contact with
massive andesites and a quartz-diorite intrusion. Structures are generally a thin fracture network associated with narrow shear
bands developed at the margin of the quartz-diorite and the target was downgraded.
At Fapoha North, a 13km
+50ppb soil anomaly in a right hand flexure of the target structure was further investigated at the end of the year by pitting.
The pits returned consistently anomalous grade, with values up to 8g/t in saprolite over the full width and strike of the target,
which is up to 170m wide. Three trenches were excavated at year end at a spacing between 1.2km and 1.4km, all sited over existing
anomalous pits. Results from two of these trenches were received at the time of writing. Trench YOTR001 returned a wide mineralized
zone of 108m at 0.40g/t, including 5m at 1.03g/t and 5.50m at 1.11g/t, whereas FTR002 yielded a low grade anomalous zone of 88m
wide (open to the east) including 5m at 0.87g/t; 29.50m at 0.38g/t and 20m at 0.64g/t. Zones of mineralization in both trenches
are hosted in a brecciated tuff in contact with a quartz diorite intrusion. Despite the low grades from initial trenches, the target
is showing geological continuity between trenches and is confirmed as a wide, low grade mineralized system. Trenching will continue
in 2016 to properly test the corridor along strike to the north and to potentially identify zones of dilation and higher grade
mineralization in the structure.
DEMOCRATIC REPUBLIC OF CONGO
Kibali
The Kibali project is located
over a world-class gold belt in the Archean of northeast DRC where Randgold holds ground over 35km strike of the KZ structure,
a regional mineralized trend which hosts the giant 17Moz KCD deposit with a banked LoM of over 10 years.
Brownfields
Megi
Scoping resource estimation
work at Megi within a $1,500/oz pit shell produced 5.63Mt at 1.72g/t. The fourth quarter scoping model shows an 18% reduction in
tonnes, a 5% increase in grade and 14% drop in ounces respectively when compared to the first quarter estimate of 6.8Mt at 1.64g/t.
The changes are attributed to a more robust revised geological model, which indicates that mineralization remains open down-plunge
to the NE, providing exploration upside. A commercial review comparing mining costs and benefits at Megi against other satellite
deposits will drive the timing of infill conversion drilling.
The brownfields team completed
the rebuilding of lithological, alteration and mineralization wireframes to enable the evaluation of a potential superpit option
at Pakaka, Pamao and Bakangwe Aval for the Pakaka pit, while Kombokolo, Sessenge, Gorumbwa and Durba Hill were remodeled and combined
for the KCD pit. Optimizations are in progress and results will guide further infill drilling around both pits.
Durba Hill
At Durba Hill, trenching
returned anomalous intersections of 14m at 1.99g/t and 10.80m at 1.26g/t (both DBTR0004) and 10m at 3.03g/t (DBTR0003) all hosted
in brecciated chert and siliciclastic BIF in the hangingwall of the dolerite above the KCD pit. Two holes were drilled on top of
Durba Hill (between KCD and Gorumbwa) to test beneath the trench. Results returned (DHDD0001) 23.46m at 2.98g/t from 105.54m (including
5.16m at 8.30g/t from 105.54m) associated with silica carbonate alteration with pyrite, and is interpreted as being a plunging
rod of mineralization. A second deeper hole intersected a broad 40m zone of weak alteration with thin intervals of strong silica
carbonate alteration containing 15m at 0.15g/t from 113.7m (including 1m at 1.1g/t from 123m). It is interpreted that the follow-up
hole clipped the edge of the mineralized rod which remains open down-plunge. Further drilling is planned for 2016.
Greenfields
KZ Structure
Understanding of the deformational
history of the Kibali area, and more specifically the mineralized KZ structure, was advanced. The team focused on the key criteria
used to identify targets along the structure and re-ranked them after ground truthing and field validation of information, based
on the potential to host a new multi-million ounce standalone deposit or an economic satellite. The analysis and ranking exercise
generated a
portfolio of 28 targets. A ranking of the portfolio
identified Kanga Sud (1), Ikamva-Kalimva (2), Sessenge SW (3), Oere-Libala (4), Tete Bakangwe (5), Megi (6) and Mengu Hill W (7)
as the areas with highest potential of delivering a new multi-million ounce orebody.
In the KCD area work progressed
on mapping the continuity of the folded F1 structure which marks the contact between clastic siliceous rocks with carbonaceous/ferruginous
units in the KCD pit. The ore lodes of the KCD deposit occur close to this faulted contact around the hinges of a recumbent F2
fold which has been over printed by a second fold event, both of which have NE plunging hinges, thought to control the distinctive
rod-like nature of the mineralized lodes at Kibali. These recumbent folds may be a more regional feature and are likely to be blind
and a number of conceptual targets exist where fold hinges are interpreted to locate.
Tete Bakangwe
At Tete-Bakangwe, which
is an old artisanal pit 4km from the plant, trenching returned significant results including 11.3m (true) at 2.04g/t, 37.35m (true)
at 4.1 g/t and 24.68m (true) at 1.59 g/t containing at least four higher grade mineralized lenses in BIF and metaconglomerate which
plunge to the NE, with potential to provide mine schedule flexibility through high grade oxide resources. The lenses are associated
with folded ironstone units cut by NE trending structures, creating a 150m wide corridor of deformation and low grade mineralization
where strong rotation of the regional foliation from the NW trend to the SW creates dilation. Down-plunge opportunities exist as
does the potential for repeated mineralized lenses to the southwest towards the historic Agbarabo open pit.
An estimation based on old
drill holes and new trench results gives an oxide potential of 30koz at 4.5g/t in a conceptual $1,500/oz pit shell which will be
drill tested in 2016.
Sessengue SW
The Sessengue SW target
is located 350m south of the Sessengue pit where folded ironstones with lithosamples to 10.7g/t are located. Historical drill results
from the target area include 22m at 1.95g/t and 8m at 1.9g/t. In 2015 results received from trenches excavated across targets returned
intersections of 22m at 4.01g/t including 12m at 6.36g/t (STR0002) and 12m at 1.5g/t, 28m at 3.18g/t and 40.5m at 3.76g/t on ironstone
units in the targets area.
These trench intersections,
combined with results from an auger program and a ground magnetics survey across the target, helped define four areas with the
potential to host at least four higher grade mineralized lenses in banded ironstone and metaconglomerate which plunge to the NE.
The target area has not been adequately tested by deep drilling, and upside opportunities clearly exist for subsurface continuation
of the lenses which may lead to the discovery of new 9000 lode style mineralized systems.
Ikamva Kalimva
Ikamva is considered to
be one of the more prospective parts of the KZ structure with structural similarities to KCD. Eight trenches were excavated during
the year to investigate the extent of mineralization and geological controls in the priority Zone 1 target area. Trenches mostly
returned thin intervals of mineralization associated with ironstones, with one trench (IVTR0003) returning significant mineralization
of 9.1 m at 3.24g/t from 72.9m and 11m at 3.87g/t from 88m, 18m at 1.51g/t from 122m and 16m at 1.18g/t from 142m. Drilling beneath
this trench failed to confirm the continuity of mineralization but did highlight the potential at Ikamva, where there are several
small Belgian pits. Further work planned on the target includes field mapping to upgrade the interpretation and to identify key
controls on high grade mineralization.
Prospect scale mapping and
sampling at Kalimva, an old Belgian mine, confirmed the NNE trending shear corridor hosting rod/augen shaped mineralized alteration
zones plunging at 30 degrees to the NNE. The down-plunge extension of mineralization in the old pits was tested by previous diamond
drilling programs with mixed results but structural and lithological observations in 2015 suggest a vertical system, rather than
the east dipping model tested previously, indicating exploration upside to be tested in 2016.
Regional
In the past year, two joint
venture agreements were concluded in the DRC: Loncor and Devon Resources, which both hold permits over the Ngayu Archean greenstone
belt, some 200km to the southwest of the Kibali project. The belt hosts a multitude of exploration opportunities and despite limited
historical exploration work hosts resources of nearly 3Moz. The agreements give Randgold exclusive exploration rights over the
majority of the Ngayu belt where it already holds 752km
2
under the KGL Isiro joint venture. The new agreements cover
a total land area of 2,200km
2
. Randgold has negotiated the right to earn up to 65% of each of the three projects through
the completion of prefeasibility studies.
The newly signed joint venture
agreements bring Randgold’s total groundholding in northeast DRC to 6,000km
2
(including Kibali) and is a significant
expansion to its footprint in an area it believes to be one of the most prospective on the continent. This work paves the way for
regional sampling programs across the area in 2016 designed to collect detailed geochemical and geochronological data which will
be used to define the most prospective belts and structures on this part of the craton.
MINERAL RIGHTS AND ORE RESERVES
Table of mineral rights at December 31, 2015:
COUNTRY
|
|
TYPE
1
|
|
AREA
|
|
|
EQUITY
|
|
|
|
|
|
(km²)
|
|
|
(%)
|
|
MALI
|
|
|
|
|
|
|
|
|
|
Loulo
|
|
EP
|
|
|
263
|
|
|
80.0
|
|
Gounkoto
|
|
EP
|
|
|
100
|
|
|
80.0
|
|
Morila
|
|
EP
|
|
|
200
|
|
|
40.0
|
|
Bena West
|
|
EEP
|
|
|
22
|
|
|
90.0
|
|
Bakolobi
2
|
|
EEP
|
|
|
120
|
|
|
Earn in minimum 51
|
%
|
Djelimangara
2
|
|
EEP
|
|
|
55
|
|
|
Earn in minimum 51
|
%
|
Djelimangara West
2
|
|
EEP
|
|
|
48
|
|
|
Earn in minimum 51
|
%
|
Sebesounkoto
2
|
|
EEP
|
|
|
29
|
|
|
Earn in minimum 51
|
%
|
Sebesounkoto Sud
2
|
|
EEP
|
|
|
28
|
|
|
Earn in minimum 51
|
%
|
Djidian
|
|
EEP
|
|
|
325
|
|
|
90.0
|
|
Kobokoto Est
2
|
|
EEP
|
|
|
100
|
|
|
65.0
|
|
Koussikoto
2
|
|
EEP
|
|
|
37
|
|
|
65.0
|
|
CÔTE D’IVOIRE
|
|
|
|
|
|
|
|
|
|
Nielle
|
|
EP
|
|
|
751
|
|
|
89.0
|
|
Boundiali
|
|
EEP
|
|
|
1,320
|
|
|
81.0
|
|
Mankono
|
|
EEP
|
|
|
704
|
|
|
81.0
|
|
Tiorotieri
2
|
|
EEP
|
|
|
86
|
|
|
89.0
|
|
Kouassi Datekro N
|
|
EEP
|
|
|
350
|
|
|
89.0
|
|
Kouassi Datekro C
|
|
EEP
|
|
|
396
|
|
|
89.0
|
|
Fapoha North
2
|
|
EEP
|
|
|
387
|
|
|
81.0
|
|
Fapoha South
2
|
|
EEP
|
|
|
398
|
|
|
81.0
|
|
Tengrela South
|
|
EEP
|
|
|
400
|
|
|
81.0
|
|
SENEGAL
|
|
|
|
|
|
|
|
|
|
Kanoumba
|
|
EEP
|
|
|
506
|
|
|
90.0
|
|
Miko
|
|
EEP
|
|
|
61
|
|
|
90.0
|
|
Dalema
|
|
EEP
|
|
|
301
|
|
|
90.0
|
|
Tomboronkoto
|
|
EEP
|
|
|
225
|
|
|
90.0
|
|
Bambadji
2
|
|
EEP
|
|
|
236
|
|
|
Earn in minimum 51
|
%
|
DEMOCRATIC REPUBLIC OF CONGO
|
|
|
|
|
|
|
|
|
|
Moto Belt
2
|
|
|
|
|
|
|
|
|
|
11447
|
|
EP
|
|
|
227
|
|
|
45.0
|
|
11467
|
|
EP
|
|
|
249
|
|
|
45.0
|
|
COUNTRY
|
|
TYPE
1
|
|
AREA
|
|
|
EQUITY
|
|
|
|
|
|
(km²)
|
|
|
(%)
|
|
11468
|
|
EP
|
|
|
46
|
|
|
45.0
|
|
11469
|
|
EP
|
|
|
92
|
|
|
45.0
|
|
11470
|
|
EP
|
|
|
31
|
|
|
45.0
|
|
11471
|
|
EP
|
|
|
113
|
|
|
45.0
|
|
11472
|
|
EP
|
|
|
85
|
|
|
45.0
|
|
5052
|
|
EP
|
|
|
302
|
|
|
45.0
|
|
5073
|
|
EP
|
|
|
399
|
|
|
45.0
|
|
5088
|
|
EP
|
|
|
292
|
|
|
45.0
|
|
Ngayu Belt
2
|
|
|
|
|
|
|
|
|
|
1796
|
|
EEP
|
|
|
97
|
|
|
Earn in minimum 65
|
%
|
1793
|
|
EEP
|
|
|
196
|
|
|
Earn in minimum 65
|
%
|
1794
|
|
EEP
|
|
|
198
|
|
|
Earn in minimum 65
|
%
|
1797
|
|
EEP
|
|
|
157
|
|
|
Earn in minimum 65
|
%
|
1798
|
|
EEP
|
|
|
185
|
|
|
Earn in minimum 65
|
%
|
1800
|
|
EEP
|
|
|
168
|
|
|
Earn in minimum 65
|
%
|
1801
|
|
EEP
|
|
|
167
|
|
|
Earn in minimum 65
|
%
|
1802
|
|
EEP
|
|
|
163
|
|
|
Earn in minimum 65
|
%
|
1803
|
|
EEP
|
|
|
147
|
|
|
Earn in minimum 65
|
%
|
1804
|
|
EEP
|
|
|
124
|
|
|
Earn in minimum 65
|
%
|
1805
|
|
EEP
|
|
|
175
|
|
|
Earn in minimum 65
|
%
|
1806
|
|
EEP
|
|
|
86
|
|
|
Earn in minimum 65
|
%
|
1807
|
|
EEP
|
|
|
119
|
|
|
Earn in minimum 65
|
%
|
2226
|
|
EEP
|
|
|
137
|
|
|
Earn in minimum 51
|
%
|
2227
|
|
EEP
|
|
|
137
|
|
|
Earn in minimum 51
|
%
|
2229
|
|
EEP
|
|
|
126
|
|
|
Earn in minimum 51
|
%
|
2230
|
|
EEP
|
|
|
155
|
|
|
Earn in minimum 51
|
%
|
2231
|
|
EEP
|
|
|
197
|
|
|
Earn in minimum 51
|
%
|
12976
|
|
EEP
|
|
|
71
|
|
|
Earn in minimum 65
|
%
|
12984
|
|
EEP
|
|
|
20
|
|
|
Earn in minimum 65
|
%
|
12988
|
|
EEP
|
|
|
70
|
|
|
Earn in minimum 65
|
%
|
12982
|
|
EEP
|
|
|
7
|
|
|
Earn in minimum 65
|
%
|
12975
|
|
EEP
|
|
|
6
|
|
|
Earn in minimum 65
|
%
|
12986
|
|
EEP
|
|
|
111
|
|
|
Earn in minimum 65
|
%
|
12990
|
|
EEP
|
|
|
11
|
|
|
Earn in minimum 65
|
%
|
Isiro Belt
|
|
|
|
|
|
|
|
|
|
2285
|
|
EEP
|
|
|
197
|
|
|
Earn in minimum 51
|
%
|
2286
|
|
EEP
|
|
|
185
|
|
|
Earn in minimum 51
|
%
|
2287
|
|
EEP
|
|
|
183
|
|
|
Earn in minimum 51
|
%
|
2288
|
|
EEP
|
|
|
173
|
|
|
Earn in minimum 51
|
%
|
2289
|
|
EEP
|
|
|
195
|
|
|
Earn in minimum 51
|
%
|
2290
|
|
EEP
|
|
|
189
|
|
|
Earn in minimum 51
|
%
|
2291
|
|
EEP
|
|
|
191
|
|
|
Earn in minimum 51
|
%
|
TOTAL AREA
|
|
|
|
|
12,307
|
|
|
|
|
1
EP Exploration Permit
EEP Exclusive exploration permit
2
Subject to a joint venture agreement.
Annual ore reserve declaration at December
31, 2015
At
|
|
|
|
|
|
|
|
|
|
|
|
|
Attributable
|
|
Mine
|
|
Category
|
|
Tonnes
(Mt)
|
|
|
Grade
(g/t)
|
|
|
Gold
(Moz)
|
|
|
Gold
(Moz)
|
|
|
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ORE RESERVES
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Kibali
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
45
|
%
|
|
|
45
|
%
|
|
|
Proved
|
|
|
4.0
|
|
|
|
5.4
|
|
|
|
1.8
|
|
|
|
1.8
|
|
|
|
0.2
|
|
|
|
0.3
|
|
|
|
0.1
|
|
|
|
0.1
|
|
|
|
Probable
|
|
|
76
|
|
|
|
78
|
|
|
|
4.3
|
|
|
|
4.3
|
|
|
|
10
|
|
|
|
11
|
|
|
|
4.7
|
|
|
|
4.8
|
|
Sub total
|
|
Proved and Probable
|
|
|
80
|
|
|
|
83
|
|
|
|
4.1
|
|
|
|
4.1
|
|
|
|
11
|
|
|
|
11
|
|
|
|
4.8
|
|
|
|
4.9
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Loulo
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
80
|
%
|
|
|
80
|
%
|
|
|
Proved
|
|
|
8.6
|
|
|
|
2.2
|
|
|
|
4.5
|
|
|
|
1.8
|
|
|
|
1.2
|
|
|
|
0.1
|
|
|
|
1.0
|
|
|
|
0.1
|
|
|
|
Probable
|
|
|
23
|
|
|
|
31
|
|
|
|
4.7
|
|
|
|
4.8
|
|
|
|
3.4
|
|
|
|
4.7
|
|
|
|
2.7
|
|
|
|
3.8
|
|
Sub total
|
|
Proved and Probable
|
|
|
32
|
|
|
|
33
|
|
|
|
4.6
|
|
|
|
4.6
|
|
|
|
4.7
|
|
|
|
4.9
|
|
|
|
3.7
|
|
|
|
3.9
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Gounkoto
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
80
|
%
|
|
|
80
|
%
|
|
|
Proved
|
|
|
4.1
|
|
|
|
4.4
|
|
|
|
3.1
|
|
|
|
3.8
|
|
|
|
0.4
|
|
|
|
0.5
|
|
|
|
0.3
|
|
|
|
0.4
|
|
|
|
Probable
|
|
|
16
|
|
|
|
18
|
|
|
|
5.2
|
|
|
|
4.6
|
|
|
|
2.7
|
|
|
|
2.6
|
|
|
|
2.2
|
|
|
|
2.1
|
|
Sub total
|
|
Proved and Probable
|
|
|
20
|
|
|
|
22
|
|
|
|
4.8
|
|
|
|
4.4
|
|
|
|
3.1
|
|
|
|
3.2
|
|
|
|
2.5
|
|
|
|
2.5
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Morila
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
40
|
%
|
|
|
40
|
%
|
|
|
Proved
|
|
|
-
|
|
|
|
0.02
|
|
|
|
-
|
|
|
|
4.0
|
|
|
|
-
|
|
|
|
0.003
|
|
|
|
-
|
|
|
|
0.001
|
|
|
|
Probable
|
|
|
15
|
|
|
|
13
|
|
|
|
0.6
|
|
|
|
0.7
|
|
|
|
0.3
|
|
|
|
0.3
|
|
|
|
0.1
|
|
|
|
0.1
|
|
Sub total
|
|
Proved and Probable
|
|
|
15
|
|
|
|
13
|
|
|
|
0.6
|
|
|
|
0.7
|
|
|
|
0.3
|
|
|
|
0.3
|
|
|
|
0.1
|
|
|
|
0.1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tongon
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
89
|
%
|
|
|
89
|
%
|
|
|
Proved
|
|
|
8.2
|
|
|
|
7.1
|
|
|
|
2.3
|
|
|
|
2.2
|
|
|
|
0.6
|
|
|
|
0.5
|
|
|
|
0.5
|
|
|
|
0.4
|
|
|
|
Probable
|
|
|
18
|
|
|
|
23
|
|
|
|
2.4
|
|
|
|
2.4
|
|
|
|
1.4
|
|
|
|
1.7
|
|
|
|
1.3
|
|
|
|
1.5
|
|
Sub total
|
|
Proved and Probable
|
|
|
26
|
|
|
|
30
|
|
|
|
2.4
|
|
|
|
2.3
|
|
|
|
2.0
|
|
|
|
2.2
|
|
|
|
1.8
|
|
|
|
2.0
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Massawa
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
83
|
%
|
|
|
83
|
%
|
|
|
Proved
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Probable
|
|
|
21
|
|
|
|
21
|
|
|
|
3.1
|
|
|
|
3.1
|
|
|
|
2.0
|
|
|
|
2.0
|
|
|
|
1.7
|
|
|
|
1.7
|
|
Sub total
|
|
Proved and Probable
|
|
|
21
|
|
|
|
21
|
|
|
|
3.1
|
|
|
|
3.1
|
|
|
|
2.0
|
|
|
|
2.0
|
|
|
|
1.7
|
|
|
|
1.7
|
|
TOTAL RESERVES
|
|
Proved and probable
|
|
|
194
|
|
|
|
201
|
|
|
|
3.6
|
|
|
|
3.6
|
|
|
|
23
|
|
|
|
24
|
|
|
|
15
|
|
|
|
15
|
|
The reporting of ore reserves is also in
accordance with SEC industry Guide and JORC 2012 Code and as such are reported to the second significant digit.
Reserve pit optimizations are carried out
at a gold price of $1,000/oz for all pits.
Underground ore reserves are also based
on a gold price of $1,000/oz. Dilution and ore loss are incorporated into the calculation of reserves.
Mineral Rights and Permits
The following map shows the position of our
current permits in West Africa:
The following map shows the position of our current permits in Central
Africa:
Although we believe that
our exploration permits will be renewed when they expire, based on the current applicable laws in the respective countries in which
we have obtained permits, there can be no assurance that those permits will be renewed on the same or similar terms, or at all.
In addition, although the mining laws of Mali, Côte d’Ivoire, Senegal and DRC provide a right to mine should an economic
orebody be discovered on a property held under an exploration permit, there can be no assurance that the relevant government will
issue a permit that would allow us to mine. All mineral rights within the countries in which we are currently prospecting are state-owned.
Our interests effectively grant us the right to develop and participate in any mine development on the permit areas.
SOCIAL RESPONSIBILITY AND ENVIRONMENTAL
SUSTAINABILITY
Sustainability Governance
We have implemented policies
and procedures to ensure we engage effectively with our stakeholders and for identifying and reporting on sustainability risks
and opportunities.
Management of sustainability
We have a wide range of
policies, processes and people in place to ensure we identify and manage the risks and opportunities that sustainability factors
present to our business, and to ensure we engage effectively and transparently with all our stakeholders.
Our sustainability governance
starts at the top and it is our board who holds ultimate responsibility for our performance in this area. Key to this is the environmental and social oversight committee, which meets quarterly and is chaired by our CEO. Sustainability considerations play
a key part in all our decisions, for example in 2015 our verdict not to proceed with a potential investment opportunity was made,
in part, because we did not feel the project met our sustainability criteria.
We also have three high
level executives who drive our work on community relations, health and safety, environmental management and sustainability reporting.
Two of these are West African nationals, in keeping with our ambition to have host country nationals involved at the highest levels
of management in our company. To avoid a hierarchical structure these executives report directly to our chief operating officers
(who sit above the mine general managers). This helps provide an important layer of independent sustainability oversight. It also
helps to integrate sustainability into the DNA of our company, ensuring that it is not reliant on one person or one department.
While responsibility sits
at the top, our management of environmental and social issues also flows from the ground upwards. Hence our extensive stakeholder
engagement program (see “—Stakeholder engagement” below) and the participation of our CEO in regular mass meetings
with employees, and open forums with community chiefs and other local representatives. Such meetings are a lively, vigorous and
important part of our governance of sustainability.
Where appropriate, we
also include achievement of sustainability targets as a component of bonus based remuneration packages. For example, part of both
our CEO’s and CFO’s annual bonus payments are dependent on the group achieving a Lost Time Injury Frequency Rate of
below 1.0. From 2016, the maximum bonus is only payable if the LTIFR is zero. Similarly, part of the CEO’s and CFO’s
bonuses are linked to achieving the target of zero class 1 environmental incidents.
Corporate governance
Our Code of Conduct helps
ensure our values are applied throughout the company and defines the standards of behavior expected of all directors, employees
and contractors. It sets out our standard on a range of issues including bribery, whistle blowing, record-keeping, fraud, interactions
with governments and sustainable development. Contravention of this code would lead to disciplinary action and the potential termination
of employment. The importance of complying with our Code of Conduct is explained to all new employees as a central part of their
induction training.
Where appropriate, we
include achievement of sustainability targets as a component of bonus-based remuneration packages. We also build succession planning
in every executive management position, including our CEO, to ensure that our sustainability work is built into the DNA of our
company.
As part of our tendering
procedure we also encourage all contractors and service providers to implement our human rights, environmental and social standards,
anticorruption and anti-bribery policies in their organizations. As detailed throughout this sustainability report, Randgold has
a comprehensive set of policies and practices in place to deal with all our sustainability challenges. We rely on our people to
effectively implement these policies, which have evolved through years of experience and are crafted to comply with host country
legislation. This means that we tend not to officially adopt or endorse specific international charters or sustainability initiatives,
even though we often agree with them and work to support them.
Examples of international
standards or initiatives that fall into this description include the IFC Performance Standards, World Bank Operational Guidelines,
OECD Convention on Combating Bribery and the Voluntary Principles on Security and Human Rights.
Anti-corruption measures
The group’s Code
of Conduct requires all our personnel, and the personnel of our contractors, suppliers and partners not to engage in any form of
bribery or corruption. Randgold undertakes due diligence on the parties it does business with. Our personnel are also trained in
anti-bribery and corruption measures to ensure the group’s Code of Conduct is fully adhered to.
The group operates a whistle
blowing policy where all our personnel and the personnel of our suppliers, contractors and partners are encouraged to report any
breach or suspected breach of the group’s anti-corruption and antibribery policies to the group’s compliance officer.
Our anti-bribery and anti-corruption policies and practices are regularly audited to assess the adequacy of and compliance with
our Code of Conduct.
We believe in full transparency
in our dealings with governments and we fully encourage our host governments’ efforts to establish procedures to ensure revenue
transparency in accordance with international standards.
Stakeholder engagement
Our stakeholder engagement
program is an integral part of our governance of sustainability and vital to ensuring our business creates value for all stakeholders.
We classify our stakeholders into eight groups, and believe that keeping open an ongoing two way dialogue with each of these diverse
constituencies is critical to the success of our business.
We engage with our stakeholders
in a variety of ways, including our annual Materiality Assessment (see “—Materiality assessment” below) and through
both formal and informal meetings and mechanisms, including correspondence, roadshows, open forums and local consultations. For
example, at Kibali we present the quarterly results to our local stakeholders and in 2016 we are looking to expand this practice
across all our operational mines. We also present our annual report and sustainability report to our host communities each year.
Our aim is to be receptive
and flexible to the feedback we receive through our stakeholder engagement program. For example at Kibali in the DRC in 2015, based
on input from government authorities, village chiefs, community representatives, local businessmen, civil society and the local
Roman catholic church, we drafted and signed a formal Memorandum of Understanding (MOU) with the local community. This acts as
a social contract of peace and is the first time we have done this with a local community.
Materiality assessment
An important element of
both our stakeholder engagement and risk management approach is a strategic prioritization of sustainability issues which we undertake
each year.
This is undertaken in
line with guidance set by the Global Reporting Initiative’s (GRI) G4 Standard for sustainability reporting. The Materiality
Assessment sees us survey both internal and external stakeholders to ask what they perceive our most critical sustainability risks
to be.
This year’s Materiality
Assessment identified 19 priority sustainability issues for 2016, of which seven were categorized as highest priority.
Issues in the top ranking
cut across a range of themes including environmental, human capital, social and governance factors. Safety, cyanide management,
water pollution and community engagement were all identified as highest priority issues in both 2015’s and 2014’s Materiality
Assessment – and this report discusses in depth how Randgold has approached each of these challenges. This year’s Materiality
Assessment also produced an additional three top priority issues: closure planning, revenue transparency and community development
and investment. In this report we discuss our strategy, policy, performance and plans in all these areas.
The results also introduced
three new issues within the medium priority category compared to 2014. These are: occupational health, attracting and retaining
staff and security forces. Five issues dropped below the medium priority line compared to last year: artisanal mining, community
grievance mechanism, corporate governance, indigenous populations and waste management, although we will continue to monitor, manage
and report on all of these.
One of the most useful
outcomes of the Materiality Assessment exercise is that it helps the Randgold team to identify where gaps in perception exist between
internal and external stakeholders, thus helping ensure we understand all our stakeholders’ needs and maximize the benefits
we bring to them.
This year’s assessment
showed a reasonably high level of convergence on the issues that both internal and external stakeholders view as highest priority.
For example safety, occupational health, skills transfer and training and water pollution all featured in the top third of priorities
for both groups.
Economic development
Strategy and policy
We recognize our responsibilities
and seek to create shared economic value for all stakeholders. As well as paying all relevant taxes, we include the governments
of our host countries as part owners on all our mines (the states of Mali, Côte d’Ivoire and the DRC all have stakes
of at least 10% in our respective mines) so we also contribute to national treasuries through dividends and royalties. We are fully
transparent about all payments and sign long term agreements within mining code obligations that include commitments to leave behind
a thriving legacy after a mine’s closure.
Our performance
Our contributions to host
countries in 2015 have been significant. This year’s payments bring Randgold’s total contributions to host countries
via taxes, royalties and dividends to over $2.5 billion.
Most of our host country
economies are heavily dependent on natural resources and we also work with these governments to support them in their efforts to
diversify their economies, for example by facilitating foreign investment. In 2015, this has included our investments in agribusiness
and support for small and medium sized enterprises through our preferential procurement system and business mentoring.
As well as being fully
transparent about our revenues and economic footprint, we strive to encourage high standards of corporate governance and transparency
in our countries of operation, with the aim of helping them attract other world-class companies to invest there. We are pleased
that as of July 2014 all our countries hosting operational mines – Mali, Côte d’Ivoire and DRC – have been
compliant with the Extractive Industries Transparency Initiative (EITI).
Further to this, we were
encouraged to see all our host countries improved their ranking in the 2015 World Bank Ease of Doing Business survey. This sends
a powerful message to international investors that the business environment in our host countries continues to improve and welcomes
world-class businesses.
Investing in infrastructure
One of our most critical
contributions to the economic development of our host countries is our investment in vital infrastructure which both makes our
mines viable and lays the foundations for future growth in the regions in which we operate. We have invested approximately $700
million in host country infrastructure during the last five years, from bridges to broadband, new roads networks to new power networks.
Examples of vital infrastructure
include a $40 million project during the construction of our Tongon mine to introduce overhead power lines to connect the Tongon
region to the national electricity grid, a venture which both helped us reduce our reliance on expensive thermal energy and diesel
generators and succeeded in lighting up an isolated region of Côte d’Ivoire. In the DRC, we are investing in the construction
of three hydropower stations which will power up to 90% of our Kibali mine and leave a community legacy that outlasts the mine.
2015 also saw us complete the construction of a new customs house on the Senegalese-Malian border, one of the vital routes to our
Loulo-Gounkoto complex.
Community development
Strategy and policies
All our mines need the
support and goodwill of the communities in which they are based to be able to operate successfully. We aim to build strong and
transparent relationships and view each community as a partner who can provide us with talented employees, a secure environment
and local knowledge and who can use us to build better local health and education facilities and more prosperous local economies.
Our guiding policy in
this area is to empower each community through the creation of community development committees (CDCs). Each CDC consists of a
representative mix of local leaders, women and youth delegates and others and is empowered to decide how best to spend an annual
community investment budget within the five broad sustainable development categories of education, primary health, food security,
potable water and local economic development.
Similarly, where we
invest in a new facility such as a school, health clinic or fresh water well we also work closely with the CDCs or local
authorities to ensure that it can be maintained after the mine has closed.
Our performance
The amount invested through
community development committees increased by over $3.6 million in 2015, a rise of 136% on the previous year. This has led to a
range of vital investments in health, education, local economic development, food security and drinking water projects across all
our host communities.
Some highlights for each
mine’s surrounding communities in 2015 include:
|
·
|
Tongon (Côte d’Ivoire)
– Included over $100,000 on health projects, over
$60,000 spent to construct new classrooms and $30,000 on new computer facilities in schools. The Tongon community was honored by
the visit of the President of Côte d’Ivoire and the Minister of Agriculture in 2015 who observed progress at the agribusiness
development projects.
|
|
·
|
Gounkoto (Mali)
– Included a $1.4 million investment to develop an agribusiness college,
around $50,000 to build a new school in Batankoto village, $14,000 for a tractor for community use and improvements to roads and
local water supply.
|
|
·
|
Loulo (Mali)
– Examples of projects include over 18 water boreholes drilled or rehabilitated,
$50,000 to construct three classrooms in Dabara, over $23,000 on medical supplies for the
|
community and a major infrastructure
investment to improve the customs offices at the nearby Senegalese border.
|
·
|
Kibali (DRC)
– Included major constructions such as a new livestock training center
and community complex housing sporting facilities. Over $30,000 for a maternity center and ultrasound room in Watsa Hospital, 19
drinking water projects, major repairs and renovations to several schools and an investment of over $500,000 to establish long
term microfinance facilities. The focus is also shifting at Kibali to viable business projects, with a total of $1 million spent
on local economic development initiatives.
|
|
·
|
Morila (Mali)
– An increase of over $1 million in investment in this community helped
cover the growth of agribusiness projects and additional community electrification initiatives such as the installation of a solar
powered water pumping system at a women’s market garden and electrification of the new youth center. Investments also included
over $30,000 on new borehole construction, improvements to waste management at local hospitals and contributions to community radio
and local soccer facilities.
|
Protecting human rights
Strategy and policies
Randgold is committed
to upholding fundamental human rights with everything we do, and wherever we operate. We have never been subject to any allegations
of serious human rights abuses or breaches of humanitarian law throughout our 20 years of operation.
We have a detailed Human
Rights Policy and Conflict Free Gold Policy, both available on our website, that cover all aspects of our business including, but
not limited to, areas of employment, resettlement, engagement of private security forces and our work with suppliers. These policies
are a part of induction for all relevant staff and ensure that our mines do not provide benefits to any armed groups who have committed
or been credibly accused of human rights abuses.
We also recognize that
we do not operate in a bubble, but as part of an economic value chain where we can have influence. Therefore we also try to proactively
encourage respect for human rights by including human rights clauses within all our supplier contracts – putting a legal
duty on contractors both large and small to comply with our zero tolerance policy in areas such as bribery or child labor. We monitor
compliance with these clauses, alongside all our terms and conditions, as part of our annual inspections of suppliers.
Safety
Strategy and policies
Safety is a top priority
for Randgold and we are determined to create an injury and fatality free working environment. It is vital that our employees can
come to work every day knowing they will be in a safe environment, and contributing to the wellbeing of their colleagues.
We have robust safety
systems in place at all mines and use the internationally recognized OHSAS 18001 safety standard to guide and inform our practices.
For example, we use a hierarchy of control to help manage our safety risks. We first seek to eliminate known hazards; where hazards
cannot be eliminated we look to technology and mechanization of processes to reduce exposure to risk and finally where exposure
to risk cannot be removed we ensure we manage those risks with careful administration and monitoring, including the compulsory
use of personal protective equipment. Our policies also include assessments of specific safety risks for each part of the mine,
holding daily toolbox safety briefings in each department and having detailed procedures and training modules in place for areas
such as chemical hazards.
Each site has an emergency
response team, including a mine rescue team where we have underground operations. All our underground operations have a number
of refuge chambers where workers can seek shelter in the
event of rock fall or cave in. This includes
15 such refuge chambers at our Loulo mine which we believe is the largest number for any mine in West Africa.
The core of our approach
to safety is to ensure each individual takes responsibility for the safety of themselves and those around them. To create this
safety culture we include safety training as a critical part of induction for every employee and contractor, we hold regular audits
to check employees’ understanding of safety behaviors, and all staff are encouraged to think proactively about safety risks.
For example we encourage a right to refuse i.e., to challenge supervisors if they feel that appropriate equipment or other safety
measures are not in place before doing a job.
If an incident occurs,
the safety, health and environment (SHE) department on each mine analyses the incident and works to ensure appropriate remedial
actions are taken. They also ensure that illiterate employees are fully briefed on the meanings of written procedures and signs
in their native language, an important consideration in some of the underdeveloped areas in which we operate.
We also have a zero tolerance
policy towards drug or alcohol abuse and unsafe behavior on site.
Our performance
Unfortunately we suffered
one fatality in 2015. The incident occurred at our Tongon mine in January where a foreman in the contract mining team was the victim
of a tractor crash in the pit. An in-depth investigation into the incident has been conducted and remedial actions were implemented
to prevent such an accident occurring again have included a prohibition of the use of tractors in the pit, defensive driving sessions
for all operators on how to respond in extreme situations, and reminder sessions on the importance of conducting thorough mechanical
checks on relevant equipment.
After achieving a record
decline in our group’s Lost Time Injury Frequency Rate (LTIFR) in 2014, to 0.47 per million hours worked, we saw the rate
rise to 0.59 per million hours worked in 2015 – the first increase in LTIFR since 2010. Although this is a disappointing
increase, the LTIFR rate still remains low – and is more than 50% below the average rate from the last five years. The rise
can be partially attributed to an increase in the number of Lost Time Injuries at our Tongon mine in particular (from zero to four),
some of which were related to contractors at the facility. We are determined to bring the rate down again in 2016 and measures
to improve safety will include looking at additional training and the introduction of new disciplinary measures which increase
the accountability of employees and contractors for unsafe behavior.
To further improve safety
we also began piloting the safety software, MyOSH, at our Loulo operation in 2015. MyOSH allows us to record all safety information
for each employee. This means we are notified when pre-safety checks are not carried out or when refresher training is required,
thus providing a useful additional tool to our management. We plan to expand the trial of MyOSH to Gounkoto in early 2016, and
across all our sites if the trial is successful.
Group lost time injury frequency rate
We are pleased to report
that both our Morila and Gounkoto mines recorded zero lost time injuries during 2015, the second year in a row Gounkoto has achieved
this milestone. Another significant achievement was a 25% drop in the Total Injury Frequency Rate (LTIFR) across the group in 2015,
thanks largely to a 34% decrease in medical treatment injuries (MTIs).
We were also encouraged
by a rise in near misses in 2015. These are incidents where no personal injury or property damage was sustained and reporting them
triggers remedial actions that can prevent future accidents. Perhaps counter-intuitively, we see a rise in near misses as part
of a positive trend towards encouraging a culture of incident awareness and increased reporting of incidents.
Group Safety Performance
|
|
|
|
|
|
|
|
|
|
|
|
2015
|
|
|
2014
|
|
|
2013
|
|
Total labor
1
|
|
|
11,348
|
|
|
|
12,341
|
|
|
|
15,373
|
|
Person hours
|
|
|
25,518,122
|
|
|
|
27,583,588
|
|
|
|
35,246,260
|
|
LTIs
2
|
|
|
15
|
|
|
|
13
|
|
|
|
20
|
|
LTIFR
3
|
|
|
0.59
|
|
|
|
0.47
|
|
|
|
0.57
|
|
Fatalities
|
|
|
1
|
|
|
|
1
|
|
|
|
1
|
|
TIFR
4
|
|
|
6.90
|
|
|
|
9.26
|
|
|
|
8.37
|
|
Near misses
|
|
|
211
|
|
|
|
189
|
|
|
|
128
|
|
|
1
|
Including persons employed by our contractors calculated as an average over the year.
|
|
2
|
Defined as injuries that occur in the execution of duties which prevent our workers from performing
those duties for at least one day.
|
|
3
|
Number of LTIs per million person hours worked.
|
|
4
|
Number of LTIs plus medical treatment injuries (MTIs) per million man-hours worked.
|
Individual Mine Level Safety Performance
|
|
|
Loulo
|
|
|
Gounkoto
|
|
|
Morila
|
|
|
Tongon
|
|
|
Kibali
|
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
Person hours
|
|
|
5,769,169
|
|
|
|
6,410,729
|
|
|
|
2,117,943
|
|
|
|
2,152,358
|
|
|
|
2,138,655
|
|
|
|
2,697,840
|
|
|
|
4,849,840
|
|
|
|
4,628,717
|
|
|
|
10,642,515
|
|
|
|
11,693,944
|
|
LTIS
|
|
|
5
|
|
|
|
4
|
|
|
|
0
|
|
|
|
0
|
|
|
|
0
|
|
|
|
3
|
|
|
|
4
|
|
|
|
0
|
|
|
|
6
|
|
|
|
6
|
|
LTIFRs
|
|
|
0.87
|
|
|
|
0.62
|
|
|
|
0
|
|
|
|
0
|
|
|
|
0
|
|
|
|
1.11
|
|
|
|
0.82
|
|
|
|
0
|
|
|
|
0.56
|
|
|
|
0.51
|
|
Fatalities
|
|
|
0
|
|
|
|
0
|
|
|
|
0
|
|
|
|
0
|
|
|
|
0
|
|
|
|
0
|
|
|
|
1
|
|
|
|
0
|
|
|
|
0
|
|
|
|
1
|
|
Near misses
1
|
|
|
52
|
|
|
|
29
|
|
|
|
45
|
|
|
|
36
|
|
|
|
4
|
|
|
|
6
|
|
|
|
41
|
|
|
|
34
|
|
|
|
69
|
|
|
|
85
|
|
|
1
|
Restated as value reported previously was the number of property damages.
|
Discovering and developing local talent
Strategy and policies
A central tenet of our
employment strategy is to attract the best candidates from our host countries and communities providing them with world-class training
and genuine opportunity to progress. It is a strategy that enables us to benefit from an efficient and effective workforce, at
a relatively low cost base compared to other peers, while also playing an important role in building strong community relations
and a secure environment for our mines.
It also provides us with
a loyal workforce and we take pride in our staff retention rates.
Our policy to prioritize
host country nationals means that for every role we seek to place someone with the right level of skills from first the local region,
then the host country, then sub-Saharan Africa and beyond. We have a target to maintain the number of nationals in our workforce
above 80% and we place a high priority and considerable resources into nurturing talent and skills for long term development.
During recruitment we
use a variety of tools such as psychometric and other tests to assess the skills and competencies of all candidates and to match
the best ones with the right roles. We then use a combination of both formal and informal training to progress careers and employee
excellence. Informal training includes skills shadowing, mentoring and on the job training which most employees engage in to a
large extent. We also have several formal training partnership arrangements in place with the universities of Pretoria, Cape Town
and Abidjan.
We also run a
stagiaire
industry placement program giving students from host country colleges opportunities to work on our mine sites for up to 12 months.
This helps us to both identify and recruit some of the most talented individuals from our countries of operation and provides essential
work experience to graduates.
Our performance
We had a total workforce
of 10,905 in 2015, of which 92% of operational staff were host country nationals. We continue to have high retention rates. For
example, at mines such as Loulo and Morila that have been in operation for over a decade, over 85% of employees have been with
us longer than 10 years.
One of our key targets
is the development and progression of host country nationals into management positions and as of 2015 the entire management teams
at Morila, Loulo and Gounkoto consisted completely of Malian nationals. A total of 17 senior management roles were transferred
from expatriates to host country nationals this year.
Owner mining
As part of our commitment
to investing in host country nationals we also introduced a shift to owner mining at Loulo’s underground mines in 2015. While
underground mining activities have always been under management control, owner mining means that rather than relying on outsourced
labor and contract staff (who are usually expats) to fulfil the underground mining function, work is now completed by our own employees.
This process has required the short term hire of over 90 international experts (down from 131 before owner mining) on rolling contracts
but ultimately will lead to a more highly skilled local workforce and then a subsequent reduction in the number of expatriates
on underground operations.
Beyond the benefits of
increased employment opportunities and knowledge transfer for our local communities, owner mining also makes good sense for us
as a business. It allows us to eliminate any duplication of functions on site and to reduce our reliance on more expensive expatriate
labor. We anticipate the cost reductions of the shift to owner mining to be about 10 to 15% on relevant costs.
Training the future
We spent more than $1.3
million on formal training for 302 employees in 2015 with rising stars gaining certification in areas such as rock mechanics, arc
welding, pump installation and maintenance, waste management and the finance for non-financial managers program run by University
of Cape Town’s Graduate School of Business. We continue to build good relations with universities in our host countries and
established a partnership with the Ferke Technical Institute at the University of Abidjan in Côte d’Ivoire in 2015.
More than 600
stagiaires
have attended practical training sessions across all our operations in the last two years with a total of 80 being recruited after
graduation, either with the operation itself or by our subcontractor companies.
On the executive development
side, a number of senior group executives as well as senior operational managers are scheduled to attend management development
programs and executive development programs at UCT, Stellenbosch University as well as the Harvard School of Business.
This year also saw the
introduction of a $1 million state of the art underground vehicle training simulators at Loulo.
Gender diversity
We are an equal opportunity
employer, with transparent non-discrimination policies in place. However one of the challenges we face in this area is that within
our countries of operation gender norms, cultural traditions and legislative barriers can all work against attracting women to
work in the extractives sector.
In 2015, a total of 5.5%
of our total workforce were women – with the highest numbers of women employed at our Kibali and Tongon mines. To help ensure
local women also benefit from our presence in the community, we also support activities targeted at supporting and developing employment
opportunities for local women. In 2015 these included the creation of women’s market gardens around all our mines and the
provision of training to women
on the use of grain mills as well as soap and
jam making. This has provided many local women with a steady source of income. We hope that over the medium term some of the community
initiatives we support that help empower women in the community may help meet this challenge.
Inducing stable industrial relations
Strategy and policies
We see our employees
as key partners in our business, and this is the foundation of our industrial relations approach.
All employees are free
to join unions and all our host countries have the right of freedom of association enshrined in law. We recognize
all groups that legitimately speak for our workers and meet with union representatives at each mine site on a monthly basis. Union
representatives also attend monthly management cost reviews, quarterly board meetings, participate in regular dialogues with each
mine’s general manager and sit in on strategic planning sessions.
Further to this our senior
management have an open door policy for staff, who are encouraged to make contact by email with any concerns they have. Our CEO
Mark Bristow also holds mass meetings twice a year at each mine. All staff are invited to attend these public forums and they provide
an important opportunity for staff to raise issues or ask any questions they feel important directly with the CEO.
Each mine has a Mine
Level Agreement (MLA) agreed between the unions and management which sets out mutually agreed rules for each mine on detailed items
such as salary increments or the parameters of acceptable behavior in a strike situation. MLAs are reviewed every three years.
Our performance
For the most part industrial
relations across all our sites have been calm and productive in 2015. In total there were three days of work lost to strike action
over the course of the year, all coming from a strike at the Loulo- Gounkoto complex in June 2015. The biggest factor behind this
strike was a combination of misinformation about the financial position of the mine – which led to some calls for unreasonable
salary increases – and competition between two unions to help shore up membership.
Key to our resolution
of this strike action, and an important foundation for avoiding a repetition, was the introduction of an extensive communication
campaign at all mines to give specific and honest information about the revenue and profitability of the mine to all employees
(rather than allowing such information to be disintermediated by union representatives). The agreement signed with the unions as
part of the resolution also saw us introduce three new salary premiums to those employees with exposure to dirt, dust and danger.
Managing health risks
Strategy and policies
In order to perform to
the best of their abilities our workforce needs to be healthy and well, and more than this they need to be free from worry about
the health and wellbeing of their families and communities. This provides a compelling business case for us to invest in much needed
local healthcare facilities and initiatives when it comes to both occupational and community health.
Our health policy is
to provide free basic healthcare to employees, their immediate family and community members within a 10km radius of each mine.
In order to achieve this we build a number of health clinics on each mine and in surrounding communities – with the aim being
to pass control and responsibility for the community clinics over to local authorities once they are established.
Our clinics work to prevent
and treat both occupational health hazards, such as dust inhalation and noise exposure, and priority community health issues. The
latter are defined by the independent baseline study that we
commission at the feasibility stage of our
projects and include standalone programs to combat malaria and HIV/AIDS. In the last year we have also worked in partnership with
local authorities and international organizations to combat the threat of Ebola in our host regions.
In order to ensure a
continual quality improvement of our health care delivery, our senior medical officers, under the supervision of our chief medical
officer, reviewed the health service provision of our operations. This looked at aspects such as strategic planning, infection
control, patient care and emergency preparedness.
Our performance
During 2015 our clinics
conducted over 80,000 medical consultations for employees and individuals in our host communities. About 31 % of these were received
by local community members or employees’ family members, reinforcing the value of our health investments to our host communities
as well as to our workforce. The bulk of consultations were for malaria, diarrhea linked diseases and respiratory conditions.
Total medical consultations in 2015
|
|
|
|
Total number of medical consultations
|
|
|
80,758
|
|
Employees
|
|
|
69%
|
|
Employee dependents
|
|
|
18%
|
|
Local community
|
|
|
13%
|
|
Occupational Health
Gold mining has a number
of inherent occupational health risks. Processes at the plants and in the pits and underground are noisy and there can be exposure
to dust and hazardous chemicals. These exposures can build-up over time into significant health risks for our employees and therefore
need to be constantly and carefully monitored and managed.
We take a number of steps
to prevent these risks, including regular site risk assessments and prework and periodic medical checks for employees. The annual
medical checks monitor employees for any signs of afflictions such as hearing loss, respiratory issues, heavy metals in the blood,
silicosis and tuberculosis. Staff who are regularly exposed to chemicals and other hazards also receive biological and radiation
testing. Our assessments of safe exposure levels are based on internationally recognized monitoring standards, including the American
conference of Governmental Industrial Hygienists (ACGIH), while our health and safety management systems are set up to comply with
OHSAS 18001 requirements.
As detailed in the earlier
safety section of this report we use a detailed hierarchy of control to minimize exposure to hazards across the workplace. This
also includes regular training and checks to ensure that the materials and equipment to deal with traumatic, toxic and cardiovascular
emergencies are in place and functioning well. All employees must pass minimum standards of fitness in order for their job to be
performed safely and a zero tolerance approach is taken to those who fail to use their personal protective equipment (PPE).
Wherever possible we also
look to use advances in equipment and technology to help reduce or eliminate occupational health risks.
Environmental management
The ore we extract, the
water and energy we use, and the climate we operate in, are all dependent on a thriving natural environment. Being careful environmental
stewards is therefore a crucial building block of our business. On top of this, by maximizing energy efficiency and recycling water
and waste we help keep our costs down.
The importance of strong
environmental management was reflected in our 2015 Materiality Assessment with issues of cyanide management and water pollution
ranked as highest priority issues, and air pollution and environmental incidents also ranking high in importance among both internal
and external stakeholders.
We have clear policies
in place to monitor and minimize all our negative environmental impacts at every stage of the mining lifecycle. We conduct environmental
and social impact assessments (ESIAs) during the feasibility stage of all our projects, and once a mine is operational we put in
place an environmental management system (EMS) to manage all identified risks in accordance with both national regulations and
international standards such as the IFC Performance Standards on Environmental and Social Sustainability. We use the global best
practice standard ISO 14001 to help set the criteria for each EMS and as of 2015 all our operations are now certified to the ISO
14001 standard with Kibali granted certification for the first time. We also conduct independent external audits to ensure our
compliance.
We are committed to transparent
reporting of our environmental impact and as well as offering details publicly in this report we provide environmental data to
the Carbon Disclosure Project (CDP) each year. The climate change score awarded to Randgold by CDP for our disclosure of environmental
data rose by 40% from 64/100 in 2014, to 90/100 in 2015.
We report on five key
areas of environmental management performance: environmental incidents, energy and climate change, water and air quality, waste
management and biodiversity.
Environmental incidents
One of our key performance
indicators in this area is the number of environmental incidents at each site. We record three types of environmental incidents
and in 2015 had zero Class 1 incidents (i.e., major incidents resulting in significant injury, damage or death); 11 Class 2 (i.e.,
medium) incidents and 85 Class 3 incidents.
The lack of major incidents
and 45% reduction in Class 2 incidents is encouraging and reflects a renewed focus on daily environmental management in 2015. An
example of a Class 2 incident in 2015 included the overflow of a detoxification pond at Loulo’s tailings dam after very high
rainfall. The incident was quickly rectified and water quality tests taken downstream immediately after the incident to check there
had been no contamination. Our only Class 1 environmental incident during the last five years occurred in December 2014 at our
Tongon mine in Côte d’Ivoire. The incident involved a burst tailings pipeline, and significant focus in early 2015
was placed on ensuring this incident was comprehensively dealt with. Remedial activities in 2015 have included the implementation
of an action plan in conjunction with the Ivorian government’s anti-pollution body, CIAPOL. A full sign off from CIAPOL to
show that all damage has been rectified is anticipated in the first quarter of 2016.
Class 3 incidents refer
to minor events such as a small leak in a pipe within site boundaries. High numbers of Class 3 incident reports are not necessarily
a bad thing as they indicate increased employee awareness of environmental impact and we use them as an early warning reporting
system which, when appropriately and promptly attended to, can help to prevent more serious incidents from occurring.
No significant environmental
fines or non-monetary sanctions were imposed on any of our operations during 2015.
Energy and emissions
Our gold mines rely on
a secure and plentiful supply of energy in order to manage everyday operations, creating a significant cost to our business. Thus,
our policy to continuously improve energy efficiency and increase access to clean energy sources helps us create tangible business
value. By reducing our greenhouse gas emissions these efforts also help future proof our mines as the world transitions towards
a low-carbon economy.
Since 2010 we have been
implementing a five year energy strategy which has included elements such as:
|
·
|
Improving the amount of hydropower in our energy mix with the creation of three hydropower plants
at Kibali, collectively capable of producing 90% of the energy needed by the mine and its surrounding communities.
|
|
·
|
Connecting our Tongon mine to the Ivorian national grid (which is largely hydroelectric and natural
gas powered), reducing the mine’s reliance on thermally-generated energy to about 10%.
|
|
·
|
Introducing lower revving generators, better spinning reserve management and other specific power
efficiency measures at Loulo in Mali.
|
|
·
|
Running energy saving awareness initiatives on all sites such as our switching off switches campaign.
|
|
·
|
Exploring other renewable energy sources and energy efficiency measures. For example, working with
the Malian government and IFC to examine the feasibility of a solar project to help connect the Loulo-Gounkoto complex and surrounding
areas to the Malian national grid.
|
In 2015, many of these
investments came to fruition with the Nzoro II hydropower plant in DRC reaching full capacity and the national grid connection
at Tongon significantly improved with 75% of energy in the third quarter coming from this source. In total 33% of all energy used
across our five mines in 2015 came from clean energy sources, an increase from 30% in 2014.
Water and air quality
Whether for industrial
use, drinking or irrigation, water management is essential to our business and to our host communities. We recognize that water
management is not just a technical debate around levels of abstraction and quantitative data – it is an issue that our key
stakeholders feel passionate about.
We operate both in areas
where water can be scarce (such as Mali and Côte d’Ivoire) and where high rainfall can create flooding risks (DRC).
Most of our mines are also located next to large rivers and the amount of water we take from freshwater sources such as these is
governed by permit restrictions set by the relevant governing authority.
One of the most important
elements of our water management policy is to maximize the amount of process water we recycle. This helps to reduce energy use
from pumping, ensures security of supply in drought prone areas and mitigates the potential of environmental incidents. Thus we
have an ambitious group target to recycle 85% of process water.
In 2015, over 61% of process
water was recycled. This is ultimately a disappointing rate as it both misses our corporate target and shows a decline from the
reported rate of 75% recycled in 2014. It is worth noting however, that one of the factors behind this relatively low figure was
a decision to adjust how we calculated water recycling at Tongon in 2015. This calculation had previously included both the storm
water dam and the return water but for consistency and standardization across the group and to ensure the reported water recycling
rate is accurate, we removed flows from the storm water dam from the calculation this year.
Water abstraction also
rose in 2015, with a notable increase of over 7,500 cubic meters in the amount of fresh water we abstracted from sources such as
local rivers. A major factor behind this was the start of TSF processing at Morila which involves blasting the tailing with water
at high pressure. This was also a factor in our water efficiency.
Water quality
We closely monitor water
quality to ensure local water sources and biodiversity are not damaged by our processes and, in line with international best practice,
test regularly for contaminants such as iron, cyanide, manganese and sulphates both in boreholes and downstream of the mine. We
have a target of zero non-compliances each year against national or IFC standards and achieved this target in 2015.
To help manage water quality
in 2015 we also engaged in ecological practices such as the planting of fast growing trees, like the Eucalyptus, at seepage areas
around the tailings dam and have plans for the creation of wetland systems to remove sediments and pollutants such as nitrates
from the water.
Air quality
Just as we take care to
guard against water pollution, we also regularly monitor air quality to ensure levels of dust particles do not cause undue irritation
and damage to humans and livestock. This is particularly important in the dry seasons in Mali and Côte d’Ivoire.
As stipulated by IFC guidelines
we have monitoring stations to measure airborne dust both on site and in local communities with the aim of ensuring levels of airborne
particulates remain below 500mg/m
2
/day. Dust suppression activities which we undertake include regular road wetting
(with priority given to heavily used roads and those in the community), speed awareness programs, use of dust suppressants such
as molasses and planting vegetation on exposed dirt and rock.
Waste management
The gold mining process
produces a significant amount of waste. This consists of both hazardous waste, where it is paramount that we leave nothing to chance,
and general (non-hazardous) waste where we take proactive steps to ensure safe and environmentally responsible disposal. We have
site-specific waste management plans that track the clearance of all substances aligned with national regulation and best practices
laid out in IFC Performance Standards.
Hazardous waste
Our hazardous waste includes
toxic substances such as cyanide, acids, used oil and chemicals. One of the most important parts of our waste management is the
handling of cyanide, an issue that has proved one of our highest priority issues in the last two Materiality Assessments.
We introduced a new internal
cyanide code in 2013 to ensure we are aligned with international best practice with regard to its production, transportation, storage
and use. Actions to implement this policy include regular tests on any water facilities accessible by birds or wildlife (such as
tailings storage facilities or solution ponds) to ensure levels of cyanide are below the levels recommended by the IFC and International
Cyanide Management Institute (ICMI), annual cyanide audits at each site and increased training and supervision for those transporting
cyanide and burning cyanide related waste.
Cyanide code audits were
carried out at all our mines in 2015 and all met the compliance levels recommended by ICMI, with the exception of Kibali which
dipped slightly below these levels in the third quarter of 2015. Steps have been taken to correct this non-compliance and in 2016
we will conduct an independent review of our cyanide processes to see if there are any gaps that need to be closed.
There was one environmental
incident related to cyanide in 2015. This occurred at Loulo when a very heavy rainfall (above 70mm) occurred during the servicing
of an intensive cyanide leaching unit. The rainfall caused an overflow of the pollution control dam which contained spill from
the unit. The contaminated water was however contained within the site and the incident was classified as a Class 2 (medium) incident.
We pay just as close attention
to other types of hazardous waste such as battery waste, chemical and solvent waste, fluorescent lighting and hydrocarbons. For
example, we hire reputable service providers and trained local businesses to dispose of used oil from our sites.
No waste deemed hazardous
under the Basel Convention is transported, exported, imported, treated or shipped internationally by Randgold.
Non-hazardous waste
We produced more than
64Mt of waste rock in 2015, our most significant waste product by volume. This waste rock and overburden is stored in rock dumps
and we shape and measure the slopes of these dumps to ensure they are safe and in line with international best practice. We also
use topsoil indigenous grasses and trees to cover
some dumps helping with erosion control and
dust levels. At the end of mine life these dumps will be recontoured and vegetated.
Other non-hazardous wastes
include scrap metal and organic waste and our levels of general waste also increased in 2015 to over 11,000t. We dispose of each
material appropriately and also see waste management as an opportunity to partner with local communities to develop self-sustaining,
profit generating waste management companies. In both DRC and Mali we have also encouraged the creation of local NGOs to recycle
and sell scrap metal generated by the mine.
Waste generated
|
|
|
|
|
|
|
|
|
|
Tonnes
|
|
2015
|
|
|
2014
|
|
|
2013
|
|
Tailings
|
|
|
18,497,138
|
|
|
|
17,174,516
|
|
|
|
12,749,069
|
|
Waste rock
|
|
|
64,382,913
|
|
|
|
86,209,131
|
|
|
|
79,546,766
|
|
Hazardous
|
|
|
7,294
|
|
|
|
6,313
|
1
|
|
|
8,090
|
|
General
2
|
|
|
11,379
|
|
|
|
5,065
|
|
|
|
5,763
|
|
|
1
|
Restated from last year.
|
|
2
|
Both organic and inorganic.
|
Tailings storage facilities
The management of tailings
storage facilities (TSFs) has been an issue that commanded media attention in 2015 and we have clear policies and management procedures
in place to ensure best practices are implemented for proper construction, operation, maintenance, monitoring and eventual closure
of our TSFs.
All our tailing dams are
water-retained dams with engineered structures not dry walls, and we minimize volumes to avoid the build-up of pressure on these
walls. Our TSFs are also subject to regular checks and reinforcements at all sites and an independent auditor, Epoch Resources,
checks the management of these facilities every quarter.
Biodiversity management
Our mines sit within functioning
ecosystems that provide us with clean air, fresh water, fertile soil and other natural services vital to our business. So protecting
these ecosystems has to be a key part of our job.
We take a dynamic approach
to land and biodiversity management through the entire life of a Randgold mine. Biodiversity elements are compiled and integrated
into the environmental impact assessments that are required at all of our operations prior to their construction. We then use satellite
imagery to monitor changes in vegetation cover over each year of operation and have a policy of constant rehabilitation of flora
and fauna while a mine is operational.
Each mine has a biodiversity
action plan (BAP) which monitors the implementation of rehabilitation plans so that on closure as much of the original ecosystem
is restored as possible. Our BAPs set out details such as which plant and animal species are native to each part of a site, and
implementation of plans is evaluated each quarter and reported to the environmental and social committee. We also
discuss these with local communities.
In 2015 we rehabilitated
approximately 20 hectares of land including the planting of over 12,200 trees from local species and the introduction of a pair
of gazelles within a protected part of the Morila mine. We also rehabilitated part of the tailings dam wall at Loulo with indigenous
plants, donated seedlings to Kenieba Forest in Mali and oversaw the creation of a more detailed database of the wildlife and their
terrestrial habitats across each site using studies of animal droppings.
At our Kibali mine in
the DRC we recognize that parts of the land cannot be rehabilitated to the optimal level, and therefore have created a biodiversity
offset scheme, based on guidance from the International Union for Conservation of Nature (IUCN). This project sees us support vital
conservation work at the nearby Garamba National Park that in turn enables our Kibali mine to achieve a net biodiversity gain.
We believe this project is not
only important from a biodiversity point of
view – but also in terms of regional development, as it is helping the National Park develop its potential for tourism, in
turn diversifying the regional economy and improving security.
None of Randgold’s
mines is located within the boundaries of any natural World Heritage Sites nor do our mines affect the habitats of any endangered
species.
Total land rehabilitated and disturbed
|
|
2015
|
|
|
2014
|
|
|
2013
|
|
Total hectares rehabilitated
|
|
|
20
|
|
|
|
16
|
|
|
|
6
|
|
Total hectares disturbed
|
|
|
53
|
|
|
|
682
|
|
|
|
1,063
|
|
MARKETING
We derive the majority
of our income from the sale of gold produced by Morila, Loulo, Gounkoto, Tongon and Kibali in the form of doré, which we
sell under agreement to a refinery. Under these agreements, we receive the ruling gold price on the day after dispatch, less refining
and freight costs, for the gold content of the doré gold. We have only one customer with whom we have an agreement to sell
all of our gold production. The “customer” is chosen periodically on a tender basis from a selected pool of accredited
refineries and international banks to ensure competitive refining and freight costs. Gold mines do not compete to sell
their product given that the price is not controlled by the producers.
PROPERTY
Our active mining areas
comprise of the Morila mining permit of 200km
2
, the Loulo mining permit of 263km
2
, the Gounkoto mining permit
of 100km
2
, the Tongon mine located within the 751km
2
Nielle exploitation permit and the Kibali mine located
within the 10 mining permits which make up the Kibali mine and cover 1,836km
2
. Our exploration permits are described
under the subheading “–Mineral Rights and Permits” in this report.
We also lease offices
in Abidjan, Côte d’Ivoire; Bamako, Mali; Dakar, Senegal; Entebbe, Uganda; St. Helier, Jersey; Johannesburg, South Africa;
Kinshasa, DRC; and London, United Kingdom.
LEGAL PROCEEDINGS
The group is in receipt
of claims for various taxes from the State of Mali totaling $280.0 million at December 31, 2015 (December 31, 2014: $313.0
million; December 31, 2013: $123.1 million), in respect of its Malian operations. Having taken professional advice, the group
considers the material claims to be without foundation and is strongly defending its position, including following the appropriate
legal process for disputes within Mali. Accordingly, no provision has been made for the material claims and the likelihood
of a material outflow of economic benefits in respect of such claims is considered remote under IFRS.
Other than as disclosed
above we are not party to any material legal or arbitration proceedings, nor is any of our property the subject of pending material
legal proceedings.
HEALTH AND SAFETY REGULATIONS
Mali
The primary laws, regulations
and standards governing Safety and Health in our Malian operations are as follows:
|
•
|
Law 1992-020 Code du travail (the Labor Code);
|
|
•
|
Ordonnance No. 99-032 le code minier, Ordonnance 200-013 le code minier modifications 2000 (the Mining Code);
|
|
•
|
Decree No. 91-278 / PM-RM Approving the Establishment Agreement Covering Research and Mining in the Republic of Mali (the
Decree);
|
|
•
|
LOI N°62-68 AN-RM du 9 août 1962 Code de prévoyance sociale (INPS-Institut National de Prévoyance Sociale);
|
|
•
|
Convention Collective (National Collective Agreement for the Mining Industry).
|
Labor Code
The Labor Code provides
generally for the following:
|
•
|
General provision for protection, prevention and hygiene;
|
|
•
|
Dangerous goods handling;
|
|
•
|
Employer responsibility regarding safety and health (implementation of safety system);
|
|
•
|
Labor inspector duty (control of employer safety system);
|
|
•
|
Injury notification to Labor Inspector within 48 hours;
|
|
•
|
Requirement to ensure medical service on site;
|
|
•
|
Medical leave (up to 12 months) and medical separation compensation; and
|
|
•
|
Establishment of a Joint Management and employees health and safety committee.
|
Mining Code
The Mining Code provides
generally for an Occupational Health and Safety Committee (Joint management and employee safety committee), Personal Protective
Equipment or PPE, safety guide, emergency procedure, means of education and sensitization, employees obligation regarding occupational
health.
The Decree
The Decree provides generally
for the following:
|
•
|
Must carry out research or mining work to ensure the safety and health of the public;
|
|
•
|
Must inform the local administrative authorities and the Director in the event of a fatal accident or serious injury or any
natural phenomenon which may have an adverse effect on the safety of the area, the safety and hygiene of the personnel or conservation
of the mine, neighboring mines or public roads; and
|
|
•
|
In the case of imminent danger or an accident, the local administrative authorities and the Director may requisition the necessary
material and personnel to alleviate the danger, at the expense of the mining company.
|
LOI N°62-68 AN-RM du 9 août 1962
Code de prévoyance sociale (INPS - Institut National de Prévoyance Sociale)
The Code de la Sécurité
Sociale provides generally for the following:
|
•
|
Requirement to have medical service on work site for occupational health and primary health care purposes;
|
|
•
|
Requirement for pre-employment medical check;
|
|
•
|
Requirement for periodical medical check of employees;
|
|
•
|
Requirement for general hygiene (ablutions, change house, potable water, workplace);
|
|
•
|
Protection against injury, environmental pollutants, occupational disease);
|
|
•
|
Notification of occupational disease to the employer by the occupational health practitioner;
|
|
•
|
Requirement for first aid training for one employee per section of work or shift;
|
|
•
|
Requirement for compensation in case of debilitating injury, occupational disease;
|
|
•
|
Requirement for notifying injury and or occupational disease to INPS/Labor inspection; and
|
|
•
|
Redeployment of employee following injury and/or occupational disease.
|
Morila, Loulo and Gounkoto
have a Committee of hygiene, safety, and working condition made up of elected labor and specialist management representatives,
as outlined in the respective labor code. This committee designates, from its members, a consultative technical sub-committee charged
with the elaboration and application of a concerted policy of improvement of health and security safety conditions at work. Its
composition, attributions and operational modalities are determined by legal provisions and regulations.
The chairman of this committee
(the general manager of the mine or his deputy) coordinates quarterly committee meetings, sets the agendas with his secretariat,
monitors resolutions and signs off on committee determinations.
The committee’s
secretariat ensures under the supervision of the chairman that:
|
•
|
follow-up activities such as action resulting from the regular surveys and inspections are carried out; and
|
|
•
|
health and safety manuals and updates are distributed, posters are posted on notice boards and safety committee minutes and
reports are distributed.
|
Each mine’s medical
officer sits on the Committee of hygiene, safety, and working condition and advises on the following:
|
•
|
working conditions improvements;
|
|
•
|
general hygiene on the operation;
|
|
•
|
protection of workers safety in the workplace; and
|
|
•
|
medical checks and eye and ear testing.
|
The Committee of hygiene,
safety, and working condition forms, from within its membership, two consultative commissions, the Commission of Inquiry and the
Educational Commission. The Commission of Inquiry:
|
•
|
investigates accidents and makes recommendations to avoid repetitions;
|
|
•
|
ensures plant, machinery and equipment have adequate protection to avoid injury; and
|
|
•
|
updates and revises safety and health manuals.
|
The Educational Commission:
|
•
|
provides information and training on safe practices and potential risks;
|
|
•
|
provides first aid training;
|
|
•
|
administers and promotes the safety suggestion scheme; and
|
|
•
|
explains, where necessary, the contents of the safety and health manual.
|
All employees are covered
by the state’s social security scheme and our medical reimbursement scheme, that reimburses a large portion of expenses related
to medical treatment and medicines. Dental and optical expenses are also covered to 50%.
No post-employment medical
aid liability exists for the group.
Côte d’Ivoire
The primary laws, regulations
and standards governing Safety and Health in our Côte d’Ivoire operations are:
|
•
|
Mining Code (95-553) of July 15, 1995;
|
|
•
|
Loi no 95-15 du 12 janvier 1995 portant Code du travail.(Labour code); and
|
|
•
|
Loi n° 99-477 du 2 août 1999 portant modification du Code de prévoyance sociale (Social security law).
|
The Mining Code provides
generally for the following:
|
•
|
Any individual or legal entity carrying out works for prospecting or mining mineral substances is required to undertake such
works in a way that the safety of the people and goods is assured;
|
|
•
|
Must adopt and comply with internal regulations concerning safety and specific hygiene measures, subject to approval by the
Mining Authority;
|
|
•
|
Any accident in a mine or quarry or in their dependencies and any identified cause of accident must be reported to the Mining
Authority as soon as possible; and
|
|
•
|
In case of impending danger or accident in a mine, mining engineers and other authorized agents of the Mining Authority must
take all necessary measures, at the expense of the individual or legal entity, to stop the danger and prevent it from occurring
again.
|
The Code de la Sécurité
Sociale provides generally for the following:
|
•
|
Requirement to have medical service on work site for occupational health and primary health care purposes;
|
|
•
|
Requirement for pre-employment medical check;
|
|
•
|
Requirement for periodical medical check of employees;
|
|
•
|
Requirement for general hygiene (ablutions, change house, potable water, workplace);
|
|
•
|
Protection against injury, environmental pollutants, occupational disease);
|
|
•
|
Notification of occupational disease to the employer by the occupational health practitioner;
|
|
•
|
Requirement for first aid training for one employee per section of work or shift;
|
|
•
|
Requirement for compensation in case of debilitating injury, occupational disease;
|
|
•
|
Requirement for notifying injury and or occupational disease to INPS/Labor inspection; and
|
|
•
|
Redeployment of employee following injury and/or occupational disease.
|
Labor Code
The Labor Code provides generally
for the following:
|
•
|
General provision for protection, prevention and hygiene;
|
|
•
|
Dangerous goods handling;
|
|
•
|
Employer responsibility regarding safety and health (implementation of safety system);
|
|
•
|
Labor inspector duty (control of employer safety system);
|
|
•
|
Injury notification to Labor Inspector within 48 hours;
|
|
•
|
Requirement to ensure medical service on site;
|
|
•
|
Medical leave (up to 12 months) and medical separation compensation; and
|
|
•
|
Establishment of a Joint Management and employees health and safety committee.
|
DRC
The Mining Code, Law No. 007/2002
signed into law on July 11, 2002, and its ancillary Mining Regulation (Decree 038/2003 of March 26, 2003), adopted in 2003,
is the primary statute forming the legal basis for mining activities in the DRC.
|
•
|
Loi no-015/2002 du 16 Octobre 2002 portant Code du travail (Labor code)
|
|
•
|
Decret-loi du 29 Juin 1961 organique de la sécurité sociale
|
Articles relating to social
and environmental impact studies are listed below:
Key Environmental Legislation in the DRC
by aspect General environment
|
•
|
Arrêté Ministériel No. 043 of December 8, 2006 and No. 08 of April 3, 2007
|
|
•
|
Ordinance No. 07/018 of May 16, 2007
|
Soils and land use
|
•
|
Article 28 (Topography, Geology and Land Use) from Chapter II of Schedule IX, Mining Regulations, Decree No. 038/2003
of March 26, 2003
|
|
•
|
Article 75 (Dead Ground Management) of Chapter V of Schedule IX, Mining Regulations, Decree No. 038 / 2003 of March 26,
2003
|
Water
|
•
|
Decree of May 6, 1952 on water
|
|
•
|
Ordinance 52-443 of December 21, 1952
|
|
•
|
Regulation on lake and watercourse contamination and pollution of July 1, 1914
|
|
•
|
Article 30 to 33 from Chapter II of Schedule IX, Mining Regulations, Decree No. 038 / 2003 of March 26, 2003
|
|
•
|
Articles 53 to 74 of Schedule IX of the Mining Regulations, Decree No. 038 / 2003 of March 26, 2003
|
Climate and air quality
|
•
|
Article 29 (Climate and Air Quality) of Schedule IX of the Mining Regulations, Decree No. 038 / 2003 of March 26,
2003
|
|
•
|
Articles 49 to 52 of Schedule IX of the Mining Regulations, Decree No. 038 / 2003 of March 26, 2003
|
Biodiversity and protected areas
|
•
|
Forest Code (Law 011,2002 of 28 May 2002)
|
|
•
|
Regulation No. 69-041 of 22 August 1969
|
|
•
|
Regulation No. 79-244 of 16 October 1997 (Amended 1995 and 1996)
|
|
•
|
Law No. 75-023 of July 22, 1975 and Regulation No. 78-190 of May 5, 1978
|
|
•
|
Articles 34 to 37 (Biological Environment) of Schedule IX of the Mining Regulations, Decree No. 038 / 2003 of March 26,
2003
|
|
•
|
Schedule XII of the Mining Regulations, Decree no. 038 / 2003 of March 26, 2003
|
Noise and vibrations
|
•
|
Schedule XIII of the Mining Regulations, Articles 1 to 6
|
|
•
|
Articles 46 to 48 from Chapter II of Schedule IX, Mining Regulations, Decree No. 038/2003 of March 26, 2003
|
Cultural heritage
|
•
|
Ordinance 70-089 of 11 March 1970
|
|
•
|
Ordinance 71-016 of 15 March 1971
|
|
•
|
Article 46 of the Constitution of the DRC of February 18, 2006
|
|
•
|
Articles 205 and 206 of the Mining Code and Regulations
|
Resettlement
|
•
|
Code Foncier Immobilier et Régime des Sûretés, April 5, 2006
|
Artisanal mining
|
•
|
Articles 223, 224, 232, 233, 416, 417 and 575 of the Mining Regulations, Decree No. 038/2003 of March 26, 2004
|
Mining code
Mining articles which were taken into account
for the Kibali mining project include the following:
|
•
|
Article 15 of the DRC Mining Code confers the responsibility on the Department in charge of Protection of the Environment,
within the Ministry of Mines, in conjunction with other government departments, of environmental protection including the technical
evaluation of the EIS and EMP of the project and the Mitigation and Rehabilitation Plan (MRP). The Mining Code is supported by
the mining regulations.
|
|
•
|
Article 42 requires that, and provides the framework within which, the EIS and EMP for a new mining right is evaluated.
|
|
•
|
Article 50 defines the scope of a mineral exploration license. The undertaking of exploitation activities on an exploration
permit is prohibited. The holder of an exploration license, however, has the exclusive right to apply for the conversion to an
exploitation license during the validity period of the exploration license.
|
|
•
|
Article 69 requires that an applicant for an exploitation permit submits an EIS and EMP for the project and approval of said
documents are required for granting of the exploitation license in terms of article 71.
|
|
•
|
Article 277 regulates works required between adjacent mines, and should such works be required, the title owners cannot object
to them and payment of costs will be pro-rata.
|
|
•
|
Article 279 stipulates the restrictions on the occupation of land and requires consent before any area within 180m from temporary
or permanently occupied buildings, 45m from ploughed land and 90m from land used for breeding cattle or with a reservoir; dam or
private water reserve is occupied.
|
|
•
|
Compensation for use of the land is regulated by articles 280 and 281.
|
|
•
|
Article 283 determines the authorized activities within the exploitation right and adjacent areas.
|
|
•
|
Article 294 allows for the confiscation of the provision for rehabilitation by the court should
the owner fail to adhere to the provisions of the EMPP at completion of the exploitation works.
|
Safety Performance
We suffered one fatality
in 2015. The incident occurred at our Tongon mine in January where a foreman in the contract mining team was the victim of a tractor
crash in the pit. An in-depth investigation into the incident has been conducted and remedial actions implemented to prevent such
an accident occurring again have included a prohibition of the use of tractors in the pit, defensive driving sessions for all operators
on to how to respond in extreme situations, and reminder sessions on the importance of conducting thorough mechanical checks on
relevant equipment.
After achieving a record
decline in our group’s Lost Time Injury Frequency Rate (LTIFR) in 2014, to 0.47 per million hours worked, we saw the rate
rise to 0.59 per million hours worked in 2015 – the first increase in LTIFR since 2010. Although this is a disappointing
increase, the LTIFR rate still remains low – and is more than 50% below the average rate from the last five years. The rise
can be partially attributed to an increase in the number of Lost Time Injuries at our Tongon mine in particular (from zero to four),
some of which were related to contractors at the facility. We are determined to bring the rate down again in 2016 and measures
to improve safety will include looking at additional training and the introduction of new disciplinary measures which increase
the accountability of employees and contractors for unsafe behavior. To further improve safety we also began piloting the safety
software, MyOSH, at our Loulo operation in 2015. MyOSH allows us to record all safety information for each employee. This means
we are notified when pre-safety checks are not carried out or when refresher training is required, thus providing a useful additional
tool to our management. We plan to expand the trial of MyOSH to Gounkoto in early 2016, and across all our sites if the trial is
successful.
See “—Social
Responsibility and Environmental Sustainability.”
C. ORGANIZATIONAL STRUCTURE
The following table identifies
our subsidiaries and joint ventures and our percentage ownership in each subsidiary or joint venture:
Countries of Incorporation/ Name
of Company
|
|
% effective
ownership
|
|
Jersey
|
|
|
|
|
Randgold Resources Limited
|
|
|
-
|
|
Mining Investments (Jersey) Limited
|
|
|
100
|
|
Randgold Resources (Burkina) Limited
|
|
|
100
|
|
Randgold Resources (Côte d’Ivoire) Limited
|
|
|
100
|
|
Randgold Resources (DRC) Limited
|
|
|
100
|
|
Randgold Resources (Ghana) Limited
|
|
|
100
|
|
Randgold Resources (Gounkoto) Limited
|
|
|
100
|
|
Randgold Resources (Kibali) Limited
|
|
|
100
|
|
Randgold Resources (Mali) Limited
|
|
|
100
|
|
Randgold Resources (Secretaries) Limited
|
|
|
100
|
|
Randgold Resources (Senegal) Limited
|
|
|
100
|
|
Randgold Resources (Somilo) Limited
|
|
|
100
|
|
Randgold Resources T1 Limited
|
|
|
100
|
|
Randgold Resources T2 Limited
|
|
|
100
|
|
Isiro (Jersey) Limited
|
|
|
51
|
|
RAL 1 Limited
|
|
|
50.1
|
|
RAL 2 Limited
|
|
|
50.1
|
|
Morila Limited
|
|
|
50
|
|
Moto (Jersey) 1 Limited
|
|
|
50
|
|
Moto (Jersey) 2 Limited
|
|
|
50
|
|
Kibali (Jersey) Limited
|
|
|
50
|
|
Kibali 2 (Jersey) Limited
|
|
|
50
|
|
Kibali Services Limited
|
|
|
50
|
|
KAS 1 Limited
|
|
|
25
|
|
Australia
|
|
|
|
|
Border Energy (Pty) Ltd
|
|
|
50
|
|
Border Resources NL
|
|
|
50
|
|
Moto Goldmines Australia (Pty) Limited
|
|
|
50
|
|
Westmount Resources NL
|
|
|
50
|
|
Burkina Faso
|
|
|
|
|
Randgold Resources Burkina Faso SARL
|
|
|
100
|
|
Countries of Incorporation/ Name
of Company
|
|
% effective
ownership
|
|
Canada
|
|
|
|
|
0858065 BC Limited
|
|
|
50
|
|
Moto Goldmines Limited
|
|
|
50
|
|
Côte d’Ivoire
|
|
|
|
|
Randgold Resources (Côte d’Ivoire) SARL
|
|
|
100
|
|
Société des Mines de Tongon SA
|
|
|
89
|
|
Democratic Republic of Congo
|
|
|
|
|
Bilanga Palm Oil SARL
|
|
|
100
|
|
Milona Entreprises SARL
|
|
|
100
|
|
Randgold Resources Congo SARL
|
|
|
100
|
|
KGL Isiro SARL
|
|
|
51
|
|
Kibali Goldmines SA
|
|
|
45
|
|
Mali
|
|
|
|
|
Randgold Resources Mali SARL
|
|
|
100
|
|
Société des Mines de Gounkoto SA
|
|
|
80
|
|
Société des Mines de Loulo SA
|
|
|
80
|
|
Kankou Moussa SARL
|
|
|
75
|
|
Société des Mines de Morila SA
|
|
|
40
|
|
South Africa
|
|
|
|
|
Seven Bridges Trading 14 (PTY) Limited
|
|
|
100
|
|
Tanzania
|
|
|
|
|
Randgold Resources Tanzania (T) Limited
|
|
|
100
|
|
The Netherlands
|
|
|
|
|
Kibali Cooperatief UA
|
|
|
50
|
|
Uganda
|
|
|
|
|
Border Energy East Africa Pty Limited
|
|
|
50
|
|
United Kingdom
|
|
|
|
|
Randgold Resources (UK) Limited
|
|
|
100
|
|
D. PROPERTY, PLANT AND EQUIPMENT
For a discussion of our
principal properties, including mining rights and permits, see “PART I. Item 4. Information on the Company—A.
History and Development of the Company” and “PART I. Item 4. Information on the Company—B. Business Overview.”
We have all material legal rights necessary to entitle us to exploit such deposits over the remaining life of mines which are estimated
in respect of Morila in Mali to 2019, Loulo in Mali to 2028, Tongon in Côte d’Ivoire to 2021, Gounkoto in Mali to 2025
and Kibali in DRC to 2031.
The exploration permits
in Côte d’Ivoire, Mali, Senegal, Burkina Faso and DRC give us the exclusive right for a fixed time period, which is
open to renewal, to prospect on the permit area.
Once a discovery is made,
we, as the permit holder, then commence negotiations with the respective governments as to the terms of the exploration or mining
concession. Depending on the country, some of the terms are more open to negotiation than others, but the critical areas which
can be agreed to are the government’s interest in the mine, taxation rates and taxation holidays, repatriation of profits
and the employment of expatriates and local labor.
Item 4A. Unresolved Staff Comments
None.
Item 5. Operating and Financial
Review and Prospects
Statements in this Annual
Report concerning our business outlook or future economic performance; anticipated revenues, expenses or other financial items;
and statements concerning assumptions made or expectations as to any future events, conditions, performance or other matters, are
“forward-looking statements” as that term is defined under the United States Federal securities laws. Forward-looking
statements are subject to risks, uncertainties and other factors which could cause actual results to differ materially from those
stated in such statements. Factors that could cause or contribute to such differences include, but are not limited to, those set
forth under “PART I. Item 3. Key Information—D. Risk Factors” in this Annual Report as well as those discussed
elsewhere in this Annual Report and in our other filings with the SEC.
General
We earn substantially
all of our revenues in US dollars and a large proportion of our costs are denominated or based in US dollars. We also have Euro,
Communauté Financière Africaine franc and Pound Sterling denominated costs, which are primarily wages and material
purchases. A large portion of our capital commitments for 2015 are denominated in South African Rand and Euros and relate to the
Loulo-Gounkoto complex and Kibali.
Impact of Malian, Côte d’Ivoire
and DRC Economic and Political Environment
We are a Jersey incorporated
company and are subject to income tax at a rate of zero percent in Jersey. However, our current significant operations are located
in Mali, Côte d’Ivoire and the DRC and are therefore subject to various economic, fiscal, monetary and political policies
and factors that affect companies operating in Mali, Côte d’Ivoire and the DRC as discussed under “PART I. Item 3.
Key Information—D. Risk Factors—Risks Relating to Our Operations.”
Impact of Favorable Tax Treaties
We are subject to corporate
tax at a rate of zero percent in Jersey. Loulo benefited from a five year tax holiday until November 7, 2010. Tongon benefited
from a five year tax holiday in Côte d’Ivoire which commenced on December 1, 2010 and expired in December 2015.
The Gounkoto convention was signed in March 2012. In terms of this convention Gounkoto benefitted from an initial corporate tax
exoneration of two years which expired in June 2013, with an opportunity to extend this to five years in the event of further investment
such as an underground mine as discussed under “PART I. Item 3. Key Information—D. Risk Factors—Risks Relating
to Our Operations.” The benefit of the tax holidays to the group was to increase its net profit by $7.9 million, $8.0 million,
and $31.3 million for the years ended December 31, 2015, 2014 and 2013, respectively.
Under Malian tax law,
income tax is based on the greater of 30% of taxable income or 0.75% of gross revenue. Under Ivorian tax law, income tax is based
on the greater of 25% of taxable income or 0.5% of gross revenue.
The Loulo, Tongon and
Gounkoto operations have no assessable capital expenditure carry forwards or assessable tax losses, as at December 31, 2015, 2014
and 2013 respectively, for deduction against future mining income. The group’s share of profits from equity accounted joint
ventures is stated net of $11.0 million (2014: $20.9 million; 2013: $7.4 million) of current and deferred tax charges primarily
in respect of Kibali and Morila. The share of profits from the Kibali joint venture is stated after deferred tax that was calculated
at 30% of profit, notwithstanding the mine has an accelerated tax allowance which reduces the cash tax paid in the current year.
Revenues
Substantially all of our
revenues are derived from the sale of gold. As a result, our operating results are directly related to the price of gold. Historically,
the price of gold has fluctuated widely. The gold price is affected by numerous factors over which we have no control. See “PART
I. Item 3. Key Information—D. Risk Factors—Risks Relating to Our Operations—The profitability of our operations,
and the cash flows generated by our operations, are affected by changes in the market price for gold which in the past has fluctuated
widely.”
We have in previous years
followed a hedging strategy the aim of which is to secure a minimum price which is sufficient to protect us in periods of significant
capital expenditure and debt finance, while at the same time allowing significant exposure to the spot gold price.
Significant changes in
the price of gold over a sustained period of time may lead us to increase or decrease our production, which could have a material
impact on our revenues.
Our Realized Gold Price
The following table sets
out the average, high and low afternoon London Bullion Market fixing price of gold and our average US dollar realized gold price
during the years ended December 31, 2015, 2014 and 2013.
|
|
Year
Ended December 31,
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2015
|
|
|
2014
|
|
|
2013
|
|
|
|
|
|
|
|
|
|
|
|
Average
|
|
|
1,160
|
|
|
|
1,266
|
|
|
|
1,411
|
|
High
|
|
|
1,296
|
|
|
|
1,385
|
|
|
|
1,694
|
|
Low
|
|
|
1,049
|
|
|
|
1,142
|
|
|
|
1,192
|
|
Average realized gold price
1
|
|
|
1,152
|
|
|
|
1,264
|
1
|
|
|
1,376
|
1
|
1
|
Our average realized gold price differs from the average gold price as a result of the timing of our gold deliveries for each year.
|
Costs and Expenses
Our operations currently
comprise five operations. Mining operations at Loulo, Gounkoto, Tongon, Kibali and, Morila are being conducted by contractors and
managed by the company. Following a review of the underground mining activities at Loulo, the mine took a decision in 2015 to take
over the mining and development activities that were previously managed by the underground mining contractor. Milling operations
are undertaken by the group’s own employees. Total cash costs in the year ended December 31, 2015, as defined by guidance
issued by the Gold Institute, made up approximately 73% of total costs and expenses and comprised mainly mining and milling costs,
including labor and consumable stores costs. Consumable stores costs include diesel, reagent and other store item costs. Contractor
costs represented 38% of total cash costs, with consumable stores costs making up 36% of total cash costs. Direct labor costs accounted
for approximately 7% of total cash costs. For a definition of total cash costs, refer to “PART I. Item 3. Key Information—A.
Selected Financial Data.”
The price of diesel for
the Loulo, Gounkoto, Kibali, Morila, and Tongon operations decreased from 2014 to 2015. Should prices decrease further, this could
significantly impact total cash costs mainly as a result of the high volume of diesel consumed to generate power and to run the
mining fleet. A significant portion of the costs at Loulo, Gounkoto, Tongon and Morila are denominated in Communauté Financière
Africaine Franc (CFA), which has a fixed exchange rate to the Euro. Therefore, costs are exposed to fluctuations in the Euro/dollar
exchange rate. The Euro/dollar exchange rate was lower in 2015 compared to 2014. The remainder of our total costs and expenses
consists primarily of amortization and depreciation, exploration costs, exchange losses, interest expense and corporate charges.
Looking Forward
Looking ahead, the group
continues to forecast an increasing production profile. Production is expected to be relatively consistent through the year, slightly
weighted to the second half. Given Randgold’s commitment to growing through discovery and development, the company will continue
to commit significant expenditure to exploration, with corporate and exploration expenses of approximately $60 million anticipated
in 2016. Total group capital expenditure, including its attributable share of joint ventures, is expected to
be approximately $240 million. At Kibali,
capital expenditure of approximately $80 million (45% of project) is expected, mostly relating to the underground shaft
developments and hydropower projects. Ongoing development of the underground mines at Loulo, as well as other projects, are expected
to cost $135 million, while Gounkoto is forecasting $6 million, mostly on the underground mine development project. Capital at
Tongon, including completion of the crusher expansion, is estimated at $10 million, and $1 million is expected at Morila (40%
of project). Continued work on the Massawa feasibility project is forecast to cost approximately $6 million in 2016.
Critical Accounting Policies
Our significant accounting
policies are more fully described in Note 2 and Note 3 to our consolidated financial statements. Some of our accounting policies
require the application of significant judgment by management in selecting the appropriate assumptions for calculating financial
estimates. Refer to Note 3 on pages F-17 to F-20 of this Annual Report for disclosure of critical accounting estimates and judgments.
By their nature, these judgments are subject to an inherent degree of uncertainty and are based on our historical experience, terms
of existing contracts, management’s view on trends in the gold mining industry and information from outside sources. The
audit committee considered and approved the key estimates and accounting policies.
The critical accounting
estimates and judgments as detailed in Note 3 to our financial statements included in this Annual Report are follows:
|
·
|
Carrying values of property, plant and equipment and joint venture investments
|
|
·
|
Capitalization and depreciation
|
|
·
|
Determination of ore reserves
|
|
·
|
Future rehabilitation obligations
|
|
·
|
Stockpiles, gold in process and product inventories
|
|
·
|
Post production open cast mining stripping
|
|
·
|
Exploration and evaluation expenditure
|
Recent accounting pronouncements
New standards and interpretations applied
The IASB has issued the
following new standards, amendments to published standards and interpretations to existing standards with effective dates on or
prior to January 1, 2015 which have been adopted by the group for the first time this year.
|
|
IFRS as issued
by the IASB
|
|
|
|
|
Effective period commencing
on or after
|
|
Impact on group
|
Annual improvements to IFRSs 2010-2012 cycle (effective July 1, 2014); and Annual improvements to IFRSs 2011- 2013 cycle
|
|
July 1, 2014
|
|
No material impact
|
Annual Improvements to IFRSs 2011-2013 Cycle
|
|
July 1, 2014
|
|
No material impact
|
IAS 19 Amendment – Defined benefit plans: employee contributions
|
|
July 1, 2014
|
|
No material impact
|
Standards effective in future period
Certain new standards,
amendments and interpretations to existing standards have been published that are relevant to the group’s activities and
are mandatory for the group’s accounting periods beginning after January 1, 2015 or later periods and which the group has
decided not to adopt early.
|
|
|
|
Effective
period
commencing on or after
|
IFRS 9
|
|
Financial instruments
|
|
January 1, 2018
|
IFRS 11
|
|
Amendment – Accounting for acquisition of interests in joint operations
|
|
January 1, 2016
|
IAS 16 & IAS 38
|
|
Amendments – Clarification of acceptable methods of depreciation and amortization
|
|
January 1, 2016
|
IFRS 15
|
|
Revenue from contracts with customers
|
|
January 1, 2017
|
IFRS 16
|
|
Leases
|
|
January 1, 2019
|
IAS 27
|
|
Amendment – Equity method in separate financial statements
|
|
January 1, 2016
|
IFRS 10 & IAS 28
|
|
Amendment – Sale or contribution of assets between an investor and its associate or joint venture
|
|
January 1, 2016
|
IAS 1
|
|
Amendment – Disclosure initiative
|
|
January 1, 2016
|
|
|
Annual improvements to IFRSs (2012 – 2014 cycle)
|
|
January 1, 2016
|
The group is currently assessing the impact
of these standards on the financial statements.
A. OPERATING RESULTS
Our operating and financial
review and prospects should be read in conjunction with our consolidated financial statements, accompanying notes thereto, and
other financial information appearing elsewhere in this Annual Report.
The information below
includes non-GAAP measures, which include 100% of the results of the group’s Loulo, Gounkoto and Tongon gold mines, together
with its 45% share of Kibali gold mine and 40% share of Morila gold mine. Refer to the explanation of non-GAAP measures provided
in the section “—Non-GAAP information” above. Non-GAAP measures are identified when used.
Years Ended December 31, 2015 and 2014
Total Revenue
Gold sales (non-GAAP)
for the group of $1.39 billion, including the attributable share of equity accounted joint ventures, were down 3% from the previous
year principally as a result of the 9% drop in the average gold price received of $1 152/oz (2014: $1 264/oz), partially offset
by a 7% increase in the number of ounces of gold sold across the group.
Total IFRS revenues from
gold sales for the year ended December 31, 2015 decreased by $85.3 million, or 7.9%, from $1,086.8 million to $1,001.4 million,
reflecting the lower average gold price received.
Share of Profits of Equity Accounted Joint Ventures
The increase in the share
of profits of equity accounted joint ventures to $77.3 million from $75.9 million in the prior year resulted from an increase in
profits from Morila, on the back of increased production and lower cost of production, partially offset by a drop in profits from
Kibali, which were lower than the previous year due to increased costs and depreciation charges. The share of profits from the
Kibali joint venture is stated after a tax charge of $8.0 million (attributable), including deferred tax calculated at 30% of profit,
despite the fact that the mine has an accelerated tax allowance which reduces the cash tax paid in the initial years.
Other Income
Other income of $15.6
million and $5.5 million for the years ended December 31, 2015 and 2014 respectively, include management fees from Morila and Kibali
of $6.1 million (2014: $5.5 million), as well as operational foreign exchange gains.
Costs and Expenses
Total Cash Costs (non-GAAP)
The following table sets
out our total ounces sold and total cash cost and production cost per ounce sold for the years ended December 31, 2015 and 2014:
|
|
Year Ended December 31,
|
|
|
|
2015
|
|
|
2014
|
|
|
|
Ounces sold
|
|
|
$ Per Ounce
|
|
|
Ounces sold
|
|
|
$ Per Ounce
|
|
Morila (40% share) cash costs
|
|
|
48,950
|
|
|
|
674
|
|
|
|
44,109
|
|
|
|
1,143
|
|
Loulo (100% share) cash costs
|
|
|
352,927
|
|
|
|
739
|
|
|
|
376,490
|
|
|
|
713
|
|
Tongon (100% share) cash costs
|
|
|
241,478
|
|
|
|
836
|
|
|
|
227,103
|
|
|
|
872
|
|
Gounkoto (100% share) cash costs
|
|
|
277,700
|
|
|
|
594
|
|
|
|
254,634
|
|
|
|
613
|
|
Kibali (45% share) cash costs
|
|
|
289,789
|
|
|
|
604
|
|
|
|
236,606
|
|
|
|
573
|
|
Total ounces (sold)
|
|
|
1,210,844
|
|
|
|
|
|
|
|
1,134,941
|
|
|
|
|
|
Group total cash costs per ounce
1
|
|
|
|
|
|
|
679
|
|
|
|
|
|
|
|
698
|
|
1
|
Refer to explanation of non-GAAP information provided in the section “—Non-GAAP information” above.
|
Total cash costs (non-GAAP)
for the year ended 31 December 2015 of $822.7 million increased by 4% on the prior year, driven by the 6% increase in tonnes milled
across the group.
Total cash cost per ounce
(non-GAAP) for the group was $679/oz, 3% lower than the prior year, due to the 7% increase in ounces sold, on the back of increased
throughput and production across the group. Total cash cost per ounce at the Loulo-Gounkoto complex was flat year on year at $675/oz,
with the lower average grade of ore milled being offset by increased plant throughput. At Morila, the mine finished processing
ore from the pit 4S pushback, resulting in a significant increase in the average ore grade milled and increased production. Together
with lower mining costs, this reduced total cash costs by 41% to $674/oz. At Tongon, total cash cost per ounce dropped by 4% to
$836/oz due to increased recoveries and throughput delivering higher production. Kibali significantly increased its production
following improved plant throughput and recoveries, partially offset by the lower ore grade milled. However, total cash costs still
increased to $604/oz due to higher mining costs from underground.
Mining and processing
costs for the year ended December 31, 2015 of $726.8 million were only slightly higher by 2.0% (2014:$712.8 million), due to good
cost control, lower fuel costs and a weaker euro/dollar exchange rate, notwithstanding the rise in plant throughput and production.
Mining and processing
costs further includes ‘other mining and processing costs’ which comprise various expenses associated with providing
on mine administration support services to the Loulo, Gounkoto and Tongon mines. These charges amounted to $60.0 million for the
year ended December 31, 2015 and $64.8 million for the year ended December 31, 2014.
Royalties decreased by
$4.8 million, or 8.5%, to $51.7 million for the year ended December 31, 2015 from $56.5 million for the year ended December 31,
2014. The decreased royalties reflect the lower average gold price received (9% decrease), partially offset by increased ounces
sold (7% increase).
Depreciation and Amortization
Depreciation and amortization
of $150.9 million for the year ended December 31, 2015 increased 3% compared to the prior year cost of $146.8 million as a result
of increased assets brought into use at the Loulo-Gounkoto complex and at Tongon in the current year.
Depreciation charges associated
with the Kibali and Morila joint ventures are included in the “share of profits of equity accounted joint ventures.”
Exploration and Corporate Expenditure
Exploration and corporate
expenditure of $45.1 million for the year ended December 31, 2015 increased by 23% from the previous year’s $36.8 million
as a result of increased exploration activity, principally drilling, during the year.
Finance Income
Finance income consists
primarily of interest received on cash held at banks, which was $0.1 million for 2015 as compared to $0.07 million in 2014. The
increase was mainly due to an increase in the average cash balances held during 2015 compared to 2014.
Finance Costs
Finance costs for the
year ended December 31, 2015 were $4.4 million compared to finance costs for the year ended December 31, 2014 of $4.2 million.
The increase of $0.2 million is mainly due to an increase in the unwinding cost of the discount on provisions for environmental
rehabilitation year on year. The increase in costs mainly reflects an adjustment to estimated rates.
Income Tax Expense
The income tax expense
of $48.0 million for the year ended December 31, 2015 decreased by 41% compared to the year ended December 31, 2014, reflecting
lower provisions for tax charges at the Loulo-Gounkoto complex, in line with lower profits. Tongon benefited from its exoneration
from corporate tax for five years which ended in December 2015.
Under Malian tax law,
income tax is based on the greater of 30% taxable income or 0.75% of gross revenue. Under Ivorian tax law, income tax is based
on the greater of 25% of taxable income or 0.5% of gross revenue. Refer to Note 4 of our financial statements included in this
Annual Report on Form 20-F for a reconciliation between implied tax on profits at statutory tax rates and actual tax charges. The
income tax charge associated with the Kibali and Morila equity accounted joint ventures is included within “share of profits
of equity accounted joint ventures.”
Non-controlling Interests
The non-controlling interests
for the year ended December 31, 2015 represent the State of Mali’s 20% share of the profits at Loulo, the Ivorian government’s
10% share and other outside shareholder’s 1% share of the profits at Tongon, as well as the State of Mali’s 20% share
of the profits at Gounkoto.
Years Ended December 31, 2014 and 2013
Total Revenue
Gold sales (non-GAAP)
for the group of $1.43 billion, including the attributable share of equity accounted joint ventures, were 13% higher than the previous
year on the back of a 23% rise in ounces sold to 1,134,941oz, offset by an 8% decrease in the average gold price received to $1,264/oz.
Total IFRS revenues from
gold sales for the year ended December 31, 2014 decreased by $50.9 million, or 4.5%, from $1,137.7 million to $1,086.8 million.
Share of Profits of Equity Accounted Joint Ventures
The increase in share
of profits of equity accounted joint ventures to $75.9 million from $54.3 million in the prior year reflected the ramp-up of Kibali,
which completed its first full year of production, partially offset by a drop in profits from Morila, which were lower than the
previous year due to lower gold production and sales. The share of profits from the Kibali joint venture is stated after a tax
charge of $20.3 million (attributable), including deferred tax calculated at 30% of profit, notwithstanding that the mine has an
accelerated tax allowance which reduces the cash tax paid in the initial years.
Other Income
Other income of $5.5 million
for the year ended December 31, 2014 compared to $6.0 million for the year ended December 31, 2013. Other income includes management
fees in respect of Kibali and Morila of $5.5 million (2013: $6.0 million).
Costs and Expenses
Total Cash Costs (non-GAAP)
The following table sets
out our total ounces sold and total cash cost and production cost per ounce sold for the years ended December 31, 2014 and 2013:
|
|
Year Ended December 31,
|
|
|
|
2014
|
|
|
2013
|
|
|
|
Ounces sold
|
|
|
$ Per Ounce
|
|
|
Ounces sold
|
|
|
$ Per Ounce
|
|
Morila (40% share) cash costs
|
|
|
44,109
|
|
|
|
1,143
|
|
|
|
56,729
|
|
|
|
763
|
|
Loulo (100% share) cash costs
|
|
|
376,490
|
|
|
|
713
|
|
|
|
312,748
|
|
|
|
776
|
|
Tongon (100% share) cash costs
|
|
|
227,103
|
|
|
|
872
|
|
|
|
236,279
|
|
|
|
828
|
|
Gounkoto (100% share) cash costs
|
|
|
254,634
|
|
|
|
613
|
|
|
|
274,802
|
|
|
|
622
|
|
Kibali (45% share) cash costs
|
|
|
236,606
|
|
|
|
573
|
|
|
|
39,690
|
|
|
|
464
|
|
Total ounces (sold)
|
|
|
1,134,941
|
|
|
|
|
|
|
|
920,248
|
|
|
|
|
|
Group total cash costs per ounce
1
|
|
|
|
|
|
|
698
|
|
|
|
|
|
|
|
715
|
|
1
|
Refer to explanation of non-GAAP information provided in the section “Non-GAAP information” above.
|
Total cash costs (non-GAAP)
for the year ended December 31, 2014 of $791.8 million increased by 20.3% (2013:$658.0 million) primarily as a result of a full
year of production at Kibali, which came online in October 2013, along with higher costs at Morila and Tongon. Total cash cost
per ounce decreased by 2% to $698/oz for the year, primarily reflecting the increase in ounces sold at Loulo-Gounkoto, on the back
of higher grade ore milled and production.
Mining and processing
costs for the year ended December 31, 2014 of $712.8 million increased by 4.7% (2013:$681.1 million), mostly on the back of higher
depreciation and amortization at the Loulo-Gounkoto complex and at Tongon, as more assets were brought into use. The total includes
depreciation and amortization described below. The total further includes ‘other mining and processing costs’ which
comprise various expenses associated with providing on mine administration support services to the Loulo, Gounkoto, and Tongon
mines. These charges amounted to $64.8 million for the year ended December 31, 2014 and $61.3 million for the year ended December
31, 2013.
Royalties decreased by
$1.9 million, or 3.3%, to $56.5 million for the year ended December 31, 2014 from $58.4 million for the year ended December 31,
2013. The decreased royalties reflect the lower average gold price received (8% decrease), partially offset by increased ounces
sold (23% increase).
Depreciation
and Amortization
Depreciation and amortization
of $146.8 million for the year ended December 31, 2014 increased by $16.2 million or 12.4% compared to the year ended December
31, 2013 as a result of increased assets brought into use at the Loulo-Gounkoto complex and at Tongon in the current year. Depreciation
charges associated with the Kibali and Morila joint ventures are included in the “share of profits of equity accounted joint
ventures.”
Exploration
and Corporate Expenditure
Exploration and corporate
expenditure was $36.8 million for the year ended December 31, 2014 and $49.5 million for the year ended December 31, 2013. Drilling
programs were undertaken across the company’s greenfields exploration targets, together with exploration work on feasibility
stage projects, including those at Kibali, Massawa, Loulo and Gounkoto, which were capitalized to property, plant and equipment.
Since the company was listed in 1997, it has discovered more than 31 million reserve ounces which, when divided by the exploration
and corporate costs expensed over this period, equates to less than $18/oz of gold.
Finance Income
Finance income amounts
consist primarily of interest received on cash held at banks, which was $0.1 million for 2014 as compared to $1.2 million in 2013.
This decrease was mainly due to a decrease in the average cash balance held during 2014 compared to 2013.
Finance Costs
Finance costs for the
year ended December 31, 2014 were $4.2 million compared to finance costs for the year ended December 31, 2013 of $7.7 million.
The decrease of $3.5 million is mainly due to a $5.0 million decrease in the foreign exchange loss on financing activities included
in the figure, partially offset by a $1.6 million increase in finance cost, mainly due to the annual facility fees of the revolving
credit facility. The company has entered into a new unsecured revolving credit facility, which doubled the size of facilities available
to $400 million, on similar terms to the previous facility and which matures in December 2018.
Income Tax
Expense
The income tax expense
amounted to $81.9 million for the year ended December 31, 2014 increased by $5.2 million and by 6.8% compared to the year ended
December 31, 2013. Gounkoto’s two year corporate tax holiday beginning from first production ended at the start of June 2013,
which contributed to the increased tax charge. Tongon will benefit from its exoneration from corporate tax for five years until
December 1, 2015. Under Malian tax law, income tax is based on the greater of 30% taxable income or 0.75% of gross revenue. Under
Ivorian tax law, income tax is based on the greater of 25% of taxable income or 0.5% of gross revenue. Refer to Note 4 of our financial
statements included in this Annual Report on Form 20-F for a reconciliation between implied tax on profits at statutory tax rates
and actual tax charges. The income tax charge associated with the Kibali and Morila equity accounted joint ventures is included
within “share of profits of equity accounted joint ventures.”
Non-controlling
Interests
The non-controlling interests
for the year ended December 31, 2014 represent the State of Mali’s 20% share of the profits at Loulo, the Ivorian government’s
10% share and other outside shareholder’s 1% share of the profits at Tongon, as well as the State of Mali’s 20% share
of the profits at Gounkoto.
B. LIQUIDITY AND CAPITAL RESOURCES
Cash Resources
The group had $213.4 million
cash and cash equivalents for the year ended December 31, 2015 and $82.8 million for the year ended December 31, 2014.
Operating Activities
Net cash generated from
operating activities for the year of $397.0 million increased by $79.4 million (25%) from the previous year, reflecting the strong
operating performance across the group and the increase in dividends received from the Kibali and Morila joint ventures.
Cash flows related to
operating working capital items increased by $78.9 million year on year, mainly due to the increase in cash flows related to trade
and other payables of $109.4 million. This occurred mainly due to the timing of payments of invoices. This was partially offset
by a decrease in cash flows related to receivables ($18.8 million) and inventories ($11.7 million) year on year.
Net cash generated from
operating activities was $317.6 million for the year ended December 31, 2014 and $464.5 million for the year ended December 31,
2013. The $146.9 million decrease year on year was due mainly to the decrease in profit before tax of $49.5 million reflecting
the 8% decrease in the gold price year on year, increased costs, including depreciation, partially offset by higher profits from
joint ventures. Cash flows related to operating working capital items decreased by $20.0 million year on year, mainly due to the
decrease in cash flows related to trade and other payables of $146.8 million. This occurred mainly due to the timing of payments
of invoices. This was partially offset by an increase in cash flows related to receivables and inventories year on year.
Investing
Investing activities for
the year ended December 31, 2015 utilized $217.8 million compared to $221.6 million utilized for the year ended December 31, 2014
and consisted primarily of $192.3 million expenditure at Loulo related to the developments at the Gara and Yalea underground mines,
including the owner mining fleet, as well as ongoing capital and exploration expenditure, while $3.1 million was incurred at Gounkoto
and $18.6 million was incurred at Tongon.
Investing activities for
the year ended December 31, 2014 utilized $221.6 million compared to $728.0 million utilized for the year ended December 31, 2013
and consisted primarily of $142.6 million expenditure at Loulo related to the developments at the Gara and Yalea underground mines
while $8.7 million was incurred at Gounkoto and $19.2 million was incurred at Tongon. Other cash outflows included additional investments
in joint ventures ($51.5 million), mostly to fund the group’s share of capital expenditure at Kibali.
Financing
Financing activities for
the year ended December 31, 2015 used $48.6 million. Financing activities for the year ended December 31, 2014 used $51.4 million.
Cash spent in 2015 mainly comprised the payments of dividends of $38.6 million paid to the company’s shareholders and $10.3
million of dividends paid to the State of Mali in relation to Gounkoto.
Financing activities for
the year ended December 31, 2014 used $51.4 million. Financing activities for the year ended December 31, 2013 used $72.2 million.
Cash spent in 2014 mainly comprised the payments of dividends of $46.1 million paid to the company’s shareholders and $10.1
million of dividends paid to the State of Mali in relation to Gounkoto.
Credit and Loan Facilities
Kibali utilizes mining
equipment under a finance lease provided by KAS 1 Limited (KAS). The group has an effective 25.05% interest in KAS which is held
through the equity accounted joint venture Kibali (Jersey) Limited. The lease term is 10 years. The finance lease liability is
recognized in respect of the equipment which has been transferred to Kibali under an installment sale agreement. The finance lease
liability is interest bearing at 8% and is to be reduced by rental payments monthly as agreed in the installment sale agreement.
The company entered into
a new unsecured revolving credit facility during 2014, which doubled the size of the facility to $400.0 million. The undrawn facility
is with HSBC and three other banks and matures in December 2018. The interest rate is LIBOR plus 1.5% at the lower end of the
range of permitted leverage. The interest rate on the credit facility, if drawn, would be LIBOR plus 1.5% per annum based
on the company’s current level of leverage. The facility includes financial covenants in respect of earnings before interest
and taxes (EBIT); earnings before interest,
taxes, depreciation and amortization (EBITDA);
net finance charges; tangible net worth; total debt; debt cover and interest cover. As of December 31, 2015, the company was in
compliance with all of its financial covenants under the credit facility.
Based on the company’s
current cash resources and available facilities, projected operating cash flows and capital expenditure, we are confident the company
will be able to meet its obligations at the prevailing gold price.
Corporation Tax Claims
The group is in receipt
of claims for various taxes from the State of Mali totaling $280.0 million (2014: $313.0 million), in respect of Malian operations.
Having taken professional advice, the group considers the material claims to be without foundation and is strongly defending its
position, including following the appropriate legal process for disputes within Mali. Accordingly, no provision has been made for
the material claims and the likelihood of a material outflow of economic benefits in respect of such claims is considered remote
under IFRS.
Loulo, Gounkoto and Morila
have legally binding mining conventions which guarantee fiscal stability, govern the taxes applicable to the companies and allow
for international arbitration in the event a dispute cannot be resolved in the country. Management continues to engage with the
Malian authorities at the highest level to resolve this issue. During the prior year, Loulo submitted a request for arbitration
at the International Centre of the Settlement of Investment Disputes against the State of Mali in relation to certain of the disputed
tax claims. The arbitration process is ongoing, with hearings having taken place in the first quarter of 2015, and the outcome
of this process is expected to be concluded in the first half of 2016.
Corporate, Exploration, Development and
New Business Expenditures
Our expenditures on corporate,
exploration, development and new business activities for the past three years are as follows:
|
|
Year Ended December
31, $000
|
|
Area
|
|
2015
|
|
|
2014
|
|
|
2013
|
|
|
|
|
|
|
|
|
|
|
|
Rest of Africa
|
|
|
4,472
|
|
|
|
1,326
|
|
|
|
2,932
|
|
Burkina Faso
|
|
|
113
|
|
|
|
211
|
|
|
|
858
|
|
Mali
|
|
|
5,087
|
|
|
|
5,389
|
|
|
|
9,148
|
|
Côte d’Ivoire
|
|
|
5,825
|
|
|
|
3,764
|
|
|
|
5,067
|
|
Senegal
|
|
|
1,669
|
|
|
|
1,971
|
|
|
|
3,599
|
|
DRC
|
|
|
156
|
|
|
|
101
|
|
|
|
1,034
|
|
Total exploration expenditure
|
|
|
17,322
|
|
|
|
12,762
|
|
|
|
22,638
|
|
Corporate expenditure
|
|
|
27,745
|
|
|
|
24,003
|
|
|
|
26,847
|
|
Total exploration and corporate expenditure
|
|
|
45,067
|
|
|
|
36,765
|
|
|
|
49,485
|
|
The Group has a portfolio
of exploration permits and projects, with various exploration programs, ranging from early stage exploration to prefeasibility
studies being undertaken. These are underway in the Democratic Republic of Congo, Mali, Senegal, Burkina Faso and Côte d’Ivoire.
Working Capital
Management believes that
our working capital resources, by way of internal sources and available credit facilities are sufficient to fund our currently
foreseeable future business requirements. Although lower than 2015, significant capital expenditure will be incurred across the
group during the year to support the planned continued growth in production, especially at Kibali, of approximately $80.0 million
(45% of project), and the ongoing development of the underground mines at Loulo, as well as other projects, where total capital
at the Loulo-Gounkoto complex is forecast at $141.0 million. Capital expenditure at Tongon, including completion of the crusher
expansion, is estimated at $10.0 million, and $1 million will be spent at Morila (45% of the project). Continued
work on the Massawa feasibility project is
estimated at $6.0 million. Consequently, total group capital expenditure for 2016 is expected to be approximately $240.0 million
(including attributable share of joint ventures).
C. RESEARCH AND DEVELOPMENT, PATENTS AND
LICENSES, ETC.
We are not involved in
any research and development and have no registered patents or licenses.
D. TREND INFORMATION
Our financial results
are subject to the movement in gold prices. In the past fiscal year, the general trend has been downwards and this has had an impact
on revenues. However it should be noted that fluctuations in the price of gold remain a distinct risk to us.
Gold Market
The gold market is relatively
liquid compared with many other commodity markets, with the price of gold generally quoted in US dollars. The physical demand for
gold is primarily for fabrication purposes, and gold is traded on a world-wide basis. Fabricated gold has a variety of uses, including
jewelry, electronics, dentistry, decorations, medals and official coins. In addition, central banks, financial institutions and
private individuals buy, sell and hold gold bullion as an investment and as a store of value.
Historically, gold has
been used as a store of value because it tends to retain its value in relative terms against basic goods in times of inflation
and monetary crisis. Therefore, large quantities of gold in relation to annual mine production are held for this purpose. This
has meant that, historically, the potential total supply of gold has been far greater than annual demand. Thus, while current supply
and demand play some part in determining the price of gold, this does not occur to the same extent as for other commodities.
Instead, gold prices have
been significantly affected, from time to time, by macro-economic factors such as expectations of inflation, interest rates, exchange
rates, changes in reserve policy by central banks, and global or regional political and economic crises. In times of inflation,
currency devaluation, and political and economic crises, gold has traditionally been seen as refuge, leading to increased purchases
of gold and a support for the price of gold.
Interest rates affect
the price of gold on several levels. High real interest rates increase the cost of holding gold, and discourage physical buying
in developed economies. High Dollar interest rates also make hedging by forward selling attractive because of the higher contango
premiums (differential between LIBOR and gold lease rates) obtained in the forward prices. Increased forward selling in turn has
an impact on the spot price at the time of sale.
Changes in reserve policies
of central banks have affected the gold market and gold price on two levels. On the physical level, a decision by a central bank
to decrease or to increase the percentage of gold in bank reserves leads to either sales or purchases of gold, which in turn has
a direct impact on the physical market for the metal. In practice, sales or purchases by central banks have often involved substantial
tonnages within a short period of time and this selling/buying can place strong pressure on the markets at the time they occur.
As important as the physical impact to official sales, announcements of rumors of changes in central bank policies which might
lead to the sale of gold reserves historically had an effect on market sentiment and encouraged large speculative positions against
gold in the futures market for the metal.
GOLD MARKET OVERVIEW
Gold demand in 2015 was
little changed from 2014 as measured by data published by the World Gold Council. While jewelry and technological demand showed
declines of 3% and 5% respectively, investment demand growth was 8% and the official sector increased its purchases by 1%.
Gold supply was down 4%
on a year earlier, primarily due to decreased contribution from recycling.
The gold price closed the
year at $1,062 per ounce, 11% down on a year earlier. The price reached a high of $1,302 in January 2015, but traded in the $1,100
to $1,200 range for most of the year.
Economic and political risks
intensified in 2015 with the slow-down in the Chinese economy, plunging oil prices, collapse in commodities prices, escalating
conflict across the Middle East and the increased threat of terrorism.
Against this background
central banks continued to add to their gold reserves as they maintained a focus on risk management through a diversification of
asset portfolios. According to the Word Gold Council’s statistics this resulted in the second highest official sector gold
demand quantity on record. The most significant development during the year was the announcement by the Chinese Central Bank that
it had accumulated more than 600 tonnes of gold during the preceding six years.
DEMAND RESILIENT
Consumer demand remained
resilient. Although jewelry demand was down 3% on 2014, the year ended on a strong basis with second half demand being the highest
in 11 years. Demand in the two dominant jewelry markets followed divergent paths. In India demand was 5% higher, despite extreme
weather conditions and falling rural revenues facing Indian consumers. Chinese demand on the other hand fell by 3% as economic
growth slowed and headwinds in the stock market damaged consumer confidence.
Investment demand was 8%
higher than 2014, as sentiment moved in favor of gold’s risk diversification and wealth-preservation properties. Bar and
coin demand showed modest gains. Outflows from gold backed ETFs slowed, particularly as western institutional investors recognized
gold as a safe haven amidst financial market volatility, geopolitical unrest and the lack of impetus from the US recovery. However,
resistance from a strong US dollar and low inflation environment continued to hamper the turnaround of ETF flows into positive
territory.
Gold demand in the technology
sector remained under pressure from a combination of substitution and slowing final product sales.
SUPPLY DECREASING
Total gold supply fell by
4% in 2015 to its lowest level since 2009. Mine production increased by only 1% year on year, the slowest annual growth rate since
2008. Gold recycling, down 7%, continued its decline in the depressed gold price environment to the lowest level since 2007. Mine
output suffered from a combination of reduced exploration budgets and project development as mining companies focused on cost cutting
and short term cash generation. The established trend of lower ore grades had a further negative impact on gold supply. Data published
by SNL Metals and Mining shows that global commodity exploration budgets have tumbled from more than $20 billion in 2012 to $9
billion in 2015, down 18% on 2014. Although gold-specific budgets were down by 14% in 2015, the precious metal remains the most
explored commodity. Exploration budgets are not expected to rebound in the near future. The focus on cost cutting by the majors
resulted in smaller exploration departments and a gravitation towards less risky brownfields work, with greenfields projects being
placed on hold or sold. Junior explorers were squeezed by poor financing opportunities, which had a further negative impact on
greenfields exploration. The predictable result is a slowdown in organic growth which will ultimately impact the gold supply pipeline
for a considerable period to come.
The volatility of gold prices
is illustrated in the following table, which shows the approximate annual high, low and average of the afternoon London Bullion
Market fixing price of gold in Dollars for the past ten years.
|
|
Price Per Ounce ($)
|
|
Year
|
|
High
|
|
|
Low
|
|
|
Average
|
|
|
|
|
|
|
|
|
|
|
|
2006
|
|
|
725
|
|
|
|
525
|
|
|
|
604
|
|
2007
|
|
|
841
|
|
|
|
608
|
|
|
|
695
|
|
2008
|
|
|
1,011
|
|
|
|
712
|
|
|
|
871
|
|
|
|
Price Per Ounce ($)
|
|
Year
|
|
High
|
|
|
Low
|
|
|
Average
|
|
2009
|
|
|
1,213
|
|
|
|
810
|
|
|
|
972
|
|
2010
|
|
|
1,421
|
|
|
|
1,058
|
|
|
|
1,224
|
|
2011
|
|
|
1,895
|
|
|
|
1,319
|
|
|
|
1,572
|
|
2012
|
|
|
1,792
|
|
|
|
1,540
|
|
|
|
1,669
|
|
2013
|
|
|
1,694
|
|
|
|
1,192
|
|
|
|
1,411
|
|
2014
|
|
|
1,385
|
|
|
|
1,142
|
|
|
|
1,266
|
|
2015
|
|
|
1,296
|
|
|
|
1,049
|
|
|
|
1,160
|
|
2016 (through February 29)
|
|
|
1,251
|
|
|
|
1,077
|
|
|
|
1,149
|
|
E. OFF-BALANCE SHEET ARRANGEMENTS
None.
F. TABULAR DISCLOSURE OF CONTRACTUAL OBLIGATIONS
Our contractual obligations
and commercial commitments are described below. The related obligations as at December 31, 2015 are set out below. The figures
presented exclude equity accounted joint venture balances:
|
|
Total
|
|
|
Less than
1 year
|
|
|
1-3 years
|
|
|
3-5 years
|
|
|
More than
5 years
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Trade and other payables
|
|
|
124,421
|
|
|
|
124,421
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
Operating lease obligations
|
|
|
21,168
|
|
|
|
2,646
|
|
|
|
5,292
|
|
|
|
5,292
|
|
|
|
7,938
|
|
Environmental rehabilitation
1
|
|
|
47,581
|
|
|
|
56
|
|
|
|
917
|
|
|
|
1,509
|
|
|
|
45,099
|
|
Loans from minority shareholders in subsidiaries
|
|
|
2,765
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
2,765
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total contractual cash obligations
|
|
|
195,935
|
|
|
|
127,123
|
|
|
|
6,209
|
|
|
|
6,801
|
|
|
|
55,802
|
|
Contracts for capital expenditure
|
|
|
35,361
|
|
|
|
35,361
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
1
|
Obligation is to rehabilitate site but amounts shown are estimated discounted cash flows.
|
Refer to Notes 10 and
19 of our financial statements included in this Annual Report for details of the Joint Venture Agreements with AngloGold Ashanti,
DTP and WAMFF Ltd.
Item 6. Directors, Senior Management
and Employees
A. DIRECTORS AND SENIOR MANAGEMENT
Our Articles of Association
provide that the board must consist of no fewer than two and no more than 20 directors at any time. Effective as of March 1, 2015,
Safiatou F. Ba-N’Daw was appointed to the board as an independent non-executive director. The board currently consists of
10 directors.
Our Articles of Association
provide that any new director should be re-elected by the shareholders at the annual general meeting following the date of the
director’s appointment. In accordance with the United Kingdom Governance Code (2014) which calls for directors to seek re-election
annually, at the annual general meeting held on May 5, 2015, Dr. D.M. Bristow, Mr. G.P. Shuttleworth, Mr. N.P.
Cole Jr., Mr. C.L. Coleman, Dr. K. Dagdelen, Dr. K. Voltaire, Mrs. J.M. Lioko, Mr. A.J. Quinn, Mr. J. Kassum
were re-elected and Ms. S.F. Ba-N’Daw was elected.
According to the Articles
of Association, the board meets at intervals determined by it from time to time.
The address of each of
our executive directors and non-executive directors is the address of our principal executive office, 3rd Floor, Unity Chambers,
28 Halkett Street, St. Helier, Jersey, JE2 4WJ, Channel Islands.
Executive Directors
D. Mark Bristow (57) Chief
Executive. Mr. Bristow has been Chief Executive Officer since the incorporation of the company, which was founded on his pioneering
exploration work in West Africa. He has subsequently led the company’s growth through the discovery and development of world
class assets into a major international gold mining business. Mr. Bristow has also played a significant part in promoting the emergence
of a sustainable mining industry in Africa. A geologist with a PhD from Natal University, South Africa, he has held board positions
at a number of global mining companies and is currently the non-executive chairman of Rockwell Diamonds Inc.
Graham P. Shuttleworth (47) Chief
Financial Officer. Mr. Shuttleworth joined us as Chief Financial Officer and Finance Director in July 2007 but has been associated
with the company since its inception, initially as part of its management team involved in listing the company on the London Stock
Exchange in 1997, and subsequently as an advisor.
A chartered accountant,
Mr. Shuttleworth was a managing director and the New York based head of metals and mining for the Americas in the global investment
banking division of HSBC before taking up his current position at the company. Mr. Shuttleworth is a graduate of the University
of Cape Town, South Africa, with a bachelor of commerce degree and an honors degree from the University of South Africa.
Non-Executive Directors
Christopher L. Coleman
(47) Non-Executive Chairman.
Chairman of the governance and nomination committee and member of the remuneration committee.
Mr. Coleman is the group head of banking of Rothschild & Co. He is a director of NM Rothschild & Sons Limited,
chairman of Rothschild Bank International in the Channel Islands and serves on a number of other boards and committees of
the Rothschild & Co. Group, which he joined in 1989. A BSc (Econ) graduate from the London School of Economics, he
was a non-executive director of the Merchant Bank of Central Africa from 2001 to 2008. He is a non-executive director of
Papa John’s International Inc. He was appointed a director in November 2008.
Norborne P. Cole (74) Senior
Independent Non-Executive Director.
Member of the remuneration committee and the governance & nomination committee. Mr.
Cole started working for the Coca-Cola Company as a field representative in the USA in 1966 and advanced steadily through the organization
becoming chief executive of Coca-Cola Amatil in Australia in 1994, a position he held until 1998. Under his leadership, Coca-Cola
Amatil grew into the second largest Coca-Cola bottler in the world. Now based in San Antonio, Texas, he serves on the boards of
a number of US companies including Papa John’s International Inc. He was appointed a director in May 2006.
Kadri Dagdelen (61) Independent
Non-Executive Director.
Member of the governance & nomination committee. A professor and previously the head of the department
of mining engineering at the Colorado School of Mines, USA, Mr. Dagdelen began his professional career as a mining engineer at
Homestake Mining Co (now Barrick Gold Corporation) and was the technical services manager when he left for academia in 1992. With
a PhD in mining engineering and a ME in geostatistics, Mr. Dagdelen has been involved in numerous research and consulting projects
worldwide. He also served on the board of directors of the Society of Mining, Exploration and Metallurgy in the USA for six years
and has chaired other professional societies that support the mining industry. He was appointed a director in January 2010.
Safiatou Francoise Ba-N’Daw
(63) Independent Non-Executive Director.
A Harvard University MBA graduate, Ms. Ba-N’Daw spent 12 years with the World
Bank as a senior financial specialist for the South Asia region, following which she was appointed Côte d’Ivoire’s
Minister of Energy, a position she held until 2000. Ms. Ba-N’Daw was subsequently appointed a director of the United Nation’s
Development Program for South-South Cooperation (formerly the Special Unit: Technical Cooperation among Developing Countries) until
2004 when she was appointed Deputy Chief of Staff to the Prime Minister of Côte d’Ivoire. She is a managing partner
of Alizes Consultants, an international consulting services firm, and deputy chairperson of Niger Omega, a Nigerian and London
based oil and gas services company. She was appointed a director in March 2015.
Jemal-ud-din Kassum (67)
Independent Non-Executive Director.
Chairman of the audit committee and member of the governance and nomination committee.
Mr. Kassum is a former World Bank vice president for the East Asia and Pacific region. Before that, he had a 25 year career with
the International Finance Corporation. He sits on the board of Thien Minh Group and Khan Bank. Based in the USA, he now provides
strategic advice to international financial institutions and governments. He was educated at Oxford University and holds an MBA
from Harvard University. He was appointed a director in January 2014.
Jeanine Mabunda Lioko
(51) Independent Non-Executive Director.
Member of the audit committee. Ms. Lioko has spent a number of years working
in the DRC’s finance industry including with Citi Group and as an advisor to the Governor of Banque Centrale du Congo. A
former Minister of Portfolio of the DRC, a position which she held for over five years, she is now a serving member of the National
Assembly of the Democratic Republic of Congo, representing the Equateur Province. Ms. Lioko is also a special advisor to the DRC
government to prevent violence against women and the recruitment of children for war. She was educated in Brussels, Belgium, and
holds a law degree from the Catholic University of Louvain and a postgraduate degree in commercial science from the ICHEC Brussels
Management School. She joined the board in January 2013.
Andrew J. Quinn (62) Independent
Non-Executive Director.
Chairman of the remuneration committee and member of the audit committee. Mr. Quinn retired at the
end of 2011 from his position as head of mining investment banking for Europe and Africa at CIBC after 15 years in the role and
more than 35 years’ experience of the mining industry. With a BSc (Hons) in mineral exploitation (mining engineering) from
Cardiff University, Mr. Quinn began his career in Anglo American’s gold division in 1975, holding various management and
technical positions in South Africa, and worked briefly for Greenbushes Tin in Australia before joining The Mining Journal in 1982
as editor of its gold publications. In 1984 he entered the financial services industry joining James Capel (later HSBC Investment
Banking) and then joining CIBC in 1996. He was appointed a director in November 2011.
Karl Voltaire (65) Independent
Non-Executive Director.
Member of the audit committee and of the remuneration committee. A graduate in mineral resources engineering
from the Ecole des Mines in Paris, Dr. Voltaire holds an MBA and PhD in economics and finance from the University of Chicago. He
started his career as a mining engineer in Haiti and subsequently spent 23 years with the World Bank Group in Washington DC, including
the International Finance Corporation where his last position was that of director of global financial markets. Thereafter Dr.
Voltaire was appointed a director of the Office of President at the African Development Bank. He was CEO of the Nelson Mandela
Institution from 2005 to 2009, and is currently a member of the Board of Trustees of the African University of Science and Technology.
He was appointed a director in May 2006. Dr. K. Voltaire will retire from the board of directors with effect from May 3, 2016.
Executive Officers
Willem Jacobs (57) GM
Operations Central and East Africa.
With a BPL (Hons) and DCom, he has served as a director of listed and private companies
in the areas of mining, engineering and manufacturing in Southern, Central and Eastern Africa for the past 20 years. He joined
Randgold in 2010.
John Steele (55) Technical
and Capital Projects Executive.
Mr. Steele was responsible for the successful construction and commissioning of our Morila,
Loulo, Tongon and Gounkoto mines and led the development and commissioning of the Kibali mine in the DRC. He also continues to
provide operational and engineering oversight to the group. Mr. Steele has a BSc (Hons) in Chemical Engineering and MBL (UNISA).
Chiaka Berthe (62) General
Manager – Operations West Africa.
With a Master’s degree in geological engineering from the Malian National School
of Engineering, Chiaka has more than 19 years’ experience in the industry. He is a member of the Australian Institute of
Mine and Metallurgy and the Geostatistical Association. Mr. Berthe was general manager of the Loulo-Gounkoto complex from 2012
to 2015, when he was appointed to his current position.
Martin Welsh (44) General
Counsel and Secretary.
Mr. Welsh joined us in 2011 and in 2012 was appointed the group’s company secretary and general
counsel. He qualified as a solicitor in 1998 and previously worked in London with Dickson Minto WS and Linklaters. Mr. Welsh holds
BA (Hons) and LLB degrees and a diploma in legal practice from the University of Strathclyde.
Rodney Quick (44) Group
GM Evaluation.
A geologist with an MSc Geology and 22 years’ experience in the gold mining industry, Mr. Quick joined
us in 1996, and has been involved in the exploration, evaluation and production phases of all our projects since Morila. He became
responsible for all project development and evaluation for the group in 2009.
Our Articles of Association
provide that the longest serving one-third of directors retire from office at each annual general meeting. Retiring directors normally
make themselves available for re-election and are re-elected at the annual general meeting on which they retire. In accordance
with the United Kingdom Governance Code (2014) the directors will offer themselves for reelection by shareholders at the company’s
annual general meeting. Our officers service as officers is regulated by standard industry employment agreements.
The date of appointment,
date of expiration and length of service for each of our directors is set forth in the table below:
Director
|
|
Date of
Appointment
|
|
Date of
Expiration
Term
|
|
Number of
Years Served
|
|
|
|
|
|
|
|
|
|
Executive
|
|
|
|
|
|
|
|
|
D.M. Bristow
|
|
8/11/95
|
|
5/05/16
1
|
|
|
21
|
|
G.P. Shuttleworth
|
|
7/03/07
|
|
5/05/16
1
|
|
|
9
|
|
Non-Executive
|
|
|
|
|
|
|
|
|
N.P. Cole
|
|
5/03/06
|
|
5/05/16
1
|
|
|
10
|
|
K. Voltaire
|
|
5/03/06
|
|
5/05/16
1
|
|
|
10
|
|
C.L. Coleman
|
|
11/03/08
|
|
5/05/16
1
|
|
|
7
|
|
K. Dagdelen
|
|
1/29/10
|
|
5/05/16
1
|
|
|
6
|
|
A.J. Quinn
|
|
11/01/11
|
|
5/05/16
1
|
|
|
4
|
|
J. Mabunda Lioko
|
|
1/28/13
|
|
5/05/16
1
|
|
|
3
|
|
J. Kassum
|
|
1/31/14
|
|
5/05/16
1
|
|
|
2
|
|
S. F. Ba-N’Daw
|
|
3/01/15
|
|
5/05/16
1
|
|
|
1
|
|
1
|
The United Kingdom Corporate Governance Code (2014) requires that all directors should stand for re-election on an annual basis. Dr. K. Voltaire will retire from the board of directors with effect from May 3, 2016. Mr. N.P. Cole Jr. intends to retire from the board of directors in November 2016.
|
None of our directors
and executive officers were selected under any arrangements or understandings between that director or executive officer and any
other person. All of our non-executive directors are considered independent directors.
B. COMPENSATION
Our objective is to ensure
that our executive remuneration policy encourages, reinforces and rewards the delivery of sustainable shareholder value. We aim
to ensure that our pay arrangements are fully aligned with our approach to risk management, and take into account our obligations
in respect of environmental, social and governance polices. We provide senior management, including executive directors, with competitive
base salaries to attract and retain high caliber executives, based on personal performance profile and relevant experience. In
addition, other elements of our remuneration program are designed to encourage and reward superior performance on an annual basis
as well as sustainable long-term performance. The remuneration committee’s policies are designed to meet these objectives
and to ensure that the individual directors are fairly and responsibly rewarded for their respective contributions to our performance.
Fixed remuneration
Fixed remuneration comprises
only base salary. No pension contributions are funded by the company. In 2016, fixed remuneration represents less than 21% for
the CEO and less than 32% for the CFO of the total remuneration package (based on target performance).
Base Salary
The CEO’s and CFO’s
base salaries are determined by the remuneration committee, taking into account the performance of the individual. The company
also benchmarks each element of it remuneration and the total remuneration package in comparison to FTSE 100, FTSE mining and comparable
international gold mining companies. When setting base salaries, the remuneration committee also takes into consideration the requirement
for extensive travel and time spent at the company’s operations in Africa. This is considered critical to the effective management
of the company’s business.
At December 31, 2015, the
annual base salaries of the executive directors were as follows:
|
•
|
CEO: Dr. DM Bristow $1,638,000
|
|
•
|
CFO: Mr. GP Shuttleworth £525,336
|
Following a review of all
aspects of the remuneration packages of the executive directors, it has been decided that the CEO’s base salary be increased
from $1,638,000 to $1,687,140 and the CFO’s base salary be increased from £525,336 to £541,096 with effect from
January 1, 2016, which represent an increase of 3%. The CEO’s and CFO’s base salary increases are in line with wider
increases across the group. As is the remuneration committee’s usual practice, it sought the views of our larger institutional
shareholders and voting guidance services before deciding on these increases.
During the year the remuneration
committee was provided with information detailing salaries of the broader Randgold employee population. The remuneration committee
has an oversight of the review of the employees’ salaries and any increases made are also taken into account when considering
the base salary increases for the CEO and CFO. The increases for the employees took effect in October 2015 and ranged from 0% to
7.5%. The average increase in employee salaries was approximately 3.7%.
Retirement Benefits
Executive directors can
elect to sacrifice up to 20% of their base salary to contribute to a defined contribution provident fund. The provident fund is
offered to all senior management within the company. The company does not make any contribution to the provident fund.
Other Benefits
Executive directors can
elect to receive other benefits, including medical aid, funded out of their base salary. Where appropriate, executive directors
may be provided with benefits while traveling for work and the cost of membership of professional associations. Life insurance
coverage is provided to the executive directors by the company through the group life insurance scheme which is also made available
to the company’s senior management.
Variable Remuneration
Variable remuneration represents
the major proportion of each executive director’s remuneration package.
In 2015, variable remuneration of the executive directors
comprised:
|
•
|
An annual bonus opportunity, coupled with
the requirement to defer a third of annual bonus earned into the Co-Investment Plan.
|
|
•
|
Participation in the Co-Investment Plan
rewarding performance over three years, with a further one year post-vesting retention requirement of the vested award.
|
|
•
|
Performance shares awarded under the Restricted
Share Scheme, rewarding performance over four years, with a further one year post-vesting retention requirement of the vested award.
|
2015 Annual Bonus
The annual bonus encourages
and rewards superior performance on an annual basis. Executive directors are eligible to receive an annual bonus, subject to the
achievement of stretching performance criteria. The performance metrics are intended to reward the achievement of challenging strategic
and financial targets that contribute to the creation of sustainable shareholder value. Each year, the remuneration committee reviews
and may make adjustments to the criteria used for measuring performance, taking into account the strategic objectives of the company
for the year, before the metrics and targets are agreed for the annual remuneration cycle.
The annual bonus payable
to the CEO for achieving target performance in 2015 was 150% of base salary, with a maximum bonus of 300% of base salary for achieving
outperformance. The annual bonus payable to the CFO for achieving target performance in 2015 was 100% of base salary, with a maximum
bonus of 200% of base salary for achieving outperformance.
Based on performance achieved
against targets during the 2015 financial year, the remuneration committee determined, based on the performance metrics, that Dr. D.M.
Bristow and Mr. G.P. Shuttleworth should receive bonus payments of $2,946,754 and $1,149,604, respectively.
Non-Executive Director Remuneration
The remuneration paid
for 2015 and to be paid for 2016 to our non-executive directors, including the chairman, is comprised of:
|
•
|
An annual retainer fee to all non-executive directors of $60,000 in each of 2015 and 2016;
|
|
•
|
An annual fee for audit committee service of $35,000 in each of 2015 and 2016;
|
|
•
|
An annual fee for remuneration committee service of $25,000 in each of 2015 and 2016;
|
|
•
|
An annual fee for governance and nomination committee service of $10,000 in each of 2015 and 2016;
|
|
•
|
The chairman of a board committee to receive an additional of $20,000;
|
|
•
|
The senior independent director received a fee of $85,000. This fee was payable in addition to
the annual fee and other committee fees for both 2015 and 2016;
|
|
•
|
The chairman, in addition to the annual fee also received a chairman fee of $225,000 (which is
inclusive of committee membership fees but exclusive of the committee chairman fee) in 2015 and 2016;
|
|
•
|
Mr. C. Coleman, as chairman of the board, received an award of 2,500 ordinary shares in 2015, fully
vested from grant;
|
|
•
|
Mr. N.P. Cole Jr., as a senior independent director, received an award of 2,000 ordinary shares
in 2015, in each case fully vested from grant; and
|
|
•
|
An award to each non-executive director of 1,500 ordinary shares in 2015, fully vested from grant.
The shares are seen as an important element of our approach to remuneration policy in relation to the chairman and non-executive
directors. They encourage share ownership and are delivered in lieu of cash. The directors are considered independent notwithstanding
an award of shares.
|
The shareholding requirement
ensures that the interests of directors are aligned with shareholders. Executive directors are required to build up a holding in
shares in the company at least equal in value to four times base salary for the CEO and two times base salary for the CFO from
the value of vested long term incentive awards. As at December 31, 2015, Dr. D.M. Bristow and Mr. G.P. Shuttleworth each exceeded
their respective shareholding requirements. New directors have three years in which to acquire the required shareholding and this
period could be extended at the discretion of the remuneration committee. Non-executive directors are required to build up and
hold shares at least equal in value to 200% of the annual retainer fee of $60,000, from the value of vested awards. All non-executive
directors met this requirement as at December 31, 2015 with the exception of Mrs. Ba-N’Daw who was appointed to the board
on March 1, 2015.
CEO Performance Shares
At the 2013 annual general
meeting, shareholders approved a one-off award of performance shares to Dr. D.M. Bristow. The vesting of the performance shares
is subject to the achievement of the conditions set out below and Dr. D.M. Bristow continuing to hold office or employment with
the company during the period of three years from April 29, 2013, the date of grant of the award of performance shares with an
equivalent value of up to $4,000,000. The achievement of each of the following conditions, which reflect the value enhancement
and focus on establishing and operating our flagship Kibali gold mine, will result in the vesting of one-fifth of the shares subject
to the award:
|
•
|
the first gold pour occurs at the Kibali
gold mine;
|
|
•
|
the cumulative production at the Kibali
gold mine in aggregate equals or exceeds 500,000oz of gold;
|
|
•
|
gold production of the Randgold group
in aggregate equals or exceeds 1Moz per annum, for any financial year of the company;
|
|
•
|
the vertical shaft at the Kibali gold
mine is completed and signed-off by the contractor of the vertical shaft and by the representative of the Kibali gold mine; and
|
|
•
|
the Nzoro II hydroelectric power station
provides electricity to the Kibali gold mine.
|
Vesting of each one-fifth
of the award is to occur on the later of the expiration of the third anniversary after the date of grant and the date on which
a condition is achieved, provided Dr. D.M. Bristow holds office or employment as at the date of achievement of the condition. The
award is subject to clawback (up to a maximum value of $4,000,000) at the discretion of the remuneration committee where a material
misstatement is found contained in the annual report and accounts of the company on which vesting of the award (or any part thereof)
is or is to be based. The CEO will not be permitted to transfer or dispose of the shares acquired on vesting of the award and will
be required to retain them until cessation of his office or employment with the company.
At December 31, 2015,
four out of five of the performance conditions have been met.
Director
|
|
Date of
award
|
|
|
Market
price at
date of
award
($)
1
|
|
|
At
Jan. 1,
2015
|
|
|
Awarded in
the year
|
|
|
Vested in
the year
|
|
|
Market
price at
date
vested
($)
|
|
|
Lapsed in
the year
|
|
|
At
Dec. 31,
2015
|
|
|
Vesting period
2
|
D.M. Bristow
|
|
|
Apr. 29, 2013
|
|
|
|
79.95
|
|
|
|
50,031
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
50,031
|
|
|
Each 1/5
th
of the award vests on the fulfilment of the relevant performance condition provided D.M. Bristow remains in office or employment with the company until April 29, 2016
|
1
|
NASDAQ Global Select Market closing price on day preceding grant or if a public holiday, the next trading day.
|
2
|
The first vesting condition in respect of 10,006 shares was met on September 24, 2013, and during 2014, the three additional performance conditions in respect of a further 30,018 shares were met. The final performance condition in respect of 10,006 shares was outstanding as at December 31, 2015. These shares will only be transferred to the CEO provided he continues in office or employment until April 29, 2016.
|
Restricted Share Scheme
The Restricted Share Scheme
was approved by shareholders on July 28, 2008. Awards are determined as a percentage of base salary, with the maximum annual
award being 200% of base salary for the CEO and 100% of base salary for the CFO.
For awards made in 2015,
following feedback from shareholders, following a review of performance measures, the remuneration committee determined that, in
order to improve the robustness of performance measurement and desensitize outcomes to volatility in the gold price, the following
three measures will apply, each weighted one third:
|
·
|
Total cash cost per ounce – measured
over four consecutive one year periods, with vesting at the end of four years. The overall vesting will be the average annual outcome
against market guidance weighted by annual production in ounces. Threshold will equal the maximum cost per ounce each year and
maximum vesting at the minimum cost per ounce as set by the board and communicated to the market in February each year.
|
|
·
|
Relative TSR – TSR is measured over
the three months before the start and the three months before the end of any four year performance period and compared to the TSR,
calculated in the same way, of a defined comparator group of international listed gold mining companies. Vesting is based on the
relative TSR outcome over the four year period. Threshold vesting occurs at median and maximum at upper quartile. The defined comparator
group for 2016 (subject to the remuneration committee discretion to add or amend the group from time to time) is:
|
|
o
|
Agnico Eagle Mines Limited;
AngloGold Ashanti Limited; Barrick Gold Corporation; Eldorado Gold Corporation; B2 Gold Corporation; Gold Fields Limited; Goldcorp
Incorporated; Kinross Gold Corporation; Newcrest Mining Limited; Newmont Mining Corporation; Yamana Gold Incorporated; Buenaventura
Mining Company Incorporated; and New Gold Incorporated.
|
|
·
|
Reserve replacement ratio is calculated
as a ratio of the cumulative four year reserves added compared with the cumulative four year reserves mined. Threshold vesting
will occur if this ratio is at least 75% with maximum vesting occurring if the ratio is 110%.
|
For 2016, the remuneration
committee has determined that the measures remain appropriate and there is no change to performance measures for the year.
The award of shares under the Restricted Share Scheme for the CEO and CFO for 2015 will vest subject to the achievement of the following performance
targets:
Level of vesting
|
|
Year 4
|
Reserve replacement ratio: cumulative over four years
|
·
Nil
|
|
Less than 75%
|
·
30%
|
|
75%
|
·
Pro-rata 30% - 100% on a straight line basis
|
|
More than 75% and less than 110%
|
·
100%
|
|
110%
|
Total cash cost per oz: Average of four years weighted by annual production in ounces
|
·
Nil
|
|
More than the higher end of costs guidance range
|
·
30%
|
|
Equal to the higher end of the costs guidance range
|
·
Pro-rata 30% - 100% on a straight line basis
|
|
Between the higher and lower costs guidance range
|
·
100%
|
|
Equal to or lower than the lowest end of the costs guidance range
|
Relative TSR: Four year TSR v comparator group
|
·
Nil
|
|
Less than 50
th
percentile
|
·
30%
|
|
50
th
percentile
|
·
Pro-rata 30% - 100% on a straight line basis
|
|
More than 50
th
percentile and less than 75
th
percentile
|
·
100%
|
|
75
th
percentile
|
The award of shares under the Restricted Share Scheme for the CEO and CFO for 2016 will vest subject to the achievement of the following performance
targets:
Level of vesting
|
|
Year 4
|
Reserve replacement ratio: cumulative over 4 years
|
·
Nil
|
|
Less than 75%
|
·
30%
|
|
75%
|
·
Pro-rata 30% - 100% on a straight line basis
|
|
More than 75% and less than 110%
|
·
100%
|
|
110%
|
Total cash cost per oz: Average of 4 years weighted by annual production in ounces
|
·
Nil
|
|
More than the higher end of costs guidance range
|
·
30%
|
|
Equal to the higher end of the costs guidance range
|
·
Pro-rata 30% - 100% on a straight line basis
|
|
Between the higher and lower costs guidance range
|
·
100%
|
|
Equal to or lower than the lowest end of the costs guidance range
|
Relative TSR: 4 year TSR v comparator group
|
·
Nil
|
|
Less than 50
th
percentile
|
·
30%
|
|
50
th
percentile
|
·
Pro-rata 30% - 100% on a straight line basis
|
|
More than 50
th
percentile and less than 75
th
percentile
|
·
100%
|
|
75
th
percentile
|
The remuneration committee
will review these performance targets in the event that the company issues a material number of new shares.
The following table summarizes
all awards of restricted shares to our executive directors and our non-executive directors outstanding, the market price on the
NASDAQ Global Select Market at the date of award, the date of grant and the vesting schedule of the award.
Restricted Share Scheme
|
|
Date of
award
|
|
Market
price at
date of
award
($)
1
|
|
|
At
Jan 1,
2015
|
|
|
Awarded
in
the
year
|
|
|
Vested
in the
year
|
|
|
Market
price at
date
vested
($)
|
|
|
Lapsed
in the
year
|
|
|
At
Dec 31,
2015
|
|
|
Vesting
2
|
DM Bristow
|
|
June 13, 2011
|
|
|
76.53
|
|
|
|
25,637
|
|
|
|
-
|
|
|
|
3,205
|
|
|
|
71.47
|
|
|
|
9,614
|
|
|
|
12,818
|
|
|
1/3 vested June 13, 2015
1/3 vests June 13, 2016
|
|
|
March 16, 2012
|
|
|
101.49
|
|
|
|
28,843
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
9,614
|
|
|
|
19,229
|
|
|
1/3 vested Mar 16, 2015
1/3 vests March 16, 2016
1/3 vests
March 16, 2017
|
|
|
March 18, 2013
|
|
|
82.37
|
|
|
|
36,724
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
36,724
|
|
|
1/3 vests March 18, 2016
1/3 vests March 18, 2017
1/3 vests
Mar 18, 2018
|
|
|
March 21, 2014
|
|
|
79.48
|
|
|
|
39,004
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
39,004
|
|
|
1/3 vests March 21, 2017
1/3 vests March 21, 2018
1/3 vests
Mar 21, 2019
|
|
|
May 12, 2015
|
|
|
73.42
|
|
|
|
-
|
|
|
|
44,619
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
44,619
|
|
|
Vests January 1, 2019
|
GP Shuttleworth
|
|
June 13, 2011
|
|
|
76.53
|
|
|
|
5,414
|
|
|
|
-
|
|
|
|
677
|
|
|
|
71.47
|
|
|
|
2,030
|
|
|
|
2,707
|
|
|
1/3 vested June 13, 2015
1/3 vests June 13, 2016
|
|
|
March 16, 2012
|
|
|
101.49
|
|
|
|
6,462
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
2,154
|
|
|
|
4,308
|
|
|
1/3 vested March 16, 2015
1/3 vests March 16, 2016
1/3
vests March 16, 2017
|
|
|
March 18, 2013
|
|
|
82.37
|
|
|
|
8,401
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
8,401
|
|
|
1/3 vests March 18, 2016
1/3 vests March 18, 2017
1/3 vests
March 18, 2018
|
|
|
March 21, 2014
|
|
|
79.48
|
|
|
|
10,170
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
10,170
|
|
|
1/3 vests March 21, 2017
1/3 vests March 21, 2018
1/3 vests
March 21, 2019
|
|
|
May 12, 2015
|
|
|
73.42
|
|
|
|
-
|
|
|
|
11,162
|
|
|
|
-
|
|
|
|
-
|
|
|
|
-
|
|
|
|
11,162
|
|
|
Vests January 1, 2019
|
|
1
|
NASDAQ Global Select Market closing price on day preceding
date of grant or if a public holiday, the next trading day.
|
|
2
|
Vesting of the executive
directors’ awards is subject to performance conditions.
|
Non-Executive Directors’ Share Awards Granted at the Company’s
2014 and 2015 Annual General Meetings
Director
|
|
Date of vesting
|
|
Number
of shares awarded
|
|
|
Market
price at date of vesting ($)
1
|
|
CL Coleman
|
|
May 6, 2014
|
|
|
1,200
|
|
|
|
80.94
|
|
|
|
May 5, 2015
|
|
|
2,500
|
|
|
|
76.15
|
|
S Ba-N’Daw
2
|
|
n/a
|
|
|
n/a
|
|
|
|
n/a
|
|
|
|
May 5, 2015
|
|
|
1,500
|
|
|
|
76.15
|
|
NP Cole Jr
|
|
May 6, 2014
|
|
|
1,200
|
|
|
|
80.94
|
|
|
|
May 5, 2015
|
|
|
2,000
|
|
|
|
76.15
|
|
Director
|
|
Date
of vesting
|
|
Number
of shares awarded
|
|
|
Market
price at date of vesting ($)
1
|
|
K Dagdelen
|
|
May 6, 2014
|
|
|
1,200
|
|
|
|
80.94
|
|
|
|
May 5, 2015
|
|
|
1,500
|
|
|
|
76.15
|
|
J Kassum
|
|
May 6, 2014
|
|
|
1,200
|
|
|
|
80.94
|
|
|
|
May 5, 2015
|
|
|
1,500
|
|
|
|
76.15
|
|
J Mabunda Lioko
|
|
May 6, 2014
|
|
|
1,200
|
|
|
|
80.94
|
|
|
|
May 5, 2015
|
|
|
1,500
|
|
|
|
76.15
|
|
AJ Quinn
|
|
May 6, 2014
|
|
|
1,200
|
|
|
|
80.94
|
|
|
|
May 5, 2015
|
|
|
1,500
|
|
|
|
76.15
|
|
K Voltaire
|
|
May 6, 2014
|
|
|
1,200
|
|
|
|
80.94
|
|
|
|
May 5, 2015
|
|
|
1,500
|
|
|
|
76.15
|
|
|
1
|
NASDAQ Global Select Market closing price on day preceding date of grant or if a public holiday,
the next trading day.
|
|
2
|
Mrs. Ba-N’Daw was appointed to the board with effect from March 1, 2015.
|
Co-Investment Plan
The Co-Investment Plan rewards sustained performance
relative to peers over a three-year period.
Each year, one third of
any annual bonus earned is compulsorily deferred and an executive director may also choose to commit further shares to the Co-Investment
Plan. For 2015 the maximum commitment opportunity offered under the Co-Investment Plan was 250% of base salary by the CEO and 125%
of base salary by the CFO. Committed shares must be retained for three years and may be matched, depending on relative TSR performance
over three years against the Euromoney Global Gold Index.
In 2015, the CEO committed
55,774 shares, and was granted an equal matching award under the Co-Investment Plan. The CFO committed 13,952 shares, and was granted
an equal matching award under the Co-Investment Plan.
If, after three years, the
TSR performance of the company equals or exceeds the performance of the Euromoney Global Gold Index, then the committed shares
may be matched on a stepped scale, as shown in the next table. The maximum level of matching is one for one and is awarded for
TSR performance of 10% per year (compounded) above the Euromoney Global Gold Index. This is considered to be a stretching level
of performance and the remuneration committee considers this target to be challenging in the context of the company’s historical
sustained outperformance of the market.
Three year TSR (performance per annum)
Compound
growth (per annum)
|
|
|
Level
of matching on committed shares
|
|
Below the index
|
|
|
-
|
|
Equal to the index
|
|
|
0.3 for 1
|
|
Index +2%
|
|
|
0.44 for 1
|
|
Index +4%
|
|
|
0.58 for 1
|
|
Index +6%
|
|
|
0.72 for 1
|
|
Index +8%
|
|
|
0.86 for 1
|
|
Index +10% or higher
|
|
|
1 for 1
|
|
Vesting of share plan awards for the performance period ending
in 2015
The following awards, granted to the CEO and
CFO, vested (or were capable of vesting) or lapsed in respect of a performance period ending in 2015:
CEO
Co-Investment
Plan
Date of grant
|
|
Award
of shares
|
|
|
Expiry
of performance period
|
|
Number
of award shares vested
|
|
March 18, 2013
|
|
|
36,724
|
|
|
December 31, 2015
|
|
|
36,724
|
|
Restricted
Share Scheme
Date of grant
|
|
Award
of shares
|
|
|
Date of vesting
|
|
Number
of award shares
|
|
June 13, 2011
|
|
|
38,456
|
|
|
June 13, 2016
|
|
|
3,205 (3
rd
tranche)
|
|
March 16, 2012
|
|
|
28,843
|
|
|
March 16, 2016
|
|
|
0 (2
nd
tranche)
|
|
March 18, 2013
|
|
|
36,724
|
|
|
March 18, 2016
|
|
|
0 (1
st
tranche
|
|
Performance
Share Award
Date of grant
|
|
Award
of shares
|
|
|
Date of vesting
|
|
Number
of award shares
|
|
April 29, 2013
|
|
|
50,031
|
|
|
April 29, 2016
|
|
|
40,024
|
|
CFO
Co-Investment
Plan
Date of grant
|
|
Award
of shares
|
|
|
Expiry of performance
period
|
|
Number
of award shares vested
|
|
March 18, 2013
|
|
|
8,401
|
|
|
December 31, 2015
|
|
|
8,401
|
|
Restricted
Share Scheme
Date of grant
|
|
Award
of shares
|
|
|
Date of vesting
|
|
Number
of award shares
|
|
June 13, 2011
|
|
|
8,121
|
|
|
June 13, 2016
|
|
|
677 (3
rd
tranche)
|
|
March 16, 2012
|
|
|
6,462
|
|
|
March 16, 2016
|
|
|
0 (2
nd
tranche)
|
|
March 18, 2013
|
|
|
8,401
|
|
|
March 18, 2016
|
|
|
0 (1
st
tranche)
|
|
Co-Investment Plan
The vesting of the Co-Investment
Plan awards granted in 2013 to the CEO and the CFO were subject to a performance condition which measures the company’s Total
Shareholder Return (TSR) performance against the Euromoney Global Gold Index. As the company’s TSR performance exceeded the
index by over 10% compound per year, the performance condition was met in full in respect of each of the awards and accordingly,
the awards vested in full on the dates set out in the above tables representing a value of $2,278,724 and $521,282 for the CEO
and CFO respectively, at a closing share price on December 31, 2015 of $62.05.
Restricted Share Scheme
The vesting of the above
restricted share scheme awards for the CEO and CFO, were subject to the achievement of operational and financial targets. Four
separate measures of business growth were used, each weighted 25%, with tranches of awards vesting after three, four and five years,
as follows:
|
•
|
Additional reserves including reserve replacement
|
|
•
|
Absolute reserves excluding reserve replacement
|
None of the performance conditions were met in
respect of 2012 and 2013 Awards, and accordingly no shares were awarded.
In respect of the 2011
Award none of the threshold targets were met except the EPS performance metric. The EPS performance condition was met in full resulting
in 25% vesting of one-third of the tranche of shares awarded in
2011. Using a share price of $62.05 on the
date the 2015 performance period ended, the value of that award is $198,850 and $41,992, respectively for the CEO and CFO.
Executive Directors’ Remuneration
|
|
Base
salary
|
|
|
Annual
bonus
1
|
|
|
Other
payments
4
|
|
|
Total
|
|
Director ($)
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
DM Bristow
|
|
|
1,638,000
|
|
|
|
1,575,000
|
|
|
|
2,946,754
|
|
|
|
2,866,579
|
|
|
|
3,454,250
|
|
|
|
3,217,825
|
|
|
|
8,039,004
|
|
|
|
7,659,404
|
|
GP Shuttleworth
|
|
|
802,324
2
|
|
|
|
816,551
|
|
|
|
1,149,604
3
|
|
|
|
1,150,008
|
|
|
|
540,770
|
|
|
|
442,494
|
|
|
|
2,492,698
|
|
|
|
2,409,053
|
|
Total
|
|
|
2,440,324
|
|
|
|
2,391,551
|
|
|
|
4,096,358
|
|
|
|
4,016,587
|
|
|
|
3,995,020
|
|
|
|
3,660,319
|
|
|
|
10,531,702
|
|
|
|
10,068,457
|
|
|
1
|
For detail of the portion of bonus deferred and performance measures met, see the sections “—Co-Investment
Plan” and “—Restricted Share Scheme” above.
|
|
2
|
Mr. GP Shuttleworth’s salary was paid in pounds but converted to dollars at the average rate
for the year of £1:$1.53.
|
|
3
|
Mr. GP Shuttleworth’s bonus will be paid in pounds in March 2016 but has been converted to
dollars at the rate of £1:$1.41.
|
|
4
|
Other payments include expenses for restricted share awards performance share awards and Co-Investment
Plan awards which are costed in accordance with IFRS 2, based on the valuation at the date of grant rather than the value of the
awards that vested in the year. Vesting is subject to a number of vesting conditions which may or may not be achieved.
|
Non-Executive Directors’ Remuneration
Non-Executive Director
|
|
Fees
|
|
|
Other
payments
1
|
|
|
Total
|
|
Director ($)
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
|
2015
|
|
|
2014
|
|
CL Coleman
|
|
|
305,000
|
|
|
|
206,668
|
|
|
|
190,375
|
|
|
|
97,128
|
|
|
|
495,375
|
|
|
|
303,796
|
|
S Ba-N’Daw
2
|
|
|
50,000
|
|
|
|
n/a
|
|
|
|
114,225
|
|
|
|
n/a
|
|
|
|
164,225
|
|
|
|
n/a
|
|
NP Cole Jr
|
|
|
186,667
|
|
|
|
135,000
|
|
|
|
152,300
|
|
|
|
97,128
|
|
|
|
338,967
|
|
|
|
232,128
|
|
K Dagdelen
|
|
|
70,000
|
|
|
|
60,000
|
|
|
|
114,225
|
|
|
|
97,128
|
|
|
|
184,225
|
|
|
|
157,128
|
|
J Kassum
|
|
|
118,333
|
|
|
|
75,833
|
|
|
|
114,225
|
|
|
|
97,128
|
|
|
|
232,558
|
|
|
|
172,961
|
|
J Mabunda Lioko
|
|
|
95,000
|
|
|
|
73,333
|
|
|
|
114,225
|
|
|
|
97,128
|
|
|
|
209,225
|
|
|
|
170,461
|
|
AJ Quinn
|
|
|
133,333
|
|
|
|
101,667
|
|
|
|
114,225
|
|
|
|
97,128
|
|
|
|
247,558
|
|
|
|
198,795
|
|
K Voltaire
|
|
|
126,667
|
|
|
|
125,000
|
|
|
|
114,225
|
|
|
|
97,128
|
|
|
|
240,892
|
|
|
|
222,128
|
|
Total
|
|
|
1,085,000
|
|
|
|
860,834
|
|
|
|
1,028,025
|
|
|
|
777,024
|
|
|
|
2,113,025
|
|
|
|
1,637,858
|
|
|
1
|
Other payments consisted only of the annual award of shares to each non-executive director approved
at the AGM (NASDAQ Global Select Market closing price on day preceding date of grant or if a public holiday, the next trading day
– 2015: $76.15 per share; 2014: $80.94 per share).
|
|
2
|
Mrs. S Ba-N’Daw was appointed to the board with effect from March 1, 2015.
|
The high and low share
prices for our ordinary shares for 2015 on the London Stock Exchange were £57.50 and £35.46, respectively, and our
high and low price for our ADSs on the NASDAQ Global Select Market were $85.84 and $54.88, respectively. The ordinary share price
on the London Stock Exchange and the price of an ADS on the NASDAQ Global Select Market at December 31, 2015, the last day of trading,
were £41.43 and $61.93, respectively.
The total number of awards
of restricted shares granted as at February 28, 2016, including shares subject to vesting conditions, held by executive officers
were as follows:
Name
|
|
Number of
Awarded
Shares
|
|
J. Steele
|
|
|
38,000
|
|
W. Jacobs
|
|
|
30,000
|
|
C. Berthe
|
|
|
22,000
|
|
M.A. Welsh
|
|
|
22,000
|
|
R. Quick
|
|
|
30,000
|
|
C. BOARD PRACTICES
Directors’ Terms of Employment
We have entered into contracts
of employment with our executive directors Dr. D.M. Bristow and Mr. G.P. Shuttleworth with a notice period of six months.
We have entered into letters
of appointment with our non-executive directors. Each director is subject to re-election annually by our shareholders in accordance
with the provisions of the United Kingdom Corporate Governance Code (2014).
Board of Directors Committees
The board has established
and delegated specific roles and responsibilities to three committees and three management committees to assist with the execution
of its mandate and in order to ensure good corporate governance. The standing committees comprise an audit committee, a remuneration
committee and a governance and nomination committee, all of which are chaired by independent non-executive directors. The audit,
remuneration, and governance and nomination committees are comprised of non-executive directors. The management committees comprise
the executive committee, the environmental and social oversight committee, both chaired by the CEO and the treasury committee,
chaired by the CFO.
Meetings of the board
committees are normally held quarterly and members of the management team can be invited to attend if required.
The board and management
have been following the developments in corporate governance requirements and best practice standards, and as these have evolved
we have responded in a positive and proactive way by assessing our practices against these requirements and modifying, or targeting
for modification, practices to bring them into compliance with these corporate governance requirements and best practice standards.
Audit Committee
Membership of the audit
committee, including its chairman, comprises only independent non-executive directors, in compliance with the Sarbanes-Oxley Act
of 2002 and the guidelines of the United Kingdom Corporate Governance Code (2014). Each of the members of the audit committee
is an independent non-executive director. The members of the audit committee are Mr. J. Kassum (chairman), Dr. K. Voltaire
(until his retirement on May 2, 2016), Mr. A.J. Quinn, Mrs. J. Mabunda Lioko and with effect from May 2, 2016, Mrs.
Ba-N’Daw. All members of the committee have considerable financial knowledge and experience to help oversee and guide the
board and us in respect of the audit and corporate governance functions.
The board adopted the
audit committee’s terms of reference on January 30, 2012 and following a review by the audit committee on February 4, 2016,
the audit committee agreed its terms of reference did not require amendment. A copy of the audit committee’s terms of reference
is available on the company’s website. The committee’s mandate, as delegated by the board, is to provide advice for
the board regarding its oversight responsibilities and its duties, roles and responsibilities include the following:
|
•
|
Monitoring the integrity of the financial statements and formal announcements relating to the group’s
financial performance and reviewing significant financial and other reporting judgments;
|
|
•
|
Reviewing and challenging, where necessary, the consistency and appropriateness of accounting principles,
policies and practices which have been adopted by the group in the preparation of the annual financial statements, financial reporting
issues and disclosures in the financial reports;
|
|
•
|
Reviewing and monitoring the effectiveness of the group’s internal control and risk management
systems, including reviewing the process for identifying, assessing and reporting key risks and control activities;
|
|
•
|
Approving the internal audit plan and reviewing regular reports from the head of internal audit
on the effectiveness of the internal control system;
|
|
•
|
Making recommendations to the board on the appointment, re-appointment or change of the group’s
external auditors and approving the remuneration and terms of engagement of the group’s external auditors;
|
|
•
|
Overseeing the board’s relationship with the external auditors and ensuring the group’s
external auditors’ independence and objectivity and the effectiveness of the audit process is monitored and reviewed;
|
|
•
|
Developing, implementing and maintaining a policy on the engagement of the group’s external
auditors’ supply of non-audit services;
|
|
•
|
Reporting to the board any matters which the committee has identified as needing to be considered,
actioned or improved upon;
|
|
•
|
Monitoring the group’s compliance with legal and regulatory requirements including ensuring
that effective procedures are in place relating to the group’s whistleblowing and anti-corruption policies; and
|
|
•
|
Assessing whether the annual report, considered in its entirety, is fair, balanced and understandable,
and provides the information necessary for shareholders to assess the company’s position and performance, business model
and strategy, and then subsequently recommending its approval to the board.
|
The audit committee also
reviews the scope of work carried out by the external auditors and holds discussions with the external auditors at least twice
a year.
The audit committee is
responsible for reviewing all financial statements prior to approval by the board, all other disclosures containing financial information
and all management reports which accompany any financial statements. The audit committee is also responsible for approval of internal
audit plans and for considering and approving the audit strategy and approach of the external auditor, any recommendation affecting
the company’s internal controls, the results of internal and external audits and any changes in accounting practices or policies.
In addition, the audit
committee is responsible for assessing management’s programs and policies relating to the adequacy and effectiveness of internal
controls over our accounting and financial systems. The audit committee reviews and discusses with the CEO and the CFO the procedures
undertaken in connection with their certifications for annual filings in accordance with the requirements of applicable securities
regulatory authorities. The audit committee is also responsible for recommending to the board the external auditor to be nominated
for shareholder approval who will be responsible for auditing the financial statements and completing other audit, review or attestation
services. The audit committee also recommends to the board the compensation to be paid to the external auditor and directly oversees
its work. Our external auditor reports directly to the audit committee. The audit committee reports directly to the board of directors.
In relation to risk management,
the committee reviews our risk policies with respect to risk identification and the risk management process, ensuring that the
requirements of the Sarbanes-Oxley Act of 2002 are met, as well as advising the board on the effectiveness of the risk management
system. Risk identification and evaluation process occurs on a continual basis, however a formal review is done by the audit committee
on an annual basis.
Our internal audit function
plays a critical role in the functioning of the audit committee with the head of internal audit reporting directly to the committee
with an administrative line to the CFO. The group’s internal control processes and systems are monitored by the group’s
internal audit function. In 2015, a formal internal audit plan, which was reviewed and approved by the audit committee, was executed
across the group’s operations using internal resources and supplemented through the engagement of external practitioners
upon specified terms. The head of internal audit has unrestricted access to both the CEO and the CFO, the board chairman and the
chairman of the audit committee and is invited to attend and present on the activities of the internal audit function at all meetings
of the audit committee. The board is confident that the unfettered access of the internal audit function to key board members and
the direct and regular reporting to the audit committee enables the function to discharge its duties as required by law and in
fulfillment of its obligations to the company. In addition, the audit committee meets regularly with internal and external auditors
without the presence of management.
Remuneration Committee
The remuneration committee
reviews the remuneration of directors and senior management and determines the structure and content of the senior executives’
remuneration packages by reference to a number of factors including current business practice and our prevailing business conditions
and the mining and exploration industry. The remuneration committee is committed to the principles of accountability and transparency,
and to ensuring that remuneration arrangements align reward with performance. The remuneration committee is guided by its terms
of reference. The members of the remuneration committee are Mr. A.J. Quinn (chairman), Mr. C.L. Coleman, Mr. N.P. Cole,
Jr. and Dr. K. Voltaire.
The remuneration committee’s
responsibilities include:
|
•
|
Determining the remuneration policy and its specific application to the executive directors, as
well as its general application to the senior executives below the main board;
|
|
•
|
The determination of levels of reward for the executive directors;
|
|
•
|
Providing guidance on evaluating the performance of the CEO, management development plans and succession
planning;
|
|
•
|
Awards made under the Restricted Share Scheme and the Co-Investment Plan; and
|
|
•
|
Communication with shareholders on the remuneration policy and the remuneration committee’s
work on behalf of the board.
|
Governance and Nomination Committee
The governance and nomination
committee’s function is to assist the board in identifying qualified individuals who are willing and have the necessary independence
and skills to act as directors of the company and be members of the board’s committees. The committee also develops and monitors
a process for evaluating the board’s effectiveness and oversees the company’s Code of Conduct. The governance and nomination
committee is guided by its terms of reference. In addition, the committee at the request of the board, interviews and recruits
any future board members. The members of the governance and nomination committee are Messrs. C. Coleman (chairman), N.P. Cole,
Jr., Dr. K. Dagdelen and Mr. J. Kassum.
The governance
and nomination committee’s responsibilities include:
|
·
|
Developing and monitoring a process for
evaluating the board’s effectiveness and overseeing the company’s code of conduct;
|
|
·
|
Regularly reviewing and evaluating the
structure, size and composition of the board and making recommendations to the board with regard to any changes;
|
|
·
|
Identifying, evaluating and recommending,
against objective criteria, candidates to fill board vacancies as and when they arise, for board approval;
|
|
·
|
Making recommendations to the board with
regard to membership of the audit committee and remuneration committee and any other of the board’s committees in consultation
with the chairmen of those committees;
|
|
·
|
Making recommendations on the constitution
of the board to ensure there is an appropriate balance in terms of skills, knowledge, independence and experience;
|
|
·
|
Succession planning for directors and
other senior managers of the company;
|
|
·
|
Assessing a director’s potential
conflict of interest and making recommendations to the board; and
|
|
·
|
Making recommendations to the board concerning
the role of senior independent director.
|
D. EMPLOYEES
At the end of each of
the past three years, the breakdown of employees, including our subsidiaries by main categories of activity was as follows:
At December 31,
|
|
2015
|
|
|
2014
|
|
|
2013
|
|
|
|
|
|
|
|
|
|
|
|
Gounkoto
|
|
|
132
|
|
|
|
151
|
|
|
|
163
|
|
Morila
|
|
|
359
|
|
|
|
302
|
|
|
|
397
|
|
Loulo
|
|
|
1,928
|
|
|
|
945
|
|
|
|
947
|
|
Tongon
|
|
|
590
|
|
|
|
449
|
|
|
|
533
|
|
Kibali
|
|
|
705
|
|
|
|
701
|
|
|
|
516
|
|
Total
|
|
|
3,714
|
|
|
|
2,548
|
|
|
|
2,556
|
|
E. SHARE OWNERSHIP
See “PART I. Item 7. Major Shareholders and Related Party
Transactions—A. Major Shareholders.”
Employee Share Option Scheme
Since 1996, we have operated
a share option scheme under which senior management may be offered options to purchase our ordinary shares. The aggregate number
of shares available for issuance under the option scheme may not exceed 15% of our issued share capital. Share options granted
since 2007 are subject to performance criteria for individual employees. Any options provided to an individual employee as defined
by the rules of the scheme, are subject to an upper limit of 2% of our issued ordinary share capital.
The exercise price of
any new share options is determined as the closing price of the share on the trading day preceding that on which the person was
granted the option.
The scheme provides for
the early exercise of all options in the event of an acquisition of a number of shares that would require an offer to be made to
all of our other shareholders.
No options were awarded
to staff in terms of the Employee Share Option Scheme during 2015.
Restricted Share Scheme
On July 28, 2008,
our shareholders approved the creation of a restricted share scheme for employees and executive directors. At that time, the board
elected to limit eligibility for awards to executive directors. The board subsequently decided that all employees would be eligible
to receive restricted shares. The aggregate number of shares available for issuance under the restricted share scheme may not exceed
5% of our issued share capital. The awards of shares under the restricted share scheme are subject to the attainment of performance
criteria agreed with the remuneration committee.
Co-Investment Plan
The Co-Investment Plan rewards sustained performance
relative to peers over a three-year period.
Each year, one third of
any annual bonus earned is compulsorily deferred and an executive director may also choose to commit further shares to the Co-Investment
Plan. For 2015 the maximum commitment opportunity offered under the Co-Investment Plan was 250% of base salary by the CEO and 125%
of base salary by the CFO. Committed shares must be retained for three years and may be matched, depending on relative total shareholder
return performance over three years against the Euromoney Global Gold Index.
See the description of the
participation of the CEO and CFO in the Co-Investment Plan under “PART I. Item 6. Directors, Senior Management and Employees—B.
Compensation—Co-Investment Plan” above.
CEO Performance Shares
See the description of
the CEO performance shares under “PART I. Item 6. Directors, Senior Management and Employees—B. Compensation—CEO
Performance Shares” above.
Item 7. Major Shareholders and
Related Party Transactions
A. MAJOR SHAREHOLDERS
As of February 28,
2016, our issued share capital consisted of 93,546,717 ordinary shares with a par value of $0.05 per share. To our knowledge we
are not, directly or indirectly, owned or controlled by another corporation, any foreign government or other person.
The following table sets
forth information regarding the beneficial ownership of our ordinary shares as of February 28, 2016, by:
|
•
|
Any person of whom the directors are aware that is interested directly or indirectly in 3% or more
of our ordinary shares;
|
|
•
|
Each of our directors; and
|
|
•
|
All of our executive officers and directors as a group.
|
Beneficial ownership is
determined in accordance with the rules of the SEC and generally includes voting or investment power with respect to securities.
Ordinary shares issuable pursuant to options, to the extent the options are currently exercisable or convertible within 60 days
of February 28, 2016, are treated as outstanding for computing the percentage of the person holding these securities but are
not treated as outstanding for computing the percentage of any other person.
Unless otherwise noted,
each person or group identified possesses sole voting and investment power with respect to the shares, subject to community property
laws where applicable. Unless indicated otherwise, the business address of the beneficial owners is: Randgold Resources Limited,
3rd Floor Unity Chambers, 28 Halkett Street, St. Helier, Jersey JE2 4WJ, Channel Islands.
|
|
Shares Beneficially Owned
|
|
|
|
|
|
|
|
|
Holder
|
|
Number
|
|
|
%
|
|
|
|
|
|
|
|
|
D.M. Bristow
|
|
|
770,715
|
|
|
|
0.82
|
|
G.P. Shuttleworth
|
|
|
79,052
|
|
|
|
0.08
|
|
C. L. Coleman
|
|
|
12,300
|
|
|
|
0.01
|
|
S. Ba-N’Daw
1
|
|
|
1,500
|
|
|
|
-
|
|
N.P. Cole Jr.
|
|
|
12,527
|
|
|
|
0.01
|
|
K. Dagdelen
|
|
|
7,500
|
|
|
|
-
|
|
J. Kassum
|
|
|
2,700
|
|
|
|
-
|
|
J. Mabunda Lioko
|
|
|
3,900
|
|
|
|
-
|
|
A.J. Quinn
|
|
|
6,328
|
|
|
|
-
|
|
K. Voltaire
|
|
|
12,027
|
|
|
|
0.01
|
|
BNY (Nominees) Limited
2
One Canada Square, London, E14 5AL
|
|
|
40,667,880
|
|
|
|
43.47
|
|
BlackRock Inc.
3
40 East 52nd Street New York, NY 10022
|
|
|
15,814,947
|
|
|
|
16.9
|
|
Vontobel Holding AG, Gottardstrasse 43, CH-8022, Zurich, Switzerland
|
|
|
6,049,367
|
|
|
|
6.47
|
|
Van Eck Associates Corporation
4
, 335 Madison Ave, 19th Floor New York, NY 10017
|
|
|
5,681,169
|
|
|
|
6.07
|
|
Directors and executive officers
5
|
|
|
908,549
|
|
|
|
0.97
|
|
1
|
Mrs. Ba-N’Daw was appointed to the board with effect from March 1, 2015.
|
2
|
Shares held by BNY (Nominees) Limited are held for and on behalf of our ADS holders.
|
3
|
BlackRock Inc. reported in its Schedule 13G/A filed with the SEC on January 8, 2016 that its beneficial ownership in us amounted to 16,119,642 ordinary shares (17.3%) on a consolidated basis. These shares are included in the shares held by BNY (Nominees) Limited.
|
4
|
Van Eck Associates Corporation reported in its Schedule 13G/A filed with the SEC on February 11, 2016 that its beneficial ownership in us amounted to 5,744,496 ordinary shares (6.16%) on a consolidated basis. These shares are included in the shares held by BNY (Nominees) Limited.
|
5
|
No director or executive officer beneficially owns in excess of 1% of the outstanding ordinary shares.
|
To the knowledge of management,
none of the above shareholders hold voting rights which are different from those held by our other shareholders.
At December 31, 2015,
a total of 41,385,040 ordinary shares (or 44.39 percent of issued ordinary share capital) were held by The Bank of New York Mellon
as depositary for our American Depositary Receipt program. Each American Depositary Share (ADS) is equivalent to one ordinary share
in the company. At December 31, 2015 the number of persons who were registered holders of ADSs was reported at 99. Randgold is
aware that many ADSs are held of record by brokers and other nominees, and accordingly the above numbers are not necessarily representative
of the actual number of persons who are beneficial holders of ADSs or the number of ADSs beneficially held by these persons.
All shareholders have
the same voting rights.
As at December 31, 2015
there were 1,288 holders of record of our ordinary shares. Of these holders 5 had registered addresses in the United States and
held a total of 12,599 ordinary shares, approximately 0.01% of the total outstanding shares. In addition, certain accounts of record
with registered addresses outside the United States, including The Bank of New York Mellon, hold our ordinary shares in whole or
in part, beneficially for United States persons.
At February 28, 2016,
40,667,880 ADSs or approximately 43.47 percent of total issued share capital, were issued and outstanding and held of record by
approximately 98 registered holders.
Insofar as is known to
us, there was no person who, directly or indirectly, joint or severally, exercised or could exercise control over Randgold nor
is Randgold aware of any arrangements which might result in a change of control of Randgold.
B. RELATED PARTY TRANSACTIONS
Other than as referred to below, none of our
directors, officers or major shareholders or, to our knowledge, their families, had any interest, direct or indirect, in any transaction
during the last fiscal year or in any proposed transaction which has affected or will materially affect us or our investment interests
or subsidiaries. Refer to Note 20 of our financial statements included in this Annual Report for details provided on related party
transactions that existed on December 31, 2015.
The Randgold Name
Under an agreement dated June 26, 1997,
Randgold & Exploration Group has licensed us to carry on business under the name “Randgold”. The license has
been provided to us on a royalty free perpetual basis. The U.K. Trademark Registry granted a registration certificate to us for
“Randgold” on February 16, 2001.
C. INTERESTS OF EXPERTS AND COUNSEL
Not applicable.
Item 8. Financial Information
See Item 18.
Item 9. The Offer and Listing
A. OFFER AND LISTING DETAILS
The following table sets
forth, for the periods indicated, the high and low sales prices of our ordinary shares, as reported by the London Stock Exchange,
and of our ADSs, as reported by the NASDAQ Global Select Market. Effective March 10, 2003, we changed the ratio of ordinary
shares to ADSs from two ordinary shares per ADS to one ordinary share per ADS, so that each ADS now represents one ordinary share.
In March 2003 we changed the currency in which the price of our ordinary shares that are traded on the London Stock Exchange are
quoted. The ordinary shares are now quoted in pound sterling and not in US dollars. The ADSs continue to be quoted on the London
Stock Exchange and the NASDAQ Global Select Market in US dollars.
|
|
Price Per Ordinary Share
|
|
|
Price Per ADS
|
|
Financial Period Ended
|
|
High(£)
|
|
|
Low (£)
|
|
|
High ($)
|
|
|
Low ($)
|
|
December 31, 2015
|
|
|
57.50
|
|
|
|
35.46
|
|
|
|
85.84
|
|
|
|
54.88
|
|
December 31, 2014
|
|
|
52.35
|
|
|
|
36.08
|
|
|
|
89.89
|
|
|
|
58.00
|
|
December 31, 2013
|
|
|
64.65
|
|
|
|
37.03
|
|
|
|
102.2
|
|
|
|
60.90
|
|
December 31, 2012
|
|
|
77.75
|
|
|
|
45.96
|
|
|
|
126.88
|
|
|
|
73.13
|
|
December 31, 2011
|
|
|
75.55
|
|
|
|
44.25
|
|
|
|
119.44
|
|
|
|
71.47
|
|
|
|
Price
Per Ordinary Share
|
|
|
Price
Per ADS
|
|
Calendar Period
|
|
High(£)
|
|
|
Low(£)
|
|
|
High($)
|
|
|
Low($)
|
|
2016
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
First Quarter (through February 29, 2016)
|
|
|
67.20
|
|
|
|
41.68
|
|
|
|
93.67
|
|
|
|
59.96
|
|
2015
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fourth Quarter
|
|
|
47.15
|
|
|
|
38.37
|
|
|
|
72.07
|
|
|
|
58.34
|
|
Third Quarter
|
|
|
43.44
|
|
|
|
35.46
|
|
|
|
68.12
|
|
|
|
54.88
|
|
Second Quarter
|
|
|
51.45
|
|
|
|
42.84
|
|
|
|
78.90
|
|
|
|
66.90
|
|
|
|
Price
Per Ordinary Share
|
|
|
Price
Per ADS
|
|
Calendar Period
|
|
High(£)
|
|
|
Low(£)
|
|
|
High($)
|
|
|
Low($)
|
|
First Quarter
|
|
|
57.50
|
|
|
|
43.18
|
|
|
|
85.84
|
|
|
|
66.45
|
|
2014
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fourth Quarter
|
|
|
44.96
|
|
|
|
36.78
|
|
|
|
71.36
|
|
|
|
58.00
|
|
Third Quarter
|
|
|
52.35
|
|
|
|
42.09
|
|
|
|
89.89
|
|
|
|
67.35
|
|
Second Quarter
|
|
|
49.05
|
|
|
|
43.28
|
|
|
|
84.89
|
|
|
|
72.14
|
|
First Quarter
|
|
|
50.65
|
|
|
|
36.08
|
|
|
|
85.48
|
|
|
|
59.19
|
|
|
|
Price Per Ordinary Share
|
|
|
Price Per ADS
|
|
Calendar Month
|
|
High (£ )
|
|
|
Low (£)
|
|
|
High ($)
|
|
|
Low ($)
|
|
2016
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
February
|
|
|
67.20
|
|
|
|
49.58
|
|
|
|
93.67
|
|
|
|
71.59
|
|
January
|
|
|
49.82
|
|
|
|
41.68
|
|
|
|
70.78
|
|
|
|
59.96
|
|
2015
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
December
|
|
|
43.19
|
|
|
|
39.48
|
|
|
|
65.35
|
|
|
|
59.08
|
|
November
|
|
|
44.04
|
|
|
|
38.70
|
|
|
|
67.20
|
|
|
|
58.77
|
|
October
|
|
|
47.15
|
|
|
|
38.37
|
|
|
|
72.07
|
|
|
|
58.34
|
|
September
|
|
|
39.93
|
|
|
|
35.46
|
|
|
|
61.20
|
|
|
|
54.88
|
|
B. PLAN OF DISTRIBUTION
Not applicable.
C. MARKETS
Our ordinary shares are
listed on the London Stock Exchange, which currently constitutes the principal non-United States trading market for those shares,
under the symbol RRS and our ADSs trade in the United States on the NASDAQ Global Select Market under the trading symbol GOLD,
in the form of American Depositary Receipts. The American Depositary Receipts are issued by The Bank of New York Mellon, as Depositary.
Each American Depositary Receipt represents one American Depositary Share. Each American Depositary Share represents one of our
ordinary shares.
D. SELLING SHAREHOLDERS
Not applicable.
E. DILUTION
Not applicable.
F. EXPENSES OF THE ISSUE
Not applicable.
Item 10. Additional Information
A. SHARE CAPITAL
Not applicable.
B. MEMORANDUM AND ARTICLES OF ASSOCIATION
General
We are a company organized
with limited liability under the laws of Jersey, Channel Islands. Our registered number is 62686.
The authorized share capital
is $8,000,000 divided into 160,000,000 ordinary shares of $0.05 each, of which 93,546,717 were issued as at February 28, 2016
and 66,453,283 were available for issue.
Details of our Memorandum
and Articles of Association are provided below.
Memorandum of Association
Clause 2 of our Memorandum
of Association provides that we shall have unrestricted corporate capacity.
Changes in Capital or Objects and Powers
Subject to the Companies
(Jersey) Law (the 1991 Law) and our Articles of Association, we may by special resolution at a general meeting:
|
•
|
increase our authorized or paid up share capital;
|
|
•
|
consolidate and divide all or any part of our shares (whether issued or not) into shares of a larger
amount;
|
|
•
|
sub-divide all or any part of our shares into shares of smaller amount than is fixed by our Memorandum
of Association;
|
|
•
|
convert any of our fully paid shares the nominal value of which is expressed in one currency into
fully paid shares of a nominal value of another currency and denominate the nominal value of our issued or unissued shares in units
of the currency into which they have been converted;
|
|
•
|
convert any of our paid-up shares into stock, and reconvert any stock into any number of paid-up
shares of any denomination;
|
|
•
|
convert any of our existing non-redeemable shares (whether issued or not) into redeemable shares
which can be redeemed;
|
|
•
|
cancel shares which, at the date of passing of the resolution, have not been taken or agreed to
be taken by any person, and diminish the amount of our share capital by the amount of the shares so cancelled;
|
|
•
|
reduce the authorized share capital;
|
|
•
|
reduce our issued share capital, any capital redemption reserve, any share premium account or any
other undistributable reserve in any way; or
|
|
•
|
alter our Memorandum of Association or Articles of Association.
|
Articles of Association
We updated our Articles
of Association following our annual general meeting on May 3, 2011, where we adopted by special resolution a modern set of articles
that a London Stock Exchange listed company should have. At the same time, changes were made to reflect new requirements imposed
by the United Kingdom Listing Authority on “premium listed” companies. Since then our shareholders approved further
updates to our Articles of Association on May 6, 2014.
General Meeting of Shareholders
We may at any time convene
general meetings of shareholders. We are required to hold an annual general meeting once every year. No more than fifteen months
may elapse between the date of one annual general meeting and the next.
Annual general meetings
require twenty business days’ notice of the place, day and time of the meeting in writing or in an electronic communication
to our shareholders. Any other general meeting (called an extraordinary general meeting) requires no less than fourteen clear days’
notice in writing or in an electronic communication. In addition, provided that it has been authorized by an ordinary resolution
of shareholders and certain other requirements are complied with, a notice may instead of being sent to shareholders, be published
on our website. Our business may be transacted at a general meeting only when a quorum of shareholders is present. Two persons
entitled to attend and to vote on the business to be transacted, each being a member or a proxy for a member or a duly authorized
representative of a corporation which is a member, constitute a quorum. NASDAQ’s Global Select Market’s marketplace
rules, which apply to all companies listed on the NASDAQ Global Select Market, state in Rule 4350(f) that the minimum quorum for
any meeting of holders of a company’s common stock is 33⅓% of the outstanding shares.
As a result, we requested,
and the NASDAQ Global Select Market granted to us, an exemption from compliance with the Rule 4350(f) requirement.
The annual general meetings
deal with and dispose of all matters prescribed by our Articles of Association and by the 1991 Law including:
|
•
|
the consideration of our annual financial statements and report of our independent accountants;
|
|
•
|
the election of directors; and
|
|
•
|
the appointment of independent auditors.
|
Voting Rights
Subject to any special
terms as to voting on which any shares may have been issued or may from time to time be held, at a general meeting, every shareholder
who is present in person (including any corporation present by its duly authorized representative) shall on a show of hands have
one vote and every shareholder present in person or by proxy shall on a poll have one vote for each share of which he is a holder.
In the case of joint holders, the vote of the senior who tenders a vote, whether in person or by proxy, shall be accepted to the
exclusion of the votes of the other joint holders. The Articles of Association include a new provision that for as long as our
shares are admitted to trading on the London Stock Exchange or on the NASDAQ Global Select Market, at any general meeting a resolution
put to the meeting shall be decided on a poll.
Unless we otherwise determine,
no shareholder is entitled to vote at a general meeting or at a separate meeting of the holders of any class of shares, either
in person or by proxy, or to exercise any other right or privilege as a shareholder in respect of any share held by him unless
all calls presently payable by him in respect of that share, whether alone or jointly with any other person, together with interest
and expenses, if any, have been paid to us.
Dividends
Subject to the provisions
of the 1991 Law and of the Articles of Association, we may, by ordinary resolution, declare dividends to be paid to shareholders
according to their respective rights and interests in our profits. However, no dividend shall exceed the amount recommended by
us. Subject to the provisions of the 1991 Law, we may pay an interim dividend, including a dividend payable at a fixed rate, if
an interim dividend appears to us to be justified by our distributable reserves.
Except as otherwise provided
by the rights attached to any shares, all dividends shall be declared and paid according to the amounts paid up, otherwise than
in advance of calls, on the shares on which the dividend is paid. All dividends, interest or other sum payable and unclaimed for
12 months after having become payable may be invested or otherwise made use of by the board for our benefit until claimed. All
dividends unclaimed for a period of
12 years after having been declared or become
due for payment shall, if we so resolve, be forfeited and shall cease to remain owing by us.
We may, with the authority
of an ordinary resolution, direct that payment of any dividend declared may be satisfied wholly or partly by the distribution of
assets, and in particular of paid up shares of the company or by the distribution of assets, or in any one or more of those ways.
We may also with the prior
authority of an ordinary resolution, and subject to such conditions as we may determine, offer to holders of shares the right to
elect to receive new shares, credited as fully paid, instead of the whole, or some part, to be determined by us, of any dividend
specified by the ordinary resolution.
The Board has discretion
under the Articles of Association to pay dividends in a currency other than US dollars.
Ownership Limitations
Our Articles of Association
and the 1991 Law do not contain limits on the number of shares that a shareholder may own.
Distribution of Assets on a Winding-Up
If we are wound up, we
may, with the sanction of a special resolution and any other sanction required by law, divide among the shareholders in specie
the whole or any part of our assets provided that no shareholder shall be compelled to accept any assets upon which there is a
liability. For that purpose, the liquidator, or the directors (where there is no liquidator) may value any assets and determine
how the dividend shall be carried out as between the shareholders or vest the whole or any part of the assets in trustees on such
trusts for the benefit of the shareholders.
Transfer of Shares
Every shareholder may
transfer all or any of his shares by instrument of transfer in writing in any usual form or in any form approved by us. The instrument
must be executed by or on behalf of the transferor and, in the case of a transfer of a share which is not fully paid up, by or
on behalf of the transferee. The transferor is deemed to remain the holder until the transferee’s name is entered in the
register of shareholders.
We may, in exceptional
circumstances approved by the Financial Conduct Authority, refuse to register the transfer of shares provided that such refusal
would not disturb the market in those shares. Subject to the requirements of the Financial Conduct Authority, we may, in our absolute
discretion and without giving any reason, refuse to register any transfer of a certificated share on which we have a lien, provided
that where any such shares are admitted to the Official List of the United Kingdom Listing Authority such discretion may not be
exercised in a way which the Financial Conduct Authority or the London Stock Exchange regards as preventing dealings in the shares
of the relevant class or classes from taking place on an open or proper basis.
We may also refuse to
register a transfer of certificated shares unless the instrument of transfer is:
|
•
|
lodged at the registered office of the Company for the time being or another place that we may
from time to time determine accompanied by the certificate for the shares to which it relates and any other evidence as we may
reasonably require to show the right of the transferor to make the transfer;
|
|
•
|
it is in respect of only one class of shares; and
|
|
•
|
in favor of not more than four transferees.
|
Unless otherwise permitted
by the Companies (Uncertificated Securities) (Jersey) Order 1999, we may not close any register relating to a participating security
without the consent of the approved operator of the relevant system.
Variation of Rights
If at any time our share
capital is divided into shares of different classes, any of the rights for the time being attached to any share or class of shares
may be varied or abrogated in the manner, if any, that is provided by the rights or, in the absence of any such provision, either
with the consent in writing of the holders of a majority in nominal value of the issued shares of the class or with the sanction
of an ordinary resolution passed at a separate meeting of the holders of the issued shares of that class. The quorum at that meeting
shall be persons holding or representing by proxy at least one-third in nominal value of the issued shares of the class in question
and at an adjourned meeting, if a quorum as stated is not present, the shareholders that are present shall be a quorum.
The special rights conferred
upon the holders of any shares of class of shares issued with preferred, deferred or other special rights shall (unless otherwise
expressly provided by the terms of issue of such shares of under the Articles of Association) be deemed not to be varied or abrogated
by the creation or issue of further shares or further classes of shares ranking pari passu therewith.
Capital Calls
Subject to the terms of
allotment of shares, we may from time to time make calls on the members in respect of any monies unpaid on the shares, whether
in respect of nominal value or premium, and not payable on a fixed date. A member must receive fourteen days’ notice of any
call and any call is deemed to be made when the resolution of the board authorizing such call was passed.
If any call is not paid
on or before the date appointed for payment, the person liable to pay that call shall pay interest on the amount unpaid from the
day upon which it became due and payable until it and any expenses incurred by us as a result of the non-payment are paid at the
HSBC bank’s base rate plus two per cent. per annum or the rate fixed by the terms of the allotment of the share such amount
of interest as we may determine provided that we may waive payment of the interest wholly in part.
Unless we otherwise determine,
no member shall be entitled to receive any dividend or to be present or to vote, either in person or by proxy, at any general meeting
or at a separate meeting of the holders of a class of shares or on a poll, or be included in a quorum, or to exercise other rights
conferred by membership in relation to the meeting or poll, unless and until any outstanding calls in respect of his shares are
paid.
Borrowing Powers
We may exercise all of
our powers to borrow money and to mortgage or charge all or any part of our undertaking, property and assets, present and future,
and uncalled capital and, subject to the provisions of the 1991 Law and the Articles of Association, to issue debentures and other
loan stock and other securities, whether outright or as collateral security for any debt, liability or obligation of ours or of
any third party.
Issue of Shares and Preemptive Rights
Subject to the provisions
of the 1991 Law and subject to and without prejudice to any rights attached to any shares, we may issue shares with any rights
or restrictions attached to them as we may from time to time determine by ordinary resolution, or if no ordinary resolution has
been passed or an ordinary resolution does not make specific provision, as we may determine. Subject to provisions of the 1991
Law, we may issue shares that are redeemable or are liable to be redeemed at our option or the option of the holder holding such
redeemable shares. Subject to the provisions of the 1991 Law the unissued shares at the date of adoption of the Articles of Association
and shares created thereafter shall be at our disposal. We cannot issue shares at a discount.
The Articles of Association
contain pre-emption rights. Before allotting any Equity Securities (as defined in the Articles of Association) such Equity Securities
are to be offered to holders of ordinary shares on the same or more favorable terms and in the same proportion of those shares
in nominal value held by the holder of the ordinary shares. Equity Securities shall not be allotted unless the period during which
any such offer may be accepted by the relevant current holders has expired or we have received notice of the acceptance or refusal
of every offer made to
holders. Pre-emption rights do not apply where
a shareholder has renounced his right for those allotted shares, shares are to be allotted under an Employee Share Scheme, shares
are to be allotted otherwise for cash or the allotment is in relation to an issue of bonus shares. Shareholders must have a period
of at least fourteen days in which to accept the offer and the offer may not be withdrawn within this period. The pre-emption rights
may be disapplied by a special resolution for the allotment of Equity Securities wholly for cash either generally or in respect
of a specific allotment where the authority granted pursuant to the special resolution is for a certain period of time. A proposed
special resolution disapplying the pre-emption rights must be recommended by the directors who must give the shareholders their
reasons for making the recommendations and if known, the amount to be paid to us in respect of the Equity Securities to be allotted.
Interests in Shares
We can give notice to
any person who is interested in shares or who has been interested in the shares at any time during the three years preceding the
date on which the disclosure notice is issued. If the interested party holds less than 0.25% of shares in a class and does not
provide the information requested by us within a reasonable time, the shareholder shall not be entitled to attend or vote at any
general meeting. If the interested party holds at least 0.25% of shares in a class and does not provide the information requested
by us within a reasonable time, the shareholder shall not be entitled to (i) attend or vote at any general meeting; (ii) receive
dividends; (iii) be allotted shares in lieu of dividends; and (iv) transfer shares. Notwithstanding these prohibitions,
the interested party can still trade his shares on the London Stock Exchange.
The Articles of Association
provide that if at any time we have a class of shares admitted to trading on the London Stock Exchange, we must comply with the
vote holder and issuer notification rules set out in Rule 5 of the UK Disclosure Rules and Transparency Rules (DTRs), which shall
apply to us and our shareholders. Shareholders have to make notifications of changes in major shareholdings. Sanctions imposed
where the provisions of Rule 5 of the DTRs are not followed included suspension of voting and/or dividend rights.
Directors obliged to notify us of their
shareholding in the Company
The Articles of Association
incorporate the requirements of Rule 3 of the DTRs and directors are obliged to notify us of their shareholding. A director is
also required to notify us of any increase in the number of shares he holds and if he disposes of any shares. Notification must
also be given by a director where he has entered into an option or warrant to acquire or dispose of shares. The notification obligation
is quite wide as it also extends to any shares held by a director’s spouse or civil law partner; child or step-child, and
any of their siblings; and any relative of a director who has shared the same household with the director over 12 months preceding
the director’s appointment. A director is also required to notify us if he or any of his family members’ hold 33% of
the voting rights of a corporate entity. We are also under an obligation to use our reasonable endeavors to procure that the directors
and those discharging managerial responsibilities and their connected persons comply with Rule 3 of the DTRs.
Meetings of the Board of Directors
Any director may, and
the secretary at the request of a director shall, call a board meeting at any time. Notice is deemed to be duly given to a director
if it is given to him personally, by word of mouth, by electronic communication or in writing. A director may waive this notice
requirement, either prospectively or retrospectively.
Subject to our Articles
of Association the board of directors may meet for the conducting of business, adjourn and otherwise regulate its proceedings as
it sees fit. The quorum necessary for the transaction of business may be determined by the board of directors and unless otherwise
determined shall be two directors. A duly convened meeting of the board of directors at which a quorum is present is necessary
to exercise all or any of the board’s authorities, powers and discretions.
The board of directors
may delegate to any director holding an executive office any of its powers, authorities and discretions for such time, on such
terms and subject to such conditions as it sees fit. In particular, it may grant the power to sub-delegate and may retain or exclude
the right of the board to exercise the delegated powers, authorities or discretions collaterally with the director. Such delegation
can be revoked at any time or its terms and
conditions altered. The board of directors
may also delegate any of its powers, authorities and discretions for such time and on such terms and subject to such conditions
as it sees fit to any committee consisting of one or more directors (if thought fit) one or more other persons, or to a person
who need not be a director. The powers, authorities and discretions that the board of directors may delegate, may include all powers
and discretions whose exercise involves or may involve the payment of remuneration or the conferring of any other benefit on all
or any of the directors.
Any person, committee
or sub-committee to whom the board of directors has delegated powers, shall in exercising such powers conform to any regulations
or charters which may from time to time be imposed by the board and which may provide for members of the committee who are not
directors to have voting rights as members of the committee / sub-committee but so that (a) the number of members who are
not directors shall not be less than one-half of the total number of members of the committee / sub-committee and (b) no resolution
of the committee / sub-committee shall be effective unless a majority of the members of the committee / sub-committee present throughout
the meeting are directors.
The Articles of Association
contain provisions setting out in general terms the power of the Board to delegate its powers.
Remuneration of Directors
Our non-executive
directors shall be entitled to receive by way of fees for their services as directors any sum that we may from time to time
determine, not exceeding in aggregate $1,500,000 per annum or any other sum as we, by ordinary resolution in a general meeting,
shall from time to time determine. That sum, unless otherwise directed by ordinary resolution of us by which it is voted, shall
be divided among the non-executive directors in the proportions and in the manner that the board determines or, if the board has
not made a determination, equally. The directors are entitled to be repaid all traveling, hotel and other expenses properly incurred
by them in or about the performance of their duties as directors.
Subject to the 1991 Law,
the Articles of Association and the requirements of the London Stock Exchange and any other relevant stock exchange, the board
of directors may now arrange for part of a fee payable to a director to be provided in the form of fully-paid shares in our capital.
The amount of the fee payable will be at the board’s discretion and shall be applied in the purchase or subscription of shares
on behalf of the relevant director. In the case of a subscription of shares, the subscription price per share shall be deemed to
be the closing middle-market quotation for a fully paid share of the Company of that class as published in the Daily Official List
of the NASDAQ Global Select Market (or such other quotation derived from such other source as the board of directors may deem appropriate)
on the day of subscription.
The salary or remuneration
of any director appointed to hold any employment or executive office may be either a fixed sum of money, or may altogether or in
part be governed by business done or profits made or otherwise determined by the board of directors, and may be in addition to
or in lieu of any fee payable to him for his services as director.
Pensions and Gratuities for Directors
We may exercise all of
our powers to provide and maintain pensions, other retirement or superannuation benefits, death or disability benefits or other
allowances or gratuities for persons who are or were directors of any company in our group and their relatives or dependents. For
this purpose, the board of directors may establish, maintain, subscribe and contribute to any scheme, trust or fund and pay premiums.
Directors’ Interests in Contracts
Subject to the provisions
of the 1991 Law and provided that his interest is disclosed as soon as practicable after a director becomes aware of the circumstances
which gave rise to his duty to disclose in accordance with the Articles of Association, a director, notwithstanding his office,
may enter into or otherwise be interested in any contract, arrangement, transaction or proposal with us, or in which we are otherwise
interested, may hold any other office or place of profit under us (except that of auditor of, or of a subsidiary of ours) in conjunction
with the office
of director and may act by himself or through
his firm in a professional capacity for us, and in any such case on such terms as to remuneration and otherwise as we may arrange,
and may be a director or other officer of, or employed by, or a party to any transaction or arrangement with, or otherwise interested
in, any company promoted by us or in which we are otherwise interested and shall not be liable to account to us for any profit,
remuneration or other benefit realized by any such office, employment, contract, arrangement, transaction or proposal.
No such contract, arrangement,
transaction or proposal shall be avoided on the grounds of any such interest or benefit.
Restrictions on Directors’ Voting
Except as provided in
our Articles of Association, a director shall not vote on, or be counted in the quorum in relation to, any resolution of the board
or of a committee of the board concerning any contract, arrangement, transaction or any other proposal whatsoever to which we are
or any of our subsidiary undertakings are or will be a party and in which he has an interest which is to his knowledge a material
interest (otherwise than by virtue of his interests in shares or debentures or other securities of or otherwise in or through us),
unless the resolution concerns any of the following matters:
|
•
|
the giving of any guarantee, security, or indemnity in respect of money lent or obligations incurred
by him or any other person at the request of or for the benefit of us or any of our subsidiary undertakings;
|
|
•
|
the giving of any guarantee, security or indemnity in respect of a debt or obligation of ours or
any of our subsidiary undertakings for which he himself has assumed responsibility in whole or in part either alone or jointly
with others under a guarantee or indemnity or by the giving of security;
|
|
•
|
a contract, arrangement, transaction or proposal concerning an offer of shares or debentures or
other securities of or by us or any of our subsidiary undertakings in which offer he is or may be entitled to participate as a
holder of securities or in the underwriting or sub-underwriting of which he is to participate;
|
|
•
|
a contract, arrangement, transaction or proposal to which we are or will be a party concerning
another company (including any of our subsidiary undertakings) in which he, is interested (directly or indirectly) whether as an
officer, shareholder, creditor or otherwise (a “relevant company”), if he does not hold an interest in five per cent.
or more of either any class of the equity share capital of or the voting rights in the relevant company;
|
|
•
|
a contract, arrangement, transaction or proposal for the benefit of our employees or any of our
subsidiary undertakings (including any pension fund or retirement, death or disability scheme) which does not award him a privilege
or benefit not generally awarded to the employees to whom it relates; and
|
|
•
|
a contract, arrangement, transaction or proposal concerning the purchase or maintenance of any
insurance policy for the benefit of directors or for the benefit of persons including directors.
|
A director shall not vote
or be counted in the quorum for any resolution of the board or committee of the board concerning his own appointment (including
fixing or varying the terms of his appointment or termination) as the holder of any office or place of profit with us or any company
in which we are interested.
Number of Directors
Unless and until otherwise
determined by a special resolution, the number of directors shall be not fewer than two or more than 20.
Directors’ Appointment and Retirement
by Rotation
Directors may be appointed
by ordinary shareholder resolution or by the board. A director appointed by the board shall hold office only until the next annual
general meeting and shall not be taken into account in determining the number of directors who are to retire by rotation. A director
shall not be required to hold any of our shares.
In accordance with the
Articles of Association directors are to retire and offer themselves for re-election (should they chose to do so) at each annual
general meeting of the company.
Directors do not have
power to appoint alternate directors.
Untraced Shareholders
Subject to the Companies
(Uncertificated Securities) (Jersey) Order 1999, we may sell any of our shares registered in the name of a shareholder remaining
untraced for 12 years who fails to communicate with us following advertisement of an intention to make such a disposal. Until we
can account to the shareholder, the net proceeds of sale will be available for use in our business or for investment, in either
case at our discretion. The proceeds will not carry interest and we are not required to account for money earned on it.
CREST
The Companies (Amendment
No. 4) (Jersey) Law 1998 and the Companies (Uncertificated Securities) (Jersey) Order 1999 allow the holding and transfer
of shares under CREST, the electronic system for settlement of securities in the United Kingdom. Our Articles of Association provide
for our shares to be held in uncertificated form in accordance with the Companies (Uncertificated Securities) (Jersey) Order 1999.
Purchase of Shares
Subject to the provisions
of the 1991 Law, we may purchase any of our own shares of any class, including redeemable shares. The 1991 Law provides that we
may, by special resolution approve the acquisition of our own shares from any source, but only if they are fully paid.
Non-Jersey Shareholders
There are no limitations
imposed by Jersey law or by our Articles of Association on the rights of non-Jersey shareholders to hold or vote on our ordinary
shares or securities convertible into our ordinary shares.
Rights of Minority Shareholders and Fiduciary
Duties
Majority shareholders
of Jersey companies have no fiduciary obligations under Jersey law to minority shareholders. However, under the 1991 Law, a shareholder
may, under some circumstances, seek relief from the court if he has been unfairly prejudiced by us. The provisions of the 1991
Law are designed to provide relief from oppressed shareholders without necessarily overriding the majority’s decision. There
may also be common law personal actions available to our shareholders.
Jersey Law and Our Memorandum and Articles
of Association
The content of our Memorandum
and Articles of Association is largely derived from an established body of corporate law and therefore they mirror the 1991 Law.
Jersey company law draws very heavily from company law in England and there are various similarities between the 1991 Law and the
English Companies Act 2006. However, the 1991 Law is considerably shorter in content than the English statutes and there are some
notable differences between English and Jersey company law. There are, for example, no provisions under Jersey law or regulations
(as there are under English law or regulations):
|
•
|
controlling possible conflicts of interests between us and our directors, such as loans by us or
directors, directors’ service contracts, substantial property transactions and contracts between us and our directors other
than a duty on directors to disclose an interest in any transaction to be entered into by us or any of our subsidiaries which to
a material extent conflicts with our interest;
|
|
•
|
specifically requiring particulars to be shown in our accounts of the amount of loans to officers
or directors’ emoluments and pensions, although these would probably be required to be shown in our accounts in conformity
to the requirement that accounts must be prepared in accordance with generally accepted accounting principles;
|
|
•
|
requiring us to file details of charges other than charges of Jersey realty;
|
|
•
|
as regards statutory preemption provisions in relation to further issues of shares.
|
|
•
|
prohibiting the giving of financial assistance by public companies; or
|
|
•
|
requiring compliance with Rule 5 of the DTRs.
|
Under Article 143 of the
1991 Law, the court may make an order giving relief, including regulation of our affairs requiring us to refrain from doing or
continuing to do an act complained of, authorizing civil proceedings and providing for the purchase of shares by any of our other
shareholders and any other consequential orders.
The court has wide powers
within its inherent jurisdiction and a shareholder could successfully bring an action in a variety of circumstances. Although there
is no statutory definition of unfairly prejudicial conduct, authority suggests that it includes oppression and discrimination and
that the test is objective.
There are no provisions
in our Memorandum or Articles of Association concerning changes of capital where these provisions would be considered more restrictive
than that required by the 1991 Law.
C. MATERIAL CONTRACTS
1. Appointment letters with our non-executive
directors: (i) Appointment Letter, dated May 6, 2014, between Randgold Resources Limited and Jemal-ud-din Kassum, (ii) Appointment
Letter, dated March 1, 2015, between Randgold Resources Limited and Safiatou Francoise Ba-N’Daw, (iii) Appointment Letter,
dated May 6, 2014, between Randgold Resources Limited and Andrew Quinn, (iv) Appointment Letter, dated May 6, 2014, between Randgold
Resources Limited and Christopher Coleman, (v) Appointment Letter, dated May 6, 2014, between Randgold Resources Limited and Kadri
Dagdelen, (vi) Appointment Letter, dated May 6, 2014, between Randgold Resources Limited and Karl Voltaire, (vii) Appointment Letter,
dated May 6, 2014, between Randgold Resources Limited and Norborne Cole Jr., and (viii) Appointment Letter, dated May 6, 2014,
between Randgold Resources Limited and Jeanine Mabunda Lioko.
Pursuant to the appointment
letters with the non-executive directors, each non-executive director’s appointment as a non-executive director is contingent
upon re-election at the forthcoming annual general meetings and the appointment is terminable by either party upon three months’
notice. The appointment letters provide that a non-executive director is entitled to receive a fee of $50,000 per year (payable
half yearly in arrears). In addition, if a non-executive director is appointed to serve on a board committee, the fees payable
will be as follows: Audit Committee-$35,000 per year; Remuneration Committee-$25,000 per year; Governance and Nomination Committee-$10,000
per year, and the chairman of a board committee is entitled to receive an additional premium to the committee assignment fee of
$20,000 per year. Each non-executive director shall receive 1,200 ordinary shares in the company per year subject to approval of
shareholders at the company’s annual general meeting. Mr. Cole’s appointment letter provides that in addition,
as the appointed senior independent director, he will receive an additional $85,000. Mr. Coleman’s appointment letter provides
that in addition, as the appointed chairman of the board of directors (inclusive of committee membership fees but exclusive of
of the committee chairman fee), he will receive an additional $200,000. On May 5, 2015, our shareholders approved an increase of
the non-executive directors’ fees and the award of ordinary shares in the company to each non-executive director. See the
description of the non-executive directors’ fee under “PART I. Item 6. Directors, Senior Management and Employee-B.
Compensation—Non-Executive Director Remuneration” above.
2. Deeds of indemnity: (i) Deed of Indemnity,
dated January 31, 2014, between Randgold Resources Limited and Jemal-ud-din Kassum and (ii) Deed of Indemnity, dated March
1, 2015, between Randgold Resources Limited and Safiatou Ba-N’Daw.
We entered into a deed
of indemnity with Jemal-ud-din Kassum pursuant to which the company shall indemnify Mr. Kassum for claims, liabilities, costs charges,
expenses or losses which may be made against him or which he may incur as a result of his directorship, subject to certain exclusions
and limitations.
We entered into a deed
of indemnity with Safiatou Ba-N’Daw pursuant to which the company shall indemnify Mrs. Ba-N’Daw for claims, liabilities,
costs charges, expenses or losses which may be made against her or which she may incur as a result of her directorship, subject
to certain exclusions and limitations.
3. Facility Agreement dated December 17, 2014
between Randgold Resources Limited, HSBC Bank PLC and other financial institutions.
In December 2014, we entered
into a $400.0 million unsecured revolving credit facility with HSBC and a syndicate of other banks which matures in May 2016 and
is at present undrawn. The interest rate, if drawn, would be LIBOR plus 1.5% per annum based on the company’s current level
of leverage. The facility includes financial covenants in respect of EBIT, EBITDA, net finance charges, tangible net worth, total
debt, debt coverage and interest coverage.
4. Amendment dated September 16, 2015 to the
Joint Venture Agreement between Randgold Resources Limited and AngloGold Ashanti Limited, dated July 16, 2009 relating to Kibali
Goldmines SA.
In September 2015, we
entered into a side letter with AngloGold Ashanti Limited to clarify certain inconsistencies contained in the Joint Venture Agreement
between Randgold Resources Limited and AngloGold Ashanti Limited, dated July 16, 2009.
D. EXCHANGE CONTROLS
There are currently no
Jersey or United Kingdom foreign exchange control restrictions on the payment of dividends on our ordinary shares or on the conduct
of our operations. Jersey is in a monetary union with the United Kingdom. There are currently no limitations under Jersey law or
our Articles of Association prohibiting persons who are not residents or nationals of the United Kingdom from freely holding, voting
or transferring our ordinary shares in the same manner as United Kingdom residents or nationals.
E. TAXATION
Material Jersey Tax Consequences
General
The following summary
of the anticipated tax treatment in Jersey in relation to the payments on the ordinary shares and ADSs is based on the taxation
law and practice as it is understood to apply at the date of this Annual Report, and does not constitute legal or tax advice and
does not address all aspects of Jersey tax law and practice (including such tax law and practice as it applies to any land or building
situated in Jersey). Prospective investors should be aware that the relevant fiscal rules and practice and their interpretation
may change. We encourage you to consult your own professional advisers on the implications of subscribing or buying, holding, selling,
redeeming or disposing of ordinary shares or ADSs and the receipt of interest and distributions, whether or not on a winding-up,
with respect to the ordinary shares or ADSs under the laws of any jurisdiction in which they may be liable to taxation.
We are subject to Jersey
income tax at the rate of zero percent in accordance with the Income Tax (Jersey) Law 1961, as amended (Income Tax Law).
The Income Tax Law provides
that the standard rate of income tax on profits of a non-financial service company regarded as resident in Jersey or having a permanent
establishment in Jersey will be zero percent.
As a non-financial service
company subject to tax at the rate of zero percent, we will not be liable for Jersey income tax other than on income arising from
Jersey land or property.
Currently, there is no
double tax treaty or similar convention between the United States and Jersey although on December 13, 2013, Jersey and the United
States signed an agreement to improve international tax compliance and to implement the US Foreign Account Tax Compliance Act (FATCA).
FATCA applies to financial institutions outside the United States. Under the relevant provisions of FATCA we are a non-financial
foreign entity and as such we have no obligation under FATCA.
Goods and Services Tax
Jersey has a tax on goods
and services supplied in the island (GST). GST is not chargeable on supplies of goods and/or services made by us outside of Jersey
and we will only incur GST on goods and/or services provided to us by GST registered businesses in Jersey.
Taxation of Dividends
Dividends are declared
and paid gross in US dollars although under the Articles of Association, dividends may be payable in a currency other than US dollars.
Under the existing Jersey law, payments in respect of the ordinary shares and ADSs, whether by dividend or other distribution paid
to shareholders (other than to residents in Jersey), will not be subject to any taxation in Jersey and no withholding in respect
of taxation will be required on those payments to any holder of our ordinary shares or ADSs.
Prior to 2012, the Income
Tax Law made provision for the taxation of an individual who is a shareholder or ultimate beneficial owner resident in Jersey who
owns 2% or more of the shares of a company resident in Jersey or with a permanent establishment in Jersey, however with effect
from January 1, 2012 these rules have been repealed. New anti-avoidance rules came into force from January 1, 2013 which extend
the range of what is a potentially taxable distribution from a Jersey resident company to Jersey resident shareholders and this
may now include repayment of loan principal, proceeds received in the course of winding up, share repurchase/redemption, etc.
Taxation of Capital Gains and Estate and
Gift Tax
Under current Jersey law,
there are no death or estate duties, capital gains, gift, wealth, inheritance or capital transfer taxes. No stamp duty or other
transfer tax is levied in Jersey on the issue or transfer of ordinary shares or ADSs unless such transfer conveys the right to
occupy Jersey land. Probate Stamp Duty (PSD) is charged on the application for Grants of Probate and Letters of Administration.
For individuals domiciled in Jersey, the whole of their estate is subject to PSD, while for individuals domiciled outside of Jersey,
just their Jersey situs assets (including shares in Jersey companies) are subject to PSD. The current rates of PSD are:
• on
estates which do not exceed £10,000 no PSD is due;
• on
estates of more than £10,000, but which do not exceed £100,000, PSD is due at the rate of 0.5%; and
• on
estates of more than £100,000, PSD of £500 is due in respect of the first £100,000 of value and then 0.75% on
the value of the estate exceeding £100,000, however total PSD may not exceed £100,000, which equates to an estate worth
£13,360,000.
Material United States Federal Income Tax Consequences
The following summary
describes the material US federal income tax consequences to US holders (as defined below) arising from the purchase, ownership
and disposition of our ordinary shares or ADSs. This summary is based on the provisions of the Internal Revenue Code of 1986, as
amended, which we refer to as the Code, final, temporary and proposed US Treasury Regulations promulgated under the Code, and administrative
and judicial
interpretations of the Code and the US Treasury
Regulations, all as in effect as of the date of this summary, and all of which are subject to change, possibly with retroactive
effect. In addition, this discussion assumes that the representations contained in the deposit agreement are true and that the
obligations in the deposit agreement and any related agreement have been and will be complied with in accordance with their terms.
This summary has no binding
effect or official status of any kind; there can be no assurance that the conclusions reached below would be sustained by a court
if challenged by the US Internal Revenue Service.
For purposes of this discussion,
a “US holder” is a holder of our ordinary shares or ADSs that is a beneficial owner of such shares or ADSs and is:
• a
US citizen;
• an
individual resident in the United States for US federal income tax purposes;
• a
domestic corporation, or other entity taxable as a corporation, organized under the laws of the United States or of any US state
or the District of Columbia;
• an
estate the income of which is includible in its gross income for US federal income tax purposes without regard to its source; or
• a
trust, if either: a US court is able to exercise primary supervision over the administration of the trust and one or more US persons
have the authority to control all the substantial decisions of the trust, or the trust has a valid election in effect under applicable
US Treasury Regulations to be treated as a US person.
This summary does not
address all aspects of US federal income taxation that may be relevant to particular US holders in light of their particular circumstances,
or to US holders subject to special rules, including, without limitation:
|
•
|
persons that hold ordinary shares or ADSs as part of a “straddle,” “synthetic
security,” “hedge,” “conversion transaction” or other integrated investment;
|
|
•
|
persons that enter into “constructive sales” involving our ordinary shares or ADSs
or substantially identical property with other transactions;
|
|
•
|
persons whose functional currency is not the US Dollar;
|
|
•
|
expatriates or former long-term residents of the United States;
|
|
•
|
financial institutions;
|
|
•
|
dealers in securities or currencies;
|
|
•
|
tax-exempt organizations;
|
|
•
|
persons that own, actually or constructively, 10% or more of our outstanding voting stock;
|
|
•
|
persons subject to the alternative minimum tax;
|
|
•
|
regulated investment companies;
|
|
•
|
real estate investment trusts;
|
|
•
|
persons who trade in securities who elect to apply a mark-to-market method of accounting; and
|
|
•
|
persons who acquired their shares or ADSs pursuant to the exercise of employee stock options or
otherwise as compensation.
|
In addition, this summary
does not address the effect of any applicable US state, local or non-US tax laws or any federal estate or gift tax consequences,
does not consider the tax treatment of persons who own our ordinary shares or ADSs through a partnership or other pass-through
entity, and deals only with ordinary shares or ADSs held by US holders as “capital assets” as defined in Section 1221
of the Code. If a partnership (including for this purpose, any entity treated as a partnership for US federal income tax purposes)
holds shares or ADSs, the tax treatment of a partner generally will depend upon the status of the partner and the activities of
the partnership. If a US holder is a partner in a partnership that holds shares or ADSs, the holder is urged to consult its own
tax advisor regarding the specific tax consequences of the ownership and disposition of the shares or ADSs.
We encourage holders of
our ordinary shares or ADSs to consult with their own tax advisors with respect to the US federal, state and local tax consequences,
as well as the tax consequences in other jurisdictions, of the purchase, ownership and disposition of our ordinary shares or ADSs
applicable in their particular tax situations.
Ownership of Ordinary
Shares or ADSs
For purposes of the Code,
US holders of ADSs should be treated for US federal income tax purposes as the owner of the ordinary shares represented by those
ADSs. Accordingly, exchanges of ordinary shares for ADSs and ADSs for ordinary shares generally should not be subject to US federal
income tax. The US Treasury has, however, expressed concerns that intermediaries in the chain of ownership between the US holder
of an ADS and the issuer of the security underlying the ADS may, in some circumstances, be taking actions that are inconsistent
with the beneficial ownership of the underlying security (for example, pre-releasing ADSs to persons that do not have the beneficial
ownership of the securities underlying the ADSs). Accordingly, the availability of the reduced tax rate (as discussed below) for
dividends received by certain non-corporate US holders, including US holders who are individuals, could be affected by future actions
that may be taken by the US Treasury and/or intermediaries in the chain of ownership between the US holders of ADSs and us.
Subject to the discussion
below under the heading “–Passive Foreign Investment Company Rules,” for US federal income tax purposes, distributions
with respect to our ordinary shares or ADSs, other than distributions in liquidation and distributions in redemption of stock that
are treated as exchanges, will be taxed to US holders as ordinary dividend income to the extent that the distributions do not exceed
our current and accumulated earnings and profits as determined for federal income tax purposes. Distributions, if any, in excess
of our current and accumulated earnings and profits will constitute a non-taxable return of capital and will be applied against
and reduce the holder’s basis in our ordinary shares or ADSs. To the extent that these distributions exceed the US holder’s
tax basis in our ordinary shares or ADSs, as applicable, the excess generally will be treated as capital gain. We do not, however,
intend to calculate our earnings and profits under US federal income tax principles. Therefore, you should expect that any distribution
from us generally will be treated for US federal income tax purposes as a dividend. Such dividends will not be eligible for the
dividends received deduction generally allowed to a US corporation under Section 243 of the Code.
Individual US holders
are eligible for reduced rates of US federal income tax (currently at a maximum rate of 20%) in respect of “qualified dividend
income”. For this purpose, qualified dividend income generally includes dividends paid by non-US corporations if, among other
things, certain minimum holding periods are met and either (i) the ordinary shares (or ADSs) with respect to which the dividend
has been paid are readily tradable on an established securities market in the United States, or (ii) the non-US corporation
is eligible for the benefits of a comprehensive US income tax treaty which provides for the exchange of information. For this purpose,
ADSs listed on the NASDAQ exchange are considered to be readily tradable on an established securities market in the United States.
Therefore, we currently believe that dividends paid with respect to our ADSs will constitute qualified dividend income for US federal
income tax purposes, provided the individual US holders of our ADSs meet certain holding period requirements. However, since our
ordinary shares are not listed on an established securities market in the United States and we are not eligible for the benefits
of a comprehensive US income tax treaty which provides
for the exchange of information, we do not
believe that dividends that we pay on our ordinary shares that are not represented by ADSs currently meet the conditions required
for these reduced tax rates. Furthermore, if we are a passive foreign investment company, as discussed below under the heading
“–Passive Foreign Investment Company Rules”, in the taxable year of the distribution or the preceding tax year,
the dividends paid with respect to our ADSs will not constitute qualified dividend income.
US holders should consult their own
tax advisors regarding the classification of any distributions from us as qualified dividend income.
Dividends from us generally
will constitute non-US-source income for foreign tax credit limitation purposes. The limitation on foreign taxes eligible for credit
is calculated separately with respect to specific classes of income. For this purpose, dividends distributed by us generally will
be treated as “passive category income” or, in the case of certain US holders, as “general category income.”
Sale or Other Disposition
of Ordinary Shares or ADSs
Subject to the discussion
below under “–Passive Foreign Investment Company Rules,” if a US holder sells or otherwise disposes of its ordinary
shares or ADSs in a taxable transaction, it will generally recognize gain or loss for US federal income tax purposes in an amount
equal to the difference between the amount realized on the sale or other taxable disposition and its tax basis in the ordinary
shares or ADSs. Such gain or loss generally will be capital gain or loss and will be long-term capital gain or loss if the US holder
has held the ordinary shares or ADSs for more than one year at the time of the sale or other taxable disposition. In general, any
gain that US holders recognize on the sale or other taxable disposition of ordinary shares or ADSs will be US source income for
purposes of the foreign tax credit limitation and any losses recognized will generally be allocated against US source income. Deduction
of capital losses is subject to limitations under the Code. US holders who sell ordinary shares for a currency other than US dollars
should consult their own tax advisor regarding the tax consequences of such sale.
Additional Medicare
Tax
US holders that are individuals,
estates or trusts and whose income exceeds certain thresholds generally will be subject to an additional 3.8% Medicare contribution
tax on unearned income, including, among other things, cash dividends on, and capital gains from the sale or other taxable disposition
of, our ordinary shares or ADSs, subject to certain limitations and exceptions. US holders should consult their own tax advisors
regarding the effect, if any, of such tax on their ownership and disposition of our ordinary shares or ADSs.
Passive Foreign Investment
Company Rules
A special and adverse
set of US federal income tax rules apply to a US holder that holds stock in a passive foreign investment company (PFIC). In general,
we will be a PFIC if 75% or more of our gross income in a taxable year is passive income. Alternatively, we will be considered
to be a PFIC if at least 50% of our assets in a taxable year, averaged over the year and determined based on fair market value,
are held for the production of, or produce, passive income.
In determining whether
a non-US corporation is a PFIC, a proportionate share of the income and assets of each corporation in which it owns, directly or
indirectly, at least a 25% interest (by value) is taken into account.
We believe that we currently
are not a PFIC and do not expect to become a PFIC in 2016. However, there is significant uncertainty in the application of the
PFIC rules to mining enterprises such as ourselves as a result of the interplay of several sets of tax rules. In addition, because
the tests for determining PFIC status are applied as of the end of each taxable year and are dependent upon a number of factors,
some of which are beyond our control, including the value of our assets, the market price of our ordinary shares, and the amount
and type of our gross income, there can be no assurance that we will not become a PFIC in the future or that the US Internal Revenue
Service will agree with our conclusion that we are not a PFIC now.
If we are a PFIC for US
federal income tax purposes for any year during a US holder’s holding period of our ADSs or ordinary shares and the US holder
does not make a “mark-to-market” election or a QEF election, both as described below:
• any
gain recognized by a US holder upon the sale of ADSs or ordinary shares, or the receipt of some types of distributions, would be
treated as ordinary income;
• this
income generally would be allocated ratably over a US holder’s holding period with respect to our ADSs or ordinary shares;
and
• the
amount allocated to prior years, with certain exceptions, will be subject to tax at the highest tax rate in effect for those years
and an interest charge would be imposed on the amount of deferred tax on the income allocated to the prior taxable years.
We generally will be treated
as a PFIC as to any US holder if we are a PFIC for any year during such holder’s holding period. However, if we cease to
satisfy the requirements for PFIC classification, a US holder may avoid PFIC classification for subsequent years if such holder
elects to recognize gain based on the unrealized appreciation in the ADSs or ordinary shares through the close of the tax year
in which we cease to be a PFIC. Additionally, if we are a PFIC, a US holder who acquires ADSs or ordinary shares from a decedent
would be denied the normally available step-up in tax basis for our ADSs or ordinary shares to fair market value at the date of
death and instead would have a tax basis equal to the lower of the fair market value or the decedent’s tax basis.
A US holder who beneficially
owns stock in a PFIC may be required to file an annual information return on Internal Revenue Service Form 8621 (Information Return
by a Shareholder of a Passive Foreign Investment Company or Qualified Electing Fund). The US Treasury and IRS continue to issue
new guidance regarding these information reporting requirements.
US holders should consult their own tax advisors regarding
the application of the information reporting rules to our ADSs or ordinary shares and how they may apply to their particular circumstances.
A US holder generally
may be able to avoid the imposition of the special tax and interest charge described above by electing to mark its ADSs or ordinary
shares to market annually, and, therefore, recognize for each taxable year, subject to certain limitations, ordinary income or
loss equal to the difference, as of the close of taxable year, between the fair market value of its ADSs or ordinary shares and
the adjusted tax basis of his or its ADSs or ordinary shares. Losses would be allowed only to the extent of the net mark-to-market
gain previously included by the US holder under the election in prior taxable years. If a mark-to-market election with respect
to ADSs or ordinary shares is in effect on the date of a US holder’s death, the tax basis of the ADSs or ordinary shares
in the hands of a US holder who acquired them from a decedent will be the lesser of the decedent’s tax basis or the fair
market value of the ADSs or ordinary shares. A mark-to-market election is available only if the ADSs or ordinary shares, as the
case may be, are considered “marketable stock.” Generally, stock will be considered marketable stock if it is “regularly
traded” on a “qualified exchange” within the meaning of applicable US Treasury Regulations. A class of stock
is regularly traded during any calendar year during which such class of stock is traded, other than in de minimis quantities, on
at least 15 days during each calendar quarter. The NASDAQ constitutes a qualified exchange, and a non-US securities exchange constitutes
a qualified exchange if it is regulated or supervised by a governmental authority of the country in which the securities exchange
is located and meets certain trading, listing, financial disclosure and other requirements set forth in US Treasury Regulations.
Because a mark-to-market
election cannot be made for equity interests in any lower-tier PFICs owned by us, a US holder may continue to be subject to the
PFIC rules described above with respect to its indirect interest in any investments held by us that are treated as an equity interest
in a PFIC for US federal income tax purposes. US holders should consult their tax advisors as to the availability and desirability
of a mark-to-market election, as well as the impact of such election on interests in any lower-tier PFICs.
In certain circumstances
a holder of stock or ADSs in a PFIC may avoid taxation under the rules described above by making a “qualified electing fund”
(QEF), election to include in income its share of a PFIC’s annual income on a current basis. However, a QEF election is only
available if the PFIC annually provides its stockholders with certain tax information, and we currently do not intend to prepare
or provide such information. Accordingly, you should assume that a QEF election is unavailable.
Rules relating to a PFIC
are very complex. US holders are encouraged to consult their own tax advisors regarding the application of the PFIC rules to their
investments in our ADSs or our ordinary shares.
Backup Withholding
and Information Reporting
Payments to US holders
in respect of our ordinary shares or ADSs may be subject to information reporting to the US Internal Revenue Service and to backup
withholding tax at a rate of 28%.
However, backup withholding
and information reporting will not apply to a US holder that is a corporation or comes within an exempt category, and demonstrates
the fact when so required, or furnishes a correct taxpayer identification number and makes any other required certification. US
holders who are required to establish their exempt status generally must provide such certification on Internal Revenue Service
Form W-9.
Backup withholding is
not an additional tax. Amounts withheld under the backup withholding rules will be allowed as a refund or credit against a US holder’s
US federal income tax liability, provided that the required procedures are followed.
In addition, US holders
should be aware of annual reporting requirements on Internal Revenue Service Form 8938 (Statement of Specified Foreign Financial
Assets) with respect to the holding of certain foreign financial assets, including our ordinary shares and ADSs that are not held
in an account maintained by certain types of financial institutions, if the aggregate value of all of such assets exceeds $50,000
(or $100,000 for married couples filing a joint return).
US holders should consult
their own tax advisors regarding the application of the information reporting and backup withholding rules to our ordinary shares
and ADSs, and the application of the annual reporting requirements to your particular situation.
Material United Kingdom Tax Considerations
The following statements
do not constitute tax advice and are intended as a general guide only to the U.K. tax position under current U.K. tax legislation,
and published HM Revenue & Customs (HMRC) practice as at the date of this document, both of which are subject to change
at any time, possibly with retrospective effect. These statements deal only with the position of shareholders who are resident
(and in the case of individuals only) domiciled solely in the U.K. for tax purposes (except where the position of a non-U.K. tax
resident shareholder is expressly referred to), who hold their ordinary shares or ADSs as an investment and who are the absolute
beneficial owners of the ordinary shares or ADSs and of all dividends of any kind paid in respect of them in circumstances where
the dividends paid are regarded for U.K. tax purposes as that person’s own income (and not the income of some other person).
The tax position of certain categories of shareholders who are subject to special rules (such as persons acquiring their shares
or ADSs (or deemed to acquire their shares or ADSs) in connection with an employment or office, dealers in securities, insurance
companies and collective investment schemes and shareholders owning 10% or more of the ordinary shares or voting power, rights
to profit or capital of the company) is not considered. Any shareholder who is in doubt as to their tax position regarding the
acquisition, ownership or disposal of their ordinary shares or ADSs, or who are subject to tax in a jurisdiction other than the
U.K., should consult their own independent tax adviser.
Dividends
A person having an interest
in ADSs or ordinary shares who is not a resident in the U.K. will not be subject to tax in the U.K. on dividends paid on ordinary
shares or ADSs, unless that person carries on a trade, profession or vocation in the U.K. (and, if that person is a company, does
so through a permanent establishment) to which the ordinary shares or ADSs in question are attributable.
A person having an interest
in ADSs or ordinary shares who is resident in the U.K. and is not a body corporate will, in general, be subject to U.K. income
tax on dividends paid by us.
A U.K. resident body corporate
holding an interest in ADSs or ordinary shares should not generally be taxable on dividends paid by us unless they are a small
company.
Under existing rules,
a U.K. resident individual shareholder will be entitled to a tax credit, which may be set off against the shareholder’s total
income tax liability on the dividend. The value of the tax credit is currently 10% of the aggregate of the dividend and the tax
credit (the “Gross Dividend”), which is also equal to one-ninth of the cash dividend received.
Such an individual U.K.
resident shareholder who is liable to income tax at the basic rate will be subject to tax on the dividend at the rate of 10% of
the Gross Dividend, so that any tax credit will satisfy in full such shareholder’s liability to income tax on the dividend.
An individual shareholder
who is liable to income tax at the higher tax rate will be taxed at the rate of 32.5% on the Gross Dividend. Any tax credit will
be set against, but not fully match, the shareholder’s tax liability on the Gross Dividend and such shareholder will have
to account for additional income tax equal to 22.5% of the Gross Dividend (which is equal to 25% of the cash dividend received)
to the extent that the Gross Dividend falls within the 40% tax band.
For taxable income above
£150,000 an additional higher rate of tax was introduced from April 6, 2010, and which from April 6, 2013 is at a rate of
45%. Dividends that fall into the 45% tax bracket will be liable to income tax at a rate of 37.5% of the Gross Dividend. Any tax
credit will be set against, but not fully match, the shareholder’s tax liability on the Gross Dividend and such shareholder
will have to account for additional income tax equal to 27.5% of the Gross Dividend (this equates to 30.56% of the cash dividend
received) to the extent that the Gross Dividend, when treated as the top slice of the shareholder’s income, falls above the
threshold for the 45% rate of tax.
An individual shareholder
will not generally be able to claim repayment from HMRC of any part of the tax credit attaching to dividends paid by us.
From April 6, 2016, the
dividend tax credit will be replaced by a dividend allowance for individuals. Under these new rules, the first £5,000 of
an individual shareholder’s dividend income will not be taxed, regardless of the level of their non-dividend income. The
rates of tax applicable to dividends received in excess of the £5,000 allowance will be taxed at the following rates: 7.5%
on dividend income falling within the basic rate band, 32.5% on dividend income received within the higher rate band, and 38.1%
on dividend income received within the additional rate band.
Each shareholder resident
outside the U.K. may also be subject to foreign taxation on dividend income under the local law of the country(ies) in which they
reside/are resident.
Capital Gains
A person having an interest
in ADSs or ordinary shares who is not resident in the U.K. will generally not be subject to tax in the U.K. on gains arising on
a disposal of our ordinary shares or interests in the ADSs.
Individuals who left the
UK after being UK resident who were resident in the U.K. for at least four out of seven tax years prior to departure, and whose
temporary period of non-residence is 5 years or less, will be subject to UK capital gains tax in the year of return on any gains
realized on the disposal during the period of absence of any assets which were owned before taking up residence abroad.
Persons having an interest
in ADSs or ordinary shares who are resident in the U.K. or who hold their ordinary shares or interests in ADSs through a U.K. trading
branch or agency (or, if that person is a company, a permanent establishment) will, in general, be subject to U.K. taxation on
gains arising on a disposal of ordinary shares or interests in ADSs.
The first £11,100
of an individual’s net chargeable gains are exempt for both the current tax year and the tax year commencing April 6, 2016.
The balance is taxed at 18% (falling to 10% from April 6, 2016) for gains that fall within the individual’s otherwise unused
basic rate income tax band (currently £31,786 and increasing to £32,001 from April 6, 2016) and 28% (falling to 20%
from April 6, 2016) thereafter.
A body corporate will
generally be subject to U.K. corporation tax on chargeable gains at the standard rate of U.K. corporation tax (currently 20%).
Inheritance Tax
Liability to U.K. inheritance
tax may arise on the death of an individual having an interest in ADSs or ordinary shares, or on a gift (or disposal at an undervalue)
of ordinary shares or ADSs by an individual who is domiciled, or deemed to be domiciled, in the U.K.
U.K. inheritance tax may
still be relevant for individuals who are neither domiciled nor deemed to be domiciled in the U.K. in respect of U.K. property.
U.K. property is generally liable to U.K. inheritance tax subject to Double Tax Treaty provisions. This is a complicated area and
individuals should consult their own independent tax adviser.
Stamp Duty and Stamp Duty Reserve Tax
No U.K. stamp duty or
stamp duty reserve tax (SDRT) should be payable on the issue of the ordinary shares or ADSs, or on the delivery of the ADSs into
a Depositary Trust Company (DTC).
No U.K. stamp duty should
in practice be payable on the transfer of ordinary shares or ADSs provided any instrument of transfer is executed and retained
outside of the U.K. and no matters or actions relating to the transfer are performed in the U.K., and no U.K. stamp duty should
arise in respect of any dealings in the ordinary shares or ADSs within a clearance service, where such dealings are effected in
book entry form in accordance with the procedures of the clearance service and not by written instrument.
SDRT should not be payable
on an unconditional agreement to transfer ADSs. Nor should SDRT be payable on any unconditional agreement to transfer ordinary
shares, provided there is no register in the U.K. in respect of the ordinary shares and provided the ordinary shares are not paired
with any shares issued by any company incorporated in the U.K.
It should be noted that
certain categories of person (for example, market makers and broker dealers) may not be liable to stamp duty or SDRT and others
may be liable at a higher rate (for example, persons connected with depository arrangements and clearance services) or may, although
not primarily liable for the tax, be required to notify and account for it under the SDRT Regulations 1986.
F. DIVIDENDS AND PAYING AGENTS
Not applicable.
G. STATEMENTS BY EXPERTS
Not applicable.
H. DOCUMENTS ON DISPLAY
You may request a copy
of our SEC filings, at no cost, by writing or calling us at Randgold Resources Limited, 3rd Floor, Unity Chambers, 28 Halkett Street,
St. Helier, Jersey, JE2 4WJ, Channel Islands, Attention: M. A. Welsh, Telephone: 011 44,1534-735-333. A copy of each report submitted
in accordance with applicable United States law is available for public review at our principal executive offices at 3rd Floor,
Unity Chambers, 28 Halkett Street, St. Helier, Jersey, Channel Islands.
A copy of each document
(or a translation thereof to the extent not in English) concerning us that is referred to in this Annual Report, is available for
public view at our principal executive offices at 3rd Floor Unity Chambers, 28 Halkett Street, St. Helier, Jersey, Channel Islands,
Attention: M.A. Welsh, Telephone: 011 44,1534-735-333.
I. SUBSIDIARY INFORMATION
Not applicable.
Item 11. Quantitative and Qualitative
Disclosures About Market Risk
Hedge Policy
Although, in general,
it is not our policy to hedge our gold sales, we believe it is prudent to hedge during times of significant capital expansion and
debt and we are sometimes required to do so under debt financing arrangements. The market price of gold has a significant effect
on our results of operations, our ability to pay dividends and undertake capital expenditure, and the market price of our ordinary
shares. Gold prices have historically fluctuated widely and are affected by numerous industry factors over which we have no control.
The aggregate effect of these factors is impossible for us to predict.
We have previously used,
and may in the future use, hedging instruments to protect the selling price of some of our anticipated gold production. These hedging
instruments were required by the terms of our previous loan agreements. The last remaining gold price forward sales contracts were
delivered into during 2010.
Foreign Currency and Commodity Price Sensitivity
In the normal course of
business, the group enters into transactions denominated in foreign currencies (primarily Euro, South African Rand, Congolese franc
and CFA). As a result, the group is subject to exposure from fluctuations in foreign currency exchange rates. In general, the group
does not enter into derivatives to manage these currency risks and no significant positions were held in 2015 and 2014. Generally,
the group does not hedge its exposure to gold price fluctuation risk and gold was sold at market prices in 2014 and 2015. Gold
sales are made in US dollars and do not expose the group to any currency fluctuation risk. However, during periods of capital expenditure
or loan finance, the company may use forward contracts or options to reduce the exposure to price movements, while maintaining
significant exposure to spot prices. These derivatives may establish a fixed price for a portion of future production while the
group maintains the ability to benefit from increases in the spot gold price for the majority of future gold production. The group
is also exposed to fluctuations in the price of consumables, such as fuel, steel, rubber, cyanide and lime, mainly due to changes
in the price of oil, as well as fluctuations in exchange rates.
Level of exposure of foreign currency risk
$000
|
|
|
December
31, 2015
|
|
|
|
December
31, 2014
|
|
|
|
|
|
|
|
|
|
|
Carrying value of foreign currency balances
|
|
|
|
|
|
|
|
|
Cash and cash equivalents includes balances denominated in:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
• Communauté Financière Africaine franc (CFA)
|
|
|
751
|
|
|
|
1,550
|
|
• Euro (EUR)
|
|
|
32
|
|
|
|
1,198
|
|
• South African rand (ZAR)
|
|
|
1,118
|
|
|
|
1,065
|
|
• British pound (GBP)
|
|
|
69
|
|
|
|
225
|
|
Trade and other receivables include balances denominated in:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
• Communauté Financière Africaine franc (CFA)
|
|
|
83,432
|
|
|
|
142,013
|
|
• Euro (EUR)
|
|
|
8,827
|
|
|
|
1,375
|
|
• South African rand (ZAR)
|
|
|
22,389
|
|
|
|
101
|
|
• British pound (GBP)
|
|
|
526
|
|
|
|
235
|
|
Trade and other payables includes balances denominated in:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
• Communauté Financière Africaine franc (CFA)
|
|
|
(42,440
|
)
|
|
|
(40,355
|
)
|
• Euro (EUR)
|
|
|
(9,703
|
)
|
|
|
(9,845
|
)
|
• South African rand (ZAR)
|
|
|
-
|
|
|
|
(1,720
|
)
|
• British pound (GBP)
|
|
|
(29
|
)
|
|
|
(636
|
)
|
The group’s exposure
to foreign currency arises where a company holds monetary assets and liabilities denominated in a currency different to the functional
currency of the holder of the instrument which is the US dollar. Set out below is the impact of a 10% change in the US dollar on
profit and equity arising as a result of the revaluation of the group’s foreign currency financial instruments.
Level
of exposure of foreign currency risk (continued)
|
|
Closing
exchange
Rate
|
|
|
Effect of 10.0%
strengthening of US
dollar on net earnings
and equity
|
|
|
|
|
|
|
|
|
At December 31, 2015
|
|
|
|
|
|
|
|
|
• Euro (EUR)
|
|
|
0.9168
|
|
|
|
1,272
|
|
• Communauté Financière Africaine franc (CFA)
|
|
|
600.91
|
|
|
|
4,174
|
|
• South African rand (ZAR)
|
|
|
15.53
|
|
|
|
995
|
|
• British pound (GBP)
|
|
|
0.68
|
|
|
|
57
|
|
At December 31, 2014
|
|
|
|
|
|
|
|
|
• Euro (EUR)
|
|
|
0.8226
|
|
|
|
(855
|
)
|
• Communauté Financière Africaine franc (CFA)
|
|
|
539.63
|
|
|
|
10,321
|
|
• South African rand (ZAR)
|
|
|
11.60
|
|
|
|
72
|
|
• British pound (GBP)
|
|
|
0.64
|
|
|
|
(18
|
)
|
The sensitivities are
based on financial assets and liabilities held at December 31 where balances were not denominated in the functional currency of
group. The sensitivities do not take into account the group’s sales and costs and the results of the sensitivities could
change due to other factors such as changes in the value of financial assets and liabilities as a result of non-foreign exchange
influenced factors.
The market price of gold
has a significant effect on our results of operations, our ability to pay dividends and undertake capital expenditure and the market
prices of our ordinary shares. Gold prices have historically fluctuated widely and are affected by numerous industry factors over
which we have no control. The aggregate effect of these factors is not possible for us to predict.
The group is fully exposed
to the spot gold price on gold sales.
Interest Rate Sensitivity
We generally do not undertake
any specific actions to cover our exposure to interest rate risk and at December 31, 2015 were not party to any interest rate risk
management transactions.
At December 31, 2013 the
fair value of our borrowings, including the short-term portion of these liabilities, excluding loans from outside shareholders
in subsidiaries, was estimated at $0. The aggregate hypothetical loss in earnings on an annual basis from a hypothetical increase
of 10% of the three month LIBOR rate was not applicable.
At December 31, 2014 the
fair value of our borrowings, including the short-term portion of these liabilities, excluding loans from outside shareholders
in subsidiaries, was estimated at $0. The aggregate hypothetical loss in earnings on an annual basis from a hypothetical increase
of 10% of the three month LIBOR rate was not applicable.
At December 31, 2015 the
fair value of our borrowings, including the short-term portion of these liabilities, excluding loans from outside shareholders
in subsidiaries, was estimated at $0. The aggregate hypothetical loss in earnings on an annual basis from a hypothetical increase
of 10% of the three month LIBOR rate was not applicable.
Concentration of credit risk
The group’s cash
balances do not give rise to a concentration of credit risk because it deals with a variety of major financial institutions. Its
receivables and loans are regularly monitored and assessed. Receivables are impaired when it is probable that amounts outstanding
are not recoverable as set out in the accounting policy note
for receivables. Gold bullion, the group’s
principal product, is produced in Mali and Côte d’Ivoire (and in the case of its joint ventures in DRC and Mali). The
gold produced is sold to the largest accredited gold refinery in the world. Credit risk is further managed by regularly reviewing
the financial statements of the refinery. The group is further not exposed to significant credit risk on gold sales, as cash is
received within a few days of the sale taking place. While not financial assets under IFRS 7, included in receivables is $102.9
million (2014: $106.8 million) (refer to Note 7 of our financial statements included in this Annual Report) relating to indirect
taxes owing to Loulo, Gounkoto and Tongon by the State of Mali, which are denominated in FCFA, which holds some credit risk for
the group. The legally binding mining conventions in Mali permit offsetting of other corporate taxes against approved unpaid TVA.
A further $61.8 million (2014: $50.5 million) is held within the underlying statement of financial position of the equity accounted
Kibali joint venture which is considered recoverable given the receipts obtained during the year and absence of significant disputed
items, albeit receipts, remain slow. See “PART I. Item 3. Key Information—D. Risk Factors.”
Item 12. Description of Securities
Other Than Equity Securities
A. DEBT SECURITIES
Not applicable.
B. WARRANTS AND RIGHTS
Not applicable.
C. OTHER SECURITIES
Not applicable.
D. AMERICAN DEPOSITARY SHARES
Fees Payable by ADS Holders
Our American Depositary
Shares, or ADSs, each representing the right to receive one of our ordinary shares, are listed on the NASDAQ Global Select Market
under the symbol “GOLD.” A copy of our Form of Amended and Restated Deposit Agreement with The Bank of New York Mellon
(Depositary) was filed with the SEC as an exhibit to our Form F-6 filed on October 7, 2009 (Deposit Agreement). Pursuant to
the Deposit Agreement, holders of our ADSs may have to pay to the Depositary, either directly or indirectly, fees or charges up
to the amounts set forth in the table below:
Associated
Fee
|
|
Depositary
Action
|
|
|
|
|
$5.00 or less per 100 ADSs (or portion thereof).
|
|
Execution and delivery of ADRs and the surrender of ADRs pursuant to the Deposit Agreement.
|
|
|
|
|
$0.02 or less per ADS (or portion thereof).
|
|
Any cash distribution made pursuant to the Deposit Agreement, including, among other things:
|
|
|
|
|
|
•
|
cash distributions or dividends,
|
|
|
|
|
|
|
•
|
distributions other than cash, shares or rights,
|
|
|
|
|
|
|
•
|
distributions in shares, and
|
Associated Fee
|
|
Depositary Action
|
|
|
|
|
|
•
|
rights of any other nature, including rights to subscribe for additional shares.
|
Taxes and other governmental charges.
|
|
As applicable.
|
|
|
|
Registration fees in effect for the registration of transfers of shares generally on the share register of the Company or foreign registrar and applicable to transfers of shares to or from the name of the Depositary or its nominee or the custodian or its nominee on the making of deposits or withdrawals.
|
|
As applicable.
|
|
|
|
A fee equal to the fee for the execution and delivery of ADSs which would have been charged as a result of the deposit of such securities.
|
|
Distributions of securities other than cash, shares or rights.
|
|
|
|
Any other charges payable by the Depositary, any of its agents (and their agents), including the custodian (by billing such owners for such charge or by deducting such charge from one or more cash dividends or other cash distributions).
|
|
Servicing of shares or other deposited securities.
|
Expenses incurred by the Depositary.
|
|
•
|
Cable, telex and facsimile transmission (where expressly provided for in the Deposit Agreement)
|
|
|
|
|
|
|
•
|
Foreign currency conversion into U.S. dollars
|
At our 2014 annual general
meeting, our shareholders approved a resolution authorizing the directors to offer shareholders the opportunity to receive new
ordinary shares or, for ADS holders, new ADSs, instead of cash in respect of the final dividend and any future dividend to be declared
or paid in the period up to and including the 2019 annual general meeting (scrip dividend). For ADS holders electing to participate
in the scrip dividend scheme, an issuance fee of $0.04 per ADS payable to the Depositary will be deducted from the cash dividend
amount an ADS holder is entitled to.
Depositary Payments for 2015
For the year ended December
31, 2015, our Depositary made no payments on our behalf in relation to our ADR program.
In July 2011, we entered
into letter agreement with the Depositary providing for the Depositary’s payment to us of certain fees, including a fee of
$900,000 per year for five years, subject to the satisfaction of specified conditions.
The accompanying notes are an integral
part of these consolidated financial statements.
The accompanying notes are an integral
part of these consolidated financial statements.
The share capital comprises
the issued ordinary shares of the company at par.
The share premium comprises
the excess value recognized from the issue of ordinary shares at par and amounts transferred from other reserves on the exercise
of share options and vesting of share awards.
Retained earnings comprise
the group’s cumulative accounting profits and losses since inception less dividends.
Other reserves comprise
the cumulative charge recognized under IFRS 2 in respect of share-based payment awards (net of amounts transferred to share capital
and share premium), as well as cumulative fair value movements in available-for-sale financial assets. At December 31, 2015, the
balance of the share-based payment reserve amounted to $67.2 million (December 31, 2014: $68.4 million; December 31, 2013: $65.1
million). The foreign currency translation reserve was $1.4 million at December 31, 2015 (December 31, 2014: $1.4 million; December
31, 2013: $1.4 million) and the cumulative net losses in available-for-sale financial assets amounted to $1.6 million at December
31, 2015 (December 31, 2014: cumulative net loss of $2.5 million; December 31, 2013: cumulative net loss of $2.1 million). Refer
to note 12 for further details of available-for-sale financial assets.
Non-controlling interests
comprise the non-controlling interests’ share of cumulative profits and losses in the group, less their share of dividends
paid.
The accompanying notes are an integral
part of these consolidated financial statements.
The effective interest rate on cash
and cash equivalents was 0.10% (2014: 0.05%; 2013: 0.54%). These funds have an average maturity of less than 90 days.
The company and its subsidiaries
together with its joint ventures (the group) carry out exploration and gold mining activities. The group currently have five operating
mines. There are three operating mines in Mali, West Africa: the Morila gold mine (equity accounted joint venture), which started
production in October 2000, the Loulo gold mine (subsidiary), which commenced production in November 2005 and the Gounkoto gold
mine (subsidiary), which began production in June 2011. The group also operates a fourth gold mine in Côte d’Ivoire,
Tongon (subsidiary), which started production in December 2010 and a fifth in the Democratic Republic of Congo (DRC), Kibali (equity
accounted joint venture) which started production in October 2013. Randgold is the operator of all of its mines.
The interests of the group
in its operating mines are held through Société des Mines de Morila SA (Morila) which owns the Morila mine, Société
des Mines de Loulo SA (Loulo) which owns the Loulo mine, Société des Mines de Tongon SA (Tongon) which owns the Tongon
mine, Société des Mines de Gounkoto SA (Gounkoto) which owns the Gounkoto mine and Kibali Goldmines SA (Kibali),
which owns the Kibali mine. Randgold holds an effective 40% interest in Morila in conjunction with AngloGold Ashanti Limited (AngloGold
Ashanti) (40%) and the State of Mali (20%). Management of Morila Limited, the 80% shareholder of Morila, is effected through a
joint venture committee, with Randgold and AngloGold Ashanti each appointing one-half of the members of the committee. The group
also holds an effective 45% interest in the Kibali gold mine (equity accounted joint venture) in the Democratic Republic of Congo
(DRC) in conjunction with AngloGold Ashanti (45%) and Société Miniére de Kilo-Moto SA UNISARL (SOKIMO) (10%).
Management of Kibali (Jersey) Limited, the effective 90% shareholder of Kibali, is effected through a joint venture committee,
with Randgold and AngloGold Ashanti each appointing one-half of the members of the committee. Randgold holds an effective 80% interest
in both Loulo and Gounkoto. The remaining 20% interest is held by the State of Mali. Randgold holds an effective 89% interest in
Tongon, 10% is held by the State of Côte d’Ivoire while the remaining 1% is held by a local Ivorian company.
The group has a portfolio
of exploration permits and projects, with various exploration programs, ranging from early stage exploration to prefeasiblity studies
being undertaken. These are underway in the DRC, Mali, Senegal and Côte d’Ivoire.
The principal accounting
policies applied in the preparation of these consolidated financial statements are set out below. These policies have been consistently
applied to all the years presented, unless otherwise stated.
The consolidated financial
statements of Randgold Resources Limited and its subsidiaries and joint ventures have been prepared in accordance with International
Financial Reporting Standards and Interpretations (collectively (IFRS)) issued by the International Accounting Standards Board
(IASB) and in accordance with Article 105 of the Companies (Jersey) Law of 1991.
The consolidated financial
statements have been prepared under the historical cost convention, as modified by the revaluation of available-for-sale financial
assets. The preparation of financial statements in conformity with IFRS requires the use of certain critical accounting estimates.
It also requires management to exercise its judgment in the process of applying the company’s accounting policies. The areas
involving a high degree of judgment or complexity, or areas where assumptions and estimates are significant to the consolidated
financial statements are disclosed in note 3.
After reviewing the group’s
budget for the next financial year, and other longer term plans, the directors are satisfied, at the time of approving the financial
statements, it is appropriate to adopt the going concern basis in preparing the financial statements. The directors have no reason
to believe that the company will not be a going concern in the foreseeable future based on forecasts and available cash resources
and available facilities.
The IASB has issued the
following new standards, amendments to published standards and interpretations to existing standards with effective dates on or
prior to January 1, 2015 which have been adopted by the group for the first time this year.
Certain new standards,
amendments and interpretations to existing standards have been published that are relevant to the group’s activities and
are mandatory for the group’s accounting periods beginning after January 1, 2015 or later periods and which the group has
decided not to adopt early.
The group is currently
assessing the impact of these standards on the financial statements.
The consolidated financial
information includes the financial statements of the company, its subsidiaries and the company’s equity accounted joint ventures
using uniform accounting policies for similar transactions and other events in similar circumstances.
Subsidiaries are entities
over which the group has power, exposure, or rights, to variable returns from its involvement and the ability to use its power
over the investee to affect the amount of the group’s returns; generally accompanying an interest of more than one-half of
the voting rights.
Subsidiaries are fully
consolidated from the date on which control is transferred to the group. They are deconsolidated from the date that control ceases.
The purchase method of accounting is used to account for the acquisition of subsidiaries by the group. The cost of an acquisition
is measured at the fair value of the assets given, equity instruments issued and liabilities incurred or assumed at the date of
exchange. Acquisition costs are expensed. Identifiable assets acquired (including mineral property interests or other identifiable
intangible assets) and liabilities and contingent liabilities assumed in a business combination are measured initially at their
fair values at the acquisition date, irrespective of the extent of any non-controlling interest. The excess of the cost of acquisition
over the fair value of the group’s share of the identifiable net assets acquired is recorded as goodwill. If the cost of
acquisition is less than the fair value of the net assets of the subsidiary acquired, the difference is recognized directly in
the statement of comprehensive income.
Inter-company transactions,
balances and unrealized gains on transactions between group companies are eliminated. Unrealized losses are also eliminated unless
the transaction provides evidence of an impairment of the asset transferred.
Accounting policies of subsidiaries
have been changed where necessary to ensure consistency with the policies adopted by the group.
The group holds interests
in a number of joint ventures. In a joint venture the parties that have joint control of the arrangement (the joint venturers)
have a right to the net assets of the arrangement. This right is accounted for in the consolidated financial statements using the
equity method. Joint control is considered to exist when there is contractual joint control; control being the power to govern
the financial and operating policies of an entity so as to obtain benefits from the activities and the ability to use its power
over the investee to affect the amounts of the group’s returns by the joint venturers.
Except for initial recognition
under IFRS 11 transition rules, further investments in additional joint venture companies are initially recognized at cost. The
cost of an acquisition is measured at the fair value of the assets given, equity instruments issued or liabilities incurred or
assumed at the date of exchange, plus costs directly attributable to the acquisition. Goodwill on joint ventures represents the
excess of the cost of acquisition of the joint venture over the group’s share of the fair value of the identifiable net assets
of the joint venture and is included in the carrying amount of the investments.
Joint ventures are accounted
for using the equity method of accounting. In applying the equity method of accounting, both for existing joint ventures subsequent
to the transition date and for any newly acquired joint ventures, the group’s share of its joint ventures’ post-acquisition
profits or losses are recognized in profit or loss and its share of post-acquisition other comprehensive income is recognized in
other comprehensive income. These post-acquisition movements and distributions received from the joint venture companies are adjusted
against the carrying amount of the investments. When the group’s share of losses in a joint venture company equals or exceeds
its interest in the joint venture company, including any other unsecured non-current receivables, the group does not recognize
further losses, unless it has obligations to make or has made payments on behalf of the joint venture company. Unrealized gains
on transactions between the group and its joint venture companies are eliminated to the extent of the group’s interest in
the joint venture companies. Unrealized losses are also eliminated unless the transaction provides evidence of an impairment of
the asset transferred. Trading receivables and payables with joint venture companies are classified within trade and other receivables
and payables. The accounting policies of joint venture companies have been changed where necessary to ensure consistency with the
accounting policies adopted by the group.
Dividends received are
classified as operating cash flows in the consolidated cash flow statement.
Investment in subsidiaries
and joint ventures are stated at cost less any provisions for impairment in the individual financial statements of the company.
Dividends are accounted for when the company becomes entitled to receive them. On the disposal of an investment, the difference
between the net disposal proceeds and the carrying amount is charged or credited to the statement of comprehensive income.
An operating segment is
a group of assets and operations engaged in performing mining or advanced exploration that are subject to risks and returns that
are different from those of other segments. Other parts of the business are aggregated and treated as part of a ‘corporate
and exploration’ segment. The group provides segmental information using the same categories of information the group’s
chief operating decision maker utilizes. The group’s chief operating decision maker is considered by management to be the
board of directors.
The group has only one
business segment, that of gold mining. Segment analysis is based on individual mining operations and exploration projects that
have a significant amount of capitalized expenditure or other fixed assets.
Items included in the financial
statements of each of the group’s entities are measured using the currency of the primary economic environment in which the
entity operates (the functional currency). The consolidated financial statements are presented in US dollars, which is also the
functional currency of the company and its significant subsidiaries and joint ventures.
Foreign currency transactions
are translated into the relevant functional currency using the exchange rates prevailing at the date of the transactions. Foreign
exchange gains and losses resulting from the settlement of such transactions and from the translation at year end exchange rates
of monetary assets and liabilities denominated in foreign currencies are recognized in the statement of comprehensive income in
other income and other expenses.
Long-lived assets including
development costs and mine plant facilities (such as processing plants, tailings facilities, raw water dams and power stations)
are initially recorded at cost. Development of orebodies includes the development costs of shaft systems and waste rock removal
that allows access to reserves that are economically recoverable in the future. Costs associated with underground development are
capitalized when the works provide access to the ore body, whereas costs associated with ore extraction from operating ore body
sections are treated as operating costs. Where relevant the estimated cost of dismantling the asset and remediating the site is
included in the cost of property, plant and equipment, subsequently they are measured at cost less accumulated amortization and
impairment.
Development costs consist
primarily of direct expenditure incurred to establish or expand productive capacity.
Costs are capitalized during
the construction of a new mine until commercial levels of production are achieved (refer to ‘Commercial production’
below), after which the relevant costs are amortized. Costs are capitalized provided that the project is considered to be commercially,
technically and economically viable. Such viability is deemed to be achieved when the group is confident that the project will
provide a satisfactory return relative to its perceived risks and is sufficiently certain of economic production. Costs which are
necessarily incurred while commissioning new assets, in the period before they are capable of operating in the manner intended
by management, are capitalized under ‘Long-lived assets and mine development costs’.
Development costs incurred
after the commencement of production are capitalized to the extent they are expected to give rise to a future economic benefit.
The group assesses the
stage of each mine construction project to determine when a mine moves into the production stage. The criteria used to assess the
start date are determined by the unique nature of each mine construction project and include factors such as the complexity of
a plant and its location. The group considers various relevant criteria to assess when the mine construction project is substantially
complete and ready for its intended use and moves into the production stage. Some of the criteria would include but are not limited
to the following:
When a mine construction
project moves into the production stage, the capitalization of certain mine construction costs ceases and subsequent costs are
either regarded as inventory or expensed, except for capitalizable costs related to subsequent mining asset additions or improvements,
open cast stripping, underground mine development or ore reserve development.
The commissioning of an
underground mine typically occurs in phases, with sections brought into production while deeper levels remain under construction.
The shared infrastructures, such as declines of shafts, are assessed to determine whether they contribute to the production areas.
Where they contribute to production, the attributable costs are transferred to production assets and start to be depreciated. The
costs transferred comprise costs directly attributable to producing zones or, where applicable, estimates of the portion of shared
infrastructure that are attributed to the producing zones.
Development activities
commence after project sanctioning by the appropriate level of management. Judgment is applied by management in determining when
a project has reached a stage at which economically recoverable reserves exist such that development may be sanctioned. In exercising
this judgment, management is required to make certain estimates and assumptions similar to those described below for capitalized
exploration and evaluation expenditure. Any such estimates and assumptions may change as new information becomes available.
In surface mining operations,
the group may find it necessary to remove waste materials to gain access to mineral ore deposits prior to and after production
commences. This waste removal activity is known as ‘stripping’. Prior to production commencing from a pit, stripping
costs are measured internally and capitalized until the point where the overburden has been removed and access to the ore commences.
Subsequent to production, waste stripping continues, either as part of ore extraction as a run of mine activity or due to strategic
decisions such as pit push-back campaigns. There are two benefits accruing to the group from stripping activity during the production
phase: usable ore that can be used to produce inventory and improved access to further quantities of material that will be mined
in future periods. Economic ore extracted during this period and subsequently is accounted for as inventory. The production stripping
costs relating to improved access to further quantities in future periods are capitalized as a stripping activity asset, if and
only if, all of the following are met:
In determining the relevant
component of the orebody for which access is improved, the group componentizes each of its mines into geographically distinct orebody
sections or phases to which the stripping activities being undertaken within that component are allocated. Such phases are determined
based on assessment of factors such as geology and mine planning.
Once determined that any
portion of the production stripping costs should be capitalized, the group typically uses the average stripping ratio of the component
or phase of the mine to which the production stripping cost related to determine the amount of the production stripping costs that
should be capitalized.
The group depreciates the
deferred costs capitalized as stripping assets on a unit of production method, with reference to the ex-pit ore treated from the
relevant ore body component or phase.
Short-lived assets including
non-mining assets are shown at cost less accumulated depreciation and impairment.
Long-lived assets include
mining properties, such as metallurgical plant, tailings and raw water dams, power plant and mine infrastructure, as well as mine
development costs and are depreciated on a unit of production basis.
Depreciation and amortization
are charged over the life of the mine (or over the remaining useful life of the asset, if shorter) based on estimated ore tonnes
contained in proven and probable reserves to be extracted using the relevant asset. As an example, underground assets are depreciated
over underground proven and probable reserves and tonnes milled from those orebodies. No future capital expenditure is included
in the depreciable value. Proven and probable ore reserves reflect estimated quantities of economically recoverable reserves, which
can be recovered in the future from known mineral
deposits. Only proven and
probable reserves are used in the tonnes milled units of production depreciation calculation. Any changes to the expected life
of the mine (or asset) are applied prospectively in calculating depreciation and amortization charges.
Depreciation of construction
and development costs for new mines commences when commercial production is achieved, as detailed above. Underground development
costs that are attributable to the commissioned sections as an underground mine are depreciated from the date the development provides
access to operational areas and ore extraction begins from those areas. Other assets under construction, such as plant improvement
projects, are depreciated from the date they are commissioned, based on assessment by the group’s engineers.
Short-lived assets which
include motor vehicles, office equipment and computer equipment are depreciated over estimated useful lives of between two to five
years but limited to the remaining mine life. Residual values and useful lives are reviewed, and adjusted if appropriate, at each
statement of financial position date. Changes to the estimated residual values or useful lives are accounted for prospectively.
Depreciation starts when the assets are ready and available for use.
The carrying amount of
the property, plant and equipment and investments in joint ventures of the group is compared to the recoverable amount of the assets
whenever events or changes in circumstances indicate that the net book value may not be recoverable. The recoverable amount is
the higher of value in use and the fair value less cost to sell. In assessing the value in use, the expected future cash flows
from the assets is determined by applying a discount rate to the anticipated risk adjusted future cash flows. The discount rate
used is the group’s weighted average cost of capital adjusted for asset specific factors when applicable. An impairment is
recognized in the income statement to the extent that the carrying amount exceeds the assets’ recoverable amount. Only proven
and probable reserves are used in the calculations and the models use the approved mine plans and exclude capital expenditure which
enhance the assets or extractable ore tonnes outside of such approved mine plans. The revised carrying amounts are amortized in
line with group accounting policies.
A previously recognized
impairment loss is reversed if the recoverable amount increases as a result of a reversal of the conditions that originally resulted
in the impairment. This reversal is recognized in the income statement and is limited to the carrying amount that would have been
determined, net of depreciation, had no impairment loss been recognized in prior years. Assets are grouped at the lowest levels
for which there are separately identifiable cash flows (cash-generating units) for purposes of assessing impairment. The estimates
of future discounted cash flows are subject to risks and uncertainties including the future gold price. It is therefore reasonably
possible that changes could occur which may affect the recoverability of property, plant and equipment investments in joint ventures.
Inventories include ore
stockpiles, gold in process and doré supplies, stores and materials, and are stated at the lower of cost or net realizable
value. The cost of ore stockpiles and gold produced is determined principally by the weighted average cost method using related
production costs.
Cost of stockpiles include
costs incurred up to the point of stockpiling, such as mining and grade control costs, but exclude future costs of production.
Ore extracted is allocated to stockpiles based on estimated grade, with grades below defined cut-off levels treated as waste and
expensed. While held in physically separate stockpiles, the group blends the ore from each stockpile at an individual mine when
feeding the processing plant to achieve the resultant gold content. In such circumstances, lower and higher grade ore stockpiles
each represent a raw material, used in conjunction with each other, to deliver overall gold production, as supported by the relevant
feed plan.
Morila’s full grade
ore stockpile was depleted in 2015. At Loulo, full grade open pit stockpile material is above 3.0g/t for Loulo 3 and 1.58g/t for
Gara, while Yalea is above 0.7g/t. No Yalea or Gara underground material is on the stockpile since all ore mined is fed. At Gounkoto,
the full grade ore stockpile is above 2.85g/t and marginal ore above 1.36g/t. Tongon’s full grade ore stockpile is above
1.34g/t and marginal ore above 0.74g/t, while Kibali’s high and medium grade ore stockpile is above 1.52g/t with a marginal
ore cut-off grade of 0.88g/t.
The processing of ore in
stockpiles occurs in accordance with the Life of Mine (LoM) processing plan that has been optimized based on the known mineral
reserves, current plant capacity and mine design. Ore tonnes contained in the stockpile which exceed the annual tonnes to be milled
as per the mine plan in the following year, are classified as non-current in the statement of financial position.
Net realizable value of
ore stockpiles is determined with reference to estimated contained gold and market gold prices applicable. Ore stockpiles which
are blended together or with future ore mined when fed to the plant are assessed as an input to the gold production process to
ensure the combined stockpiles are carried at the lower of cost and net realizable value. Ore stockpiles which are not blended
in production are assessed separately to ensure they are carried at the lower of cost and net realizable value, although no such
stockpiles are currently held.
Costs of gold inventories
include all costs incurred up until production of an ounce of gold such as milling costs, mining costs and directly attributable
mine general and administration costs but exclude transport costs, refining costs and royalties. Net realizable value is determined
with reference to estimated contained gold and market gold prices.
Stores and materials consist
of consumable stores and are valued at weighted average cost after appropriate impairment of redundant and slow moving items. Consumable
stock for which the group has substantially all the risks and rewards of ownership are brought onto the statement of financial
position as current assets.
Interest is recognized
on a time proportion basis, taking into account the principal outstanding and the effective rate over the period to maturity. Borrowing
costs are expensed as incurred except to the extent that it relates directly to the construction of property, plant and equipment
during the time that is required to complete and prepare the asset for its intended use, when it is capitalized as part of property,
plant and equipment. Borrowing costs are capitalized as part of the cost of the asset where it is probable that the asset will
result in economic benefit and where the borrowing cost can be measured reliably. No interest or borrowing costs have been capitalized
during the year.
Royalty arrangements based
on mineral production are in place at each operating mine. The primary type of royalty is a net smelter return royalty. Under this
type of royalty the group pays the holder an amount calculated as the royalty percentage multiplied by the value of gold production
at market gold prices less selling costs. A royalty expense is recorded when revenue from the sale of gold is recognized.
Financial instruments are
measured as set out below. Financial instruments carried on the consolidated statement of financial position include cash and cash
equivalents, trade and other receivables, trade and other payables, available for sale financial assets.
Cash and cash equivalents
are carried in the consolidated statement of financial position at cost. For the purpose of the cash flow statement, cash and cash
equivalents comprise cash on hand, deposits held at call with banks, other short term highly liquid investments with a maturity
of three months or less at the date of purchase and bank overdrafts. In the consolidated statement of financial position, bank
overdrafts are included in borrowings in current liabilities.
Trade and other receivables
are recognized initially at fair value. There is a rebuttable presumption that the transaction price is fair value unless this
could be refuted by reference to market indicators. Subsequently, trade and other receivables are measured at amortized cost using
the effective interest method, less provision for impairment. A provision for impairment of trade receivables is established when
there is objective evidence that the group will not be able to collect all amounts due according to the original terms of receivables.
Significant financial difficulties of the debtor, probability that the debtor will enter bankruptcy or financial reorganization,
and default or delinquency in payments are considered indicators that the trade receivable may be impaired. The amount of the provision
is the difference between the asset’s carrying amount and the present value of estimated future cash flows, discounted at
the effective interest rate. The amount of the provision is recognized in mining and processing costs in the consolidated statement
of comprehensive income.
Available-for-sale financial
assets are non-derivatives that are either designated in this category or not classified in any of the other categories. Available-for-sale
financial assets are designated on acquisition. They are normally included in current assets and are carried at fair value. Where
a decline in the fair value of an available-for-sale financial asset constitutes objective evidence of impairment, the amount of
the loss is recognized in the consolidated statement of comprehensive income within other expenses, other movements in fair value
are recognized in other reserves within equity.
Borrowings (including bank borrowings
when applicable and loans from minorities)
Borrowings are recognized
initially at fair value, which equates to the proceeds received, net of transaction costs incurred. Borrowings are subsequently
stated at amortized cost; any difference between the proceeds (net of transaction costs) and the redemption value is recognized
in the statement of comprehensive income over the period of the borrowings using the effective interest method. Borrowings are
classified as current liabilities unless the group has an unconditional right to defer settlement of the liability for at least
12 months after the statement of financial position date.
Accounts payable and other
short term monetary liabilities, are initially recognized at fair value, which equates to the transaction price, and subsequently
carried at amortized cost using the effective interest method.
The net present value of
estimated future rehabilitation costs is provided for in the consolidated financial statements and capitalized within property,
plant and equipment on initial recognition. Rehabilitation will generally occur on closure or after closure of a mine. Initial
recognition is at the time of the construction or disturbance occurring and thereafter as and when additional construction or disturbances
take place. The estimates are reviewed annually to take into account the effects of inflation and changes in estimated risk adjusted
rehabilitation works cost and are discounted using rates that reflect the time value of money. Annual increases in the provision
due to the unwinding of the discount are recognized in the consolidated statement of comprehensive income as a finance cost. The
present value of additional disturbances and changes in the estimate of the rehabilitation liability are recorded to mining assets
against an increase/decrease in the rehabilitation provision. The rehabilitation asset is amortized as noted previously. Rehabilitation
projects undertaken, included in the estimates, are charged to the provision as incurred. Environmental liabilities, other than
rehabilitation costs, which relate to liabilities arising from specific events, are expensed when they are known, probable and
may be reasonably estimated.
Provisions are recognized
when the group has a present legal or constructive obligation as a result of past events where it is probable that an outflow of
resources embodying economic benefits will be required to settle the obligation, and a reliable estimate of the amount of the obligation
can be made.
Current tax is the tax
expected to be payable on the taxable income for the year calculated using rates (and laws) that have been enacted or substantively
enacted by the consolidated statement of financial position date. It includes adjustments for tax expected to be payable or recoverable
in respect of previous periods.
Taxation paid in the consolidated
statement of cash flows relates to corporate tax liability payments. In Mali, the State is not reimbursing value added tax (TVA)
due to the group as required under the legally binding mining convention. The group has an existing legal right under its mining
convention to offset the TVA against corporate tax as it falls due. As a result, payments made under the TVA taxation system are
being made in the knowledge that such payments first represent payments on account for corporate tax. The group records such payments
as ‘taxation paid’ in the consolidated statement of cash flows as this is considered to present a more appropriate
reflection of the group’s corporate tax contribution by management. Once corporate tax liabilities are met, the remaining
payments under the TVA system represent normal recoverable TVA and are not reflected in the consolidated statement of cash flows
as ‘taxation paid’.
Deferred tax is provided
in full, using the liability method, on temporary differences arising between the tax bases of assets and liabilities and their
carrying amounts in the consolidated financial statements. However, if the temporary difference arises from initial recognition
of an asset or liability in a transaction other than a business combination that at the time of the transaction affects neither
accounting nor taxable profit nor loss, it is not recognized. Deferred tax is determined using tax rates (and laws) that have been
enacted or substantively enacted by the statement of financial position date and are expected to apply when the temporary differences
reverses. Deferred tax assets are recognized to the extent that it is probable that future taxable profit will be available against
which the temporary differences can be utilized. Deferred tax is provided on temporary differences arising on investments in subsidiaries
and joint ventures, except where the timing of the reversal of the temporary difference is controlled by the group and it is probable
that the temporary difference will not reverse in the foreseeable future.
Under the statutory requirements
of the 1999 Malian Mining Code (the ‘Code’), the State of Mali is entitled to advanced payment of dividends. The advanced
payment entitlement is calculated based on 10% of profits after certain deductions. The advanced dividends paid are deducted from
the ordinary dividends that the government receives under its 20% equity interest in Gounkoto. Given the statute, a liability is
recognized at each balance sheet date based on 10% of the accrued profit measure. The liability is extinguished upon the subsequent
payment of the advanced dividend. An ‘other receivables’ asset is recorded as the advanced dividend automatically entitles
Gounkoto to reduce future cash flows paid to the State of Mali and creates economic benefit. The carrying value of the asset is
reviewed for impairment. Ordinary dividends are recorded as a reduction in non-controlling interest once declared.
The group discloses contingent
liabilities when possible obligations exist as a result of past events, unless the possible outflows of economic benefits are considered
remote. By their nature, contingencies will often only be resolved when one or more future events occur or fail to occur. The assessment
of such contingencies inherently involves the exercise of significant judgment and estimates of the outcome of future events. In
certain circumstances, to provide transparency, the group voluntarily elects to disclose information regarding claims for which
any outflow of economic benefit is considered remote.
Ordinary shares are classified
as equity. Incremental costs directly attributable to the issue of new shares or options are shown in equity as a deduction from
the proceeds.
The group has defined contribution
plans. A defined contribution plan is a pension plan under which the group pays fixed contributions into a separate entity. The
group has no legal or constructive obligations to pay further contributions if the fund does not hold sufficient assets to pay
all employees the benefits relating to employee service in the current and prior periods. For defined contribution plans, the group
pays contributions to publicly or privately administered provident funds on a mandatory, contractual or voluntary basis. The group
has no further payment obligations once the contributions have been paid. The contributions are recognized as employee benefit
expenses when they are due. Prepaid contributions are recognized as an asset to the extent that a cash refund or a reduction in
the future payments is available.
Termination benefits are
payable when employment is terminated before the normal retirement date, or whenever an employee accepts voluntary redundancy in
exchange for these benefits. The group recognizes termination benefits when it is demonstrably committed to either: terminating
the employment of current employees according to a detailed formal plan without possibility of withdrawal; or providing termination
benefits as a result of an offer made to encourage voluntary redundancy. Benefits falling due more than 12 months after statement
of financial position date are discounted to present value.
The group recognizes a
liability and an expense for bonuses. The group recognizes a provision where contractually obliged or where there is a past practice
that has created a constructive obligation.
The fair value of the employee
services received in exchange for the grant of options, restricted shares or participation in the group’s Co-Investment Plan
is recognized as an expense. The total amount to be expensed over the vesting period is determined by reference to the fair value
of the options or shares awards determined at the grant date:
Non-market vesting conditions
are included in assumptions about the number of options that are expected to become exercisable or the number of shares that the
employee will ultimately receive. This estimate is revised at each statement of financial position date and the difference is charged
or credited to the statement of comprehensive income, with a corresponding adjustment to equity. Market performance conditions
are included in the fair value assumptions on the grant date with no subsequent adjustment. The proceeds received on exercise of
the options net of any directly attributable transaction costs are credited to equity. When the options are exercised, the company
issues new shares. The proceeds received net of any directly attributable transaction costs are credited to share capital (nominal
value) and share premium when the options are exercised. Transfers are made between other reserves and share premium when options
are exercised and shares vest for the cumulative share based expense.
Determining whether an
arrangement is, or contains, a lease is based on the substance of the arrangement and requires an assessment of whether fulfilment
of the arrangement is dependent on the use of a specific asset or assets and whether the arrangement conveys a right to use the
asset. Leases of plant and equipment where the group assumes a significant portion of risks and rewards of ownership are classified
as a finance lease. Finance leases are capitalized at the estimated present value of the underlying lease payments. Each lease
payment is allocated between the liability and the finance charges to achieve a constant rate on the finance balance outstanding.
The interest portion of the finance payment is charged to the consolidated statement of comprehensive income over the lease period.
The plant and equipment acquired under the finance lease are depreciated over the useful lives of the assets, or over the lease
term if shorter.
Leases in which a significant
portion of the risks and rewards of ownership are retained by the lessor are classified as operating leases. Payments made under
operating leases are charged to the consolidated statement of comprehensive income on a straight-line basis over the period of
the lease.
The company enters into
contracts for the sale of gold. Revenue arising from gold sales under these contracts is recognized when the price is determinable,
the product has been delivered in accordance with the terms of the contract, the significant risks and rewards of ownership have
been transferred to the customer and collection of the sales price is reasonably assured. These criteria are met when the gold
leaves the mines’ smelt houses. As sales from gold contracts are subject to customer survey adjustment, sales are initially
recorded on a provisional basis using the group’s best estimate of the contained metal. Subsequent adjustments are recorded
in revenue to take into account final assay and weight certificates from the refinery, if different from the initial certificates.
The differences between the estimated and actual contained gold have historically not been significant.
The group expenses all
exploration and evaluation expenditures until the directors conclude that a future economic benefit is more likely than not of
being realized, i.e. ‘probable’. While the criteria for concluding that an expenditure should be capitalized is always
probable, the information that the directors use to make that determination depends on the level of exploration.
Exploration and evaluation
expenditure on brownfield sites, being those adjacent to mineral deposits which are already being mined or developed, is expensed
as incurred until the directors are able to demonstrate that future economic benefits are probable through the completion of a
prefeasibility study, after which the expenditure is capitalized as a mine development cost. A ‘prefeasibility study’
consists of a comprehensive study of the viability of a mineral project that has advanced to a stage where the mining method, in
the case of underground mining, or the pit configuration, in the case of an open pit, has been established, and which, if an effective
method of mineral processing has been determined, includes a financial analysis based on reasonable assumptions of technical, engineering,
operating economic factors and the evaluation of other relevant factors. The prefeasibility study, when combined with existing
knowledge of the mineral property that is adjacent to mineral deposits that are already being mined or developed, allow the directors
to conclude that it is more likely than not that the group will obtain future economic benefit from the expenditures.
Exploration and evaluation
expenditure on greenfield sites, being those where the group does not have any mineral deposits which are already being mined or
developed, is expensed until such time as the directors have sufficient information to determine that future economic benefits
are probable, after which the expenditure is capitalized as a mine development cost. The information required by directors is typically
a final feasibility study however a prefeasibility study may be deemed to be sufficient where the additional work required to prepare
a final feasibility study is not significant or the work done at prefeasibility level clearly demonstrates an economic asset. Exploration
and evaluation expenditure relating to extensions of mineral deposits which are already being mined or developed, including expenditure
on the definition of mineralization of such mineral deposits, is capitalized as a mine development cost following the completion
of an economic evaluation equivalent to a prefeasibility study. This economic evaluation is distinguished from a prefeasibility
study in that some of the information that would normally be determined in a prefeasibility study is instead obtained from the
existing mine or development. This information when combined with existing knowledge of the mineral property already being mined
or developed allow the directors to conclude that more likely than not the group will obtain future economic benefit from the expenditures.
Costs relating to property acquisitions are capitalized within development costs.
Dividend distribution to
the company’s shareholders is recognized as a liability in the group’s financial statements in the period in which
the dividends are approved by the board of directors and declared to shareholders.
Earnings per share are
computed by dividing net income by the weighted average number of ordinary shares in issue during the year.
Diluted earnings per share
are presented when the inclusion of potential ordinary shares has a dilutive effect on earnings per share.
Some of the accounting
policies require the application of significant judgment by management in selecting the appropriate assumptions for calculating
financial estimates or determining the appropriate accounting treatment for a transaction.
By their nature, these
judgments are subject to an inherent degree of uncertainty and are based on historical experience, terms of existing contracts,
management’s view on trends in the gold mining industry and information from outside sources. The estimates and assumptions
that have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next
financial year are discussed below.
Included in trade and other
receivables are TVA receivables of $102.9 million ($96.5 million current and $6.4 million non-current) (2014: $106.8 million) (2014:
$80.5 million current and $26.3 million non-current) (2013: $125.7 million) (2013: $76.7 million current and $49.0 million non-current)
consisting primarily of recoverable TVA balances owing by the fiscal authorities in Mali. In Mali the TVA owing is being offset
against other tax owing to the State, in accordance with the legal right of offset under the relevant mining conventions. A further
$61.8 million (2014: $50.5
million; 2013: $36.4 million)
(at 45% attributable share) is included in the underlying consolidated statement of financial position of the Kibali joint venture.
Profit forecasts for the
mine, using approved budgets and mine plans, supports recovery of the balance through such offsetting by 2017 (2014: 2018; 2013:
2015), although the recovery and timing is subject to estimates of factors such as gold price and production. The gold price is
consistent with that used in the group’s impairment tests detailed below. We are also continuing to engage with authorities
in Mali to pursue the cash settlement of the outstanding TVA balances. The group continues to seek recovery of TVA in the DRC,
in line with the Mining Code and the carrying value of the receivable has been assessed considering factors such as the level of
receipts in the period and to date, relationships and communications with government officials and the tax authority and the limited
quantum of disputed submissions. Judgment exists in assessing recovery of these receivables.
The group is in receipt
of claims for various taxes from the State of Mali totaling $280.0 million (December 31, 2014: $313.0 million; December 31, 2013:
$123.1 million), in respect of its Malian operations. Having taken professional advice, the group considers the material claims
to be without foundation and is strongly defending its position, including following the appropriate legal process for disputes
within Mali. Accordingly, no provision has been made for the material claims and the likelihood of a material outflow of economic
benefits in respect of such claims is considered remote under IFRS.
Loulo, Gounkoto and Morila
have legally binding mining conventions which guarantee fiscal stability, govern the taxes applicable to the companies and allow
for international arbitration in the event a dispute cannot be resolved in the country. Management continues to engage with the
Malian authorities at the highest level to resolve this issue. During the prior year, Loulo submitted a request for arbitration
at the International Centre of the Settlement of Investment Disputes against the State of Mali in relation to certain of the disputed
tax claims. The arbitration process is ongoing, with hearings having taken place in the first quarter of 2015, and the outcome
of this process is expected to be concluded in the first half of 2016.
Carrying values of property, plant and equipment and joint
venture investments
The group assesses at each
reporting period whether there is any indication that these assets may be impaired. If such indication exists, the group estimates
the recoverable amount of the asset. The recoverable amount is assessed by reference to the higher of ‘value in use’
(being the net present value of expected future cash flows of the relevant cash generating unit) and ‘fair value less cost
to sell’. The estimates used for impairment reviews are based on detailed approved mine plans and operating plans. Future
cash flows are based on estimates of:
The impairment tests did
not indicate impairment and head room existed at each mine. Given the significance of gold prices and the longevity of mine plans,
the directors consider gold price and discount rate sensitivities to be relevant.
A reduction in forward
gold prices in excess of 10% is required to give rise to an impairment at any of the mines. The discount rate would need to increase
to 13.2% to give rise to impairment at any of the mines with the greatest discount rate sensitivity being at Loulo.
However, having considered
such scenarios, the directors remain satisfied that no impairment is appropriate. The models are considered suitably conservative
with proven and probable reserves determined based on $1,000/oz gold price (2014: $1,000/oz) as shown below.
There are several methods
for calculating depreciation, i.e. the straight line method, the production method using ounces produced and the production method
using tonnes milled. The directors believe that the tonnes milled method is the best indication of plant and infrastructure usage.
Refer to note 2 for the depreciation policy. Estimates are required regarding the allocation of assets to relevant proven and probable
reserves in the unit of production calculations, with assessments involving the group’s mining, capital and geology departments.
Proven and probable reserves are used in each depreciation calculation, which is considered to be a suitably conservative measure
of the future ore extractable using existing assets. Expenditure incurred to date in underground infrastructure development, is
depreciated over the remaining proven and probable reserves of the underground mine, as the infrastructure provides access to the
future mining areas.
The group applies judgment
in allocating costs between operating and capital items in respect of underground mining and in determining the date depreciation
commences. Costs are capitalized when the activity provides access to future ore bodies and are expensed as operating costs when
the works involve extraction of ore from operational sections of the orebody. The nature of activity is assessed based on information
provided by contractors, together with inspections by the group’s mining teams where contractor mining is used. The nature
of activity is assessed by the group’s mining teams where owner mining applies. Direct labor, materials and other costs are
specifically allocated based on the activity performed. Indirect costs that attributable to underground works are allocated between
capital and operating expenses based on factors such as development versus operating meters.
Judgment is required in
determining the point at which assets under construction at Kibali began commercial production and should be depreciated. Depreciation
start dates are determined considering the factors detailed in note 2 and during the year Kibali underground mine assets attributable
to production started to be depreciated. Judgment was applied in identifying the costs considered attributable to production. Additionally,
given ongoing mine construction and development, judgment was required in allocating costs between operating costs, ore stockpiles
and ongoing capital works. Costs have been allocated based on the underlying activity and economic benefits.
The following gold prices
were used in the mineral reserves optimization calculations:
Changes in the gold price
used could result in changes in the mineral reserve optimization calculations which impact LoM plans. Mine modelling is a complex
process and hence it is not feasible to perform sensitivities on gold price assumptions in respect of ore reserves.
The group estimates its
ore reserves and mineral resources based on information compiled by Competent Persons as defined in accordance with the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves of December 2004 (the JORC Code). Reserves determined
in this way are used in the calculation of depreciation and amortization, as well as the assessment of the carrying value of property,
plant and equipment and joint ventures and timing of mine closure obligations. There are numerous uncertainties inherent in estimating
ore reserves and assumptions that are valid at the time of estimation may change significantly when new information becomes available.
Changes in the forecast
prices of commodities, exchange
rates, production costs or recovery rates may change the economic status of reserves and may, ultimately, result in the reserves
being restated.
The net present value of
current rehabilitation estimates have been discounted to their present value at 2.25% per annum (2014: 2.0%) (2013: 2.5%) being
the prevailing risk free interest rates. Expenditure is generally expected to be incurred at the end of the respective mine lives.
The group undertakes regular assessments by external experts of its mine closure plans, together with assessments by internal staff
in the intervening periods, to determine the required rehabilitation works, cost of works and timing of such works. Judgment is
required in determining the appropriate costs, timing of costs, discount rates and inflation. For further information, including
the carrying amounts of the liabilities, refer to note 14. A 1% change in the discount rate on the group’s rehabilitation
estimates would result in an impact of $5.3 million (2014: $7.0 million) (2013: $7.1 million) on the provision for environmental
rehabilitation, and an impact of $0.6 million (2014: $0.5 million) (2013: $0.5 million) on the consolidated statement of comprehensive
income.
Costs that are incurred
in or benefit the productive process are accumulated as stockpiles, gold in process and product inventories. Net realizable value
tests are performed at least annually and represent the estimated future sales price of the product based on contained gold and
metals prices, less estimated costs to complete production and bring the product to sale. Judgment is required in assessing whether
stockpiles of different grades should be tested individually, or tested as inputs to the gold production process, as detailed in
the group’s accounting policy. In the current year, the stockpiles were tested for each individual mine, reflecting the planned
blended feed of such stockpiles to the mill on the basis that they are blended together and with future ore mined.
Stockpile quantities are
measured by estimating the number of tonnes added and removed from the stockpile, the number of contained gold ounces based on
assay data, and the estimated recovery percentage based on the expected processing method. Stockpile tonnages are verified by periodic
surveys. The forecast gold prices and cost escalators were those used in the impairment test detailed above.
The group capitalizes costs,
associated with stripping activity, to expose the orebody, within mining assets. Judgment is required in determining the relevant
section or phase of the orebody to which stripping activity relates, based on assessment of factors such as mine planning, geology
of the open cast pits and strategic board decisions such as the pushback campaigns. The group subsequently depreciates relevant
stripping assets as that section of the orebody is mined. This similarly requires judgment over the eligible costs and the relevant
section of the orebody for depreciation.
The group has to apply
judgment in determining whether exploration and evaluation expenditure should be capitalized or expensed. Management exercises
this judgment based on the results of economic evaluations, prefeasibility or feasibility studies. Costs are capitalized where
those studies conclude that more likely than not the group will obtain future economic benefit from the expenditures.
Refer to note 15 for the
key assumptions used in determining the value of share-based payments.
The company is subject
to an income tax rate in Jersey at 0%. Tongon benefited from a five year tax holiday in Côte d’Ivoire from the commencement
of production in December 2010 until the tax exoneration period expired in December 2015. Gounkoto benefited from a two year tax
holiday until the tax exoneration expired on June 1, 2013. It has a further tax holiday, up to a maximum of five years in total,
in the event of further capital investment, such as an underground mine. The benefit of the tax holidays to the group was to increase
its net profit by $7.9 million (2014: $8.0 million; 2013: $31.3 million). Accordingly, had the group not benefited from the tax
holidays in Mali and Côte d’Ivoire, earnings per share would have been reduced by $0.09 for the year ended December
31, 2015 (2014: $0.09; 2013: $0.34). Under Malian tax law, income tax is based on the greater of 30% of taxable income or 0.75%
of gross revenue. Under Ivorian tax law, income tax is based on the greater of 25% of taxable income or 0.5% of gross revenue.
The Loulo, Gounkoto and Tongon operations have no assessable capital expenditure carry forwards for assessable tax losses, at December
31, 2015, 2014 and 2013, respectively, for deduction against future mining income. The group’s share of profits from equity
accounted joint ventures is stated net of $11.0 million (2014: $20.9 million; 2013: $7.4 million) of current and deferred tax charges
primarily in respect of Morila and Kibali.
The total authorized number
of ordinary shares is 120 million (2014: 120 million; 2013: 120 million) of $0.05(2014: $0.05; 2013: $0.05). All issued shares
are fully paid. The total number of issued shares at December 31, 2015 was 93,232,920 shares (2014: 92,674,085 shares; 2013: 92,245,531
shares). Refer to the consolidated statement of changes in equity on page F-4 for more detail on the annual movement of the number
of ordinary shares, share capital and share premium, including the movement arising from the issue of restricted shares, exercise
of share options and vesting of share awards and the scrip dividends.
Refer to note 15 for details on share
options and share awards issued. $55.7 million ($0.60 per share) was paid as dividends in 2015 (2014: $46.3 million/$0.50 per share;
2013: $46.1 million/$0.50 per share) of which $38.6 million was paid in cash and $17.1 million was paid as scrip dividends. On
February 5, 2016, the board of directors proposed an annual dividend of $0.66 per share which, if approved, will result in an aggregate
dividend payment of $61.5 million and is expected to be paid in May 2016. The proposed dividend in respect of 2015 is subject to
shareholder approval at the annual general meeting to be held on May 3, 2016. An optional scrip dividend has been proposed whereby
shareholders can elect to receive new ordinary shares in the company.
470,212 restricted share awards were
also antidilutive at December 31, 2015 (2014: 584,199; 2013: 601,084). The total number of potentially issuable shares at December
31, 2015 was 1,766,813 (2014: 1,712,651; 2013: 1,680,652).
The classes within trade
and other receivables do not contain impaired assets. The carrying values are considered to approximate fair values.
The credit quality of receivables
that are not past due or impaired is considered high. The maximum exposure to credit risk at the reporting date is the fair value
of each class of receivable mentioned above. The group does not hold any collateral as security although it has the legally binding
right to offset TVA balances with other taxation payable in Mali, and exercises this right. Refer to note 17 for further information
on the concentration of credit risk.
The terms of payment of
trade receivables are less than seven days, advances to contractors 30 days and taxation debtors are six months.
All inventory and ore stockpiles
are started at the lower of cost or net realizable value.
Non-current ore stockpiles reflect
ore tonnes not planned to be processed within the next 12 months.
Included in property, plant
and equipment are long-lived assets which are amortized on a unit of production basis as detailed in note 2 and comprise the metallurgical
plants, tailings and raw water dams, power plants and mine infrastructure and development costs. The net book value of these assets
was $1,535.4 million at December 31, 2015 (2014: $1,467.1 million).
Included in property, plant
and equipment are short-lived assets which are amortized over their useful lives and are comprised of motor vehicles and other
equipment. The net book value of these assets was $7.7 million at December 31, 2015 (2014: $14.5 million).
Included in property, plant
and equipment are undeveloped property costs of $1.7 million (2014: $2.0 million).
Property, plant and equipment
include capitalized stripping costs, related to the production phase of opencast mining. The net book value at December 31, 2015
was $2.0 million (2014: $10.9 million).
The joint venture agreements
and structures for Kibali and Morila, together with the asset leasing joint ventures (KAS 1 Limited, RAL 1 Limited and RAL 2 Limited)
provide the group with interests in the net assets of those companies, rather than interests in underlying assets and obligations.
Accordingly, under IFRS 11, the group’s share of joint ventures has been accounted for using the equity method.
The following tables represent
the group’s share of the assets and liabilities of the respective joint venture which are included in the consolidated balance
sheet and statement of comprehensive income within the total investments in joint ventures, share of profits of equity accounted
joint ventures and share of equity accounted joint ventures’ other comprehensive expenses.
The segmental report in
note 16 presents information based on the group’s effective 45% interest in the underlying Kibali gold mine as reported internally.
As such, that differs to the 50% interest in the Kibali (Jersey) Limited group.
The group’s effective
interest in Kibali is 45%. The group holds a 50% joint venture interest in Kibali (Jersey) Limited with AngloGold Ashanti. Joint
control is provided through shareholdings and the joint venture agreement. Kibali (Jersey) Limited holds an effective 90% interest
in Kibali Goldmines SA thereby giving the group an effective 45% interest in that mine. Refer to note 1 for details.
Note that the KAS 1 Limited
asset leasing joint venture in which the group has an effective 25.01% interest is included within the Kibali joint venture as
Kibali (Jersey) Limited is the joint venture partner with DTP.
Refer to note 1 for the nature of operations,
country of incorporation and the ownership interest in Morila. Joint control exists through the joint venture agreement with AngloGold
Ashanti.
RAL 1 Limited is an asset leasing joint
venture in which the group has a 50.1% interest with DTP being the joint venture partner. The joint venture operates in Mali and
Côte d’Ivoire and is incorporated in Jersey.
Set out below is the summarized
financial information for RAL 2 Limited which are accounted for using the equity method (amounts stated at 100% before intercompany
eliminations). The group has a 50.1% interest with WAMFF Ltd being the joint venture partner.
KGL Isiro SARL is an exploration
company in which the group has a 51% interest with Kilo Goldmines Ltd being the joint venture partner. The total exploration expenses
incurred in 2015 amounted to $0.9 million (2014: $2.4 million), of which $0.4 million (2014: $1.2 million) is the group’s
share. The net loss and net assets are immaterial.
There is no deferred tax
on other comprehensive income items. There are no unrecognized deferred tax liabilities in respect of undistributed profits.
As at December 31, 2015,
$22.3 million of the provision relates to Loulo (December 31, 2014: $28.2 million), $18.8 million (2014: $21.0 million) of the
provision relates to Tongon, while $6.5 million relates to Gounkoto (2014: $6.7 million). The provisions for rehabilitation costs
include estimates for the effect of inflation and changes in estimates and have been discounted to their present value at 2.25%
(2014: 2.0%) per annum, being an estimate equivalent to the risk free rate determined with reference to US government bonds with
maturity dates comparable to the estimated rehabilitation of the mines. Rehabilitation cash flows are risk adjusted. Limited environmental
rehabilitation regulations currently exist in Mali and Côte d’Ivoire to govern the mines, so the directors have based
the provisions for environmental rehabilitation on standards set by the World Bank, which require an environmental management plan,
an annual environmental report, a
closure plan, an up-to-date
register of plans of the facility, preservation of public safety on closure, carrying out rehabilitation works and ensuring sufficient
funds exist for the closure works. However, it is reasonably possible that the group’s estimate of its ultimate rehabilitation
liabilities could change as a result of changes in regulations or cost estimates. The group is committed to rehabilitation of its
mines. It makes use of independent environmental consultants for advice and it also uses past experience in similar situations
to ensure that the provisions for rehabilitation are adequate. Current LoM plans envisage the expected outflow to primarily occur
at the end of the LoM which is 2028 for Loulo, 2021 for Tongon and 2025 for Gounkoto.
The group contributes to
several defined contribution provident funds. The provident funds are funded on the ‘money accumulative basis’ with
the members and company having been fixed in the constitutions of the funds. All the group’s employees, other than those
directly employed by West African subsidiary companies, are entitled to be covered by the above mentioned retirement benefit plans.
Retirement benefits for employees employed by West African subsidiary companies are provided by the state social security system
to which the company and employees contribute a fixed percentage of payroll costs each month.
Share options, restricted
shares and participation in Co-Investment Plan share awards are granted to directors and employees in exchange for services rendered.
The fair value of employee
services received as consideration for share options (equity settled) of the company is calculated using the Black-Scholes option
pricing model. Options vest after two, three and four years and lapse after a maximum term of 10 years. No new options were granted
during 2015, 2014 and 2013 and therefore no inputs to the option model, etc. are provided for the current year. 12,000 share options
vested during 2015 and no options lapsed during the year. A reconciliation of the movements in the options during 2013,2014 and
2015 is provided below.
The following table summarizes
the information about the options outstanding, including options that are not yet exercisable:
The following table summarizes
information about options that are exercisable as at December 31, 2015, 2014 and 2013:
Share-based payments – restricted shares and participation
in Co-Investment Plan
The company operates restricted
share schemes for directors and employees, as well as participation in a Co- Investment Plan for directors and senior management.
Restricted shares issued
to employees are subject to a satisfactory performance level being achieved during the 12 month period prior to the exercise date
of each tranche of shares. The minimum performance level to be achieved is defined as level 3 on the company’s performance
management system. All employees to whom restricted shares have been granted are expected to meet this level of performance. The
performance period is typically up to five years where the employee must remain in employment for the shares to vest. There are
no market based vesting conditions on the share awards.
The fair value of the restricted
shares issued in 2015, 2014 and 2013 are detailed below and the share-based payment charge is charged to profit evenly between
the grant and vesting dates. The restriction on the shares (no dividends received during the vesting period) had a minimal impact
on the fair value estimate at the grant date. The restricted shares have an exercise price of nil.
The fair value of the restricted
shares issued in 2015 was calculated using the Black-Scholes pricing model. The key assumptions used in this model for shares granted
during the year ending December 31, 2015 were as follows:
In 2014, there were 497,600
awards: 383,700 awards in January 2014 and 113,900 awards in August 2014. The market price at the award dates was $68.4 and $85.9
respectively and vested over three, four and five years in equal tranches. The volatility, risk free rate and dividend yield had
no significant impact on fair value but were consistent with those above. The total fair value of the awards was $35.0 million
over the vesting periods.
The restricted shares issued
to executive directors in 2009 and 2010 were subject to directors remaining employed, as well as being subject to a market performance
condition, being the company’s relative TSR performance over three years against the HSBC Global Gold Index (since renamed
the Euromoney Global Gold Index). This was assessed and had a minimal impact on the fair value estimate at the grant date. The
fair value of the restricted shares was based on the share price on the grant date and the share-based payment charge is charged
to profit evenly between the grant and vesting dates. The restriction on the shares (no dividends received during the vesting period)
had a minimal impact on the fair value estimate at the grant date. The restricted shares have an exercise price of nil. Details
of the awards that vested and lapsed in the year are shown below under ‘Restricted Shares issued to directors and management
(excluding Co-Investment Plan)’, together with details of the award dates and market prices at award and vesting dates.
Restricted share awards granted to executive directors in 2013,
2014 and 2015
The Restricted Share Scheme
for 2011, 2012 and 2013 operates with conditional share awards, where the awards will vest in three equal one-third tranches subject
to the fulfilment of performance conditions measured on an annual basis. Shares awarded in 2015 and 2014 are subject to one four-year
performance period of assessment. If the performance conditions are met, awards vest at the end of each performance period. The
2011, 2012 and 2013 awards are subject to four performance conditions: absolute TSR (market based), EPS growth, additional reserves
and absolute reserves. The 2014 awards are subject to three performance conditions: absolute TSR (market based), EPS growth and
additional reserves. The 2015 awards are subject to three performance conditions: absolute TSR (market based), total cash cost
per ounce and
additional reserves. Grant
date fair value was calculated using the market-based measure. No dividends are attributable during the vesting period.
The fair value of the restricted
shares issued to executive directors in 2015 and 2014 was calculated using a Monte Carlo simulation model. The key assumptions
used in this model for shares awarded during the years ending December 31, 2015, 2014 and 2013 were as follows:
At the company’s
annual general meeting in 2013, shareholders approved a one-off award of performance shares to the CEO. The vesting of the performance
shares is subject to the achievement of the conditions set out in “PART I. Item 6. Directors, Senior Management and Employees—B.
Compensation” in the Annual Report on Form 20-F and the CEO continuing to hold office or employment with the company during
the period of three years from April 29, 2013, the date of grant of the award of performance shares. The fair value was determined
at $4.0 million.
At December 31, 2015, four
out of five of the performance conditions have been met. Accordingly, the performance condition in respect of 10,006 shares was
met at a value of $71.54 per share in 2013 and the performance conditions in respect of 30,018 shares, comprising three tranches
each of 10,006 shares, were met at a value of $67.41 per share in 2014. In aggregate 40,024 shares will be transferred to the CEO
provided the CEO holds office or employment with the company as at April 29, 2016.
Restricted shares issued to directors and management (excluding
Co-Investment Plan)
Movements in the number
of restricted shares outstanding and their issue prices are as follows:
Participation in Co-Investment Plan by executive directors
in 2015, 2014 and 2013
One third of any annual
bonus earned is compulsorily deferred and an executive director may also choose to commit further shares into a Co-Investment Plan.
The maximum commitment which may be made is 250% and 200% of base salary by the CEO and 125% and 100% of base salary by the CFO
for 2015 and 2014, respectively. Committed shares must be retained for three years and may be matched, depending on relative TSR
performance over three years against the Euromoney Global Gold Index. If after three years the TSR performance of the company equals
or exceeds the performance of the Euromoney Global Gold Index, then the committed shares may be matched on a stepped scale. Refer
to “PART I. Item 6. Directors, Senior Management and Employees—B. Compensation” in the Annual Report on Form
20-F for further details. The maximum level of matching is one-for-one. The vesting of the award is dependent on the company’s
TSR performance relative to the Euromoney Global Gold Index.
The fair value of awards
made under the Co-Investment Plan in 2015, 2014 and 2013 was calculated using a Monte Carlo simulation model.
The key assumptions used
in this model for awards made under the Co-Investment Plan during the years ending December 31, 2015, 2014 and 2013 were as follows:
Senior management had the
opportunity to participate in Randgold’s Senior Management Co-Investment Plan in 2015 and 2014. The maximum commitment which
may be made in the Co-Investment Plan is 100% of base salary. Committed shares must be retained for three years and may be matched,
depending on the relative TSR performance over three years against the Euromoney Global Gold Index. If after three years the TSR
performance of the company equals or exceeds the performance of the Euromoney Global Gold Index, then the committed shares may
be matched on a stepped scale. The maximum level of matching is one-for-one. The vesting of the award is dependent on the company’s
TSR performance relative to the Euromoney Global Gold Index.
The fair value of awards
made under the Co-Investment Plan in 2015 and 2014 was calculated using a Monte Carlo simulation model. The key assumptions used
in this model for awards made under the Co-Investment Plan during the years ending December 31, 2015 and 2014 were as follows:
Operating segments have
been identified on the basis of internal reports about components of the group that are regularly reviewed by the group’s
chief operating decision maker. The operating segments included in internal reports are determined on the basis of their significance
to the group. In particular, operating mines are reported as separate segments and exploration projects that have significant capitalized
expenditure or other fixed assets are also reported separately. The Kibali and Morila joint ventures are included on a line by
line basis, reflecting internal reporting. Other parts of the group, including the RAL 1 Limited, RAL 2 Limited and KAS 1 Limited
joint ventures, are included with corporate and exploration. The group’s chief operating decision maker is considered by
management to be the board of directors. An analysis of the group’s business segments, excluding intergroup transactions,
is set out below. Major customers are not identifiable because all gold is sold to an agent.
In the normal course of
its operations, the group is exposed to gold price, currency, interest rate, liquidity and credit risks. In order to manage these
risks, the group may enter into transactions which make use of on-balance sheet derivatives. The group does not acquire, hold or
issue derivatives for trading purposes. The group has developed a risk management process to facilitate, control and monitor these
risks. The board has approved and monitors this risk management process, inclusive of documented treasury policies, counterpart
limits, controlling and reporting structures.
The treasury committee
is responsible for treasury financial risk management activities within the group. The treasury committee reviews and recommends
to the board all treasury counterparties, limits, instruments and any hedge strategies. At least two members of the treasury committee
need to be present for a decision to be made, one of whom needs to be an executive director. Unless specific dispensation is obtained
from the audit committee, the treasury committee is permitted to invest up to $50 million or 20% of the total funds (whichever
is the higher) with each approved institution with an investment rating of AA- or higher noting that no institution can exceed
$100 million. The treasury committee is also permitted to invest up to $12.5 million or 5% of the total funds (whichever is the
higher) with each approved institution with an investment rating above A but below AA-, provided that no investment exceeds $25
million. Approximately one third of the cash for the group was held with the group’s principal bankers at year end with the
remainder held with eight other financial institutions, in line with the treasury policy. The treasury committee is responsible
for managing investment, gold price, currency, liquidity and credit risk. The treasury committee monitors adherence to treasury
risk management policy and counterparty limits and provides regular reports to the board.
The financial risk management
objectives of the group are defined as follows:
The group continues to
hold material TVA receivable balances in Mali. While management continue to pursue recovery of the TVA in cash, it is recognized
that in practice given the continued absence of payment, the TVA may only be recovered through the tax offset mechanism set out
in the mining convention. Management reports the TVA position and movements on a quarterly basis to the audit committee.
Refer to “PART I.
Item 3. Key Information—D. Risk Factors” in the Annual Report on Form 20-F for details on the group’s risk factors.
In the normal course of
business, the group enters into transactions denominated in foreign currencies (primarily euro, South African rand and Communauté
Financière Africaine franc). As a result, the group is subject to exposure from fluctuations in foreign currency exchange
rates. In general, the group does not enter into any material derivatives to manage these currency risks and no significant positions
were held in 2015 and 2014. Generally, the group does not hedge its exposure to gold price fluctuation risk and gold was sold at
market spot prices in 2013, 2014 and 2015. Gold sales are made in US dollars and do not expose the group to any currency fluctuation
risk. However, during periods of capital expenditure or loan finance, the company may use forward contracts or options to reduce
the exposure to price movements, while maintaining significant exposure to spot prices. These derivatives may establish a fixed
price for a portion of future production while the group maintains the ability to benefit from increases in the spot gold price
for the majority of future gold production. The group is also exposed to fluctuations in the price of consumables, such as fuel,
steel, rubber, cyanide and lime, mainly due to changes in the price of oil, as well as fluctuations in exchange rates.
The group’s exposure
to foreign currency arises where a company holds monetary assets and liabilities denominated in a currency different to the functional
currency of the holder of the instrument which is the US dollar. The following table shows the impact of a 10% change in the US
dollar on profit and equity arising as a result of the revaluation of the group’s foreign currency financial instruments:
The sensitivities are based
on financial assets and liabilities held at December 31 where balances were not denominated in the functional currency of the group.
The sensitivities do not take into account the group’s sales and costs and the results of the sensitivities could change
due to other factors such as changes in the value of financial assets and liabilities as a result of non-foreign exchange influenced
factors.
Fluctuations in interest
rates impact on the value of short term cash investments and interest payable on financing activities (including long term loans),
giving rise to interest rate risk. In the ordinary course of business, the group receives cash from its operations and is required
to fund working capital and capital expenditure requirements.
The group generally enters
into variable interest bearing borrowings. This cash is managed to ensure surplus funds are invested in a manner to achieve maximum
returns while minimizing risks. The group has in the past been able to actively source financing through public offerings, shareholder
loans and third party loans.
The company maintains a
$400.0 million unsecured revolving credit facility with HSBC and a syndicate of banks which matures in December 2018 and is at
present undrawn. Based on the company’s current cash resources and available facilities, projected operating cash flows and
capital expenditure, we are confident the company will be able to meet its obligations at the present gold price.
The facility, if drawn,
bears interest at LIBOR plus 1.5%, at the lower end of the leverage grid and includes financial covenants in respect of EBIT, EBITDA,
net finance charges, tangible net worth, total debt, debt cover and interest cover.
The other financial instruments
of the group that are not included in the tables above are non-interest bearing and are therefore not subject to interest rate
risk.
The group’s cash
balances do not give rise to a concentration of credit risk because it deals with a variety of major financial institutions. Its
receivables and loans are regularly monitored and assessed. Receivables are impaired when it is probable that amounts outstanding
are not recoverable as set out in the accounting policy note for receivables. Gold bullion, the group’s principal product,
is produced in Mali and Côte d’Ivoire (and in the case of its joint ventures in DRC and Mali). The gold produced is
sold to the largest accredited gold refinery in the world. Credit risk is further managed by regularly reviewing the financial
statements of the refinery. The group is further not exposed to significant credit risk on gold sales, as
cash is received within a
few days of the sale taking place. While not financial assets under IFRS 7, included in receivables is $102.9 million (2014: $106.8
million) (refer to note 7) relating to indirect taxes owing to Loulo, Gounkoto and Tongon by the State of Mali, which are denominated
in FCFA, which holds some credit risk for the group. The legally binding mining conventions in Mali permit offsetting of other
corporate taxes against approved unpaid TVA. A further $61.8 million (2014: $50.5 million) is held within the underlying statement
of financial position of the equity accounted Kibali joint venture which is considered recoverable given the receipts obtained
during the year and absence of significant disputed items, albeit receipts, remain slow.
The group’s objectives
when managing capital are to safeguard its ability to continue as a going concern in order to provide returns for shareholders
and benefits for other stakeholders and to maintain an optimal capital structure to reduce the cost of capital. In order to maintain
or adjust the capital structure, the group may adjust the amount of dividends paid to shareholders, buyback shares, return capital
to shareholders, issue new shares or sell assets to reduce debt. Consistent with others in the industry, the group monitors capital
on the basis of the gearing ratio. This ratio is calculated as net debt (net cash) divided by total capital. Net debt is calculated
as total borrowings (including borrowings and trade and other payables, as shown in the consolidated statement of financial position)
less cash and cash equivalents. Total capital is calculated as equity, as shown in the consolidated statement of financial position,
plus net debt (net cash).
The following table analyses
the group’s financial liabilities into the relevant maturity groupings based on the remaining period from the statement of
financial position to the contractual maturity date. As the amounts disclosed in the table are the contractual undiscounted cash
flows, these balances will not necessarily correspond with the amounts disclosed in the statement of financial position.
The following table shows
the carrying amounts and fair values of the group’s financial instruments outstanding at December 31, 2015 and 2014. The
fair value of a financial instrument is defined as the amount at which the instrument could be exchanged in a current transaction
between willing parties other than in a forced or liquidation sale.
The table above shows the
level of the fair value valuation hierarchy applied to financial instruments carried at fair value. The total financial assets
valued using level 1 is $0.9 million (2014: $1.5 million). There have been no transfers between the levels of fair value hierarchy
during the current or prior year. Randgold does not hold any financial instruments that are fair valued using a level 2 or level
3 valuation. No material derivative financial instruments currently exist. All other financial instrument carrying values approximate
fair value.
The carrying amounts are
a reasonable estimate of the fair values because of the short maturity of such instruments or their interest bearing nature.
Under the Kibali Joint
Venture Agreement (JVA) the obligation of the parties (Randgold Resources (Kibali) Ltd and AngloGold Ashanti Holdings plc) in respect
of the future funding (including but not limited to operating costs, capital costs and other costs) of the company Kibali Goldmines
SA and/or the Kibali project shall be pro-rata in proportion to their respective percentage interests in Kibali at the time any
such future funding is required. In accordance with the Kibali JVA, Kibali will be funded via intercompany loans, however Kibali
Goldmines SA became self-funding in 2015 and repaid $70 million to shareholders in 2015. The approved capital expenditure plan
for 2016 is $177.3 million (2015: $280 million) and is expected to be self-funded by operating cash flows.
The lease relates to the
oxygen plant at Loulo leased from Maligaz. The duration of the contract is 10 years and the contract is renewable for additional
periods of 5 years thereafter. The future aggregate minimum lease payments
1
under operating leases are as follows:
As discussed more fully in note 3 the group
has received claims for various taxes in respect of subsidiaries and joint ventures from the State of Mali totaling $280.0 million.
The group considers the material claims to be without merit or foundation.
In terms of the operator
agreement with Morila, a management fee calculated as 1% of the total sales of Morila and is payable to Randgold (through Mining
Investment (Jersey) Ltd). Seven Bridges Trading 14 (Pty) Ltd provided administration services to Rockwell Diamonds Inc. (Rockwell).
Dr. DM Bristow is a non-executive director of Rockwell. The balances outstanding at year end related to Rockwell were negligible
(2014 and 2013: nil). Refer to note 10 for details of the company’s investments in and loans to subsidiaries and joint ventures
within the group together with its relevant share of income and expense.
This includes compensation
for 2 executive directors (2014: 2; 2013: 2), 8 non-executive directors (2014: 7; 2013: 8) and 20 executive management personnel
(2014: 21; 2013: 19). Refer to directors’ and executives’ profiles in “PART I. Item 6. Directors, Senior Management
and Employees—A. Directors and Senior Management” in the Annual Report on Form 20-F for detail of their roles and responsibilities.
No significant subsequent
events requiring disclosure adjustment occurred.